Appendix D contains a list of projects that are not planned for construction within the four-
year time frame of the TIP, but are referenced in the current Transportation Improvement
Program in order to allow engineering, feasibility, environmental clearance or other pre-
construction/project development efforts to continue.
Please note that most of these projects are preliminary and do not represent any
commitment of construction funding, but are strictly intended to pursue environmental
clearance and early project development activities. Consistency with the Mobility Plan will
be reexamined as alternatives are explored in these studies and environmental clearance
efforts.
North Central Texas Council of Governments DFW Metropolitan Planning Organization
this is a blank page
T h i s p a g e i s i n t e n t i o n a l l y b l a n k
D.1
2019-2022 Transportation Improvement Program
Environmental Clearance Projects Dallas District
North Central Texas Council of Governments DFW Metropolitan Planning Organization D.2
DALLAS-FORT WORTH MPOWEDNESDAY, MARCH 20, 2019
10:59:09 AM
PAGE: 1
RURAL PROJECTSAPPENDIX D
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR
DALLAS DISTRICT PROJECTS
FY 2019-2022 TRANSPORTATION IMPROVEMENT PROGRAM
DALLAS COLLIN 0000-18-027 CS C FRISCO FRISCO
LEBANON RD FROM COIT RD
WIDEN FROM 2 LANES TO 4 LANES
LOCAL CONTRIBUTION PAID BY FRISCO
INDEPENDENCE PKWY
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
NRSA1-DAL-167MTP REFERENCE:
83112MPO PROJECT ID:
Project History:
DALLAS DENTON 0000-18-031 CS C FLOWER MOUND FLOWER MOUND
DENTON CREEK BLVD AT IH 35W
INTERCHANGE
LOCAL CONTRIBUTION PAID BY CITY OF FLOWER MOUND
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
NRSA1-DAL-178MTP REFERENCE:
83129.2MPO PROJECT ID:
DENTON CREEK SPINE RD WILL BE PAID BY DEVELOPER
Project History:
DALLAS COLLIN 0000-18-082 MH E VARIOUS COLLIN CO
ON COLLIN COUNTY OUTER LOOP FROM DNT
DEVELOP SCHEMATIC FOR ROW ACQUISITION
LOCAL CONTRIBUTION PAID BY COLLIN COUNTY
US 75
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-110.20.1, FT3-008, RSA1-2.150.650
MTP REFERENCE:
84149MPO PROJECT ID:
Project History:
DALLAS ROCKWALL 0009-05-012 SH 66 E,R VARIOUS TXDOT-DALLAS
EAST OF ERBY CAMPBELL
WIDEN AND RECONSTRUCT FROM 2 LANE RURAL UNDIVIDED TO 4 LANE URBAN DIVIDED WITH 2/2 COUPLET FROM W OF HOUSTON ST TO JOSEPHINE ST
FM 1777
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
RSA1-2.370.800, RSA1-2.370.820, RSA1-2.370.825
MTP REFERENCE:
54132MPO PROJECT ID:
Project History:
DALLAS DALLAS 0009-11-129 IH 30 C VARIOUS TXDOT-DALLAS
IH 45
RECONST 4/6/8 LN DISCONT TO 4/6 LN CONT FRTG RDS; IH 45 TO US 80: RECONST & WIDEN 8 TO 10 MAINLANES W/1 REV HOV TO 2 REV MGD LNS; US 80 TO IH 635: RECONST 6 TO 6 MAINLANES W/1 REV HOV LN TO 1 REV MANAGED LN; IH 635 TO BASS PRO: OPERATIONAL IMPROVEMENTS
BASS PRO DRIVE
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-28.60.3, FT1-28.70.1, FT1-28.70.2MTP REFERENCE:
13043MPO PROJECT ID:
10-YEAR PLAN PROJECTProject History:
DALLAS DALLAS 0009-11-181 IH 30 C DALLAS TXDOT-DALLAS
IH 35E
RECONSTRUCT AND WIDEN 6 TO 12 MAINLANES AND RECONSTRUCT AND WIDEN 0/2 LANE DISCONTINUOUS TO 2/8 LANE DISCONTINUOUS FRONTAGE ROADS
IH 45
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-28.60.1, FT1-28.60.2MTP REFERENCE:
13030MPO PROJECT ID:
10-YEAR PLAN PROJECTProject History:
DALLAS DALLAS 0009-11-238 IH 30 E,R GARLAND TXDOT-DALLAS
BASS PRO DRIVE IN GARLAND
WIDEN TO ADD SHOULDER
DALROCK RD
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
MO3-001MTP REFERENCE:
55179MPO PROJECT ID:
Project History:
DALLAS ROCKWALL 0009-12-215 IH 30 E,R VARIOUS TXDOT-DALLAS
DALROCK RD (DALLAS C/L)
DALROCK TO HORIZON RD; ADD SHOULDER; RECONST & WIDEN EXIST 6 TO 8 ML; RECONST EXIST 4/6 DISCONT TO 4/6 CONTINUOUS FRTG RDS; RAMP MODIFICATIONS
SH 205
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-28.90.1MTP REFERENCE:
55221MPO PROJECT ID:
Project History:
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
DALLAS-FORT WORTH MPOWEDNESDAY, MARCH 20, 2019
10:59:09 AM
PAGE: 2
RURAL PROJECTSAPPENDIX D
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR
DALLAS DISTRICT PROJECTS
FY 2019-2022 TRANSPORTATION IMPROVEMENT PROGRAM
DALLAS ROCKWALL 0009-12-219 IH 30 C VARIOUS TXDOT-DALLAS
SH 205
RECONSTRUCT & WIDEN 4 TO 6 MAIN LANES; RECONSTRUCT & WIDEN 4 TO 4/6 LANE FRONTAGE ROADS; CONSTRUCT NEW & RECONSTRUCT EXISTING INTERCHANGES; RAMP MODIFICATIONS
WEST OF FM 2642 (HUNT COUNTY LINE)
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-28.90.2, IN1-28.546.1, IN1-28.548.1, IN1-28.549.1, IN1-28.550.2, IN1-28.551.1
MTP REFERENCE:
13036MPO PROJECT ID:
10-YEAR PLAN PROJECTProject History:
DALLAS ROCKWALL 0009-12-220 IH 30 E,R ROCKWALL TXDOT-DALLAS
DALROCK
CONSTRUCT 0/4 TO 4/6 LANE FRONTAGE ROADS; RECONSTRUCT HORIZON RD INTERCHANGE AND RAMP MODIFICATIONS
REVISE LIMITS
EAST OF HORIZON
11/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-28.90.1, IN1-28.550.2, NRSA1-28.90.1
MTP REFERENCE:
55195MPO PROJECT ID:
Project History:
DALLAS COLLIN 0047-04-022 SH 5 E,R MELISSA TXDOT-DALLAS
SH 121
RECONSTRUCT AND WIDEN 2 LANE RURAL HIGHWAY TO 4 LANE URBAN HIGHWAY
CR 375
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
RSA1-1.680.200, RSA1-1.680.210MTP REFERENCE:
20085MPO PROJECT ID:
PLANNING CSJ 0047-04-900Project History:
DALLAS COLLIN 0047-05-054 SH 5 C MCKINNEY TXDOT-DALLAS
SPUR 399
RECONSTRUCT AND WIDEN 2/4 LANE UNDIVIDED ROADWAY TO 4/6 LANE DIVIDED URBAN ROADWAY
SH 121
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
RSA1-1.680.225, RSA1-1.680.250, RSA1-1.680.275, RSA1-1.680.300
MTP REFERENCE:
13026MPO PROJECT ID:
10-YEAR PLAN PROJECTProject History:
DALLAS COLLIN 0047-06-161 US 75 C ALLEN TXDOT-DALLAS
AT RIDGEVIEW DRIVE
RECONSTRUCT INTERCHANGE
REVISE LIMITS
11/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
IN1-23.510.1MTP REFERENCE:
13044MPO PROJECT ID:
10-YEAR PLAN PROJECTProject History:
DALLAS DALLAS 0047-07-219 US 75 E VARIOUS TXDOT-DALLAS
IH 635
HOV ACCESS RAMPS STUDY (DALLAS COUNTY PORTION)
RTR 121-DA2
DALLAS/COLLIN COUNTY LINE
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
AO1-23.50.1, FT3-014MTP REFERENCE:
20217MPO PROJECT ID:
PLANNING CSJ 0047-07-908Project History:
DALLAS COLLIN 0047-09-034 SH 5 C MCKINNEY TXDOT-DALLAS
FRISCO ROAD (N OF FM 1378)
RECONSTRUCT 2 LANE UNDIVIDED ROADWAY TO 4 LANE DIVIDED URBAN ROADWAY (ULTIMATE 6 LANES)
SPUR 399
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
RSA1-1.680.310MTP REFERENCE:
13010MPO PROJECT ID:
10-YEAR PLAN PROJECTProject History:
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
DALLAS-FORT WORTH MPOWEDNESDAY, MARCH 20, 2019
10:59:09 AM
PAGE: 3
RURAL PROJECTSAPPENDIX D
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR
DALLAS DISTRICT PROJECTS
FY 2019-2022 TRANSPORTATION IMPROVEMENT PROGRAM
DALLAS COLLIN 0047-14-053 US 75 C,E VARIOUS TXDOT-DALLAS
NORTH OF CR 370
RECONSTRUCT AND WIDEN FROM 4 LANE TO 6 LANE FREEWAY AND RECONSTRUCT EXISTING 4 LANE TO 4/6 LANE FRONTAGE ROADS
RTR 121-CC1
CR 375 (GRAYSON COUNTY LINE)
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-23.10.1MTP REFERENCE:
20084MPO PROJECT ID:
Project History:
DALLAS ELLIS 0048-04-090 IH 35E E,R WAXAHACHIE TXDOT-DALLAS
US 77 SOUTH
RECONSTRUCT 4 INTERCHANGES (BUS 287/US 287 BYPASS/LOFLAND/STERRET RD), 4 LN DISCON TO 4/6 LN CONTINUOUS FRTG RD & RAMP MODIFICATIONS
REVISE SCOPE
US 77 NORTH
02/2019LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-7.100.5, IN1-1.7.1, IN1-7.508.1, IN1-7.509.1, IN1-7.512.1, TSMO2-001
MTP REFERENCE:
55092MPO PROJECT ID:
PREVIOUS PLANNING CSJ 0048-04-912; ROW CSJ 0048-04-096
Project History:PENDING FHWA APPROVAL
DALLAS ELLIS 0048-04-092 IH 35E E,R WAXAHACHIE TXDOT-DALLAS
AT FM 1446
RECONSTRUCT INTERCHANGE AT FM 1446 INCLUDING 4 TO 4/6 LANE FRONTAGE ROADS AND RAMP MODIFICATIONS
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
IN1-7.504.1, MO3-001MTP REFERENCE:
55227MPO PROJECT ID:
Project History:
DALLAS ELLIS 0048-04-093 IH 35E E,R WAXAHACHIE TXDOT-DALLAS
AT FM 66
RECONSTRUCT INTERCHANGE AT FM 66 INCLUDING 4 TO 4/6 LANE FRONTAGE ROADS AND RAMP MODIFICATIONS
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
IN1-7.503.1, MO3-001MTP REFERENCE:
55228MPO PROJECT ID:
Project History:
DALLAS DENTON 0081-03-047 US 377 C ARGYLE DENTON CO
SOUTH OF FM 1171
RECONSTRUCT AND WIDEN ROADWAY FROM 2 LANE RURAL TO 4 LANE DIVIDED URBAN
RTR 121-DE1
CRAWFORD ROAD
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
RSA1-1.540.230MTP REFERENCE:
20115MPO PROJECT ID:
Project History:
DALLAS DENTON 0081-03-054 US 377 E VARIOUS DENTON CO
CRAWFORD RD
RECONSTRUCT AND WIDEN 2 LANE RURAL HIGHWAY TO 6 LANE DIVIDED URBAN
NORTH OF HICKORY CREEK
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
RSA1-1.540.220MTP REFERENCE:
55002MPO PROJECT ID:
Project History:
DALLAS DENTON 0081-04-038 US 377 E VARIOUS DENTON CO
NORTH OF HICKORY CREEK
RECONSTRUCT AND WIDEN 2 LANE RURAL HIGHWAY TO 6 LANE DIVIDED URBAN
FM 1830
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
RSA1-1.540.220MTP REFERENCE:
55004MPO PROJECT ID:
Project History:
DALLAS DENTON 0081-06-040 US 377 E,R VARIOUS TXDOT-DALLAS
US 380
RECONSTRUCT AND WIDEN 2 LANE UNDIVIDED ROADWAY TO 4 LANE DIVIDED FACILITY (ULTIMATE SIX LANE)
NORTH OF BUS 377E
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
RSA1-1.523.120, RSA1-1.523.130MTP REFERENCE:
55229MPO PROJECT ID:
Project History:
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
DALLAS-FORT WORTH MPOWEDNESDAY, MARCH 20, 2019
10:59:09 AM
PAGE: 4
RURAL PROJECTSAPPENDIX D
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR
DALLAS DISTRICT PROJECTS
FY 2019-2022 TRANSPORTATION IMPROVEMENT PROGRAM
DALLAS DENTON 0081-13-050 IH 35W E,R VARIOUS TXDOT-DALLAS
SH 114
WIDEN AND RECONSTRUCT 4 LANE RURAL TO 6 MAIN LANE URBAN FREEWAY AND RECONSTRUCT 2/4 TO 4/6 LANE FRONTAGE ROADS
IH 35W/IH 35E INTERCHANGE
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-5.10.2, FT1-5.10.1MTP REFERENCE:
55242MPO PROJECT ID:
Project History:
DALLAS DENTON 0081-13-058 IH 35W E,R VARIOUS TXDOT-DALLAS
TARRANT COUNTY LINE
RECONSTRUCT AND WIDEN 4 LANE RURAL TO 6 LANE URBAN FREEWAY AND CONSTRUCT 4 TO 4/6 LANE FRONTAGE ROADS
SH 114
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-5.20.1MTP REFERENCE:
55230MPO PROJECT ID:
Project History:
DALLAS COLLIN 0091-03-022 SH 289 E,R VARIOUS TXDOT-DALLAS
N BUS 289C, NORTH OF CELINA
RECONSTRUCT AND WIDEN 2 LANE RURAL HIGHWAY TO 4 LANE DIVIDED URBAN (ULTIMATE 6 LANES)
N CR 60/CR 107 (GRAYSON C/L)
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
RSA1-1.605.200MTP REFERENCE:
54023MPO PROJECT ID:
Project History:
DALLAS DALLAS 0092-02-130 IH 45 E,R VARIOUS TXDOT-DALLAS
AT SL 9
RECONSTRUCT EXISTING 2 TO 2 LANE SOUTHBOUND FRONTAGE ROAD AND RAMP MODIFICATIONS
ADD PROJECT TO APPENDIX D OF THE 2019-2022 TIP/STIP
11/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
IN1-27.6.1, NRSA1-27.30.2, TSMO2-001
MTP REFERENCE:
55249MPO PROJECT ID:
Project History:
DALLAS DALLAS 0094-07-044 SH 183 E,R IRVING TXDOT-DALLAS
1.0 MILE EAST OF SL 12
RECONSTRUCT EXISTING 8 GP LANES, 2 TO 6 CONCURRENT MANAGED LANES, AND 4/6 DISCONTINUOUS TO 6/8 CONTINUOUS FRONTAGE ROADS (ULTIMATE)
REMOVE CONSTRUCTION PHASE FROM APPENDIX D OF THE 2019-2022 TIP/STIP
WEST END OF ELM FORK TRINITY RIVER BRIDGE
11/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-22.40.2MTP REFERENCE:
53198MPO PROJECT ID:
10-YEAR PLAN PROJECTProject History:
DALLAS DALLAS 0094-07-045 SH 183 E,R IRVING TXDOT-DALLAS
WEST END OF ELM FORK TRINITY RIVER BRIDGE
RECONSTRUCT AND WIDEN 6/8 TO 6/8 GP LANES, 2 TO 2/6 MANAGED LANES & RECONSTRUCT 4/6 DISCONTINUOUS TO 4/8 LANE CONTINUOUS FRONTAGE ROADS (ULTIMATE)
REMOVE CONSTRUCTION PHASE FROM APPENDIX D OF THE 2019-2022 TIP/STIP
WEST OF IH 35E
11/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-22.40.2, FT1-22.40.3MTP REFERENCE:
54072MPO PROJECT ID:
10-YEAR PLAN PROJECTProject History:
DALLAS DALLAS 0095-02-096 US 80 C SUNNYVALE TXDOT-DALLAS
BELT LINE RD
RECONSTRUCT AND WIDEN 4 TO 6 MAINLANES AND 2/4 TO 4/6 LANE CONTINUOUS FRONTAGE ROADS
LAWSON RD
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-32.10.3MTP REFERENCE:
53110MPO PROJECT ID:
10-YEAR PLAN PROJECTProject History:
DALLAS DALLAS 0095-02-107 US 80 C MESQUITE TXDOT-DALLAS
EAST OF TOWN EAST BLVD
RECONSTRUCT AND WIDEN 4 TO 6/8 MAINLANES AND 2/6 TO 4/6 LANE FRONTAGE ROADS AND RECONSTRUCT IH 635 INTERCHANGE
BELT LINE RD
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-32.10.1, FT1-32.10.2, IN1-32.131.1
MTP REFERENCE:
53109MPO PROJECT ID:
10-YEAR PLAN PROJECTProject History:
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
DALLAS-FORT WORTH MPOWEDNESDAY, MARCH 20, 2019
10:59:09 AM
PAGE: 5
RURAL PROJECTSAPPENDIX D
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR
DALLAS DISTRICT PROJECTS
FY 2019-2022 TRANSPORTATION IMPROVEMENT PROGRAM
DALLAS KAUFMAN 0095-04-069 US 80 E TERRELL TXDOT-DALLAS
AT SH 205/FM 148
INTERSECTION IMPROVEMENTS
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
TSMO2-001MTP REFERENCE:
55207MPO PROJECT ID:
Project History:
DALLAS DALLAS 0095-10-033 US 80 E,R MESQUITE TXDOT-DALLAS
IH 30
RECONSTRUCT AND WIDEN 4 TO 6 MAIN LANES AND 2/6 TO 4/6 LANE CONTINUOUS FRONTAGE ROADS
REVISE SCOPE
EAST OF TOWN EAST BLVD
11/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-32.10.1MTP REFERENCE:
53108MPO PROJECT ID:
Project History:
DALLAS DALLAS 0095-13-038 IH 20 E,R MESQUITE TXDOT-DALLAS
LAWSON ROAD
ADD 0 TO 4 LANE CONTINUOUS FRONTAGE ROADS
KAUFMAN COUNTY LINE
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
NRSA1-30.90.2MTP REFERENCE:
55232MPO PROJECT ID:
Project History:
DALLAS KAUFMAN 0095-14-027 IH 20 E,R VARIOUS TXDOT-DALLAS
DALLAS COUNTY LINE
ADD 0 TO 4 CONTINUOUS FRONTAGE ROADS
SP 557
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
AO1-30.100.1, AO1-30.100.2MTP REFERENCE:
55219MPO PROJECT ID:
Project History:
DALLAS COLLIN 0135-03-046 US 380 E,R PRINCETON TXDOT-DALLAS
AIRPORT ROAD
WIDEN 4 LANE ROADWAY TO 6 LANE DIVIDED
4TH STREET
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
RSA1-2.225.660MTP REFERENCE:
55233MPO PROJECT ID:
Project History:
DALLAS COLLIN 0135-04-033 US 380 E,R PRINCETON TXDOT-DALLAS
4TH STREET
WIDEN 4 LANE ROADWAY TO 6 LANES DIVIDED
CR 458
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
RSA1-2.225.660MTP REFERENCE:
55234MPO PROJECT ID:
Project History:
DALLAS DENTON 0196-01-108 IH 35E E,R VARIOUS TXDOT-DALLAS
TURBEVILLE RD
RECONSTRUCT EXISTING 6/8 INTERIM GP LANES TO 8 GP LANES; RECONSTRUCT AND CONVERT 2 INTERIM REVERSIBLE TO 4 CONCURRENT MANAGED LANES
US 77
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-7.10.3, FT1-7.10.4, FT1-7.10.5MTP REFERENCE:
25033.1MPO PROJECT ID:
PART OF REGIONAL 10 YEAR PLANProject History:
DALLAS DENTON 0196-02-124 IH 35E C,E,R VARIOUS TXDOT-DALLAS
DALLAS COUNTY LINE
RCNST & CONVERT 2 REV TO 4 CONC MNGD LNS; RCNST 6 TO 6/8 COLL DISTR LNS (DALLAS C/L TO SH 121); RCNST 8 TO 8 GP LNS (SH 121 TO FM 407); RCNST 2/6 TO 2/8 CONT FRTG (FM 407 TO SRT/SH 121); AND RCNST 4/6 TO 2/6 CONT FRTG FROM (SRT/SH 121 TO DALLAS C/L)
FM 407
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-7.10.6, FT1-7.20.1MTP REFERENCE:
13033MPO PROJECT ID:
PART OF REGIONAL 10 YEAR PLANProject History:
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
DALLAS-FORT WORTH MPOWEDNESDAY, MARCH 20, 2019
10:59:09 AM
PAGE: 6
RURAL PROJECTSAPPENDIX D
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR
DALLAS DISTRICT PROJECTS
FY 2019-2022 TRANSPORTATION IMPROVEMENT PROGRAM
DALLAS DENTON 0196-02-125 IH 35E C,E,R VARIOUS TXDOT-DALLAS
FM 407
RECONSTRUCT EXISTING 4 GENERAL PURPOSE LANES (NB ONLY); WIDEN AND CONVERT 2 LANE REVERSIBLE TO 4 LANE CONCURRENT MANAGED LANES; WIDEN 4/6 LANE CONTINUOUS TO 4/8 LANE CONTINUOUS FRONTAGE ROADS
TURBEVILLE ROAD
11/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-7.10.5MTP REFERENCE:
25033.2MPO PROJECT ID:
PART OF REGIONAL 10 YEAR PLANProject History:
DALLAS DALLAS 0196-03-199 IH 35E E DALLAS TXDOT-DALLAS
IH 30
RECONSTRUCT 10 TO 10 GENERAL PURPOSE LANES, CONSTRUCT 2 REVERSIBLE MANAGED LANES, AND RECONSTRUCT EXISTING 2/6 LANE FRONTAGE ROADS
LOWEST STEMMONS PHASE 2
NORTH OF OAK LAWN AVE
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-7.60.6; FT1-7.70.1MTP REFERENCE:
55061MPO PROJECT ID:
Project History:
DALLAS DALLAS 0196-03-223 IH 35E E,R DALLAS TXDOT-DALLAS
LOMBARDY LANE
CONSTRUCT 0 TO 2 SB FRONTAGE ROAD AND RAMP MODIFICATIONS
SPUR 482 (STOREY RD)
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-7.50.1, NRSA1-7.50.1, TSMO2-005
MTP REFERENCE:
52201MPO PROJECT ID:
Project History:
DALLAS DALLAS 0196-03-266 IH 35E E DALLAS TXDOT-DALLAS
NORTH OF OAK LAWN AVE
RECONSTRUCT EXISTING 10 GENERAL PURPOSE LANES, CONSTRUCT 2 REVERSIBLE MANAGED LANES, AND RECONSTRUCT EXISTING 4/6 LANE FRONTAGE ROADS
LOWER STEMMONS
SH 183
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-7.60.1; FT1-7.60.2; FT1-7.60.3; FT1-7.60.4; FT1-7.60.5
MTP REFERENCE:
55062MPO PROJECT ID:
Project History:
DALLAS DALLAS 0196-03-274 IH 35E C,E,R VARIOUS TXDOT-DALLAS
IH 635
RECONSTRUCT & CONVERT 2 REVERSIBLE TO 4 CONCURRENT MANAGED LANES; RECONSTRUCT 6 TO 6/8 GENERAL PURPOSE LANES (IH 635 TO SH 121); RECONSTRUCT 6 TO 8 COLLECTOR DISTRIBUTOR LANES (SH 121 TO DENTON C/L) (IH 35E PHASE 2)
DENTON COUNTY LINE
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-7.20.1, FT1-7.30.1MTP REFERENCE:
13012.2MPO PROJECT ID:
10-YEAR PLAN PROJECTProject History:
DALLAS DALLAS 0197-02-107 US 175 E DALLAS TXDOT-DALLAS
SH 310 AND SM WRIGHT
RECONSTRUCT AND WIDEN FREEWAY FROM 6 TO 8 LANES WITH AUXILIARY LANES AND DISCONTINUOUS FRONTAGE ROADS
IH 20
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-36.10.1, AO1-36.10.2MTP REFERENCE:
11900MPO PROJECT ID:
Project History:
DALLAS ELLIS 0261-01-041 US 67 E,R CEDAR HILL TXDOT-DALLAS
AT LAKE RIDGE PARKWAY
CONSTRUCT GRADE SEPARATION (PHASE 1)
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
MO3-002, TSMO2-001MTP REFERENCE:
55014MPO PROJECT ID:
Project History:
DALLAS DALLAS 0261-02-044 US 67 E,R DALLAS TXDOT-DALLAS
FM 1382
CONSTRUCT FROM 0 TO 1 REVERSIBLE EXPRESS LANE
SOUTH OF IH 20
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-38.20.1MTP REFERENCE:
55040MPO PROJECT ID:
Project History:
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
DALLAS-FORT WORTH MPOWEDNESDAY, MARCH 20, 2019
10:59:09 AM
PAGE: 7
RURAL PROJECTSAPPENDIX D
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR
DALLAS DISTRICT PROJECTS
FY 2019-2022 TRANSPORTATION IMPROVEMENT PROGRAM
DALLAS DENTON 0353-02-037 SH 114 E,R ROANOKE TXDOT-DALLAS
WEST OF IH 35W
CONST NEW 0 TO 6 LN RURAL FRWY, ROANOKE BY-PASS,WESTERN SECTION
BUS 114K
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-12.20.4MTP REFERENCE:
55235MPO PROJECT ID:
Project History:
DALLAS DENTON 0353-02-072 SH 114 E FORT WORTH TXDOT-DALLAS
EAST OF FM 156
CONSTRUCT 0 TO 6 MAINLANES, AND RECONSTRUCT EXISTING 4/6 FRONTAGE ROADS TO 4/8 FRONTAGE ROADS
WEST OF IH 35W
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-12.20.3MTP REFERENCE:
53195MPO PROJECT ID:
Project History:
DALLAS DALLAS 0353-04-068 SP 348 E IRVING TXDOT-DALLAS
SH 114
WIDEN 4 LANE DIVIDED URBAN TO 6 LANE DIVIDED URBAN
W OF LUNA RD (NEAR ELM FORK TRIN R)
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
RSA1-2.410.225, RSA1-2.410.250MTP REFERENCE:
54054MPO PROJECT ID:
Project History:
DALLAS DALLAS 0353-04-907 SH 114 E,R IRVING TXDOT-DALLAS
EAST OF INTERNATIONAL PARKWAY
EAST OF INT PKWY TO SH 161: RECONSTRUCT AND WIDEN 7 TO 8 GP LNS, 1 WB TO 4 CONCUR HOV/MNGD LNS AND 4 LN TO 4/8 LN DISCONT FRDS; FROM SH 161 TO SP 348: WIDEN 6 TO 8 GP LNS, 2 TO 4 CONCUR HOV/MNGD LNS, AND RECONSTRUCT 4/8 LN TO 4/8 LN CONT FRDS (ULTIMATE)
SP 348
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-12.50.1, FT1-12.50.2MTP REFERENCE:
11951MPO PROJECT ID:
Project History:
DALLAS DALLAS 0353-06-905 SH 114 E,R IRVING TXDOT-DALLAS
SP 348
WIDEN 4 TO 8 GENERAL PURPOSE LANES, 2 TO 4 CONCURRENT HOV/MANAGED LANES, AND RECONSTRUCT 4/6 LANE TO 4/8 LANE CONTINUOUS FRONTAGE ROADS (ULTIMATE)
EAST OF ROCHELLE BLVD
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-12.50.3MTP REFERENCE:
11950MPO PROJECT ID:
Project History:
DALLAS DALLAS 0353-06-906 SH 114 E,R IRVING TXDOT-DALLAS
EAST OF ROCHELLE BLVD
WIDEN 2 TO 4 CONCURRENT MANAGED LANES FROM EAST OF ROCHELLE BLVD TO SH 183; WIDEN 4 TO 6 GENERAL PURPOSE LANES AND RECONSTRUCT 4/6 TO 4/8 CONTINUOUS FRONTAGE ROADS FROM SL 12 TO SH 183 (ULTIMATE)
SH 183
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-12.50.4, FT1-12.505MTP REFERENCE:
52569MPO PROJECT ID:
Project History:
DALLAS DENTON 0353-09-002 SH 114 E ROANOKE TXDOT-DALLAS
WEST OF US 377
CONSTRUCT 0 TO 6 LANE GRADE SEPARATION OVER US 377
EAST OF US 377
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-12.30.1, TSMO2-001MTP REFERENCE:
55177MPO PROJECT ID:
Project History:
DALLAS COLLIN 0364-04-049 SS 399 E,R MCKINNEY TXDOT-DALLAS
AT SH 5
CONSTRUCT GRADE SEPARATION
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
TSMO2-001MTP REFERENCE:
55156MPO PROJECT ID:
Project History:
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
DALLAS-FORT WORTH MPOWEDNESDAY, MARCH 20, 2019
10:59:09 AM
PAGE: 8
RURAL PROJECTSAPPENDIX D
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR
DALLAS DISTRICT PROJECTS
FY 2019-2022 TRANSPORTATION IMPROVEMENT PROGRAM
DALLAS TARRANT 0364-05-925 SH 183 E,R FORT WORTH TXDOT-FORT WORTH
SH 121
WIDEN 3 TO 6 CONCURRENT MANAGED LANES AND RECONSTRUCT AND WIDEN EXISTING 2/6 LANE DISCONTINUOUS TO 4/6 CONTINUOUS FRONTAGE ROADS (ULTIMATE)
REVISE LIMITS
SH 10
11/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-22.10.1MTP REFERENCE:
55034MPO PROJECT ID:
Project History:
DALLAS DALLAS 0442-02-159 IH 35E C,E,R DALLAS TXDOT-DALLAS
US 67
CONSTRUCT 0 TO 1 REVERSIBLE EXPRESS LANE
LAURELAND DR
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-7.90.1; FT1-7.90.2MTP REFERENCE:
55094MPO PROJECT ID:
10-YEAR PLAN PROJECTProject History:
DALLAS DALLAS 0442-02-162 IH 35E C VARIOUS TXDOT-DALLAS
ELLIS COUNTY LINE
CONSTRUCT INTERCHANGE AT LOOP 9 AND IH 35E
ADD PROJECT TO APPENDIX D OF THE 2019-2022 TIP/STIP
BEAR CREEK ROAD
11/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
IN1-7.6.1, TSMO2-001MTP REFERENCE:
54119.5MPO PROJECT ID:
Project History:
DALLAS ELLIS 0442-03-044 IH 35E C VARIOUS TXDOT-DALLAS
REESE DRIVE
CONSTRUCT INTERCHANGE AT LOOP 9 AND IH 35E
ADD PROJECT TO APPENDIX D OF THE 2019-2022 TIP/STIP
DALLAS COUNTY LINE
11/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
IN1-7.6.1, TSMO2-001MTP REFERENCE:
54119.6MPO PROJECT ID:
Project History:
DALLAS ROCKWALL 0451-01-053 SH 205 E ROCKWALL TXDOT-DALLAS
SOUTH OF FM 548
WIDEN 2 LANE RURAL HIGHWAY TO 4 LANE DIVIDED (6 LANE ULTIMATE)
JCT SH 205/JOHN KING (S. GOLIAD ST)
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
RSA1-1.715.475, RSA1-1.715.500, RSA1-1.715.525
MTP REFERENCE:
55071MPO PROJECT ID:
Project History:
DALLAS KAUFMAN 0451-02-028 SH 205 E TERRELL TXDOT-DALLAS
SOUTH OF FM 548
WIDEN 2 LANE RURAL HIGHWAY TO 4 LANE DIVIDED (6 LANE ULTIMATE)
US 80
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
RSA1-1.715.525, RSA1-1.715.550, RSA1-1.715.610
MTP REFERENCE:
55072MPO PROJECT ID:
Project History:
DALLAS ROCKWALL 0451-05-001 SH 205 C,E,R ROCKWALL TXDOT-DALLAS
JCT SH 205/JOHN KING (S GOLIAD ST)
WIDEN 4 TO 6 LANE DIVIDED URBAN ROADWAY
JCT SH 205/JOHN KING (N GOLIAD ST)
11/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
RSA1-1.720.300, RSA1-1.720.350MTP REFERENCE:
13038MPO PROJECT ID:
PART OF REGIONAL 10 YEAR PLANProject History:
DALLAS KAUFMAN 0495-01-064 SP 557 C,E TERRELL TERRELL
AT LAS LOMAS PARKWAY (CR 305)
CONSTRUCT PHASE 1 (4-LANES) OF ULTIMATE 8 LANE BRIDGE PLUS CONNECTIONS TO LAS LOMAS PARKWAY
LOCAL CONTRIBUTION PAID FOR BY CITY OF TERRELL AND KAUFMAN CO
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
NRSA1-DAL-104MTP REFERENCE:
53138.2MPO PROJECT ID:
Project History:
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
DALLAS-FORT WORTH MPOWEDNESDAY, MARCH 20, 2019
10:59:09 AM
PAGE: 9
RURAL PROJECTSAPPENDIX D
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR
DALLAS DISTRICT PROJECTS
FY 2019-2022 TRANSPORTATION IMPROVEMENT PROGRAM
DALLAS KAUFMAN 0495-01-065 SP 557 C,E TERRELL TERRELL
AT LAS LOMAS PARKWAY (CR 305)
CONSTRUCT PHASE 2 (FINAL 4-LANES) OF ULTIMATE 8 LANE BRIDGE PLUS CONNECTIONS TO LAS LOMAS PARKWAY
LOCAL CONTRIBUTION PAID FOR BY CITY OF TERRELL
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
NRSA1-DAL-105MTP REFERENCE:
83262MPO PROJECT ID:
Project History:
DALLAS KAUFMAN 0495-01-071 IH 20 E,R TERRELL TXDOT-DALLAS
SP 557
ADD 0 TO 4 CONTINUOUS FRONTAGE ROADS
EAST OF CR 138 (WILSON RD)
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
AO1-30.110.1MTP REFERENCE:
55220MPO PROJECT ID:
Project History:
DALLAS VARIOUS 0549-02-028 SH 121 E,R MELISSA TXDOT-DALLAS
NORTH OF CR 635
RECONSTRUCT AND WIDEN THREE LANE UNDIVIDED TO FOUR LANE DIVIDED RURAL ROADWAY
CR 635 (FANNIN COUNTY LINE)
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
RSA1-1.745.200MTP REFERENCE:
55167MPO PROJECT ID:
TRANSITION AREA ASSOCIATED WITH TIP 20076/CSJ 0549-03-021
Project History:
DALLAS COLLIN 0549-03-021 SH 121 E,R MELISSA TXDOT-DALLAS
NORTH OF FM 455
RECONSTRUCT AND WIDEN FROM TWO LANE TO FOUR LANE RURAL DIVIDED; CONSTRUCT 0 TO 2 LANE DISCONTINUOUS FRONTAGE ROADS AND FM 2862 INTERCHANGE
CR 635 (FANNIN COUNTY LINE)
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
IN1-11.505.1, RSA1-1.745.200, RSA1-1.745.250, RSA1-1.745.260
MTP REFERENCE:
20076MPO PROJECT ID:
Project History:
DALLAS COLLIN 0549-03-028 SH 121 E BLUE RIDGE TXDOT-DALLAS
SOUTH OF SH 160
RECONSTRUCT AND WIDEN FROM TWO LANE TO FOUR LANE RURAL DIVIDED
NORTH OF SH 160
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
RSA1-1.745.200; RSA1-1.745.250MTP REFERENCE:
55102MPO PROJECT ID:
ROW PURCHASED UNDER CSJ 0549-03-025
Project History:
DALLAS DALLAS 0581-02-077 SL 12 E,R VARIOUS TXDOT-DALLAS
SP 408
RECONSTRUCT & WIDEN 6 TO 8 GENERAL PURPOSE LANES FROM SH 356 TO SH 183; CONSTRUCT 0 TO 2 REVERSIBLE MANAGED LANES, RECONSTRUCT AND WIDEN 4 DISCONTINUOUS TO 4/6 LANE CONTINUOUS FRONTAGE ROADS FROM SP 408 TO SH 183 (ULTIMATE)
SOUTH OF SH 183
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-17.20.1, FT1-17.20.2, FT1-17.30.1MTP REFERENCE:
11930MPO PROJECT ID:
Project History:
DALLAS DALLAS 0581-02-146 SL 12 C,E,R DALLAS TXDOT-DALLAS
AT IH 30
CONSTRUCT DIRECT CONNECTORS (PHASE 1)
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
IN1-17.28.1MTP REFERENCE:
13018MPO PROJECT ID:
10-YEAR PLAN PROJECTProject History:
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
DALLAS-FORT WORTH MPOWEDNESDAY, MARCH 20, 2019
10:59:09 AM
PAGE: 10
RURAL PROJECTSAPPENDIX D
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR
DALLAS DISTRICT PROJECTS
FY 2019-2022 TRANSPORTATION IMPROVEMENT PROGRAM
DALLAS KAUFMAN 0751-05-001 FM 148 E,R CRANDALL TXDOT-DALLAS
SOUTH OF FM 3039
CONSTRUCT 0 TO 2 LANE RURAL UNDIVIDED ROADWAY
ADD PROJECT TO APPENDIX D OF THE 2019-2022 TIP/STIP
US 175
11/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
NRSA1-DAL-175MTP REFERENCE:
83284MPO PROJECT ID:
2013 KAUFMAN COUNTY BOND PROGRAM; RELATED TO TIP 83284/CSJ 0751-05-001
Project History:
DALLAS DALLAS 0918-45-812 CS C IRVING IRVING
ON CONFLANS RD FROM SH 161
CONSTRUCT 0 TO 4 LANE DIVIDED FACILITY WITH NEW SIDEWALKS AND SHARED USE PATH
VALLEY VIEW LANE
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
NRSA1-DAL-11, BP2-002MTP REFERENCE:
11237.2MPO PROJECT ID:
2017 PE AUDIT PROJECTProject History:
DALLAS ROCKWALL 1015-01-024 FM 549 E ROCKWALL ROCKWALL CO
SH 205
WIDEN FROM 2 LANE RURAL TO 4 LANE URBAN
LOCAL CONTRIBUTION PAID BY ROCKWALL COUNTY
SH 276
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
NRSA1-DAL-127MTP REFERENCE:
83221MPO PROJECT ID:
Project History:
DALLAS ROCKWALL 1016-01-023 FM 551 E FATE ROCKWALL CO
IH 30
RECONSTRUCT 2-LANE TO 3-LANE W/ CONTINUOUS LEFT TURN LANE
SH 66
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
TSMO2-001MTP REFERENCE:
53051MPO PROJECT ID:
Project History:
DALLAS ROCKWALL 1017-01-015 FM 552 E ROCKWALL ROCKWALL CO
SH 205
WIDEN FROM 2 LANE RURAL TO 4 LANE URBAN SECTION
LOCAL CONTRIBUTION PAID BY ROCKWALL COUNTY
SH 66
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
NRSA1-DAL-126MTP REFERENCE:
55006MPO PROJECT ID:
Project History:
DALLAS ELLIS 1051-01-038 FM 664 E,R VARIOUS TXDOT-DALLAS
US 287 IN WAXAHACHIE
WIDEN 2 LANE RURAL TO 6 LANE DIVIDED URBAN
FM 1387
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
RSA1-1.563.200MTP REFERENCE:
83223MPO PROJECT ID:
Project History:
DALLAS ELLIS 1051-01-051 FM 664 C VARIOUS TXDOT-DALLAS
IH 35E
RECONSTRUCT AND WIDEN 2/4 LANE RURAL ROADWAY TO 6 LANE DIVIDED URBAN
REVISE SCOPE; CHANGE TIP CODE FROM 13035 TO 13035.1; REVISE LIMITS
WEST OF FERRIS ROAD
02/2019LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
RSA1-2.710.300, RSA1-2.710.325MTP REFERENCE:
13035.1MPO PROJECT ID:
PART OF REGIONAL 10 YEAR PLAN; RELATED TO TIP 13035.2/CSJ 1051-03-001
Project History:PENDING FHWA APPROVAL
DALLAS ELLIS 1051-01-052 FM 664 C MIDLOTHIAN TXDOT-DALLAS
FM 1387
RECONSTRUCT AND WIDEN 2 LANE RURAL TO 4 LANE DIVIDED URBAN ROADWAY (ULTIMATE 6 LANE)
WESTMORELAND ROAD
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
RSA1-1.563.200, RSA1-2.710.225MTP REFERENCE:
13028MPO PROJECT ID:
PART OF REGIONAL 10 YEAR PLANProject History:
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
DALLAS-FORT WORTH MPOWEDNESDAY, MARCH 20, 2019
10:59:09 AM
PAGE: 11
RURAL PROJECTSAPPENDIX D
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR
DALLAS DISTRICT PROJECTS
FY 2019-2022 TRANSPORTATION IMPROVEMENT PROGRAM
DALLAS ROCKWALL 1290-03-016 SH 276 E,R ROCKWALL TXDOT-DALLAS
FM 549
RECONSTRUCT AND WIDEN 2 LANE RURAL TO 4 LANE DIVIDED URBAN (ULTIMATE 6)
FM 551
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
RSA1-2.375.250MTP REFERENCE:
51255MPO PROJECT ID:
Project History:
DALLAS ROCKWALL 1290-03-020 SH 276 E,R ROCKWALL TXDOT-DALLAS
FM 551
RECONSTRUCT AND WIDEN 2 LANE RURAL TO 4 LANE DIVIDED URBAN (ULTIMATE 6)
FM 548
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
RSA1-2.375.275MTP REFERENCE:
52524MPO PROJECT ID:
Project History:
DALLAS ROCKWALL 1290-04-011 SH 276 E,R ROCKWALL TXDOT-DALLAS
FM 548
RECONSTRUCT AND WIDEN 2 LANE RURAL TO 4 LANE DIVIDED URBAN (ULTIMATE 6)
WEST OF COUNTY ROAD 2472 (HUNT COUNTY LINE)
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
RSA1-2.375.300MTP REFERENCE:
54035MPO PROJECT ID:
Project History:
DALLAS COLLIN 1392-01-044 FM 1378 E,R VARIOUS TXDOT-DALLAS
FM 3286
CONSTRUCT INTERSECTION IMPROVEMENTS
ADD PROJECT TO APPENDIX D OF THE 2019-2022 TIP/STIP
11/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
TSMO2-001MTP REFERENCE:
55248MPO PROJECT ID:
Project History:
DALLAS COLLIN 1392-03-012 FM 1461 E,R VARIOUS TXDOT-DALLAS
WEST OF COUNTY ROAD 166
WIDEN AND RECONSTRUCT 2 LANE RURAL TO 4 LANE URBAN (ULTIMATE 6 LANES)
CR 123
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
NRSA1-DAL-300MTP REFERENCE:
55236MPO PROJECT ID:
Project History:
DALLAS ELLIS 1394-02-027 FM 1387 C MIDLOTHIAN TXDOT-DALLAS
MIDLOTHIAN PARKWAY
RECONSTRUCT AND WIDEN FROM 2 LANE UNDIVIDED RURAL TO 4 LANE URBAN DIVIDED (ULTIMATE 6 LANE)
FM 664
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
NRSA1-DAL-193MTP REFERENCE:
13020MPO PROJECT ID:
PART OF REGIONAL 10 YEAR PLANProject History:
DALLAS DENTON 1951-01-011 FM 1515 E,R DENTON DENTON CO
BONNIE BRAE
WIDEN 2 LANE RURAL SECTION TO 6 LANE DIVIDED URBAN
MASCH BRANCH ROAD
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
NRSA1-DAL-302MTP REFERENCE:
55239MPO PROJECT ID:
Project History:
DALLAS COLLIN 1973-01-015 FM 1461 E,R VARIOUS TXDOT-DALLAS
SH 289
WIDEN AND RECONSTRUCT 2 LANE RURAL TO 4 LANE URBAN (ULTIMATE 6 LANES)
WEST OF COUNTY ROAD 166
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
NRSA1-DAL-301MTP REFERENCE:
55237MPO PROJECT ID:
Project History:
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
DALLAS-FORT WORTH MPOWEDNESDAY, MARCH 20, 2019
10:59:09 AM
PAGE: 12
RURAL PROJECTSAPPENDIX D
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR
DALLAS DISTRICT PROJECTS
FY 2019-2022 TRANSPORTATION IMPROVEMENT PROGRAM
DALLAS DENTON 2250-02-014 SL 288 C DENTON DENTON CO
US 380 WEST OF DENTON
CONSTRUCT TWO LANE RURAL ROADWAY ON NEW LOCATION PH 1 OF ULTIMATE FREEWAY - EXTENSION OF LOOP 288
LOCAL CONTRIBUTION PAID BY DENTON COUNTY
IH 35W SOUTH OF DENTON
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
RSA1-1.430.150MTP REFERENCE:
53075MPO PROJECT ID:
RELATED TO TIP 20175/CSJ 2250-02-013Project History:
DALLAS DALLAS 2374-01-983 IH 635 E DALLAS TXDOT-DALLAS
EAST OF US 75
WIDEN EXISTING 2 TO 4 CONCURRENT MANAGED LANES
LBJ EAST CORRIDOR
MILLER ROAD
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-131.10.1MTP REFERENCE:
55165.3MPO PROJECT ID:
10-YEAR PLAN PROJECTProject History:
DALLAS DALLAS 2374-01-984 IH 635 E DALLAS TXDOT-DALLAS
MILLER ROAD
WIDEN EXISTING 2 TO 4 CONCURRENT MANAGED LANES
LBJ EAST CORRIDOR
WEST OF THE KCS RR (WEST OF SH 78)
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-131.10.2MTP REFERENCE:
55060.3MPO PROJECT ID:
10-YEAR PLAN PROJECTProject History:
DALLAS DALLAS 2374-02-985 IH 635 E GARLAND TXDOT-DALLAS
WEST OF THE KCS RR (WEST OF SH 78)
WIDEN EXISTING 2 TO 4 CONCURRENT MANAGED LANES
LBJ EAST CORRIDOR
IH 30
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-131.10.2, FT1-131.10.3MTP REFERENCE:
55075.4MPO PROJECT ID:
10-YEAR PLAN PROJECTProject History:
DALLAS DALLAS 2374-04-083 IH 20 E GRAND PRAIRIE TXDOT-FORT WORTH
TARRANT COUNTY LINE
WIDEN FROM 8 TO 10 GENERAL PURPOSE LANES
CHANGE CSJ FROM 2374-05-084 TO 2374-04-083; RELATED TO TIP 55214/CSJ 2374-05-084
SH 161
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-30.70.2MTP REFERENCE:
55213MPO PROJECT ID:
Project History:
DALLAS DALLAS 2374-07-063 IH 635 E COPPELL TXDOT-DALLAS
ROYAL LANE
CONSTRUCT 0 TO 2 LANE WB FRONTAGE ROAD AND RAMP MODIFICATIONS
LOCAL CONTRIBUTION TO BE PAID BY COPPELL
WEST OF BELT LINE RD
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
AO1-130.10.2, NRSA1-130.10.2, TSMO2-005
MTP REFERENCE:
54047MPO PROJECT ID:
Project History:
DALLAS KAUFMAN 2588-01-017 FM 548 C FORNEY TXDOT-DALLAS
N OF US 80
WIDEN AND RECONSTRUCT 2 LANE RURAL TO 4 LANE URBAN DIVIDED (6 LANE ULTIMATE)
REVISE LIMITS
S OF SH 205 (ROCKWALL C/L)
11/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
NRSA1-DAL-169MTP REFERENCE:
55111MPO PROJECT ID:
PART OF REGIONAL 10 YEAR PLANProject History:
DALLAS ROCKWALL 2588-02-008 FM 548 C VARIOUS TXDOT-DALLAS
S OF SH 205 (KAUFMAN COUNTY LINE)
WIDEN AND RECONSTRUCT 2 LANE RURAL TO 4 LANE DIVIDED URBAN ROADWAY (ULTIMATE 6)
SH 205
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
NRSA1-DAL-190MTP REFERENCE:
13017MPO PROJECT ID:
10 YEAR PLAN PROJECTProject History:
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
DALLAS-FORT WORTH MPOWEDNESDAY, MARCH 20, 2019
10:59:09 AM
PAGE: 13
RURAL PROJECTSAPPENDIX D
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR
DALLAS DISTRICT PROJECTS
FY 2019-2022 TRANSPORTATION IMPROVEMENT PROGRAM
DALLAS COLLIN 2845-01-014 FM 455 E,R ANNA COLLIN CO
WILDWOOD TRAIL
WIDEN FACILITY TO 4 LANE URBAN DIVIDED (ULTIMATE 6 LANE DIVIDED)
SH 121
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
NRSA1-DAL-51MTP REFERENCE:
52559MPO PROJECT ID:
COLLIN COUNTY TO DONATE PLANS; ANNA TO PROVIDE PE FUNDS AS WELL
Project History:
DALLAS COLLIN 2845-01-020 FM 455 E,R ANNA TXDOT-DALLAS
SH 5
RECONSTRUCT AND WIDEN 2 TO 4 LANE URBAN DIVIDED (ULTIMATE 6 LANES)
REVISE LIMITS
EAST OF WILDWOOD TRAIL
02/2019LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
NRSA1-DAL-306MTP REFERENCE:
55238MPO PROJECT ID:
Project History:PENDING FHWA APPROVAL
DALLAS DALLAS 2964-06-011 SH 190 E,R VARIOUS TXDOT-DALLAS
IH 30
CONSTRUCT 0 TO 6 LANE TOLLWAY AND 0 TO 4 LANE DISCONTINUOUS FRONTAGE ROADS
PGBT EAST BRANCH
US 80
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-39.10.1MTP REFERENCE:
54015MPO PROJECT ID:
Project History:
DALLAS DALLAS 2964-06-012 SH 190 E VARIOUS TXDOT-DALLAS
US 80
CONSTRUCT 0 TO 6 LANE TOLLWAY AND 0 TO 4 LANE DISCONTINOUS FRONTAGE ROADS
EIS ONGOING; PBGT EAST BRANCH
IH 20
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-39.10.1MTP REFERENCE:
54070MPO PROJECT ID:
Project History:
DALLAS DALLAS 2964-10-006 SL 9 E,R VARIOUS TXDOT-DALLAS
US 67
CONSTRUCT 0 TO 2 (ULTIMATE 6) LANE FRONTAGE ROADS
IH 35E
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-6.20.1MTP REFERENCE:
55105MPO PROJECT ID:
PRIOR CSJ 2964-10-901Project History:
DALLAS DALLAS 2964-10-008 SL 9 C VARIOUS TXDOT-DALLAS
IH 35E
CONSTRUCT 0 TO 2 LANE FRONTAGE ROADS (ULTIMATE 6) INCLUDING ITS, SIDEWALKS, AND TURN LANES
RTR 121-DA2; CMAQ FUNDS FOR ITS, SIDEWALKS, AND TURN LANES ONLY
DALLAS/ELLIS COUNTY LINE
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
BP2-002, FT1-6.30.1, RSA1-2.700.225MTP REFERENCE:
.05 .04NOX (LBS/DAY): VOC (LBS/DAY):
54119.1MPO PROJECT ID:
BREAKOUT OF TIP 54119/CSJ 2694-10-005; 10-YEAR PLAN PROJECT
Project History:
DALLAS DALLAS 2964-10-009 SL 9 C VARIOUS TXDOT-DALLAS
ELLIS/DALLAS COUNTY LINE
CONSTRUCT 0 TO 2 LANE FRONTAGE ROADS (ULTIMATE 6) INCLUDING ITS, SIDEWALKS, AND TURN LANES
CMAQ FUNDS FOR ITS, SIDEWALKS, AND TURN LANES ONLY
IH 45
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
BP2-002, FT1-6.30.1, RSA1-2.700.225MTP REFERENCE:
.05 .04NOX (LBS/DAY): VOC (LBS/DAY):
54119.2MPO PROJECT ID:
BREAKOUT OF TIP 54119/CSJ 2964-10-005; 10-YEAR PLAN PROJECT
Project History:
DALLAS DALLAS 2964-10-902 SL 9 E,R VARIOUS TXDOT-DALLAS
IH 45
CONSTRUCT 0 TO 2 (ULTIMATE 6) LANE FRONTAGE ROADS
IH 20
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-6.40.1; FT1-6.50.1, RSA1-2.700.275, RSA1-2.700.300
MTP REFERENCE:
55106MPO PROJECT ID:
Project History:
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
DALLAS-FORT WORTH MPOWEDNESDAY, MARCH 20, 2019
10:59:09 AM
PAGE: 14
RURAL PROJECTSAPPENDIX D
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR
DALLAS DISTRICT PROJECTS
FY 2019-2022 TRANSPORTATION IMPROVEMENT PROGRAM
DALLAS ELLIS 2964-12-001 SL 9 C VARIOUS TXDOT-DALLAS
IH 35E
CONSTRUCT 0 TO 2 LANE FRONTAGE ROADS (ULTIMATE 6) INCLUDING ITS, SIDEWALKS, AND TURN LANES
DALLAS COUNTY LINE
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
BP2-002, TSMO2-001, FT1-6.30.1MTP REFERENCE:
.05 .04NOX (LBS/DAY): VOC (LBS/DAY):
54119.3MPO PROJECT ID:
PART OF REGIONAL 10 YEAR PLANProject History:
DALLAS ELLIS 2964-12-002 SL 9 C VARIOUS TXDOT-DALLAS
DALLAS/ELLIS COUNTY LINE
CONSTRUCT 0 TO 2 LANE FRONTAGE ROADS (ULTIMATE 6) INCLUDING ITS, SIDEWALKS, AND TURN LANES
ELLIS/DALLAS COUNTY LINE
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
BP2-002, TSMO2-001, FT1-6.30.1MTP REFERENCE:
.05 .04NOX (LBS/DAY): VOC (LBS/DAY):
54119.4MPO PROJECT ID:
PART OF REGIONAL 10 YEAR PLANProject History:
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
2019-2022 Transportation Improvement Program
Environmental Clearance Projects Fort Worth District
North Central Texas Council of Governments DFW Metropolitan Planning Organization D.16
DALLAS-FORT WORTH MPOTUESDAY, FEBRUARY 5, 2019
10:21:44 AM
PAGE: 1
RURAL PROJECTSAPPENDIX D
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR
FORT WORTH DISTRICT PROJECTS
FY 2019-2022 TRANSPORTATION IMPROVEMENT PROGRAM
FORT WORTH PARKER 0000-02-014 EASTERN LOOP C WEATHERFORD PARKER CO
US 180
WIDEN FROM 2 LANE RURAL TO 4 LANE ULTIMATE
LOCAL CONTRIBUTION PAID BY PARKER CO
IH 20
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
RSA1-1.230.200MTP REFERENCE:
83251MPO PROJECT ID:
Project History:
FORT WORTH TARRANT 0008-13-124 IH 820 C,E,R VARIOUS TXDOT-FORT WORTH
NORTH INTERCHANGE AT SH 121
FROM SH 121/183 INTERCHANGE TO TRINITY BLVD: RECONST 9 TO 11 MAIN LANES WITH 2 CONCURRENT MANAGED TOLL LANES AND 2/6 LANE CONT FRONTAGE RDS; FROM TRINITY BLVD TO RANDOL MILL RD: RECONST 4 TO 10 MAIN LANES (ULTIMATE)
RANDOL MILL ROAD
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-151.10.1, FT1-151.20.1MTP REFERENCE:
55009MPO PROJECT ID:
Project History:
FORT WORTH TARRANT 0008-13-125 IH 820 C FORT WORTH TXDOT-FORT WORTH
IH 20
RECONSTRUCT WIDEN FREEWAY FROM 4/8 TO 8/14 LANE FACILITY
BRENTWOOD STAIR ROAD
11/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
AO1-151.30.1, FT1-151.30.2, FT1-151.40.1
MTP REFERENCE:
55041MPO PROJECT ID:
Project History:
FORT WORTH TARRANT 0008-16-043 IH 20 C,E FORT WORTH TXDOT-FORT WORTH
AT CHISHOLM TRAIL
ADD NB/SB DIRECT CONNECT RAMPS
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
IN1-30.31.1MTP REFERENCE:
13019MPO PROJECT ID:
PART OF REGIONAL 10-YEAR PLANProject History:
FORT WORTH WISE 0013-07-083 US 81 C DECATUR TXDOT-FORT WORTH
NORTH OF CR 2195
CONSTRUCT MAINLANE GRADE SEPARATION AT RELOCATED FM 1810 AND US 81D WITH ADDITION OF RAMPS AND 0 TO 2 LANE FRONTAGE ROADS
ADD PROJECT TO APPENDIX D OF THE 2019-2022 TIP/STIP
NORTH OF US 380
11/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
NRSA1-1.10.3, NRSA1-1.10.4, TSMO2-001
MTP REFERENCE:
13004.2MPO PROJECT ID:
10-YEAR PLAN PROJECT; SPLIT FROM TIP 13004/CSJ 2418-01-013
Project History:
FORT WORTH WISE 0013-08-111 US 81/287 E VARIOUS TXDOT-FORT WORTH
SH 114
CONVERT FRONTAGE ROADS TO 4/6 ONE-WAY OPERATION
WISE/TARRANT COUNTY LINE
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
NRSA1-1.30.1, NRSA1-1.30.2, NRSA1-1.40.1, NRSA1-1.40.2
MTP REFERENCE:
55026MPO PROJECT ID:
Project History:
FORT WORTH WISE 0013-09-012 BU 81-D C DECATUR TXDOT-FORT WORTH
CR 1160 - REALIGNED FM 1810 INTERSECTION
REALIGNMENT OF BU 81-D AT REALIGNED INTERSECTION OF US 81/287 & FM 1810/BU 81-D
ADD PROJECT TO APPENDIX D OF THE 2019-2022 TIP/STIP
NORTH OF CR 2090
02/2019LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
NRSA1-FTW-74, TSMO2-001MTP REFERENCE:
13004.3MPO PROJECT ID:
10-YEAR PLAN PROJECTProject History:PENDING FHWA APPROVAL
FORT WORTH TARRANT 0014-15-033 US 287 E FORT WORTH TXDOT-FORT WORTH
ON US 81/US 287 FROM FM 3479 (HARMON ROAD)
RECONSTRUCT NORTHBOUND FRONTAGE ROAD AND EXIT RAMP SOUTH OF FM 3479
SOUTH OF NORTH TARRANT PARKWAY CROSSOVER
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
NRSA1-1.40.2MTP REFERENCE:
53029MPO PROJECT ID:
Project History:
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
DALLAS-FORT WORTH MPOTUESDAY, FEBRUARY 5, 2019
10:21:44 AM
PAGE: 2
RURAL PROJECTSAPPENDIX D
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR
FORT WORTH DISTRICT PROJECTS
FY 2019-2022 TRANSPORTATION IMPROVEMENT PROGRAM
FORT WORTH TARRANT 0014-15-034 US 287 E FORT WORTH TXDOT-FORT WORTH
ON US 81/US 287 FROM FM 3479 (HARMON ROAD)
CONSTRUCT TURNAROUND FROM NB TO SB AT NORTH TARRANT PARKWAY; RECONSTRUCT EXISTING SOUTHBOUND FRONTAGE ROAD FROM FM 3479 TO US 287
SOUTHBOUND ENTRANCE RAMP
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
NRSA1-1.40.2, IN1-1.536.1MTP REFERENCE:
53030MPO PROJECT ID:
Project History:
FORT WORTH TARRANT 0014-15-035 US 287 E FORT WORTH TXDOT-FORT WORTH
ON US 81/US 287 FROM NORTH ENTRANCE/EXIT RAMP NORTH
RECONSTRUCT NB FRONTAGE ROAD FROM FM 3479 TO RAMP AND SOUTHBOUND FRONTAGE ROAD FROM RAMP TO FM 3479
FM 3479 (HARMON ROAD)
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
NRSA1-1.40.2MTP REFERENCE:
53031MPO PROJECT ID:
Project History:
FORT WORTH TARRANT 0014-15-036 US 287 E FORT WORTH TXDOT-FORT WORTH
ON US 81/US 287 FROM NORTH OF FM 3479
CONSTRUCT AUXILIARY LANE FROM NORTHBOUND ENTRANCE FROM FM 3479 AND IH 35W TO NORTH TARRANT PARKWAY; AUXILIARY LANE FOR SOUTHBOUND EXIT TO FM 3479 AND ENTRANCE FROM NORTH TARRANT
NORTH OF IH 35W INTERCHANGE
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-1.40.2, MO3-001MTP REFERENCE:
53032MPO PROJECT ID:
Project History:
FORT WORTH TARRANT 0014-15-037 US 287 E VARIOUS TXDOT-FORT WORTH
ON US 81/287 FROM TARRANT/WISE COUNTY LINE
CONVERT FRONTAGE ROADS FROM 4 DISC. FRTG ROADS TO 4/8 CON. FRTG ROADS ONE-WAY OPERATION
IH 35W
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-1.40.2, NRSA1-1.40.2MTP REFERENCE:
55027MPO PROJECT ID:
Project History:
FORT WORTH TARRANT 0014-16-252 IH 35W C,E,R FORT WORTH TXDOT-FORT WORTH
IH 820
WIDEN 4 LANES TO 8 LANES WITH INTERMITTENT AUXILIARY LANES AND 2/3 TO 2/3/4 FRONTAGE ROAD CONNECTIONS; AND ADD 2 MANAGED LANES FROM BASSWOOD TO IH 820 FOR AN ULTIMATE OF 6 MANAGED LANES (SECTION 3B)
LOCAL CONTRIBUTION PAID BY CDA PARTNER
US 81/287
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-5.40.1, FT1-5.40.2MTP REFERENCE:
11578MPO PROJECT ID:
Project History:
FORT WORTH TARRANT 0014-16-268 IH 35W C,E,R FORT WORTH TXDOT-FORT WORTH
IH 820 (SEGMENT 3A-ULTIMATE)
WDN 4 TO 8 GP LNS & RCNST 4/6 DSCNT FR FROM IH 820 TO SH 183; WDN 6 TO 8 GP LNS & WDN 4 DSCNT TO 4/6 CONT FR LNS FROM SH 183 TO SH 121; RCNST 8 TO 8 GP LANES & 4 TO 4/6 DSCNT FR LNS FROM SH 121 TO IH 30
LOCAL CONTRIBUTION PAID FOR BY CDA PARTNER
IH 30
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-5.50.1, FT1-5.50.2, FT1-5.60.1, IN1-5.11.1
MTP REFERENCE:
54109MPO PROJECT ID:
Project History:
FORT WORTH HOOD 0080-04-094 US 377 E,R GRANBURY TXDOT-FORT WORTH
FM 167 NORTH
WIDEN 4 LANE TO 6 LANE DIVIDED
EAST OF OLD ACTON HIGHWAY
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
RSA1-1.540.470, RSA1-1.540.480MTP REFERENCE:
54071MPO PROJECT ID:
RELATED TO TIP 54018/CSJ 0080-03-049 AND TIP 54019/CSJ 0080-04-081
Project History:
FORT WORTH TARRANT 0081-12-041 IH 35W C,E,R FORT WORTH TXDOT-FORT WORTH
US 81/287
RECONSTRUCT FROM 4 TO 6 LANES WITH 0 TO 4 CONCURRENT MANAGED TOLL LANES AND 4/8 DISCONTINUOUS TO 4/8 CONTINUOUS FRONTAGE ROAD LANES (SEGMENT 3C)
LOCAL CONTRIBUTION TO BE FUNDED BY CDA PARTNER
DENTON COUNTY LINE
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-5.20.2MTP REFERENCE:
54104.1MPO PROJECT ID:
CAT 10 CONGRESSIONAL EARMARK- IMD; RELATED TO CSJ 0081-13-060
Project History:
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
DALLAS-FORT WORTH MPOTUESDAY, FEBRUARY 5, 2019
10:21:44 AM
PAGE: 3
RURAL PROJECTSAPPENDIX D
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR
FORT WORTH DISTRICT PROJECTS
FY 2019-2022 TRANSPORTATION IMPROVEMENT PROGRAM
FORT WORTH DENTON 0081-13-060 IH 35W C,R FORT WORTH TXDOT-FORT WORTH
DENTON COUNTY LINE
RECONSTRUCT FROM 4 TO 6 LANES WITH 0 TO 4 CONCURRENT MANAGED TOLL LANES AND 4/8 DISCONTINUOUS TO 4/8 CONTINUOUS FRONTAGE ROAD LANES (SEGMENT 3C) (ULTIMATE)
LOCAL CONTRIBUTION PAID BY CDA PARTNERS
EAGLE PARKWAY
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-5.20.2MTP REFERENCE:
54104.2MPO PROJECT ID:
RELATED TO TIP 54104.1/CSJ 0081-12-041Project History:
FORT WORTH TARRANT 0171-05-068 SH 199 C LAKE WORTH TXDOT-FORT WORTH
AZLE AVENUE
CONSTRUCT 0 TO 6 FREEWAY MAIN LANES, CONSTRUCT 0 TO 4/6 LANE CONTINUOUS FRONTAGE LANES, AND INTERCHANGE AT IH 820
IH 820
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-14.20.7, IN1-14.153.1MTP REFERENCE:
13005MPO PROJECT ID:
10 YEAR PLAN PROJECTProject History:PENDING FHWA APPROVAL
FORT WORTH TARRANT 0171-05-094 SH 199 C VARIOUS TXDOT-FORT WORTH
IH 820
RECONSTRUCT 4/6 TO 4/6 LANE DIVIDED URBAN
WEST FORK OF TRINITY RIVER
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
RSA1-2.280.725, RSA1-2.280.740, RSA1-2.280.750
MTP REFERENCE:
13037MPO PROJECT ID:
10 YEAR PLAN PROJECTProject History:PENDING FHWA APPROVAL
FORT WORTH TARRANT 0353-03-101 SH 114 E GRAPEVINE TXDOT-FORT WORTH
FM 1709
CONSTRUCT REMAINING COMPONENTS OF DFW CONNECTOR PROJECT INCLUDING SH 114 EXPRESS LANE CONNECTIONS, INTERCHANGE AT INTERNATIONAL PARKWAY/DFW AIRPORT, TEXAN TRAIL, AND FM 1709 CONNECTOR
DALLAS COUNTY LINE
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
IN1-11.12.1, IN1-11.12.2MTP REFERENCE:
55192MPO PROJECT ID:
Project History:
FORT WORTH TARRANT 0363-01-110 SH 26 E,R HURST TXDOT-FORT WORTH
IH 820
RECONSTRUCT FROM 4 LANE TO 6 LANE DIVIDED
BROWN TRAIL (HURST SECTION)
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
RSA1-1.495.250, RSA1-1.495.275MTP REFERENCE:
54065MPO PROJECT ID:
Project History:
FORT WORTH TARRANT 0363-03-051 SH 121 E,R RICHLAND HILLS TXDOT-FORT WORTH
IH 820
RECONSTRUCT FROM 6 GP LANES TO 6 GP LANES; 4 LANE CONT FRONTAGE ROADS TO 2/6 LANE CONT FRONTAGE ROADS AND 2 CONCURRENT MANAGED TOLL LANES (ULTIMATE)
HANDLEY-EDERVILLE
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-11.100.1MTP REFERENCE:
54133MPO PROJECT ID:
Project History:
FORT WORTH JOHNSON 0747-05-035 FM 157 C,R MANSFIELD TXDOT-FORT WORTH
BU 287 P
REALIGN AND WIDEN ROADWAY AND WIDEN 2 TO 4 LANES RURAL DIVIDED
US 67
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
RSA1-1.465.400, RSA1-1.465.425MTP REFERENCE:
54053MPO PROJECT ID:
Project History:
FORT WORTH VARIOUS 0902-00-173 VA C VARIOUS NCTCOG
REGIONAL PLACEHOLDER; BIKE/PEDESTRIAN SAFETY POOL
BIKE/PEDESTRIAN SAFETY POOL- INCLUDING TOD, PEDESTRIAN CONNECTIONS, SCHOOL SITING, ETC.
NO CHANGE
11/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
BP2-001MTP REFERENCE:
NOX (LBS/DAY): VOC (LBS/DAY):
11651MPO PROJECT ID:
Project History:
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
DALLAS-FORT WORTH MPOTUESDAY, FEBRUARY 5, 2019
10:21:44 AM
PAGE: 4
RURAL PROJECTSAPPENDIX D
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR
FORT WORTH DISTRICT PROJECTS
FY 2019-2022 TRANSPORTATION IMPROVEMENT PROGRAM
FORT WORTH VARIOUS 0902-00-946 VA C VARIOUS NCTCOG
REGION WIDE PROJECT TO ASSIST LOCAL PARTNERS AS THEY IMPLEMENT AV DEPLOYMENTS BY PROVIDING FUNDING FOR COSTS RELATED
INCLUDES LOCAL GOVERNMENT STAFF & CONSULTANT TIME, INFRASTRUCTURE UPGRADES (EX: SIGNAL, STRIPING, DSRC & 5G CONNECTIVITY), LEGAL SERVICES, PUBLIC ED, SAFETY (EX: COORD W/ FIRST RESPONDERS); SOFTWARE & TECH EXPERTISE; NCTCOG ADMINISTRATION
ADD PROJECT TO APPENDIX D OF THE 2019-2022 TIP/STIP
TO DEPLOYMENTS AND SUPPORTING COSTS OF ACTIVE AUTOMATED VEHICLE DEPLOYMENTS IN PARTNERSHIP WITH THE PRIVATE SECTOR;
02/2019LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
TT3-005, TT3-006, TT3-007, TT3-010MTP REFERENCE:
11684MPO PROJECT ID:
Project History:PENDING FHWA APPROVAL
FORT WORTH VARIOUS 0902-00-947 VA C VARIOUS NCTCOG
REGION WIDE PROJECT TO ASSIST LOCAL PARTNERS AS THEY IMPLEMENT AV DEPLOYMENTS BY PROVIDING FUNDING FOR COSTS RELATED
INCLUDES LOCAL GOVERNMENT STAFF & CONSULTANT TIME, INFRASTRUCTURE UPGRADES (EX: SIGNAL, STRIPING, DSRC & 5G CONNECTIVITY), LEGAL SERVICES, PUBLIC ED, SAFETY (EX: COORD W/ FIRST RESPONDERS); SOFTWARE & TECH EXPERTISE; NCTCOG ADMINISTRATION
ADD PROJECT TO APPENDIX D OF THE 2019-2022 TIP/STIP
TO DEPLOYMENTS AND SUPPORTING COSTS OF ACTIVE AUTOMATED VEHICLE DEPLOYMENTS IN PARTNERSHIP WITH THE PRIVATE SECTOR;
02/2019LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
TT3-005, TT3-006, TT3-007, TT3-010MTP REFERENCE:
11684MPO PROJECT ID:
Project History:PENDING FHWA APPROVAL
FORT WORTH TARRANT 0902-90-021 CS E HASLET HASLET
HASLET PARKWAY/INTERMODAL PARKWAY CONNECTOR FROM IH 35W/SH 170
CONSTRUCT 0 TO 4 LANE DIVIDED URBAN
TRANSPORT DRIVE
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
RSA1-RSA1-2.325.170, RSA1-2.325.180, RSA1-2.325.190
MTP REFERENCE:
11898.2MPO PROJECT ID:
Project History:
FORT WORTH TARRANT 1068-01-213 IH 30 C FORT WORTH TXDOT-FORT WORTH
IH 820
RECONSTRUCT FROM 6 TO 8 MAIN LANES; RECONSTRUCT 2/8 LANE TO 2/8 LANE DISCONTINUOUS FRONTAGE ROADS AND CONVERT 2 WAY FRONTAGE ROAD SECTIONS TO 1 WAY EB AND WB (1 LANE TO 2 LANE DISCONTINUOUS)
CAMP BOWIE BLVD
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-28.20.1MTP REFERENCE:
13002MPO PROJECT ID:
10 YEAR PLAN PROJECTProject History:
FORT WORTH TARRANT 1068-01-214 IH 30 C FORT WORTH TXDOT-FORT WORTH
SS 580 (E OF LINKCREST DR)
RECONSTRUCT 4 TO 6 MAIN LANES; RECONSTRUCT 4 LANE DISCONTINUOUS FRONTAGE ROADS TO 4/6 LANE CONTINUOUS FRONTAGE ROADS; RECONSTRUCT SS 580 INTERCHANGE
IH 820
02/2019LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-28.10.3, IN1-28.515.1MTP REFERENCE:
13003MPO PROJECT ID:
10 YEAR PLAN PROJECTProject History:
FORT WORTH TARRANT 1068-02-127 IH 30 C,E ARLINGTON TXDOT-FORT WORTH
COOPER ST
WIDEN 6 TO 8 GENERAL PURPOSE LANES, CONVERT 2 CONCURRENT EXPRESS LANES TO 3 CONCURRENT EXPRESS LANES, MODIFICATIONS TO SH 360 CONNECTIONS AND RAMP MODIFICATIONS
DALLAS COUNTY LINE
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-28.40.3MTP REFERENCE:
55097MPO PROJECT ID:
Project History:
FORT WORTH TARRANT 1068-02-147 IH 30 C ARLINGTON TXDOT-FORT WORTH
SIX FLAGS DRIVE
RECONSTRUCT AND WIDEN 6 TO 8 GENERAL PURPOSE LANES, 2 CONCURRENT EXPRESS LANES AND CONSTRUCT 0 TO 4 CONTINUOUS FRONTAGE ROAD LANES
DALLAS COUNTY LINE
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-28.40.3MTP REFERENCE:
13001MPO PROJECT ID:
10 YEAR PLAN PROJECTProject History:PENDING FHWA APPROVAL
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
DALLAS-FORT WORTH MPOTUESDAY, FEBRUARY 5, 2019
10:21:44 AM
PAGE: 5
RURAL PROJECTSAPPENDIX D
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR
FORT WORTH DISTRICT PROJECTS
FY 2019-2022 TRANSPORTATION IMPROVEMENT PROGRAM
FORT WORTH TARRANT 2266-02-936 SH 360 C,E ARLINGTON NTTA
SUBLETT/CAMP WISDOM ROAD
CNST 4 TO 8 TOLL LN FRM SUBLETT/CAMP WISDOM RD TO DEBBIE LN; 4 TO 6 TOLL LN FRM DEBBIE LN TO TARRANT/ELLIS CO LINE; ADD 4/6 TO 4/6 CONT FRD FRM SUBLETT/CAMP WISDOM TO HERITAGE & 4 TO 4 TOLL LN & 4 TO 4 CONT FRDS FRM HERITAGE TO TARRANT/ELLIS CO LINE (ULT)
LOCAL CONTRIBUTION PAID BY NTTA
TARRANT/ELLIS COUNTY LINE
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-9.40.2, FT1-9.40.3, FT1-9.40.4, FT1-9.40.5
MTP REFERENCE:
55028MPO PROJECT ID:
Project History:
FORT WORTH TARRANT 2266-03-946 SH 360 C,E ARLINGTON NTTA
TARRANT/ELLIS COUNTY LINE
CONSTRUCT 4 TO 6 TOLL LANES AND 4 TO 4 CONTINUOUS FRONTAGE ROADS (ULTIMATE)
LOCAL CONTRIBUTION PAID BY NTTA
US 287
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-9.40.5MTP REFERENCE:
55030MPO PROJECT ID:
Project History:
FORT WORTH TARRANT 2374-05-066 IH 20 C,E,R ARLINGTON TXDOT-FORT WORTH
ANGLIN DRIVE
RECONSTRUCT AND WIDEN 8/10 TO 10/12 GENERAL PURPOSE LANES, 8 COLLECTOR DISTRIBUTOR LANES, AND RECONSTRUCT AND WIDEN 4/6 CONTINUOUS FRTG RD TO 4/8 DISCONTINUOUS FRTG RD
PARK SPRINGS
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-30.40.2; FT1-30.50.1; FT1-30.60.1MTP REFERENCE:
55043MPO PROJECT ID:
RELATED TO CSJ 0008-13-125Project History:
FORT WORTH TARRANT 2374-05-084 IH 20 C ARLINGTON NCTCOG
PARK SPRINGS BLVD
WIDEN FROM 8 TO 10 GENERAL PURPOSE LANES
ADD PROJECT TO APPENDIX D OF THE 2019-2022 TIP/STIP
DALLAS COUNTY LINE
11/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-30.60.2, FT1-30.60.3, FT1-30.70.1MTP REFERENCE:
13027.1MPO PROJECT ID:
10-YEAR PLAN PROJECT; RELATED TO TIP 13027/CSJ 2374-05-902
Project History:
FORT WORTH WISE 2418-01-013 FM 1810 C,R DECATUR NCTCOG
EAST OF PUBLIC ROAD 1122
REALIGNMENT OF FM 1810 AND GRADE SEPARATION AND RETAINING WALLS AT REALIGNED INTERSECTION AT US 81/287 & BU 81D
INTERSECTION OF US 81/287 AT FM 1810
11/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
IN1-1.582.1, NRSA1-FTW-65, TSMO2-001
MTP REFERENCE:
13004.1MPO PROJECT ID:
Project History:
FORT WORTH DENTON 3559-01-004 SH 170 E VARIOUS TXDOT-FORT WORTH
TARRANT COUNTY LINE
RECONSTRUCT 0 TO 4 LANE FREEWAY BETWEEN EXISTING FRONTAGE ROADS
SH 114 INTERCHANGE
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
FT1-10.20.1MTP REFERENCE:
54068MPO PROJECT ID:
Project History:
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
2019-2022 Transportation Improvement Program
Environmental Clearance Projects Paris District
North Central Texas Council of Governments DFW Metropolitan Planning Organization D.22
DALLAS-FORT WORTH MPOTUESDAY, FEBRUARY 5, 2019
10:21:23 AM
PAGE: 1
RURAL PROJECTSAPPENDIX D
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR
PARIS DISTRICT PROJECTS
FY 2019-2022 TRANSPORTATION IMPROVEMENT PROGRAM
PARIS HUNT 0000-00-010 SH 24/SH 11 C,E COMMERCE TXDOT-PARIS
CULVER ST TO LIVE OAK ST AND SH 11 FROM SH 24 TO MONROE ST
CONSTRUCT PEDESTRIAN SAFETY AND TRAFFIC CALMING IMPROVEMENTS
LOCAL CONTRIBUTION PAID BY HUNT COUNTY
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
BP2-002, MO3-001MTP REFERENCE:
13053MPO PROJECT ID:
PART OF REGIONAL 10 YEAR PLANProject History:
PARIS HUNT 0009-13-167 IH 30 C GREENVILLE TXDOT-PARIS
AT FM 1570
CONSTRUCT INTERCHANGE
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
IN1-28.536.1MTP REFERENCE:
13050MPO PROJECT ID:
PART OF REGIONAL 10 YEAR PLAN; RELATED TO TIP 55223/CSJ 0009-13-900
Project History:
PARIS HUNT 0009-13-168 IH 30 C,R VARIOUS TXDOT-PARIS
SOUTH OF FM 36
RECONSTRUCT OVERPASS
NORTH OF FM 36
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
IN1-28.534.1MTP REFERENCE:
55224MPO PROJECT ID:
Project History:
PARIS HUNT 0009-13-169 IH 30 C,R VARIOUS TXDOT-PARIS
SOUTH OF FM 1565
CONSTRUCT OVERPASS
NORTH OF FM 1565
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
IN1-28.534.2MTP REFERENCE:
55225MPO PROJECT ID:
Project History:
PARIS HUNT 0009-13-170 IH 30 C,R VARIOUS TXDOT-PARIS
SOUTH OF CR 2509
CONSTRUCT NEW INTERCHANGE
NORTH OF CR 2509
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
IN1-28.590.1MTP REFERENCE:
55226MPO PROJECT ID:
R IN FY22 IS ROW; R IN APPENDIX D IS FOR UTILITIES; PART OF REGIONAL 10 YEAR PLAN
Project History:
PARIS HUNT 0009-13-900 IH 30 R VARIOUS TXDOT-PARIS
WEST OF FM 1903
RECONSTRUCT OVERPASS AND APPROACHES
EAST OF FM 1903
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
MO3-002MTP REFERENCE:
55223MPO PROJECT ID:
OFFSET BY A REDUCTION ON TIP 13050/CSJ 0009-13-167
Project History:
PARIS HUNT 0692-01-900 FM 1570 R GREENVILLE TXDOT-PARIS
IH 30
WIDEN 2 LANE TO 4 LANE DIVIDED ROADWAY (SOUTH PROJECT)
SH 34
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
RSA1-2.260.225MTP REFERENCE:
13051MPO PROJECT ID:
Project History:
PARIS HUNT 1290-05-019 SH 276 E,R OTHER TXDOT-DALLAS
HUNT COUNTY LINE
RECONSTRUCT AND WIDEN 2/4 LANE RURAL TO 4 LANE DIVIDED URBAN (TRANSITION)
ADD PROJECT TO APPENDIX D OF THE 2019-2022 TIP/STIP
COUNTY ROAD 2472
02/2019LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
RSA1-2.375.375MTP REFERENCE:
55151MPO PROJECT ID:
Project History:PENDING FHWA APPROVAL
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
DALLAS-FORT WORTH MPOTUESDAY, FEBRUARY 5, 2019
10:21:23 AM
PAGE: 2
RURAL PROJECTSAPPENDIX D
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR
PARIS DISTRICT PROJECTS
FY 2019-2022 TRANSPORTATION IMPROVEMENT PROGRAM
PARIS HUNT 2659-01-010 FM 1570 C,R GREENVILLE TXDOT-PARIS
IH 30
CONSTRUCT 2 LANE TO 4 LANE DIVIDED WITH SHOULDERS (HMAC PAVEMENT AND RR CROSSING) NORTH PROJECT
CHANGE CSJ FROM 2659-01-900 TO 2659-01-010
SH 66
07/2018LIMITS FROM:
TIP DESCRIPTION:
REMARKS:
LIMITS TO:
REV DATE:
NRSA1-PAR-7MTP REFERENCE:
13052MPO PROJECT ID:
PART OF REGIONAL 10 YEAR PLANProject History:
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER