Page 1: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)
Page 2: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 2 of 71

We would like to bring in your kind attention that we have applied for Environmental Clearance for expansion of our plants / addition of new products and obtained ToR from MoEF&CC vide letter no IA-

J-11011/582/2017-IA-II (I) dated 10-02-2018 (copy is enclosed for your kind reference).

We would like to request you to kindly visit our site (Ankleshwar) and verify our compliances against given

conditions in existing environmental clearance issued on 17-07-2003 and kindly issue the compliance certificate for

submission to MoEF&CC, New Delhi. A DVD is also enclosed herewith containing soft copy of our compliance report. We hope that the above is in order. In case you need any additional information, we can provide the same on hearing from you. Thanking you. Yours faithfully, For, UPL Limited

S M KARHALE General Manager (Environment) Encl : a/a Copy to : The Zonal Officer Central Pollution Control Board Parivesh Bhavan Opp VMC Ward Office # 10 Subhanpura, Vadodara – 390 023 : The Regional Officer Gujarat Pollution Control Board GPCB XGN ID # 15833 Ankleshwar – 393 002

Page 3: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 3 of 71

Condition Compliance Status

No Description

* The Environmental Clearance is issued for the

following products

Penoxaline @ 150 MT / Month

Cartap @ 50 MT / Month

Metabromuron @ 50 MT / Month

Phosphamidon @ 150 MT / Month

Dichlorovos @ 200 MT / Month; and

Antracol / Mancozeb @ 500/800 MT /

Month

Environmental Clearance also contains the

following by-products

Hydrated Sodium Sulphate @ 737 MT /

Month

Sodium Sulphite Solution @ 298 MT /

Month

Sodium Bromide Solution @ 95 MT / Month

Sodium Sulphate Solids @ 31 MT / Month

Liquefied Methyl Chloride @ 131 MT /

Month

30 % HCL @ 138 MT / Month

Complied.

Production details are attached as Annexure 1 for the

period of July 2017 to December 2017.

The unit has obtained CCA amendment for product mix

change. Presently, unit is operated as per GPCB Consent

to Operate (CC&A) renewed with amendment for existing

products and new solid & liquid formulation products; vide

GPCB CC&A # 88493 dated 26.09.2017 valid up to

12.05.2018 (The copy of valid CC& A is attached as

Annexure-2).

Condition Compliance Status

No. Description

SPECIFIC CONDITIONS

* The land area of the project is 1, 36,777 m2. Project does not involve forest land and displacement of people.

Water requirement is 951.1 kl / day. Solid waste in the form of ETP Sludge (30 MT / Month); Incinerator

Ash (4.5 MT / Month) and Inorganic Solids from Monocrotophos Plant (75.6 MT / Month); Solid Salts (82

MT / Month); and Salt from RO System will be disposed off in the secured landfill facility. NOC from GPCB

was obtained on 29.06.2002. Public Hearing was held on 16.01.2002. – Complied, The unit has obtained

CTE/CTO for product mix change, expansion of formulation products hence the quantity of hazardous

waste has been changed. Please refer Annexure 2 (Valid CC & A) for revised quantities of hazardous waste.

* MOEF accords Environmental Clearance to the project under provisions of EIA Notification dated 27.01.1994

as amended subsequently subject to compliance of various special and general conditions

Page 4: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 4 of 71

1 Gaseous emissions (SO2, NOX, HCl, HC

and Cl2) and PM from various process units should conform to standards

prescribed by authorities. At no time, emissions to go beyond standards. During

failure of pollution control systems, unit

should not be restarted until measures are rectified to achieve the efficiency

Complied.

-The stack Monitoring done internally and through NABL Accredited

Laboratory – Bharuch Enviro Infrastructure Ltd (BEIL). The third party

analysis range as follows in a table below. The detailed monitoring

analysis reports of third party and internal laboratory are given as

Annexure 3.

Sr. No Pollutant / Source GPCB Limit Measurement

Range

Flue Gas Stacks (Boiler Stacks & Hot Air Generator Stack/ CaCl2 Plant Stack)

1 Particulate Matter : Boiler 1/2 &3, Hot Air

Generator, CaCl2 Plant 150 mg/nM3 8.4 – 64

2 Sulphur Dioxide (SO2) - Boiler 1/2 &3,

Hot Air Generator 100 ppm 1.6 - 26.10

3 Oxides of Nitrogen (NOX) - Boiler 1/2

&3, Hot Air Generator 50 ppm 6.4 - 23.8

Process Emissions - Pesticide Technical / Intermediate /Formulation

1 Particulate Matter - Pesticide

Mancozeb/Maneb/Zineb/Ziram/Antracol (Technical) & Formulation

20 mg/nM3 BDL - 13.20

2 HCl - IKI Plant Caustic Scrubber 20 mg/nM3 BDL

3 Chlorine - TMP Plant 09 mg/nM3 BDL

5 Ammonia - TMP Plant 175 mg/nM3 BDL - 0.7

6 SO2 - IKI Plant - Caustic Scrubber 40 mg/nM3 BDL

7 Ammonia - IKI Plant - Water Scrubber 30 mg/nM3 BDL – 21

Other Plant Emissions - Non Pesticide Process

1 HCl - PCl3 Storage 20 mg/nM3 3.1 - 14.0

2 Cl2 - PCL3 Storage 9 mg/nM3 BDL - 0.7

-Reports are attached herewith for the period of July 2017 to December 2017.

-All parameters are within permissible limit.

The Ambient Air Quality Monitoring conducted by internal and external

agency is enclosed as Annexure – 4 & analysis range is as follows done by

ISO 14001 Certified & NABL Accredited Laboratory(M/s Bharuch Enviro

Infrastructure Limited)

Sr No

Major Parameters

Norms / Limit

(µg / m3)

Monitoring result /

range (µg/ m3)

AMBIENT AIR QUALITY MONITORING – µg/ m3

1 PM 10 100 30 – 87

2 PM 2.5 60 19.3 – 44

3 SOx 80 15.3 – 30

4 NOx 80 15.3 – 21.7

5 HCL 200 2.1 – 26

6 NH3 400 12.8– 94

7 H2S 500 BDL

8 HC 160 BDL

9 CL2 100 BDL – 7

10 CO 2000 BDL

Page 5: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 5 of 71

2 Fugitive emissions in workplace

environment, product, raw material storage areas must be monitored. Flue gas

emissions should conform to standards prescribed by GPCB

Complied.

Fugitive emission monitoring at various locations are being carried out by QA Department. Fugitive Emission Reports are attached herewith for the period

of July 2017 to December 2017. Detailed analysis report is enclosed in

Annexure –5 & analysis range is as follows.

Sr No Major

Parameters TLV (ppm)

Monitoring result / range (ppm)

Fugitive Emission

1 Cl2 0.5 BDL-2.5

2 NH3 25 BDL-10.00

3 CS2 10 BDL-2.5

3 Process emissions (SPM, HCl, SO2, Methyl Chloride and VOC) should be

scrubbed through caustic venturi scrubber

and conform to standards. Efficiency of scrubber to be improved and maintained

as per best practicable technology. VOC data to be monitored and submitted to

MOEF. Additional venturi scrubber for Mancozeb, Penoxaline, Phosphamidon

plant and a scrubber for Cartap plant to be

installed in addition to process scrubbers already installed in the unit

Complied.

Air pollution control systems are provided at various stacks. The unit has

provided additional venturi scrubber at Mancozeb Plant. The production of

products Penoxaline, Phosphamidon and Cartap has been discontinued and removed from GPCB Consent.

VOC Monitoring is done through QA Department by using handy PHOTOVAC monitoring kit.

The company has installed recovery plant for generated methyl chloride gas. Recovered MeCl is sold as valuable by product.

The VOC monitoring data is attached herewith in Annexure –6.

The stack Monitoring done internally and through NABL Accredited

Laboratory – Bharuch Enviro Infrastructure Ltd (BEIL). The third party

analysis range as follows in a table below. The detailed monitoring

analysis reports of third party and internal laboratory are given as

Annexure 3.

Sr. No Pollutant / Source GPCB Limit Measurement

Range

Flue Gas Stacks (Boiler Stacks & Hot Air Generator Stack/ CaCl2 Plant Stack)

1 Particulate Matter : Boiler 1/2 &3, Hot

Air Generator, CaCl2 Plant 150 mg/nM3 8.4 – 64

2 Sulphur Dioxide (SO2) - Boiler 1/2 &3,

Hot Air Generator 100 ppm 1.6 - 26.10

3 Oxides of Nitrogen (NOX) - Boiler 1/2

&3, Hot Air Generator 50 ppm 6.4 - 23.8

Process Emissions - Pesticide Technical / Intermediate /Formulation

1 Particulate Matter - Pesticide

Mancozeb/Maneb/Zineb/Ziram/Antracol (Technical) & Formulation

20 mg/nM3 BDL - 13.20

2 HCl - IKI Plant Caustic Scrubber 20 mg/nM3 BDL

3 Chlorine - TMP Plant 09 mg/nM3 BDL

5 Ammonia - TMP Plant 175 mg/nM3 BDL - 0.7

6 SO2 - IKI Plant - Caustic Scrubber 40 mg/nM3 BDL

7 Ammonia - IKI Plant - Water Scrubber 30 mg/nM3 BDL – 21

Other Plant Emissions - Non Pesticide Process

1 HCl - PCl3 Storage 20 mg/nM3 3.1 - 14.0

2 Cl2 - PCL3 Storage 9 mg/nM3 BDL - 0.7

Page 6: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 6 of 71

4 As reflected in EIA / EMP Report,

effluent generation should not exceed 195 m3 / day. The waste streams to be

segregated into high and low pollution load streams. Effluent with high organic

load to be incinerated and dilute streams

like from R & D, washing, domestic, dilute streams from process and scrubber

blow down, to be given primary, secondary and tertiary treatment before

discharging into GIDC drain. Treated effluent to conform to standards. Non

toxic effluent to be diverted to RO plant

and re-cycled to minimize fresh water consumption.

Complied.

The pesticide products are always in seasonal demand and generates effluent in peak demand. The GPCB has granted NOC No: PC/BRCH-37(8)/20061 dated

23rdjuly 2002 with full load capacity of 423.1 KL/Day for product quantity granted EC by MoEF, New Delhi.

As per Existing CC & A of GPCB H 88493 dated 26/09/2017 the treated waste

water discharge quantity is 423.1 KL/Day.

The Unit has installed effluent treatment plant with 400 KLD Capacity

facilitated with primary, secondary & tertiary treatment levels. Treated effluent is discharged to Notified GIDC drain to final Effluent treatment plant operated

(FETP) by NCT, Ankleshwar for further treatment & disposal to deep sea

through pipeline. Details of quantity discharged are attached herewith as

Annexure 7.

The company has implemented stream wise proper segregation as follows.

Sr. No Stream Characteristics Treatment

1 Toxic & Organic Incineration

2 High TDS & Low COD Evaporation

3 High COD Pre Treatment followed by ETP

4 Bio Degradable Effluent (Low COD/Low TDS)

To Effluent Treatment Plant

Unit has installed water recycling system (R.O Plant) @ 125 KL/Day. Permeate from RO (Reverse Osmosis) System is taken to cooling tower water

make up. The quantity of RO Permeate month wise details attached in

Annexure -8.

5 Waste stream should be treated before

taking into solar evaporation pond. Solvent from effluent to be recovered

before discharging into solar evaporation

pond. As reflected in EIA / EMP Report, Company to install forced evaporation

system for aqueous waste to avoid discharge of effluent into solar

evaporation pond

Complied.

Company has discontinued Solar Evaporation ponds from August 2007. The correspondence for discontinuation of solar evaporation has been submitted to

MoEF, New Delhi in August 2007. The unit has installed mechanical single

stage evaporation for treatment of high COD, low TDS waste water. The Unit

has membership of Bharuch Enviro Infrastructure Ltd (BEIL), Ankleshwar.

The aqueous effluent containing high COD, High TDS is sent to Bharuch

Enviro Infrastructure Ltd (BEIL) for further treatment & disposal.

The solvents / valuable by products have been recovered from waste streams generated during production process.

Single Stage Evaporation System is in operation for High TDS waste.

Details are attached for the period July 2017 to December 2017 in

Annexure –8.

6 Company to recover Methyl Chloride

(CH3CL) by installation of CH3CL recovery plant. Solvent recovery to be

improved and attempts to be made to achieve at least 90 % recovery wherever

possible. Rest solvent which can’t be

recovered, to be incineration. Action to be submitted to Ministry within 3 months

Complied.

Methyl Chloride Plant is in operation with average monthly recovery more than 90%.

We have solvent recovery above 95%. The generated residue after solvent

recovery sent to common incinerator Bharuch Enviro Infrastructure Ltd

(BEIL), Ankleshwar for treatment & disposal.

The methyl chloride recovery quantity has been given in Annexure 1.

Page 7: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 7 of 71

7 Company to upgrade existing incinerator

for incineration of hazardous waste. Organic waste, solid waste generated, to

be collected and incinerated for total destruction. As reflected in EIA / EMP

Report, solid waste and ash obtained after

incinerator should be stored in plant premises in a pit with impervious flooring

and leachate collection system. Ash and sludge from ETP to be finally disposed off

in a TSDF of BEIL. Leachate to be sent to ETP for treatment

Not Applicable - Company has discontinued operation of Incinerator for

disposal of Hazardous Waste. The organic waste collected and sent to

incineration of Bharuch Enviro Infrastructure Ltd (BEIL), Ankleshwar.

Complied: The company is a valid member of Bharuch Enviro Infrastructure

Ltd (BEIL) & ETP Sludge has been sent to TSDF of Bharuch Enviro

Infrastructure Ltd (BEIL), Ankleshwar.

Details of incinerable waste / landfillable waste sent to Bharuch Enviro

Infrastructure Ltd (BEIL), Ankleshwar is attached for the period July 2017 to December 2017 In Annexure -9

8 Destruction efficiency of incinerator to be

assessed by agency like CPCB and reported. Company to monitor VOCs and

data submitted to MOEF / CPCB /

GPCB regularly

Not Applicable.

Company has discontinued operation of Incinerator since April 2004. The incinerable waste has been sent to common incineration facility to Bharuch

Enviro Infrastructure Ltd, Ankleshwar. The Company has valid membership of

common facility Bharuch Enviro Infrastructure Ltd (BEIL) Ankleshwar.

9 As per CREP, bio assay test to be replaced by Toxicity Factor Test Method

developed by CPCB. TF=4 to be achieved by December 2003 and TF=2 by July 2006.

Action plan to be submitted within 3 months

Complied.

The unit has achieved Tf factor less than 2 for treated waste water from ETP.

The company has established in-house captive monitoring facility for treated waste water parameter monitoring. The unit has installed online monitoring

system to treated effluent before discharge to FETP operated by NCT for further treatment & deep sea disposal through pipeline. The treated effluent analysis

reports for July 2017 to December 2017 attached as Annexure 10.

TF factor monitoring results are attached for the period of July 2017 to December 2017 In Annexure -10.

The CREP report has been submitted to concerned authority in year 2003-04.

The latest CREP report submitted is attached as Annexure 11.

10 Green belt in 0.2 hectors in addition to

3.66 hector to be provided to mitigate the

effect of fugitive emissions in the plant. Development of green belt along the

boundary wall, open space and avenue roads to be improved in consultation with

local DFO as per CPCB guidelines

Complied

Total - 190 Nos. of trees have been planted during period July 2017 to December 2017.

The unit was established in 1980-81 at notified industrial estate, GIDC,

Ankleshwar. Till date 16.8 % of factory area is developed as green belt due to old establishment and space constrains. The company has developed in house

nursery since 1993-94 and donates 1000-2000 no of saplings without charges to surrounding area. The unit has signed agreement for development of 1,82,108

Sq M (45 Acre) of land with green belt from ~ 3 km distance at survey no

611/613/614/615 & 616 located at village – Mandva.

Page 8: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 8 of 71

11 Company to adopt waste minimization /

cleaner production techniques to reduce pollution load and action plan to be

submitted to Ministry within 3 months

Complied.

The unit has special team like Maxpro, Maxpro+, Green Cell & R & D for resource reduction and recovery improvement, yield improvement and waste

conversion to valuable products. The unit has implemented following Cleaner production technology / waste minimization technologies.

1) TMP Plant – Mother liquor contains 70 % Ammonium Chloride (NH4Cl),

company has installed Ammonia recovery plant & generated Ammonium Chloride (NH4CL) is treated in Ammonia recovery plant and converted in

to valuable products like Ammonia, CaCl2 & Di Calcium Phosphate (DCP

sludge) as a Fertilizer.

2) Mancozeb/Antracol/Zineb/Ziram generates Mix Liquor containing 10 %

Sodium sulphate & company has installed MEE for recovery of pure sodium sulphates.

3) Monocrotophos Plant: Generates Methyl Chloride gas & company has

installed Methyl Chloride recovery plant & recovered Methyl Chloride has been sold as by product.

4) The company has installed 100 KLD RO System & permeate is recycled

back in process.

5) The generated boiler steam condensate recycled back to boiler (50-60 %)

6) Unit has provided economizer at boiler for heat recovery.

7) Implementation of non-chemical treatment in cooling towers to reduce

blow down by 20 %.

8) Bio Degradable Waste – Company has installed captive Bio Gas Plant &

Organic compost yard for conversion of food waste to organic manure.

12 Company to undertake rain water harvesting measures as per action plan

submitted to Ministry

Complied.

The unit was established in 1980-81 at notified industrial estate, GIDC,

Ankleshwar. Till date 23025 Sq. M of factory area is developed as green belt due to old establishment and space constrains. The rain water harvesting /

recharging system is not implemented fully due to space constrains and other

organic impurities collected with initial rain fall. The ground water recharge is not practicable due to higher ground water levels hence the rain water is allowed

to flow through developed green belt area to ground for replenishment of ground water. The unit is not using any ground water since establishment. The unit has

identified approx. 600 M2 area within existing green belt area for development of rain water harvesting. The harvested rain water will be used within plant

premises for gardening or cooling purpose.

13 Company to comply with Environmental Protection measures and safeguards

recommended in EIA / EMA / RRA reports as well as recommendations of

Public Hearing panel

Complied.

An Environmental Cell is in operation, coordinating environmental protection

activities. Full-fledged effluent treatment system with primary, secondary and tertiary treatment is in operation. Treated effluent is monitored and given for

further treatment and disposal to Final Effluent Treatment Plant of M/s NCT.

Proper scrubbers are in operation to control air pollution and stack / ambient air monitoring is carried out regularly. Hazardous wastes generated are disposed

off as per GPCB Consent. Monthly Reports are submitted to GPCB.

The unit is operated as per GPCB Consent to Operate (CC&A) renewed

with amendment vide GPCB CC&A # H 88493 dated 26.09.2017 valid up

to 12.05.2018 (The copy of valid CC& A is attached as Annexure-2).

Page 9: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 9 of 71

B GENERAL CONDITIONS

1 Company to adhere to stipulations made

by GPCB

Complied.

The unit is complying to conditions given by GPCB in CC&A. The adequacy of consent is confirmed by GPCB Appointed Environmental Auditor on annual

basis by submission of Environmental Audit Report to GPCB.

The unit submits various Reports / Returns to GPCB on time. pH, magnetic

flow ,TOC, COD, BOD, TN, Ammonical Nitrogen, TSS meter and real-time

data are transmitted to GPCB & CPCB web site.

2 No further expansion / modifications in

the plant to be carried out without prior approval of MOEF. In case of deviations

/ alterations in the project proposals from

those submitted, a fresh reference to be made to Ministry to assess adequacy of

conditions imposed and add additional environmental protection measures

required, if any

Complied

The unit has obtained CCA amendment for product mix change. Presently,

unit is operated as per GPCB Consent to Operate (CC&A) renewed with

amendment for existing products and new solid & liquid formulation

products; vide GPCB CC&A # 88493 dated 26.09.2017 valid up to

12.05.2018 (The copy of valid CC& A is attached as Annexure-2).

The unit has applied to MoEF&CC for Environmental Clearance for

proposed expansion of Pesticides & Intermediate Products in Month of

December 2017. The ToR is awaited from MoEF&CC.

3 Company to comply with MSIHC Rules 2000. Prior approvals of Chief Inspector

of Factories, Chief Inspector of Explosives, Fire Safety Inspectorate etc, to

be obtained

Complied.

The unit has obtained various statutory licenses & approvals.

4 Company to comply with HWM Rules and authorization from GPCB to be

obtained

Complied

The unit is operated as per GPCB Consent to Operate (CC&A) vide GPCB

CC&A # 88493 dated 26.09.2017 valid up to 12.05.2018 (The copy of

valid CC& A is attached as Annexure-2). The Hazardous waste management

is covered under GPCB Consent & Adequacy of GPCB Consent is reviewed and report on adequacy of compliance has been submitted to GPCB by GPCB

Appointed Environmental Auditors.

5 Overall noise levels in and around plant area to be kept within the standards (85

dBA) by providing noise control measures including acoustic hoods, silencers,

enclosures etc, on all sources of noise generation. Ambient noise levels to

conform to standards i.e. 75 dBA (day

time) and 70 dBA (night time)

Complied.

The workplace noise monitoring at plant areas has been regularly conducted

by internally. The unit has provided silencers, hoods and earmuffs to workers

working near Boiler & compressor area.

Ambient Noise level monitoring results at different location around Plants area

are attached for period July 2017 to December 2017 in Annexure -12.

6 Occupational health surveillance program

to be undertaken as regular exercise for all

employees, specifically for those engaged in handling hazardous substances. First

aid facilities in OHC to be strengthened and medical records of each employees to

be maintained

Complied

Regular medical checkup of each employee has been conducted for 687

employees during July 2017-December 2017.

Pre-employment medical checkup was done for all new joiners for the period of

July 2017 to December 2017.

Page 10: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 10 of 71

7 A separate Environment Management

Cell with full-fledged laboratory to be set up to carry out the environmental

management and monitoring functions

Complied.

Water, Stack Monitoring, Bio Assay Test, Tf Factor Test, Ambient Air Monitoring, VOC monitoring, Solid Waste Analysis, Noise Level Monitoring

Workplace Monitoring are carried out. Also, Environmental Audit is being carried out regularly.

8 Company to provide adequate funds for

recurring and non-recurring expenses to implement the conditions stipulated by

MOEF as well as state government along with implementation schedule for all

conditions stipulated. The funds should

not be diverted for any other purposes

Complied.

The funds are already provided as part of manufacturing activities and operation of ETP and disposal of Hazardous / Non Hazardous wastes. Separate cost codes

are also available. The environmental prevention and protection expenditures incurred during period 2017-18 (YTD – Jan 2018) is Rs. 3.75 Lakhs/Day for

waste water treatment, air pollution control, environment management cell and

green belt development. The year wise details of environmental expenditures are tabulated below.

Year

Effluent

Treatment &

Waste Disposal

Cost in Rs.

Lakhs

Green Belt

Development &

Maintenance Cost in

Rs. Lakhs

Expenses for

Environment

Management

Cell in Rs.

Lakhs

2003-04 59.26 4.04 4.88

2004-05 81.32 2.50 14.23

2005-06 129.79 5.87 19.92

2006-07 297.44 2.96 32.70

2007-08 420.02 6.32 45.23

2008-09 543.15 5.09 75.62

2009-10 384.13 5.22 93.29

2010-11 739.53 15.14 80.12

2011-12 653.62 21.21 96.30

2012-13 493.25 11.88 96.85

2013-14 564.23 12.65 113.01

2014-15 584.33 13.42 123.13

2015-16 825.89 29.70 141.52

2016-17 922.05 20.18 161.66

2017-18

(YTD) 1153.88 29.20 153.01

Total in Rs.

Lakhs 7851.89 185.37 1251.47

Additionally Unit has invested Rs. 12.44 Crores for Environmental

Improvements mainly consists of MEE, Forced Evaporation System, Energy

conservation, waste reduction, and water recycling / reuse & air pollution control.

9 Implementation of the project and Environmental Action Plan to be

monitored by MOEF, Regional Office at

Bhopal, GPCB / CPCB. A six monthly compliance report to be submitted to

monitoring agencies

Complied.

Half yearly compliance reports are being sent during February and August every

year to Ministry of Environment and Forests Regional Office, Western Region,

Bhopal.

Page 11: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 11 of 71

10 Company to inform that public that

project has been accorded Environmental Clearance by Ministry and copies are

available with GPCB and may be seen at MOEF web site. This should be

advertised within 7 days in two local

newspapers and copies to be submitted to RO- GPCB.

Complied.

Published in Gujarati and English newspapers; and copies submitted to GPCB and MOEF. The copy of advertisement submission information submitted to

MoEF is attached as Annexure 13.

11 Company to inform RO-GPCB as well as

Ministry, date of financial closure and final approval of the project by concerned

authorities and date of commencing the land development work, if any

Complied.

The project has been implemented on 31-12-2004. The cost incurred for implementation is Rs. 13.77 Crores. The consent for operation with all

production quantities mentioned is granted by GPCB vide consent order no 4553 dated 17/12/2004.

- Ministry may revoke or suspend the

clearance, if implementation of any of the conditions is not satisfactory

Noted

- Ministry reserves the right to stipulate additional conditions if required.

Company, in a time bound manner, will

implement the same

Noted

- The above conditions will be enforced

inter-alia under provisions of various acts and rules

Noted

Page 12: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 12 of 71

Annexure - 1

BY-PRODUCTS – All figs in MT

MONTH CACL2 FUSED

CACL2 SOL. 30%

AMMONIUM SOL. 20%

SODIUM BISULPHITE

20% SOL. HCl 30% MECL Liq NaSH

Jul 17 410 2609.41 652 3.823 30 109.2 0.4425 Aug 17 641 3244.31 1023.99 9.2 20 162.192 0 Sep 17 728.5 3164.12 1049.97 6 25 111.132 0.437

Oct.’17 851 2905.68 922 8.28 17.97 90.234 0

Nov'17 1156 2918.69 1055.31 8.56 43 76.36 3.2

Dec`17 1155.00 3216.41 1015.79 7.28 30 6.3 1.96

FORMULATION PRODUCTS –All fig’s in MT/M

MONTH

Acifluorfen (Fen-04 )

Formulation

Mancozeb Formulation

IKI formulation

MCP (PHOSKILL)

FORMULATION

Dichlorovas Formulation

Antracol FORMULATION

Sulfosulfuron formulation

Jul 17 227.35 453.63 100.53 283.78 439.31 0 0 Aug 17 344.746 575.841 78.68 228.93 356.89 0 0 Sep 17 305.6 794.496 0 14.15 0 0 0

Oct.’17 278.5 805.96 0.02 0 0 0 0

Nov'17 237.75 1074.11 0.01 0 0 225.75 0

Dec`17 235 1020.576 0 0 0 217 0

PRODUCTION DETAILS

MO

NT

H

PRODUCTION (MT) M

on

ocr

oto

ph

os

Dic

hlo

rov

os

Ma

nco

zeb

An

tra

col

Zin

eb

Tri

-Me

thy

l P

ho

sph

ite

Tri

-eth

yl

Ph

osp

hit

e

IKI

(Flo

cin

am

id)

(SF

10

)Su

lfo

sulf

ur

an

Te

bu

con

azo

le

Aci

flu

orf

en

Te

ch.

(Fe

n-0

4 )

MA

NE

B

Zir

am

Jul 17 730.02 0 0 212.25 0 942.9 0 47 5.495 0 0 16 173.95

Aug 17 318.32 12 0.0 221.2 0.0 1005.84 0 48.8 8.26 0 0 12 157.2

Sep 17 184 486 0.0 101.5 61.2 1094.46 0 20.7 6.965 0 0 0 71.643

Oct.’17 40 511.75 14 86.8 293.33 835 0

19.20

5.0 0 0 0 64.5

Nov'17 56.81 476 1.9 0 190.6 779.38 0 9.6 0.77 0 0 5.6 63.3

Dec`17 25.3 348 18.4 0

240.175

1100.435

0 38.4 0 0 0 0 0 25

Page 13: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 13 of 71

Annexure – 3 STACK MONITORING REPORT

(BHARUCH ENVIRO INFRASTRUCTURE LTD ANALYSIS REPORT) MONTH: July 2017

PESTICIDES AND PESTICIDES INTERMEDIATES PLANT: Sr. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOx SPM SO2

No. (STACK) SAMPLING 20 mg/m3

5 mg/m3 30 mg/m3

50 mg/m3

20 mg/m3 100 mg/m3

TMP PLANT VENT OF

1 SCRUBBER ATTACHED 4.07.2017 -------- BDL BDL -------- -------- --------

TO R-901 AND R-902

MANCOZEB PLANT(OLD) Shutdown from

1/7/17 to 31/7/17

--------

--------

--------

--------

Unit not in

operation

-------- 2 WET SCRUBBER SPRAY

DRIER

MANCOZEB PLANT(NEW)

-------- -------- -------- -------- -------- --------

--------- 3 SPD WET SCRUBBER

OUTLET

ANTRACOL PLANT (BAG FILTER)

4.07.2017 --------

---------

----------

---------

----------

---------

---------

19

13.2

10

---------

5 4

ANTRACOL PLANT (HOT AIR GENERATOR)

4.07.2017

5 IKI Plant (attached to water scrubber)

-------- -------- -------- -------- -------- -------- ---------

5 IKI Plant (attached to Caustic scrubber)

-------- -------- -------- -------- -------- -------- ---------

6 Formulation Plant (attached to Bag Filter – VFBD)

4.07.2017 -------- -------- -------- -------- 13 ---------

7 Formulation Plant (attached to Bag Filter – ACM Mill)

4.07.2017 -------- -------- -------- -------- 12 ----------

OTHER CHEMICAL PLANT

Sr. AREA IDENTIFICATION DATE OF HCl CHLORINE NH3 NOX SPM SO2

No. (STACK) SAMPLING 09 mg/m3

9 mg/m3 175 mg/m3

50 PPM 150 mg/m3

40 mg/nM3

STACK ATTACHED TO

BOILER B5 GT-3138 4.07.2017 -------- --------- --------- 18 22.4 8.4

5

BOILER B6 GT-3476 4.07.2017 --------- --------- ---------- 20 12 4

BOILER B7 GT-3515 4.07.2017 --------- --------- ---------- 21 15 3.4

SPRAY DRYER SYSTEM

OF CACL2 PLANT 4.07.2017 -------- --------- -------- ------- 64 -------- 6

IN PCL3 PLANT STACK ATTACHED TO

STORAGE SCRUBBER

---------

---------

----------

--------- 7 4.7.2017 14 BDL

ALL THE PARAMETERS ARE WITHIN THE LIMITS

Page 14: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 14 of 71

STACK MONITORING REPORT (BHARUCH ENVIRO INFRASTRUCTURE LTD ANALYSIS REPORT)

MONTH: August 2017 PESTICIDES AND PESTICIDES INTERMEDIATES PLANT:

Sr. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOx SPM SO2

No. (STACK) SAMPLING 20

mg/m3 5 mg/m3 30

mg/m3 50

mg/m3 20

mg/m3 100

mg/m3

TMP PLANT VENT OF 24.08.2017 -------- BDL 0.7 --------- --------- ---------

1 SCRUBBER ATTACHED

TO R-901 AND R-902

MANCOZEB PLANT(OLD) Shutdown from 1/8/17 to 31/8/17

-------- --------- -------- --------- Unit NIO --------- 2 WET SCRUBBER SPRAY

DRIER

MANCOZEB PLANT(NEW) Shutdown from 1/8/17 to 31/8/17

-------- --------- --------- --------- Unit NIO -------- 3 SPD WET SCRUBBER

OUTLET

4

ANTRACOL PLANT (BAG FILTER) ANTRACOL PLANT (HOT AIR GENERATOR)

--------

-------- --------- -------- 13.6 11 6.4

24.08.2017

5 Formulation Plant (attached

to Bag Filter – VFBD) 24.08.2017 -------- -------- -------- -------- 11 --------

6 Formulation Plant (attached

to Bag Filter – ACM Mill) 24.08.2017 -------- -------- -------- -------- 9 --------

7

IKI Plant (attached to water scrubber)

-------- -------- -------- -------- -------- -------- --------

OTHER CHEMICAL PLANT

Sr. AREA IDENTIFICATION DATE OF HCl CHLORINE NH3 NOX SPM SO2

No. (STACK) SAMPLING 09

mg/m3 9 mg/m3 175

mg/m3 50 PPM 150

mg/m3 40

mg/nM3

STACK ATTACHED TO

BOILER B5 GT-3138 24.08.2017 -------- ---------- --------- 6.4 15.8 8.7

6

BOILER B6 GT-3476 24.08.2017 --------- ---------- --------- 23.8 51.7 18.1

BOILER B7 GT-3515 24.08.2017 --------- --------- --------- 20.3 41.2 16.9

SPRAY DRYER SYSTEM OF CACL2 PLANT

-------- --------- --------- ---------- 17 ----------

7 24.08.2017

IN PCL3 PLANT STACK ATTACHED TO STORAGE SCRUBBER

--------- 8 24.08.2017 4.8 BDL --------- --------- ---------

ALL THE PARAMETERS ARE WITHIN THE LIMITS

Page 15: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 15 of 71

STACK MONITORING REPORT :(BHARUCH ENVIRO INFRASTRUCTURE LTD ANALYSIS REPORT) MONTH: SEPTEMBER 2017

PESTICIDES AND PESTICIDES INTERMEDIATES PLANT:

Sr. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOx SPM SO2

No. (STACK) SAMPLING 20

mg/m3 5 mg/m3 30

mg/m3 50

mg/m3 20

mg/m3 100

mg/m3

TMP PLANT VENT OF 19.09.2017 --------- BDL BDL -------- -------- ---------

1 SCRUBBER ATTACHED

TO R-901 AND R-902

MANCOZEB PLANT(OLD)

--------- --------- -------- ------- BDL ------- 2 WET SCRUBBER SPRAY 19.09.2017

DRIER

3

MANCOZEB PLANT(NEW) SPD WET SCRUBBER OUTLET

Shutdown from

01/9/17 to 30/9/17

-------- --------- -------- -------- -------- --------

ANTRACOL PLANT (BAG FILTER)

Shutdown from

11/9/17 to 30/9/17

-------- -------- ---------- --------- ---------- --------

4

ANTRACOL PLANT (HOT AIR GENERATOR)

5

Formulation Plant (attached to Bag Filter – VFBD)

Shutdown from 7.09.17 to 30.09.17

-------- -------- ---------- --------- ---------- --------

6

Formulation Plant (attached to Bag Filter – ACM Mill)

Shutdown from 4.09.17 to 30.09.17 ------- ------- -------- -------- ------- ---------

7

IKI Plant (attached to water scrubber)

------- ------- ------- -------- --------- ------- --------

OTHER CHEMICAL PLANT

Sr. AREA IDENTIFICATION DATE OF HCl CHLORINE NH3 NOX SPM SO2

No. (STACK) SAMPLING 09

mg/m3 9 mg/m3 175

mg/m3 50 PPM 150

mg/m3 40

mg/nM3

STACK ATTACHED TO

BOILER B5 GT-3138 19.09.2017 ------ ------- ------- 16.4 15.8 2.7

5

BOILER B6 GT-3476 19.09.2017 ------ ------ ------- 19.3 48.7 26.1

BOILER B7 GT-3515 19.09.2017 ------ ------- ------- 18.4 9.7 1.6

SPRAY DRYER SYSTEM OF CACL2 PLANT

------ ------- ------- ------ 13 ----- 6 19.09.2017

IN PCL3 PLANT STACK ATTACHED TO STORAGE SCRUBBER

------ 7 19.09.2017 3.1 BDL ------ ------ -------

ALL THE PARAMETERS ARE WITHIN THE LIMITS

Page 16: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 16 of 71

STACK MONITORING REPORT: (BHARUCH ENVIRO INFRASTRUCTURE LTD ANALYSIS REPORT) MONTH: OCTOBER 2017

PESTICIDES AND PESTICIDES INTERMEDIATES PLANT:

Sr. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOx SPM SO2

No. (STACK) SAMPLING 20

mg/m3 5 mg/m3 30

mg/m3 50

mg/m3 20

mg/m3 100

mg/m3

TMP PLANT VENT OF ------- -------- -------- -------- -------- -------- ---------

1 SCRUBBER ATTACHED

TO R-901 AND R-902

MANCOZEB PLANT(OLD) Shutdown

from 1.10.17 to 30.10.17

------- ------- ------- ------- ------- ------- 2 WET SCRUBBER SPRAY

DRIER

MANCOZEB PLANT(NEW)

------- ------- ------- ------- BDL ------- 3 SPD WET SCRUBBER 04.10.2017

OUTLET

ANTRACOL PLANT (BAG FILTER) 04.10.2017

------- ------- ------- ------- BDL -------

4

ANTRACOL PLANT (HOT AIR GENERATOR)

5 Formulation Plant (attached to Bag Filter – VFBD)

Shutdown from 1.10.17 to 30.10.17

------- ------- ------- ------- ------- -------

6 Formulation Plant (attached to Bag Filter – ACM Mill)

------- ------- ------- ------- ------- -------

7 IKI Plant (attached to water scrubber)

------- ------- ------- ------- ------- ------- -------

OTHER CHEMICAL PLANT

Sr. AREA IDENTIFICATION DATE OF HCl CHLORINE NH3 NOX SPM SO2

No. (STACK) SAMPLING 09

mg/m3 9 mg/m3 175

mg/m3 50 PPM 150

mg/m3 40

mg/nM3

STACK ATTACHED TO

BOILER B5 GT-3138 ------- ------- -------- ------- ------ -------- -------

5

BOILER B6 GT-3476 ------- ------- -------- -------- -------- ------- --------

BOILER B7 GT-3515 ------- -------- --------- -------- -------- --------- --------

SPRAY DRYER SYSTEM OF CACL2 PLANT

------ ------- ------- ------- 27.3 ------- 6 04.10.2017

IN PCL3 PLANT STACK ATTACHED TO STORAGE SCRUBBER

------ 7 04.10.2017 4.9 BDL ------ ------- -------

-

ALL THE PARAMETERS ARE WITHIN THE LIMITS

Page 17: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 17 of 71

STACK MONITORING REPORT: (BHARUCH ENVIRO INFRASTRUCTURE LTD ANALYSIS REPORT) MONTH: NOVEMBER 2017

PESTICIDES AND PESTICIDES INTERMEDIATES PLANT:

Sr. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOx SPM SO2

No. (STACK) SAMPLING 20

mg/m3 5 mg/m3 30

mg/m3 50

mg/m3 20

mg/m3 100

mg/m3

TMP PLANT VENT OF

1 SCRUBBER ATTACHED 10.11.2017 ----- BDL BDL ----- ------ ------

TO R-901 AND R-902

MANCOZEB PLANT(OLD) Shutdown from

1/11/17 to 30/11/17

------ ------ ------ ------ ------ ----- 2 WET SCRUBBER SPRAY

DRIER

MANCOZEB PLANT(NEW)

------ -------- ------- ------- BDL ------- 3 SPD WET SCRUBBER 10.11.2017

OUTLET

ANTRACOL PLANT (BAG FILTER) 10.11.2017

----- ------ ------- ------- 13.2

-------

4

ANTRACOL PLANT (HOT AIR GENERATOR)

5 Formulation Plant (attached to Bag Filter – VFBD)

Shutdown from

1/11/17 to 30/11/17

------ ------- ------ ------- ------ ------

6 Formulation Plant (attached to Bag Filter – ACM Mill) ------ ------ ------ ------ ------ ------

7 IKI PLANT STACK ATTACHED TO WATER SCRUBBER 10.11.2017 ------ ------- BDL ------ ------ ------

8 IKI PLANT STACK ATTACHED TO CAUSTIC SCRUBBER 10.11.2017 BDL ------ ------ ------ ------ BDL

OTHER CHEMICAL PLANT

Sr. AREA IDENTIFICATION DATE OF HCl CHLORINE NH3 NOX SPM SO2

No. (STACK) SAMPLING 09

mg/m3 9 mg/m3 175

mg/m3 50 PPM 150

mg/m3 40

mg/nM3

STACK ATTACHED TO

BOILER B5 GT-3138 10.11.2017 ----- ------- ------- 14.4 15.8 2.7

5

BOILER B6 GT-3476 10.11.2017 ------ ------ ------ 19.3 48.7 26.1

BOILER B7 GT-3515 Not in

operation ------ ------- ------- ------- ------- ------

SPRAY DRYER SYSTEM OF CACL2 PLANT

------ ------- ------ ------ 13 ----- 6 10.11.2017

IN PCL3 PLANT STACK ATTACHED TO STORAGE SCRUBBER

------- 7 10.11.2017 3.1 BDL ----- ------ ------

-

ALL THE PARAMETERS ARE WITHIN THE LIMITS

Page 18: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 18 of 71

STACK MONITORING REPORT: (BHARUCH ENVIRO INFRASTRUCTURE LTD ANALYSIS REPORT) MONTH: DECEMBER 2017

PESTICIDES AND PESTICIDES INTERMEDIATES PLANT:

Sr. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOx SPM SO2

No. (STACK) SAMPLING 20

mg/m3 5 mg/m3 30

mg/m3 50

mg/m3 20

mg/m3 100

mg/m3

TMP PLANT VENT OF

1 SCRUBBER ATTACHED 11.12.2017 ------ BDL 25 ------- ------- ------

TO R-901 AND R-902

MANCOZEB PLANT(OLD) ------ ------- -------- -------- BDL ------

2 WET SCRUBBER SPRAY 11.12.2017

DRIER

MANCOZEB PLANT(NEW) Shutdown

from 1.12.17 to 31.12.17

------ ------- -------- -------- -------- --------

3 SPD WET SCRUBBER

OUTLET

ANTRACOL PLANT (BAG FILTER)

11.12.2017 ------- ------- ------ ------- 11 --------

4

ANTRACOL PLANT (HOT AIR GENERATOR)

5 FORMULATION PLANT BAG FILTER

Shutdown from 1.12.17 to 31.12.17

------- ------- ------- ------- -------- ---------

6 IKI PLANT STACK ATTACHED TO WATER SCRUBBER

11.12.2017 ------- -------- 21 ------- ------- ------

7 IKI PLANT STACK ATTACHED TO CAUSTIC SCRUBBER

11.12.2017 BDL -------- --------- --------- --------- BDL

OTHER CHEMICAL PLANT

Sr. AREA IDENTIFICATION DATE OF HCl CHLORINE NH3 NOX SPM SO2

No. (STACK) SAMPLING 09

mg/m3 9 mg/m3 175

mg/m3 50 PPM 150

mg/m3 40

mg/nM3

STACK ATTACHED TO 11.12.2017 ------- -------- ------- 15.6 8.4 3.1

BOILER B5 GT-3138

7

BOILER B6 GT-3476 11.12.2017 ------ -------- -------- 20.3 41.7 23.6

BOILER B7 GT-3515 Not in Operation ------- -------- -------- ------- -------- -------

SPRAY DRYER SYSTEM OF CACL2 PLANT 11.12.2017 ------- -------- -------- -------- 19 ------- 8

IN PCL3 PLANT STACK ATTACHED TO STORAGE SCRUBBER

9 11.12.2017 BDL BDL

ALL THE PARAMETERS ARE WITHIN THE LIMITS

Page 19: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 19 of 71

STACK MONITORING REPORT (INTERNAL LAB ANALYSIS REPORT)

MONTH : JUL-2017

PESTICIDES AND PESTICIDE INTERMEDIATES PLANT :

Sr. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2

No. (STACK) SAMPLING 20 mg/Nm3

5 mg/Nm3

30 mg/Nm3

50 mg/Nm3 20 mg/Nm3

100 mg/Nm3

TMP PLANT VENT OF 09.07.17 ------ BDL BDL ------ ------ ------

1 SCRUBBER ATTACHED

TO R-901 AND R-902 27.07.17 ------ BDL BDL ------ ------ ------

MANCOZEB PLANT(New) 09.07.17 ------ ------ ------ ------ 16.00 ------

2 WET SCRUBBER SPRAY

DRIER (Mojj) 25.07.17 ------ ------ ------ ------ 19.00 ------

MANCOZEB PLANT(Old) Shut down ------ ------ ------ ------ ------ ------

3 SPD WET SCRUBBER 01.07.17 to 31.07.17

OUTLET ( L&T) ------ ------ ------ ------ ------ ------

SPRAY DRIER SYSTEM 09.07.17 ------ ------ ------ ------ 13.20 ------

4 OF ANTRACOL PLANT

25.07.17 ------ ------ ------ ------ 15.00 ------

Formulation plant (ULALA) 09.07.17 ------ ------ ------ ------ 13.00 ------

5 Stack attached to VFBD

23.07.17 ------ ------ ------ ------ 16.00 ------

Formulation plant (ULALA) 09.07.17 ------ ------ ------ ------ 12.00 ------

6 Stack attached to ACM Mill

23.07.17 ------ ------ ------ ------ 19.00 ------

Sr. AREA IDENTIFICATION DATE OF HCL SO2 NH3

No. SAMPLING 20 mg/Nm3

40 mg/Nm3

30 mg/Nm3

Flonicamide Plant

scrubber, SO2 and HCL 09.07.17 3.80 12.60 ------ ------ ------ ------

1

23.07.17 2.70 16.30 ------ ------ ------ ------

Flonicamide Plant

Scrubber, Ammonia 09.07.17 ------ ------ 14.00 ------ ------ ------

2

23.07.17 ------ ------ 11.00 ------ ------ ------

OTHER CHEMICAL PLANT :

Sr. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2

No. (STACK) SAMPLING 20 mg/m3

9 mg/m3

175 mg/m3

50 mg/Nm3 150 mg/m3

100 mg/Nm3

IN PCL3 PLANT STACK 09.07.17 14.00 BDL ------ ------ ------ ------

1 ATTACHED TO

STORAGE SCRUBBER 27.07.17 10.00 BDL ------ ------ ------ ------

SPRAY DRIER SYSTEM 09.07.17 ------ ------ ------ ------ 64.00 ------

2 OF CACL2 PLANT

23.07.17 ------ ------ ------ ------ 72.00 ------

STACK ATTACHED TO

3 BOILER B5 GT-8460 05.07.17 ------ ------ ------ 18.00 22.40 8.40

4 BOILER B6 GT-9099 05.07.17 ------ ------ ------ 20.00 12.00 4.00

5 BOILER B7 GT-3515 05.07.17 ------ ------ ------ 21.00 15.00 3.40

ALL THE PARAMETERS ARE WITHIN THE LIMITS

STACK MONITORING REPORT

Page 20: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 20 of 71

MONTH : AUG-2017

PESTICIDES AND PESTICIDE INTERMEDIATES PLANT :

Sr. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2

No. (STACK) SAMPLING 20 mg/Nm3

5 mg/Nm3

30 mg/Nm3

50 mg/Nm3 20 mg/Nm3

100 mg/Nm3

TMP PLANT VENT OF 05.08.17 ------ BDL BDL ------ ------ ------

1 SCRUBBER ATTACHED

TO R-901 AND R-902 21.08.17 ------ BDL 4.53 ------ ------ ------

MANCOZEB PLANT(New) Shut down ------ ------ ------ ------ ------ ------

2 WET SCRUBBER SPRAY 01.08.17 to 31.08.17

DRIER (Mojj) ------ ------ ------ ------ ------ ------

MANCOZEB PLANT(Old) Shut down ------ ------ ------ ------ ------ ------

3 SPD WET SCRUBBER 01.08.17 to 31.08.17

OUTLET ( L&T) ------ ------ ------ ------ ------ ------

SPRAY DRIER SYSTEM 08.08.17 ------ ------ ------ ------ 14.00 ------

4 OF ANTRACOL PLANT

26.08.17 ------ ------ ------ ------ 17.00 ------

Formulation plant (ULALA) 08.08.17 ------ ------ ------ ------ 16.00 ------

5 Stack attached to VFBD

22.08.17 ------ ------ ------ ------ 11.00 ------

Formulation plant (ULALA) 08.08.17 ------ ------ ------ ------ 13.00 ------

6 Stack attached to ACM Mill

22.08.17 ------ ------ ------ ------ 9.00 ------

Sr. AREA IDENTIFICATION DATE OF HCL SO2 NH3

No. SAMPLING 20 mg/Nm3

40 mg/Nm3

30 mg/Nm3

Flonicamide Plant

scrubber, SO2 and HCL 05.08.17 6.10 11.20 ------ ------ ------ ------

1

21.08.17 4.80 13.80 ------ ------ ------ ------

Flonicamide Plant

Scrubber, Ammonia 05.08.17 ------ ------ 12.00 ------ ------ ------

2

21.08.17 ------ ------ 14.30 ------ ------ ------

OTHER CHEMICAL PLANT :

Sr. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2

No. (STACK) SAMPLING 20 mg/m3

9 mg/m3

175 mg/m3

50 mg/Nm3 150 mg/m3

100 mg/Nm3

IN PCL3 PLANT STACK 05.08.17 3.10 BDL ------ ------ ------ ------

1 ATTACHED TO

STORAGE SCRUBBER 22.08.17 4.80 BDL ------ ------ ------ ------

SPRAY DRIER SYSTEM 08.08.17 ------ ------ ------ ------ 48.0 ------

2 OF CACL2 PLANT

22.08.17 ------ ------ ------ ------ 28.0 ------

STACK ATTACHED TO

3 BOILER B5 GT-8460 22.08.2017 ------ ------ ------ 6.40 15.80 8.70

4 BOILER B6 GT-9099 22.08.2017 ------ ------ ------ 23.80 51.70 18.10

5 BOILER B7 GT-3515 22.08.2017 ------ ------ ------ 20.30 41.20 16.90

ALL THE PARAMETERS ARE WITHIN THE LIMITS

STACK MONITORING REPORT

Page 21: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 21 of 71

F/QA/003

MONTH : SEP-2017

PESTICIDES AND PESTICIDE INTERMEDIATES PLANT :

Sr. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2

No. (STACK) SAMPLING 20 mg/Nm3

5 mg/Nm3

30 mg/Nm3

50 mg/Nm3 20 mg/Nm3

100 mg/Nm3

TMP PLANT VENT OF 05.09.17 ------ BDL BDL ------ ------ ------

1 SCRUBBER ATTACHED

TO R-901 AND R-902 19.09.17 ------ 0.06 BDL ------ ------ ------

MANCOZEB PLANT(New) Shut down ------ ------ ------ ------ ------ ------

2 WET SCRUBBER SPRAY 01.09.17 to 30.09.17

DRIER (Mojj) ------ ------ ------ ------ ------ ------

MANCOZEB PLANT(Old) Shut down ------ ------ ------ ------ ------ ------

3 SPD WET SCRUBBER 01.09.17 to 30.09.17

OUTLET ( L&T) ------ ------ ------ ------ ------ ------

SPRAY DRIER SYSTEM 09.09.17 ------ ------ ------ ------ 17.00 ------

4 OF ANTRACOL PLANT

Shut down ------ ------ ------ ------ ------ ------

11.09.17 to 30.09.17

Formulation plant (ULALA) 04.09.17 ------ ------ ------ ------ 13.00 ------

5 Stack attached to VFBD

Shut down ------ ------ ------ ------ ------ ------

07.09.17 to 30.09.17

Formulation plant (ULALA) 04.09.17 ------ ------ ------ ------ 15.00 ------

6 Stack attached to ACM Mill

Shut down ------ ------ ------ ------ ------ ------

07.09.17 to 30.09.17

Sr. AREA IDENTIFICATION DATE OF HCL SO2 NH3

No. SAMPLING 20 mg/Nm3

40 mg/Nm3

30 mg/Nm3

Flonicamide Plant

scrubber, SO2 and HCL 04.09.17 6.70 10.90 ------ ------ ------ ------

1

20.09.17 3.10 8.10 ------ ------ ------ ------

Flonicamide Plant

Scrubber, Ammonia 04.09.17 ------ ------ 15.00 ------ ------ ------

2

20.09.17 ------ ------ 11.20 ------ ------ ------

OTHER CHEMICAL PLANT :

Sr. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2

No. (STACK) SAMPLING 20 mg/m3

9 mg/m3

175 mg/m3

50 mg/Nm3 150 mg/m3

100 mg/Nm3

IN PCL3 PLANT STACK 05.09.17 2.28 BDL ------ ------ ------ ------

1 ATTACHED TO

STORAGE SCRUBBER 19.09.17 BDL BDL ------ ------ ------ ------

SPRAY DRIER SYSTEM 09.09.17 ------ ------ ------ ------ 13.00 ------

2 OF CACL2 PLANT

20.09.17 ------ ------ ------ ------ 10.00 ------

STACK ATTACHED TO

3 BOILER B5 GT-8460 19.09.17 ------ ------ ------ 16.40 15.80 2.70

4 BOILER B6 GT-9099 19.09.17 ------ ------ ------ 19.30 48.70 26.10

5 BOILER B7 GT-3515 19.09.17 ------ ------ ------ 18.40 9.70 1.60

ALL THE PARAMETERS ARE WITHIN THE LIMITS

STACK MONITORING REPORT

Page 22: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 22 of 71

F/QA/003

MONTH : OCT-2017

PESTICIDES AND PESTICIDE INTERMEDIATES PLANT :

Sr. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2

No. (STACK) SAMPLING 20 mg/Nm3

5 mg/Nm3

30 mg/Nm3

50 mg/Nm3 20 mg/Nm3

100 mg/Nm3

TMP PLANT VENT OF 03.10.17 ------ 0.29 10.20 ------ ------ ------

1 SCRUBBER ATTACHED

TO R-901 AND R-902 18.10.17 ------ 0.06 BDL ------ ------ ------

MANCOZEB PLANT(New) Shut down ------ ------ ------ ------ ------ ------

2 WET SCRUBBER SPRAY 01.10.17 to 31.10.17

DRIER (Mojj) ------ ------ ------ ------ ------ ------

MANCOZEB PLANT(Old) Shut down ------ ------ ------ ------ ------ ------

3 SPD WET SCRUBBER 01.10.17 to 31.10.17

OUTLET ( L&T) ------ ------ ------ ------ ------ ------

SPRAY DRIER SYSTEM 04.10.17 ------ ------ ------ ------ BDL ------

4 OF ANTRACOL PLANT

23.10.17 ------ ------ ------ ------ 13.20 ------

Formulation plant (ULALA) Shut down ------ ------ ------ ------ ------ ------

5 Stack attached to VFBD (01.10.17 to 31.10.17)

------ ------ ------ ------ ------ ------

Formulation plant (ULALA) Shut down ------ ------ ------ ------ ------ ------

6 Stack attached to ACM Mill (01.10.17 to 31.1017)

------ ------ ------ ------ ------ ------

Sr. AREA IDENTIFICATION DATE OF HCL SO2 NH3

No. SAMPLING 20 mg/Nm3

40 mg/Nm3

30 mg/Nm3

Flonicamide Plant

scrubber, SO2 and HCL 03.10.17 2.90 15.40 ------ ------ ------ ------

1

25.10.17 3.10 17.70 ------ ------ ------ ------

Flonicamide Plant

Scrubber, Ammonia 03.10.17 ------ ------ 16.30 ------ ------ ------

2

25.10.17 ------ ------ 12.40 ------ ------ ------

OTHER CHEMICAL PLANT :

Sr. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2

No. (STACK) SAMPLING 20 mg/m3

9 mg/m3

175 mg/m3

50 mg/Nm3 150 mg/m3

100 mg/Nm3

IN PCL3 PLANT STACK 03.10.17 1.67 0.02 ------ ------ ------ ------

1 ATTACHED TO

STORAGE SCRUBBER 18.10.17 3.60 BDL ------ ------ ------ ------

SPRAY DRIER SYSTEM 04.10.17 ------ ------ ------ ------ 27.30 ------

2 OF CACL2 PLANT

23.10.17 ------ ------ ------ ------ 20.90 ------

STACK ATTACHED TO

3 BOILER B5 GT-8460 Not in operation ------ ------ ------ ------ ------ ------

(10.10.17)

4 BOILER B6 GT-9099 10.10.17 ------ ------ ------ 15.00 12.00 3.10

5 BOILER B7 GT-3515 10.10.17 ------ ------ ------ 17.00 9.00 3.50

ALL THE PARAMETERS ARE WITHIN THE LIMITS

STACK MONITORING REPORT

Page 23: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 23 of 71

F/QA/003

MONTH : NOV-2017

PESTICIDES AND PESTICIDE INTERMEDIATES PLANT :

Sr. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2

No. (STACK) SAMPLING 20 mg/Nm3

5 mg/Nm3

30 mg/Nm3

50 mg/Nm3 20 mg/Nm3

100 mg/Nm3

TMP PLANT VENT OF 06.11.17 ------ BDL 5.30 ------ ------ ------

1 SCRUBBER ATTACHED

TO R-901 AND R-902 23.11.17 ------ BDL BDL ------ ------ ------

MANCOZEB PLANT(New) 10.11.17 ------ ------ ------ ------ BDL ------

2 WET SCRUBBER SPRAY

DRIER (Mojj) 28.11.17 ------ ------ ------ ------ BDL ------

MANCOZEB PLANT(Old) Not in operation ------ ------ ------ ------ ------ ------

3 SPD WET SCRUBBER 01.11.17 to 30.11.17

OUTLET ( L&T) ------ ------ ------ ------ ------ ------

SPRAY DRIER SYSTEM 10.11.17 ------ ------ ------ ------ 13.00 ------

4 OF ANTRACOL PLANT

28.11.17 ------ ------ ------ ------ 17.00 ------

Formulation plant (ULALA) Shut down ------ ------ ------ ------ ------ ------

5 Stack attached to VFBD (01.11.17 to 30.11.17

------ ------ ------ ------ ------ ------

Formulation plant (ULALA) Shut down ------ ------ ------ ------ ------ ------

6 Stack attached to ACM Mill (01.11.17 to 30.11.17

------ ------ ------ ------ ------ ------

Sr. AREA IDENTIFICATION DATE OF HCL SO2 NH3

No. SAMPLING 20 mg/Nm3

40 mg/Nm3

30 mg/Nm3

Flonicamide Plant

scrubber, SO2 and HCL 10.11.17 0.84 27.20 ------ ------ ------ ------

1

28.11.17 1.02 18.42 ------ ------ ------ ------

Flonicamide Plant

Scrubber, Ammonia 10.11.17 ------ ------ BDL ------ ------ ------

2

28.11.17 ------ ------ 12.40 ------ ------ ------

OTHER CHEMICAL PLANT :

Sr. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2

No. (STACK) SAMPLING 20 mg/m3

9 mg/m3

175 mg/m3

50 mg/Nm3 150 mg/m3

100 mg/Nm3

IN PCL3 PLANT STACK 10.11.17 0.74 BDL ------ ------ ------ ------

1 ATTACHED TO

STORAGE SCRUBBER 28.11.17 2.30 BDL ------ ------ ------ ------

SPRAY DRIER SYSTEM 10.11.17 ------ ------ ------ ------ 13.00 ------

2 OF CACL2 PLANT

28.11.17 ------ ------ ------ ------ 20.90 ------

STACK ATTACHED TO

3 BOILER B5 GT-8460 10.11.17 ------ ------ ------ 14.40 15.80 2.70

4 BOILER B6 GT-9099 10.11.17 ------ ------ ------ 19.30 48.70 26.10

5 BOILER B7 GT-3515 10.11.17 ------ ------ ------ ------ ------ ------

Not in operation

ALL THE PARAMETERS ARE WITHIN THE LIMITS

STACK MONITORING REPORT

Page 24: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 24 of 71

F/QA/003

MONTH : DEC-2017

PESTICIDES AND PESTICIDE INTERMEDIATES PLANT :

Sr. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2

No. (STACK) SAMPLING 20 mg/Nm3

9 mg/Nm3

175 mg/Nm3

50 mg/Nm3 20 mg/Nm3

100 mg/Nm3

TMP PLANT VENT OF 16.12.17 ------ BDL BDL ------ ------ ------

1 SCRUBBER ATTACHED

TO R-901 AND R-902 28.12.17 ------ BDL BDL ------ ------ ------

MANCOZEB PLANT(New) 11.12.17 ------ ------ ------ ------ BDL ------

2 WET SCRUBBER SPRAY

DRIER (Mojj) 22.12.17 ------ ------ ------ ------ BDL ------

MANCOZEB PLANT(Old) Not in operation ------ ------ ------ ------ ------ ------

3 SPD WET SCRUBBER 01.12.17 to 31.12.17

OUTLET ( L&T)

SPRAY DRIER SYSTEM 11.12.17 ------ ------ ------ ------ 15.00 ------

4 OF ANTRACOL PLANT

22.12.17 ------ ------ ------ ------ 12.00 ------

Formulation plant (ULALA) Shut down ------ ------ ------ ------ ------ ------

5 Stack attached to VFBD 01.12.17 to 31.12.17

------ ------ ------ ------ ------ ------

Formulation plant (ULALA) Shut down ------ ------ ------ ------ ------ ------

6 Stack attached to ACM Mill 01.12.17 to 31.12.17

------ ------ ------ ------ ------ ------

Sr. AREA IDENTIFICATION DATE OF HCL SO2 NH3

No. SAMPLING 20 mg/Nm3

40 mg/Nm3

30 mg/Nm3

Flonicamide Plant

scrubber, SO2 and HCL 16.12.17 BDL BDL ------ ------ ------ ------

1

28.12.17 0.14 3.80 ------ ------ ------ ------

Flonicamide Plant

Scrubber, Ammonia 16.12.17 ------ ------ 26.00 ------ ------ ------

2

28.12.17 ------ ------ 21.00 ------ ------ ------

OTHER CHEMICAL PLANT :

Sr. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2

No. (STACK) SAMPLING 20 mg/m3

9 mg/m3

175 mg/m3

50 mg/Nm3 150 mg/m3

100 mg/Nm3

IN PCL3 PLANT STACK 11.12.17 2.32 BDL ------ ------ ------ ------

1 ATTACHED TO

STORAGE SCRUBBER 28.12.17 0.10 BDL ------ ----- ------ ------

SPRAY DRIER SYSTEM 15.12.17 ------ ------ ------ ------ 20.20 ------

2 OF CACL2 PLANT

29.12.17 ------ ------ ------ ------ 17.10 ------

STACK ATTACHED TO

3 BOILER B5 GT-8460 11.12.17 ------ ------ ------ 15.60 8.40 3.10

4 BOILER B6 GT-9099 11.12.17 ------ ------ ------ 20.30 41.70 23.60

5 BOILER B7 GT-3515 11.12.17 ------ ------ ------ ------ ------ ------

Not in operation

ALL THE PARAMETERS ARE WITHIN THE LIMITS

STACK MONITORING REPORT

Page 25: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 25 of 71

Annexure 4 AMBIENT AIR MONITORING - (UPL INTERNAL LAB ANALYSIS REPORTS)

AMBIENT AIR MONITORING REPORT MONTH:JUL-2017

PM 2.5 AMMON

IA

CL2 HCL NOX SO2

LIMITS --> 60 400 100 200 80 80

Microg/

m3 Microg/

m3 Microg/

m3 Microg/

m3 Microg/

m3 Microg/m3

LOCATION DATE

NEAR MAIN GATE 03.07.17 41 9 BDL BDL 8 --

NEAR MAIN GATE 05.07.17 46 7 BDL BDL -- 9

NEAR MAIN GATE 07.07.17 42 BDL BDL 2 7 --

NEAR MAIN GATE 10.07.17 35 BDL BDL BDL -- 9

NEAR MAIN GATE 12.07.17 39 5 BDL BDL 5 --

NEAR MAIN GATE 15.07.17 43 BDL BDL BDL -- 10

NEAR MAIN GATE 17.07.17 32 7 BDL BDL 5 --

NEAR MAIN GATE 24.07.17 38 BDL BDL BDL -- 6

NEAR MAIN GATE 27.07.17 31 BDL BDL BDL 3 --

NEAR MAIN GATE 30.07.17 40 6 BDL BDL -- 8

Maximu

m 46 9 BDL 2 8 10

Minimum 31 BDL BDL BDL 3 6

Average 39 7 BDL 2 6 8

%Deviati

on Nil Nil Nil Nil Nil Nil

All the parameters are within the limits

Page 26: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 26 of 71

AMBIENT AIR MONITORING REPORT MONTH:JUL-2017

PM 10

AMMON

IA CL2 HCL NOX SO2

LIMITS --> 100 400 100 200 80 80

Microg/

m3 Microg/

m3 Microg/

m3 Microg/

m3 Microg/

m3 Microg/

m3

LOCATION DATE

B/H CACL2 PLANT 03.07.17 72 48 6 20 19 --

B/H CACL2 PLANT 05.07.17 84 30 7 8 -- 14

B/H CACL2 PLANT 07.07.17 69 35 4 11 15 --

B/H CACL2 PLANT 10.07.17 80 37 BDL BDL -- 28

B/H CACL2 PLANT 12.07.17 74 29 5 BDL 14 --

B/H CACL2 PLANT 15.07.17 70 44 BDL BDL -- 28

B/H CACL2 PLANT 17.07.17 68 55 4 17 15 --

B/H CACL2 PLANT 24.07.17 62 27 5 BDL -- 21

B/H CACL2 PLANT 27.07.17 66 28 5 BDL 12 --

B/H CACL2 PLANT 30.07.17 72 24 BDL BDL -- 24

Maximu

m 84 55 7 20 19 28

Minimum 62 24 BDL BDL 12 14

Average 72 36 5 14 15 23

%Deviati

on Nil Nil Nil Nil Nil Nil

All the parameters are within the limits

Page 27: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 27 of 71

AMBIENT AIR MONITORING REPORT MONTH:JUL-2017

PM 10

PM 2.5 AMMON

IA CL2 HCL NOX SO2

LIMITS --> 100 60 400 100 200 80 80

Microg/

m3 Microg/

m3 Microg/

m3 Microg/

m3 Microg/

m3 Microg/m

3 Microg

/m3

LOCATION DATE

B/H BREQUATING PLANT

03.07.17 74 40 17 9 13 16 --

B/H BREQUATING PLANT

05.07.17 79 -- 19 8 11 -- 18

B/H BREQUATING PLANT

07.07.17 76 -- 13 BDL 12 14 --

B/H BREQUATING PLANT

10.07.17 61 32 10 BDL BDL -- 24

B/H BREQUATING

PLANT 12.07.17 77 -- 12 BDL BDL 14 --

B/H BREQUATING

PLANT 15.07.17 71 -- 15 3 6 -- 20

B/H BREQUATING PLANT

17.07.17 64 35 14 6 10 12 --

B/H BREQUATING PLANT

24.07.17 68 37 10 4 BDL -- 20

B/H BREQUATING PLANT

27.07.17 69 -- 12 7 BDL 16 --

B/H BREQUATING PLANT

30.07.17 60 -- 7 BDL 8 -- 22

Maximu

m 79 40 19 9 13 16 24

Minimum 60 32 7 BDL BDL 12 18

Average 70 36 13 6 10 14 21

%Deviati

on Nil Nil Nil Nil Nil Nil Nil

All the parameters are within the limits

Page 28: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 28 of 71

AMBIENT AIR MONITORING REPORT

MONTH:AUG-2017

PM 2.5 AMMO

NIA

CL2 HCL NOX SO2

LIMITS --> 60 400 100 200 80 80

Microg/

m3

Microg/

m3

Microg/

m3

Microg/

m3

Microg/

m3

Microg/

m3

LOCATION DATE

NEAR MAIN GATE 03.08.17 32 BDL BDL BDL 6 --

NEAR MAIN GATE 05.08.17 40 BDL BDL BDL -- 5

NEAR MAIN GATE 08.08.17 49 3 BDL BDL 5

NEAR MAIN GATE 10.08.17 44 4 BDL BDL -- 9

NEAR MAIN GATE 12.08.17 37 3 BDL BDL 6 --

NEAR MAIN GATE 15.08.17 45 BDL BDL BDL -- 4

NEAR MAIN GATE 17.08.17 42 6 BDL BDL 8 --

NEAR MAIN GATE 24.08.17 38 BDL BDL BDL -- 5

NEAR MAIN GATE 27.08.17 46 BDL BDL 4 11 --

NEAR MAIN GATE 30.08.17 48 3 2 3 -- 9

Maximu

m 49 6 2 4 11 9

Minimu

m 32 BDL BDL BDL 5 4

Average 42 1.9 0.2 1 7 6

%Devia

tion Nil Nil Nil Nil Nil Nil

All the parameters are within the limits

Page 29: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 29 of 71

AMBIENT AIR MONITORING REPORT

MONTH:AUG-2017

PM 10

AMMO

NIA CL2 HCL NOX SO2

LIMITS --> 100 400 100 200 80 80

Microg/

m3

Microg/

m3

Microg/

m3

Microg/

m3

Microg/

m3

Microg/

m3

LOCATION DATE

B/H CACL2 PLANT 03.08.17 67 20 BDL BDL 16 --

B/H CACL2 PLANT 05.08.17 52 10 BDL 5 -- 20

B/H CACL2 PLANT 08.08.17 53 11 BDL 4 12 --

B/H CACL2 PLANT 10.08.17 72 18 BDL 10 -- 24

B/H CACL2 PLANT 12.08.17 62 15 5 7 19

B/H CACL2 PLANT 15.08.17 74 10 BDL 8 -- 18

B/H CACL2 PLANT 17.08.17 70 25 BDL 13 13 --

B/H CACL2 PLANT 24.08.17 61 15 4 BDL -- 25

B/H CACL2 PLANT 27.08.17 71 13 4 6 17 --

B/H CACL2 PLANT 30.08.17 69 8 BDL 5 -- 16

Maximu

m 74 25 5 13 19 25

Minimu

m 52 8 BDL BDL 12 16

Average 65 15 4 7 15 21

%Devia

tion Nil Nil Nil Nil Nil Nil

All the parameters are within the limits

Page 30: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 30 of 71

AMBIENT AIR MONITORING REPORT

MONTH:AUG-2017

PM 10

PM 2.5 AMMO

NIA CL2 HCL NOX SO2

LIMITS --> 100 60 400 100 200 80 80

Microg/

m3

Microg/

m3

Microg/

m3

Microg/

m3

Microg/

m3

Microg/

m3

Microg/

m3

LOCATION DATE

B/H BREQUATING

PLANT 03.08.17 72 44 9 5 BDL 18 --

B/H BREQUATING

PLANT 05.08.17 56 30 13 3 12 -- 15

B/H BREQUATING

PLANT 07.08.17 64 -- 6 3 9 13 --

B/H BREQUATING

PLANT 10.08.17 81 34 10 10 BDL -- 25

B/H BREQUATING

PLANT 12.08.17 60 -- 9 BDL 10 14 --

B/H BREQUATING

PLANT 15.08.17 61 -- 10 2 6 -- 18

B/H BREQUATING

PLANT 17.08.17 65 40 10 5 7 15 --

B/H BREQUATING

PLANT 24.08.17 74 42 8 BDL 7 -- 24

B/H BREQUATING

PLANT 27.08.17 74 -- 7 BDL BDL 21 --

B/H BREQUATING

PLANT 30.08.17 73 -- 12 BDL BDL -- 20

Maximu

m 81 44 13 10 12 21 25

Minimu

m 56 30 6 BDL BDL 13 15

Average 68 38 9 5 9 16 20

%Devia

tion Nil Nil Nil Nil Nil Nil Nil

All the parameters are within the limits

Page 31: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 31 of 71

AMBIENT AIR MONITORING REPORT

MONTH:SEP-2017

PM 2.5 AMMO

NIA

CL2 HCL NOX SO2

LIMITS --> 60 400 100 200 80 80

Microg/

m3

Microg/

m3

Microg/

m3

Microg/

m3

Microg/

m3

Microg/

m3

LOCATION DATE

NEAR MAIN GATE 03.09.17 35 BDL BDL BDL 12 --

NEAR MAIN GATE 06.09.17 31 BDL BDL BDL -- 10

NEAR MAIN GATE 08.09.17 51 BDL BDL BDL 9 ---

NEAR MAIN GATE 10.09.17 48 BDL BDL BDL -- 12

NEAR MAIN GATE 13.09.17 36 BDL BDL BDL 11 ---

NEAR MAIN GATE 17.09.17 41 BDL 2 4 -- 9

NEAR MAIN GATE 20.09.17 38 BDL BDL BDL 14 ---

NEAR MAIN GATE 25.09.17 48 BDL 2 5 -- 17

NEAR MAIN GATE 28.09.17 36 BDL BDL BDL 8 --

NEAR MAIN GATE 30.09.17 32 BDL BDL BDL -- --

Maximu

m 51 BDL 2 5 14 17

Minimu

m 31 BDL BDL BDL 8 9

Average 40 BDL 2 5 11 12

%Devia

tion Nil Nil Nil Nil Nil Nil

All the parameters are within the limits

Page 32: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 32 of 71

AMBIENT AIR MONITORING REPORT

MONTH:SEP-2017

PM 10

AMMO

NIA CL2 HCL NOX SO2

LIMITS --> 100 400 100 200 80 80

Microg/

m3

Microg/

m3

Microg/

m3

Microg/

m3

Microg/

m3

Microg/

m3

LOCATION DATE

B/H CACL2 PLANT 03.09.17 72 48 6 20 19 --

B/H CACL2 PLANT 06.09.17 52 10 BDL 5 -- 20

B/H CACL2 PLANT 08.09.17 68 17 4 10 16 --

B/H CACL2 PLANT 10.09.17 72 12 BDL 2 -- 24

B/H CACL2 PLANT 13.09.17 78 26 5 BDL 15

B/H CACL2 PLANT 17.09.17 62 27 5 BDL -- 21

B/H CACL2 PLANT 20.09.17 70 10 5 BDL 18 --

B/H CACL2 PLANT 25.09.17 70 25 BDL 13 -- 20

B/H CACL2 PLANT 28.09.17 49 13 BDL 8 22 --

B/H CACL2 PLANT 30.09.17 74 31 BDL 7 .-- 15

Maximu

m 78 48 6 20 22 24

Minimu

m 49 10 BDL BDL 15 15

Average 67 22 5 9 18 20

%Devia

tion Nil Nil Nil Nil Nil Nil

All the parameters are within the limits

Page 33: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 33 of 71

AMBIENT AIR MONITORING REPORT

MONTH:SEP-2017

PM 10

PM 2.5 AMMO

NIA CL2 HCL NOX SO2

LIMITS --> 100 60 400 100 200 80 80

Microg/

m3

Microg/

m3

Microg/

m3

Microg/

m3

Microg/

m3

Microg/

m3

Microg/

m3

LOCATION DATE

B/H BREQUATING

PLANT 03.09.17 78 ,-- 13 BDL BDL -- 21

B/H BREQUATING

PLANT 06.09.17 62 28 14 BDL BDL 18 --

B/H BREQUATING

PLANT 08.09.17 71 35 9 3 5 -- 25

B/H BREQUATING

PLANT 10.09.17 58 34 11 BDL 2 15 --

B/H BREQUATING

PLANT 13.09.17 52 -- 7 5 7 -- 24

B/H BREQUATING

PLANT 17.09.17 74 -- 10 3 BDL 14 --

B/H BREQUATING

PLANT 20.09.17 49 41 7 5 7 -- 24

B/H BREQUATING

PLANT 25.09.17 68 -- 7 BDL BDL 18 --

B/H BREQUATING

PLANT 28.09.17 85 -- BDL 3 5 -- 30

B/H BREQUATING

PLANT 30.09.17 62 -- 16 7 13 19 --

Maximu

m 85 41 16 7 13 19 30

Minimu

m 49 28 BDL BDL BDL 14 21

Average 66 35 10 4 7 17 25

%Devia

tion Nil Nil Nil Nil Nil Nil Nil

All the parameters are within the limits

Page 34: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 34 of 71

AMBIENT AIR MONITORING REPORT MONTH:OCT-2017

PM 2.5 AMMON

IA CL2 HCL NOX SO2

LIMITS --> 60 400 100 200 80 80

Microg/

m3 Microg/

m3 Microg/

m3 Microg/

m3 Microg/

m3 Microg/

m3

LOCATION DATE

NEAR MAIN GATE 04.10.17 36 BDL BDL BDL -- 6

NEAR MAIN GATE 07.10.17 35 BDL BDL 3 7 --

NEAR MAIN GATE 10.10.17 32 2 BDL 5 -- 9

NEAR MAIN GATE 13.10.17 46 5 BDL BDL 6

NEAR MAIN GATE 16.10.17 57 BDL BDL BDL -- 8

NEAR MAIN GATE 21.10.17 51 BDL BDL BDL 9 --

NEAR MAIN GATE 23.10.17 56 BDL BDL BDL -- 4

NEAR MAIN GATE 25.10.17 32 2 BDL BDL 8 --

NEAR MAIN GATE 28.10.17 47 BDL BDL 3 -- 10

NEAR MAIN GATE 31.1017 44 BDL BDL BDL 8 --

Maximu

m 57 5 BDL 5 9 10

Minimum 32 BDL BDL BDL 6 4

Average 44 3 BDL 4 8 7

%Deviati

on Nil Nil Nil Nil Nil Nil

All the parameters are within the limits

Page 35: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 35 of 71

AMBIENT AIR MONITORING REPORT MONTH:OCT-2017

PM 10

AMMON

IA CL2 HCL NOX SO2

LIMITS --> 100 400 100 200 80 80

Microg/

m3 Microg/

m3 Microg/

m3 Microg/

m3 Microg/

m3 Microg/

m3

LOCATION DATE

B/H CACL2 PLANT 04.10.17 52 21 3 12 -- 26

B/H CACL2 PLANT 07.10.17 49 13 BDL 8 21 --

B/H CACL2 PLANT 10.10.17 68 17 BDL 9 -- 27

B/H CACL2 PLANT 13.10.17 56 28 2 12 15 --

B/H CACL2 PLANT 16.10.17 76 19 3 11 -- 17

B/H CACL2 PLANT 21.10.17 70 12 1 5 21 --

B/H CACL2 PLANT 23.10.17 67 37 BDL 7 -- 15

B/H CACL2 PLANT 25.10.17 62 18 BDL 6 12 --

B/H CACL2 PLANT 28.10.17 70 44 BDL BDL -- 28

B/H CACL2 PLANT 31.1017 55 29 BDL BDL 12 --

Maximu

m 76 44 3 12 21 28

Minimum 49 12 BDL BDL 12 15

Average 63 24 2 9 16 23

%Deviati

on Nil Nil Nil Nil Nil Nil

All the parameters are within the limits

Page 36: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 36 of 71

AMBIENT AIR MONITORING REPORT MONTH:OCT-2017

PM 10

PM 2.5 AMMON

IA CL2 HCL NOX SO2

LIMITS --> 100 60 400 100 200 80 80

Microg/

m3 Microg/

m3 Microg/

m3 Microg/

m3 Microg/

m3 Microg/

m3 Microg/

m3

LOCATION DATE

B/H BREQUATING PLANT

04.10.17 59 36 6 1 4 10 --

B/H BREQUATING PLANT

07.10.17 61 -- 10 BDL 6 -- 18

B/H BREQUATING PLANT

10.10.17 71 42 9 BDL 11 -- 16

B/H BREQUATING PLANT

13.10.17 76 -- 14 3 BDL 18

B/H BREQUATING

PLANT 16.10.17 76 58 BDL BDL 9 6 --

B/H BREQUATING

PLANT 21.10.17 79 49 7 3 7 -- 21

B/H BREQUATING PLANT

23.10.17 65 35 11 BDL BDL 20 --

B/H BREQUATING PLANT

25.10.17 71 -- 15 BDL BDL -- 20

B/H BREQUATING PLANT

28.10.17 68 -- 7 BDL BDL 18

B/H BREQUATING PLANT

31.1017 81 39 BDL BDL 8 -- 16

Maximu

m 81 58 15 3 11 20 21

Minimum 59 35 BDL BDL BDL 6 16

Average 71 43 10 2 8 14 18

%Deviati

on Nil Nil Nil Nil Nil Nil Nil

All the parameters are within the limits

Page 37: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 37 of 71

AMBIENT AIR MONITORING REPORT MONTH:NOV-2017

PM 2.5 AMMONI

A CL2 HCL NOX SO2

LIMITS --> 60 400 100 200 80 80

Microg/m3 Microg/

m3 Microg/

m3 Microg/

m3 Microg/

m3 Microg/m3

LOCATION

DATE

NEAR MAIN GATE 03.11.17 48 BDL BDL BDL -- 9

NEAR MAIN GATE 06.11.17 28 4 BDL BDL 5 --

NEAR MAIN GATE 08.11.17 27 BDL BDL BDL -- 8

NEAR MAIN GATE 10.11.17 36 BDL BDL 5 8 --

NEAR MAIN GATE 13.11.17 29 BDL BDL 4 -- 9

NEAR MAIN GATE 16.11.17 57 BDL BDL BDL -- 8

NEAR MAIN GATE 18.11.17 43 BDL BDL BDL 4 --

NEAR MAIN GATE 20.11.17 33 4 BDL BDL -- 7

NEAR MAIN GATE 22.11.17 56 BDL BDL BDL 10 --

NEAR MAIN GATE 26.11.17 39 BDL BDL BDL -- 10

NEAR MAIN GATE 30.11.17 30 5 BDL 5 6 --

Maximum 57 5 BDL 5 10 10

Minimum 27 BDL BDL BDL 4 7

Average 39 4 BDL 5 6 9

%Deviatio

n Nil Nil Nil Nil Nil Nil

All the parameters are within the limits

Page 38: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 38 of 71

AMBIENT AIR MONITORING REPORT MONTH:NOV-2017

PM 10 AMMONI

A CL2 HCL NOX SO2

LIMITS --> 100 400 100 200 80 80

Microg/m3 Microg/

m3 Microg/

m3 Microg/

m3 Microg/

m3 Microg/m3

LOCATION DATE

B/H CACL2 PLANT 03.11.17 77 13 BDL 9 -- 15

B/H CACL2 PLANT 06.11.17 57 7 BDL 4 19 --

B/H CACL2 PLANT 08.11.17 58 18 3 BDL -- 18

B/H CACL2 PLANT 10.11.17 61 17 BDL 9 21 --

B/H CACL2 PLANT 13.11.17 49 13 BDL 8 -- 15

B/H CACL2 PLANT 16.11.17 83 19 3 11 -- 18

B/H CACL2 PLANT 18.11.17 55 13 BDL BDL 12 --

B/H CACL2 PLANT 20.11.17 62 15 5 7 -- 15

B/H CACL2 PLANT 22.11.17 70 22 BDL 5 14 --

B/H CACL2 PLANT 26.11.17 57 9 BDL 7 -- 18

B/H CACL2 PLANT 30.11.17 53 10 BDL 5 17 --

Maximum 83 22 5 11 21 18

Minimum 49 7 BDL BDL 12 15

Average 62 14 4 7 17 17

%Deviatio

n Nil Nil Nil Nil Nil Nil

All the parameters are within the limits

Page 39: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 39 of 71

AMBIENT AIR MONITORING REPORT MONTH : NOV 2017

PM 10 PM 2.5 AMMONI

A CL2 HCL NOX SO2

LIMITS --> 100 60

400 100 200 80 80

Microg/m3 Microg/

m3 Microg/

m3 Microg/

m3 Microg/

m3 Microg/m3 Microg/m3

LOCATION DATE

B/H BREQUATING PLANT

03.11.17 78 58 6 1 4 -- 10

B/H BREQUATING PLANT

06.11.17 60 37 5 BDL BDL 15 --

B/H BREQUATING PLANT

08.11.17 74 -- 6 BDL 3 -- 12

B/H BREQUATING PLANT

10.11.17 84 58 9 BDL 11 6 --

B/H BREQUATING PLANT

13.11.17 61 -- BDL BDL 6 -- 10

B/H BREQUATING PLANT

16.11.17 61 46 BDL BDL 9 -- 9

B/H BREQUATING PLANT

18.11.17 75 -- BDL BDL 8 11 --

B/H BREQUATING PLANT

20.11.17 65 -- 7 BDL BDL -- 15

B/H BREQUATING PLANT

23.11.17 77 59 4 1 7 9 --

B/H BREQUATING PLANT

26.11.17 58 24 BDL BDL BDL -- 12

B/H BREQUATING PLANT

30.11.17 38 20 BDL BDL BDL 7 --

Maximum 84 59 9 1 11 15 15

Minimum 38 20 BDL BDL BDL 6 9

Average 66 43 6 1 7 10 11

%Deviatio

n Nil Nil Nil Nil Nil Nil Nil

All the parameters are within the limits

Page 40: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 40 of 71

AMBIENT AIR MONITORING REPORT MONTH:DEC-2017

PM 2.5 AMMON

IA CL2 HCL NOX SO2

LIMITS --> 60 400 100 200 80 80

Microg/

m3 Microg/

m3 Microg/

m3 Microg/

m3 Microg/

m3 Microg/

m3

LOCATION DATE

NEAR MAIN GATE 03.12.17 36 BDL BDL BDL -- 5

NEAR MAIN GATE 06.12.17 32 BDL BDL BDL 8 --

NEAR MAIN GATE 09.12.17 46 BDL BDL BDL -- 12

NEAR MAIN GATE 12.12.17 34 BDL BDL 5 6 --

NEAR MAIN GATE 15.12.17 39 BDL BDL 4 -- 10

NEAR MAIN GATE 18.12.17 43 BDL BDL BDL 9 --

NEAR MAIN GATE 21.12.17 35 BDL BDL BDL -- 7

NEAR MAIN GATE 25.12.17 41 BDL BDL 4 12 --

NEAR MAIN GATE 28.12.17 53 BDL BDL 3 -- 15

NEAR MAIN GATE 31.12.17 29 BDL BDL BDL 11 --

Maximu

m 53 0 BDL 5 12 15

Minimum 29 BDL BDL BDL 6 5

Average 39 BDL BDL 4 9 10

%Deviati

on Nil Nil Nil Nil Nil Nil

All the parameters are within the limits

Page 41: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 41 of 71

AMBIENT AIR MONITORING REPORT MONTH:DEC-2017

PM 10

AMMON

IA CL2 HCL NOX SO2

LIMITS --> 100 400 100 200 80 80

Microg/

m3 Microg/

m3 Microg/

m3 Microg/

m3 Microg/

m3 Microg/

m3

LOCATION DATE

B/H CACL2 PLANT 03.12.17 74 10 BDL 8 -- 15

B/H CACL2 PLANT 06.12.17 69 7 BDL 4 16 --

B/H CACL2 PLANT 09.12.17 52 21 3 BDL -- 22

B/H CACL2 PLANT 12.12.17 60 18 BDL 9 20 --

B/H CACL2 PLANT 15.12.17 54 12 BDL 8 -- 13

B/H CACL2 PLANT 18.12.17 48 20 3 12 17 --

B/H CACL2 PLANT 21.12.17 30 26 BDL 7 -- 18

B/H CACL2 PLANT 25.12.17 36 32 BDL BDL 21 --

B/H CACL2 PLANT 28.12.17 42 21 BDL BDL -- 15

B/H CACL2 PLANT 31.12.17 49 24 BDL 4 19 --

Maximu

m 74 32 3 12 21 22

Minimum 30 7 BDL BDL 16 13

Average 51 19 3 7 19 17

%Deviati

on Nil Nil Nil Nil Nil Nil

All the parameters are within the limits

Page 42: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 42 of 71

AMBIENT AIR MONITORING REPORT MONTH:DEC-2017

PM 10

PM 2.5 AMMON

IA CL2 HCL NOX SO2

LIMITS --> 100 60 400 100 200 80 80

Microg/

m3 Microg/

m3 Microg/

m3 Microg/

m3 Microg/

m3 Microg/

m3 Microg/

m3

LOCATION DATE

B/H BREQUATING PLANT

03.12.17 72 44 BDL BDL 5 -- 18

B/H BREQUATING PLANT

06.12.17 62 32 BDL BDL BDL 15 --

B/H BREQUATING PLANT

09.12.17 68 -- BDL BDL 4 -- 12

B/H BREQUATING PLANT

12.12.17 82 39 4 BDL BDL 13 --

B/H BREQUATING

PLANT 15.12.17 63 -- BDL BDL 6 -- 15

B/H BREQUATING

PLANT 18.12.17 60 47 BDL BDL 8 9 --

B/H BREQUATING PLANT

21.12.17 48 -- BDL BDL BDL -- 22

B/H BREQUATING PLANT

25.12.17 49 24 BDL BDL 4 21 --

B/H BREQUATING PLANT

28.12.17 31 -- BDL BDL BDL -- 16

B/H BREQUATING PLANT

31.12.17 38 21 BDL BDL BDL 16 --

Maximu

m 82 47 4 0 8 21 22

Minimum 31 21 BDL BDL BDL 9 12

Average 57 35 4 BDL 5 15 17

%Deviati

on Nil Nil Nil Nil Nil Nil Nil

All the parameters are within the limits

Page 43: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 43 of 71

AMBIENT AIR ANALYSIS REPORT (BY BHARUCH ENVIRO INFRASTRUCTURE LTD)

JULY TO DECEMBER 2017

MONTH LOCATION DATE OF

SAMPLING

PM 10 PM 2.5

SOx NOx HCL CL2 NH3 H.C. H2S CO

100 µg /m3

60 µg /m3

80 µg /m3

80 µg /m3

200 µg /m3

100 µg /m3

400 µg /m3

160 µg /m3

500 µg /m3 2000

µg /m3

July 17 Near ETP 04-07-2017 87 44 30 19 26 7 94 BDL BDL BDL Aug 17 Near ETP 04-08-2017 56 30 26.8 15.3 12 3 55 BDL BDL BDL Sep 17 Near ETP 19-09-2017 36.7 21 25 17.8 8 BDL 48 BDL BDL BDL

Oct’17

Near Utility Office

04-10-2017 49.2 24.5 15.3 21.7 8.3 BDL 12.8

BDL BDL BDL

Nov'17

Near Utility Office

10-11-2017 36.7 21 25.4 17.8 8 BDL 48

BDL BDL BDL

Dec`17

Near Utility Office

11-12-2017 30.4 19.3 22.1 16.3 2.1 BDL 34

BDL BDL BDL

Page 44: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 44 of 71

Annexure - 5 FUGITIVE EMISSIONS REPORT

FUGITIVE EMISSIONS REPORT ( Form no:37)

MONTH : JULY-2017

SR. PLANT AREA Date : 07.07.17 Date : 24.07.17

NO. IDENTIFICATION Parameter &

Limit

Time : 15.00 TO 16.00

Time : 15.30 TO 16.30

1.A MCP PLANT Near Chlorine tonner area CHLORINE TLV = 0.5

ppm BDL BDL

2.A AMMONIA

PLANT RVDF Gfloor Area AMMONIA TLV=25 PPM

5.00 7.00

2.B High way side(Near boundry) 1.00 2.00

2.C Behind Cacl2 plant 2.00 2.00

3.A MANCOZEB

PLANT During Cs2 Tanker unloading

CARBON DISULPHIDE TLV=10 PPM

BDL BDL

3.B Near ST-702A BDL BDL

3.C Near D-14 Tank BDL BDL

3.D Near P-14 Tank BDL BDL

3.E Mancozeb Packing Area 2.00 2.00

3.F Mancozeb Storage Godown BDL BDL

Remark : All parameter passes as per requirement.

FUGITIVE EMISSIONS REPORT ( Form no:37)

MONTH : AUG-2017

SR. PLANT AREA Parameter &

Limit

Date : 16.08.17

Date : 28.08.17

NO. IDENTIFICATION

Time : 11.30 TO 12.30

Time : 16.00 TO 17.30

1.A MCP PLANT Near Chlorine tonner area CHLORINE TLV = 0.5 ppm

BDL BDL

2.A AMMONIA

PLANT RVDF Gfloor Area AMMONIA

TLV=25 PPM

5.00 2.50

2.B High way side(Near boundry) 2.00 2.00

2.C Behind Cacl2 plant 2.00 1.00

3.A MANCOZEB

PLANT During Cs2 Tanker unloading

CARBON DISULPHIDE TLV=10 PPM

BDL BDL 3.B Near ST-702A BDL BDL 3.C Near D-14 Tank BDL BDL 3.D Near P-14 Tank BDL BDL 3.E Mancozeb Packing Area 2.00 2.50 3.F Mancozeb Storage Godown BDL BDL

Remark : All parameter passes as per requirement.

Page 45: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 45 of 71

FUGITIVE EMISSIONS REPORT ( Form no:37)

MONTH : SEP-2017

SR. PLANT AREA Parameter &

Limit Date : 09.09.17 Date : 25.09.17

NO. IDENTIFICATION

Time : 11.30 TO 12.30

Time : 16.00 TO 17.00

1.A MCP PLANT Near Chlorine tonner area CHLORINE TLV = 0.5 ppm

BDL BDL

2.A AMMONIA

PLANT RVDF Gfloor Area AMMONIA TLV=25 PPM

5.00 10.00

2.B High way side(Near boundry) 2.00 10.00

2.C Behind Cacl2 plant 1.00 5.00

3.A MANCOZEB

PLANT During Cs2 Tanker unloading

CARBON DISULPHIDE TLV=10 PPM

BDL BDL

3.B Near ST-702A BDL BDL

3.C Near D-14 Tank BDL BDL

3.D Near P-14 Tank BDL BDL

3.E Mancozeb Packing Area 2.00 BDL

3.F Mancozeb Storage Godown BDL BDL

Remark : All parameter passes as per requirement.

FUGITIVE EMISSIONS REPORT ( Form no:37)

MONTH : OCT-2017

SR. PLANT AREA Date : 10.10.2017 Date : 24.10.17

NO. IDENTIFICATION Parameter &

Limit

Time : 14:00 TO 15:00

Time : 11.30 TO 112.30

1.A MCP PLANT Near Chlorine tonner area CHLORINE TLV = 0.5 ppm

BDL BDL

2.A AMMONIA

PLANT RVDF Gfloor Area AMMONIA TLV=25 PPM

10.00 5.00

2.B High way side(Near boundry) 5.00 2.50

2.C Behind Cacl2 plant 5.00 2.50

3.A MANCOZEB

PLANT During Cs2 Tanker unloading

CARBON DISULPHIDE TLV=10 PPM

BDL BDL

3.B Near ST-702A BDL BDL

3.C Near D-14 Tank BDL BDL

3.D Near P-14 Tank BDL BDL

3.E Mancozeb Packing Area BDL <2.5

3.F Mancozeb Storage Godown BDL BDL

Remark : All parameter passes as per requirement.

Page 46: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 46 of 71

FUGITIVE EMISSIONS REPORT ( Form no:37)

MONTH : NOV-2017

SR. PLANT AREA

Parameter & Limit Date : 07.11.2017 Date : 21.11.2017

NO. IDENTIFICATION Time : 11 TO 12:00 Time : 12.00 TO

13.00

1.A MCP PLANT Near Chlorine tonner area CHLORINE TLV = 0.5 ppm

BDL BDL

2.A AMMONIA

PLANT RVDF Gfloor Area AMMONIA

TLV=25 PPM

5.00 2.50

2.B High way side(Near boundry) BDL BDL

2.C Behind Cacl2 plant BDL BDL

3.A MANCOZEB

PLANT During Cs2 Tanker unloading

CARBON DISULPHIDE TLV=10 PPM

BDL BDL

3.B Near ST-702A BDL BDL

3.C Near D-14 Tank BDL BDL

3.D Near P-14 Tank BDL BDL

3.E Mancozeb Packing Area BDL <2.5

3.F Mancozeb Storage Godown BDL BDL

Remark : All parameter passes as per requirement.

FUGITIVE EMISSIONS REPORT ( Form no:37)

MONTH : DEC-2017

SR. PLANT AREA Date : 11.12.2017 Date : 23.12.2017

NO. IDENTIFICATION Time : 12:30 TO 13:30 Time : 12:30 TO 13:30

1.A MCP PLANT Near Chlorine tonner area CHLORINE TLV = 0.5 ppm

BDL BDL

2.A AMMONIA

PLANT RVDF Gfloor Area AMMONIA TLV=25 PPM

2.50 5.00

2.B High way side(Near boundry) 2.50 2.50

2.C Behind Cacl2 plant BDL 2.50

3.A MANCOZEB

PLANT During Cs2 Tanker unloading

CARBON DISULPHIDE TLV=10 PPM

BDL BDL

3.B Near ST-702A BDL BDL

3.C Near D-14 Tank BDL BDL

3.D Near P-14 Tank BDL BDL

3.E Mancozeb Packing Area BDL 2.00

3.F Mancozeb Storage Godown BDL BDL

Remark : All parameter passes as per requirement.

Page 47: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 47 of 71

Annexure - 6

VOC Monitoring Data

Subject Total VOC monitoring analysis data.

Date of Monitoring 13.09.2017

Time 15.30hrs to 17.30.hrs

Location Different Plant & Location at UPL-1

Instrument used On line digital VOC monitoring Instrument of UNIT-02

Instrument operation Operated by Mr. H.J.Patel (Q.A)

Sr.no. Location Parameter Remarks Remarks

1 TMP Plant - Drum filling area Total VOC 2 ppb

2 TMP Plant - Ground floor area Total VOC 1 ppb

3 TMP Plant - First floor area Total VOC BDL

4 TMP Plant - Near Solvent Storage Tank Total VOC BDL

5 MCP Plant – Ground floor back side Total VOC BDL

6 MCP Plant - Ground floor , Centre Total VOC 2 ppb

7 MCP Plant - First floor , Centre Total VOC BDL

8 MCP Plant - Second floor , Centre Total VOC BDL

9 ETP Plant - Near Aer-2 & Aer-3 area Total VOC BDL

10 ETP Plant - Haz.Drum storage area Total VOC BDL

11 Drum storage area, Behind ETP Plant Total VOC 2 ppb

12 Raw material Drum storage area - Pond site Total VOC BDL

13 Pilot plant - Ground floor area Total VOC 4 ppb

14 Pilot plant - First floor area Total VOC 2 ppb

15 Pilot plant - Second floor area, Total VOC 2 ppb

16 Pilot plant - Ground floor area, Methanol Feeding pump Total VOC

BDL

17 FG storage godown Total VOC BDL

18 Drum storage area- Opposite FG godown, near parking Total VOC BDL

19 Main gate Total VOC BDL

20 On Road, Near Boiler Total VOC BDL

21 On Road, Between Antracol plant & Electrical Dept. Total VOC BDL

22 R & D Lab Total VOC BDL

23 Q.A.Lab Total VOC BDL

24 MaxPro Lab Total VOC BDL

Page 48: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 48 of 71

VOC Monitoring Data

Subject Total VOC monitoring analysis data.

Date of Monitoring 26.12.2017

Time 15.30hrs to 17.30.hrs

Location Different Plant & Location at UPL-1

Instrument used On line digital VOC monitoring Instrument of UNIT-02

Instrument operation Operated by Mr. H.J.Patel (Q.A)

Sr.no. Location Parameter Remarks Remarks

1 TMP Plant - Drum filling area Total VOC 2 ppb

2 TMP Plant - Ground floor area Total VOC BDL

3 TMP Plant - First floor area Total VOC BDL

4 TMP Plant - Near Solvent Storage Tank Total VOC BDL

5 MCP Plant – Ground floor back side Total VOC BDL Plant under shutdown

6 MCP Plant - Ground floor , Centre Total VOC BDL Plant under shutdown

7 MCP Plant - First floor , Centre Total VOC BDL Plant under shutdown

8 MCP Plant - Second floor , Centre Total VOC BDL Plant under shutdown

9 ETP Plant - Near Aer-2 & Aer-3 area Total VOC BDL

10 ETP Plant - Haz.Drum storage area Total VOC BDL

11 Drum storage area, Behind ETP Plant Total VOC 1 ppb

12 Raw material Drum storage area - Pond site Total VOC BDL

13 Pilot plant - Ground floor area Total VOC 2 ppb

14 Pilot plant - First floor area Total VOC 2 ppb

15 Pilot plant - Second floor area, Total VOC 2 ppb

16 Pilot plant - Ground floor area, Methanol Feeding pump Total VOC

BDL

17 FG storage godown Total VOC BDL

18 Drum storage area- Opposite FG godown, near parking Total VOC BDL

19 Main gate Total VOC BDL

20 On Road, Near Boiler Total VOC BDL

21 On Road, Between Antracol plant & Electrical Dept. Total VOC BDL

22 R & D Lab Total VOC BDL

23 Q.A.Lab Total VOC BDL

24 MaxPro Lab Total VOC BDL

Page 49: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 49 of 71

Annexure – 7

DETAILS OF GIDC WATER CONSUMPTION & TREATED EFFLUENT DISCHARGED TO FETP, NCT, ANKLESHWAR (INDUSTRIAL + DOMESTIC)

MONTH WATER CONSUMPTION TREATED EFFLUENT DISCHARGE QUANTITY TO FETP, NCT, ANKLESHAWR

ALL QUANTITY IN KL/MONTH

July 17 28641 10113 Aug 17 29711 8718 Sep 17 26578 7306

Oct’17 28655 10283

Nov'17 24077 10025

Dec`17 16706 10556

Annexure – 8

DETAILS OF TREATMENT FOR HIGH TDS EFFLUENT WASTE WATER IN EVAPORATION SYSTEM AND PERMEATE GENERATION FROM WATER RECYCLING SYSTEM (RO)

MONTH

High TDS effluent for evaporation (KL)*

REUSABLE PERMEATE GENERATED FROM RO PLANT**

–KL

July 17 1240.00 0

Aug 17 1190.00 0

Sep 17 950.00 0

Oct’17 185 at Site + 586 KL at BEIL. 0

Nov'17 1551.79 1482

Dec`17 1222.41 2313

Page 50: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 50 of 71

Annexure – 9 DETAILS OF INCINERABLE WASTE - MT

MONTH

OPENING STOCK (MT)

GENERATION DISPOSAL (Total Sent to BEIL)

CLOSING STOCK ORGANIC AQUEOUS

July 17 32.37 71.81 29.69 84.52 49.35 Aug 17 49.35 49.57 40.95 92.52 47.35 Sep 17 47.35 55.00 40.50 108.80 34.05

Oct’17 34.05 75 45 105.31 48.74

Nov'17 48.74 134.06 136.13 293.30 25.63

Dec`17 25.63 118.78 85 202.78 26.63

DETAILS OF SOLID WASTE (LAND FILLING) MONTH Op. Stock GENERATION Solid Cl.

Stock ETP Sludge Salt - Total- construction debris Sent to BEIL

All Quantities in MT

July`17 8.35 35.79 178.09 222.23 0.00 213.88 8.35

Aug`17 8.35 36.00 190.39 234.74 0 222.26 12.48

Sept`17 12.48 38.6 185 236.08 0 227.58 8.5

Oct`17 8.50 34.00 155.25 197.75 1660.87 1847.07 11.55

Nov`17 11.55 41.42 195 247.97 932.6 1158.98 21.59

Dec`17 21.59 34.53 188.88 245.00 0 215.88 29.12

DETAILS OF SOLID WASTE (LANDFILLING)

TOTAL LANDFILL WASTE DETAILS –All Quantities are in MT/Month

MONTH (ETP SLUDGE + SALT)* DCP SLUDGE** NON-RECYCLABLE PLASTIC

WASTE/INSULATION WASTE TOTAL

July 17 213.88 563.02 24.57 801.47 Aug 17 222.26 471.14 40.91 734.31 Sep 17 227.58 670.45 32.84 930.87

Oct’17 1847.07 233.84 22.93 2103.84

Nov'17 1158.98 506.79 34.01 1699.78

Dec`17 215.88 742.30 37.30 995.48

DETAILS OF DCP SLUDGE (BY-PRODUCT / SOLD AS SOIL CONDITIONER & BEIL)

MONTH OPENING

STOCK (MT) GENERATION

(MT)

DISPATCH (MT) CLOSING STOCK (MT)

PARTY* BEIL

July`17 281.96 808 0 563.02 526.94

Aug`17 526.94 600 0 471.14 655.80

Sept`17 655.80 1090 0 670.45 1075.35

Oct`17 814.93 350 0 233.84 931.09

Nov`17 931.09 850 267.49 506.79 1006.81

Dec`17 1006.81 890 759.32 742.3 395.19 (*) Sold as Soil Conditioner to below given end user:

1) G B AGRO Industries, Plot no 1723, GIDC, Panoli, Ankleshwar - 394116.

Page 51: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 51 of 71

Annexure 10 TREATED EFFLUENT ANALYSIS REPORT

(OUR INTERNAL LAB ANALYSIS REPORTS)

TREATED EFFLUENT WATER ANALYSIS REPORT

MONTH : JUL-2017

DATE PH TEMP. TSS TDS BOD COD AMMONI

- Phos- D.O. Chlori- Sulph- Oil &

Phen-

Sulphi-

Cyani-

CAL-N phates des ates Grease Olic des des

G.P.C.B. 5.50

to 40°C 100 2100 30 100 5 4 600 1000 10 1 0.5 0.2

LIMITS 8.50 MAX. mg/l mg/l mg/l mg/l 50 mg/l mg/l mg/l mg/l mg/l mg/l mg/l mg/l mg/l

01.07.2017

8.31 29 30 1800 14 80 BDL 2.8 4.5

02.07.2017

8.20 28 28 1820 10 68 BDL 3.1 4.5

03.07.2017

7.30 29 29 1660 7 56 BDL 3.0 4.6

04.07.2017

7.69 30 32 1740 16 88 7 3.0 4.6

05.07.2017

7.51 30 28 1810 10 68 BDL 3.7 4.6

06.07.2017

7.49 30 24 1850 13 76 BDL 3.4 4.6

07.07.2017

7.71 31 24 1810 10 60 BDL 3.5 4.5 480 802 1 BDL BDL BDL

08.07.2017

8.01 31 28 1760 10 64 3 3.2 4.5

09.07.2017

7.40 30 23 1870 4 36 3 3.8 4.6

10.07.2017

7.50 30 25 1970 8 60 11 3.6 4.5

11.07.2017

8.09 31 28 1900 10 64 BDL 3.2 4.5

12.07.2017

7.38 30 32 1870

15 88 BDL 3.0 4.5

13.07.2017

7.66 32 30 1790 14 72 4 3.4

4.5

14.07.2017

7.92 32 28 1820 17 88 11 3.0 4.6 440 810 BDL BDL BDL BDL

15.07.2017

6.83 29 30 1890 12 72 BDL 3.4

4.5

16.07.2017

7.70 29 31 1730 14 80 3 3.9 4.5

17.07.2017

7.80 29 30 1850 10 52 BDL 3.2 4.6

18.07.2017

7.32 28 32 1810 12 72 18 3.5 4.6

19.07.2017 7.41

29 32 1680 14 80 BDL 3.1 4.6

20.07.2017

7.01 30 28

2020 12 72 21

2.8 4.6

21.07.2017

6.98 29 26 1900 14 76 28 2.7 4.6 549 890 BDL BDL BDL BDL

22.07.2017

7.09 28 30 1750 14 76 28 2.4 4.6

23.07.2017

7.15 28 28 1700 8 56 BDL 2.1 4.6

24.07.2017

7.21 29 26 1640 8 56 BDL 2.2 4.6

Page 52: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 52 of 71

25.07.2017

7.80 29 24 1560 6 40 BDL 2.2 4.6

26.07.2017

7.07 29 25 1770 6 40 BDL 1.9 4.7

27.07.2017

7.19 29 24 1800

8 56 4 2.0 4.7

28.07.2017

7.11 29 22 1810 7 48 BDL 2.6 4.6 520 798 1 BDL BDL BDL

29.07.2017

7.10 28 24 1730 15 84 20 2.8 4.7

30.07.2017

7.40 27 25 1520 10 56 BDL 3.0 4.6

31.07.2017

7.50 28 25 1470 12 68 6 3.1

4.7

PARAM-

PH TEMP. TSS TDS BOD

COD

AMMONI-

PHOSP-

D.O. CHLOR

- SULP- Oil &

Phen-

Sulphi-

Cyani-

ETER CAL N HATES IDES HATE

S Grease Olic des des

AVG 7.48 29 27 1777 11 66 5.39 3.0 4.6 497 825 1 BDL BDL BDL

RANGE (MIN-MAX)

6.83 27 22 1470 4 36 BDL 1.9 4.5 440 798 BDL BDL BDL BDL

8.31 32 32 2020 17 88 28 3.9 4.7 549 890 1 BDL BDL BDL

DATE

Colour

(pt/co)

Total Chromi

um

Copper

Nickel Zinc

Lead

Fluorides

Mercury

Arsenic

Cadmium

Total Resi.

Chlorine

Hexav. Chromi

um

Insecticide/ Pesticides

G.P.C.B.

100 2 2 3 5 0.1 1.5 0.01 0.2 2 1 0.1

Absent

LIMITS Units mg/l mg/

l mg/l

mg/l

mg/l

mg/l mg/l mg/l mg/l mg/l mg/l

Findings

5 BDL 0.001

BDL 0.02

0 BDL NA NA BDL BDL 0.20 BDL BDL

Note : All parameters are within the limit.

BIOASSAY TEST:---

Toxicity factor test study being carried out.Total 10 experiments conducted and observed Tf<2 after 48 hrs.

Page 53: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 53 of 71

TREATED EFFLUENT WATER ANALYSIS REPORT

MONTH : AUG-2017

DATE PH TEMP. TSS TDS BOD COD

AMMONI-

Phos- D.O. Chlori- Sulph- Oil & Phen

- Sulphi

- Cyani

-

CAL-N phates des ates Grease Olic des des

G.P.C.B. 5.50

to 40°C 100 2100 30 100 5 4 600 1000 10 1 0.5 0.2

LIMITS 8.50 MAX. mg/l mg/l mg/l mg/

l 50 mg/l mg/l mg/l mg/l mg/l mg/l mg/l mg/l mg/l

01.08.2017 8.05 30 24 1860 10 68 10 3.2 4.5

02.08.2017 7.70 29 25 1900 14 76 25 3.4 4.6

03.08.2017 7.70 29 25 1850 8 60 10 3.5 4.5

04.08.2017 7.22 30 22 1740 8 52 8 3.1 4.5

05.08.2017 7.62 31 27 1650 8 48 BDL 3.0 4.6

06.08.2017 7.33 31 26 1420 8 60 6 3.6 4.6

07.08.2017 7.88 31 28 1590 8 52 3 3.9 4.5 497 618 BDL BDL BDL BDL

08.08.2017 7.89 31 27 1600 9 60 6 3.8 4.5

09.08.2017 7.69 31 28 1650 8 52 4 3.2 4.6

10.08.2017 7.76 31 26 1680 9 56 4 3.5 4.4

11.08.2017 7.67 30 25 1830 8 52 3 4.1 4.4

12.08.2017 7.23 31 24 1780 12 72 29 4.0 4.5

13.08.2017 6.80 28 25 1720 6 48 3 3.8 4.4

14.08.2017 8.10 31 28 1640 5 44 8 3.9 4.4 481 664 1 BDL BDL BDL

15.08.2017 7.89 30 24 1520 5 44 3 3.2 4.4

16.08.2017 7.83 30 26 1550 4 40 11 3.1 4.6

17.08.2017 7.50 31 26 1860 5 44 BDL 2.7 4.5

18.08.2017 7.52 31 25 1950 4 36 BDL 2.9 4.4

19.08.2017 7.98 31 22 1960 4 40 BDL 3.0 4.5

20.08.2017 7.86 29 26 1900 5 44 BDL 3.1 4.5

21.08.2017

8.06 30 24 1880 6 48 4 3.2 4.6 550 726 1 BDL BDL BDL

22.08.2017

7.90 28 25 1760 6 48 6 2.9 4.4

23.08.2017

7.69 28 24 1690 7 48 BDL 3.0 4.5

24.08.2017

Discharge stopped

25.08.2017

8.05 30 26 1700 10 60 6 3.5 4.6

26.08.2017

7.65 31 28 1760 6 44 BDL 3.4 4.6

Page 54: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 54 of 71

27.08.2017

7.40 28 26 1820

9 56 8 3.1 4.7

28.08.2017

7.99 30 29 1860 8 48 BDL 3.5 4.6 548 788 BDL BDL BDL BDL

29.08.2017

7.57 30 28 1820 9 52 BDL 3.2 4.7

30.08.2017

7.70 28 27 1950 16 96 13 3.6 4.8

31.08.2017

8.05 29 25 1910 15 96 8 3.6

4.8

PARAM-

PH TEMP. TSS TDS BOD

COD

AMMONI-

PHOSP-

D.O. CHLOR

- SULP- Oil &

Phen-

Sulphi-

Cyani-

ETER CAL N HATE

S IDES

HATES

Grease Olic des des

AVG 7.71 30 26 1760 8 55 5.74 3.4 4.5 519 699 1 BDL BDL BDL

RANGE (MIN-MAX)

6.80 28 22 1420 4 36 BDL 2.7 4.4 481 618 BDL BDL BDL BDL

8.10 31 29 1960 16 96 29 4.1 4.8 550 788 1 BDL BDL BDL

DATE

Colour

(pt/co)

Total Chromi

um

Copper

Nickel

Zinc

Lead

Fluorides

Mercury

Arsenic

Cadmium

Total Resi.

Chlorine

Hexav. Chromi

um

Insecticide/ Pesticides

G.P.C.B.

100 2 2 3 5 0.1 1.5 0.01 0.2 2 1 0.1

Absent LIMIT

S Units mg/l mg/l mg/l

mg/l

mg/l

mg/l mg/l mg/l mg/l mg/l mg/l

Findings

5 BDL 0.010 BDL 0.050

BDL NA NA BDL BDL 0.20 BDL BDL

Note : All parameters are within the limit.

BIOASSAY TEST:---

Toxicity factor test study being carried out.Total 10 experiments conducted and observed Tf<2 after 48 hrs.

TREATED EFFLUENT WATER ANALYSIS REPORT

MONTH : SEP-2017

DATE PH TEMP. TSS TDS BOD COD AMMON

I- Phos- D.O. Chlori- Sulph- Oil &

Phen-

Sulphi-

Cyani-

CAL-N phates des ates Grease Olic des des

G.P.C.B. 5.50

to 40°C 100 2100 30 100 5 4 600 1000 10 1 0.5 0.2

LIMITS 8.50 MAX. mg/l mg/l mg/l mg/l 50 mg/l mg/l mg/l mg/l mg/l mg/l mg/l mg/l mg/l

01.09.2017

7.94 29 23 1830 13 80 7 2.6 4.7

02.09.2017

8.20 30 28 1860 8 68 BDL 2.70 4.6

03.09.2017

7.54 29 26 1900 10 68 BDL 2.5 4.6

04.09.2017

8.32 29 28 1990 9 52 BDL 2.2 4.5

05.09.2017

7.30 30 26 1940 12 76 BDL 2.4 4.7

Page 55: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 55 of 71

06.09.2017

7.62 30 27 1940 10 60 BDL 3.0 4.6

07.09.2017

7.65 31 30 1950 9 52 BDL 3.4 4.6 510 844 1 BDL BDL BDL

08.09.2017

7.48 31 28 1850 10 64 4 3.9 4.7

09.09.2017

7.70 30 29 1800 6 40 BDL 3.1 4.4

10.09.2017

7.10 31 34 1780 8 72 BDL 3.4 4.6

11.09.2017

7.60 31 27 1810 10 68 6 3.0 4.7

12.09.2017

7.61 31 25 1680 10 68 4 3.1 4.7

13.09.2017

Discharge stopped

14.09.2017

7.18 30 26 1760 14 88 15 3.4 4.8 430 802 1 BDL BDL BDL

15.09.2017

7.25 30 32 1900 96 BDL 3.1 4.7

16.09.2017

7.62 30 29 1880 12 76 BDL 3.2 4.7

17.09.2017

7.52 31 27 1750 13 84 7 3.6 4.8

18.09.2017

7.21 31 24 1840 10 64 BDL 4.0 4.6

19.09.2017

7.23 31 23 1430 12 76 4 4.1 4.7

20.09.2017

8.11 31 25 1420 6 40 BDL 3.3 4.4

21.09.2017

7.20 31 29 1690 80 8 3.9 4.6 509 744 1 BDL BDL BDL

22.09.2017

7.55 30 26 1540 12 72 10 3.7 4.7

23.09.2017

7.30 31 28 1580 12 76 BDL 3.5 4.7

24.09.2017

7.32 31 27 1550 12 76 4 3.2 4.7

25.09.2017

8.30 30 29 1660 8 48 3 2.8 4.4

26.09.2017

Discharge stopped

27.09.2017

7.84 31 28 1690 7 60 BDL 2.4 4.6

28.09.2017

7.86 31 32 1840 16 96 3 2.2 4.8 490 843 BDL BDL BDL BDL

29.09.2017

8.20 31 26 1880 16 96 BDL 2.7 4.7

30.09.2017

8.15 31 26 1750 14 80 BDL 2.9 4.7

PARAM-

PH TEMP. TSS TDS BOD

COD

AMMONI-

PHOSP-

D.O. CHLOR

- SULP- Oil &

Phen-

Sulphi-

Cyani-

ETER CAL N HATE

S IDES

HATES

Grease Olic des des

AVG 7.64 30 27 1768 11 71 2.42 3.1 4.6 485 808 1 BDL BDL BDL

RANGE (MIN-MAX)

7.10 29 23 1420 6 40 BDL 2.2 4.4 430 744 BDL BDL BDL BDL

8.32 31 34 1990 16 96 15 4.1 4.8 510 844 1 BDL BDL BDL

Page 56: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 56 of 71

DATE

Colour

(pt/co)

Total Chromi

um

Copper

Nickel

Zinc

Lead

Fluorides

Mercury

Arsenic

Cadmium

Total Resi.

Chlorine

Hexav. Chromi

um

Insecticide/ Pesticides

G.P.C.B.

100 2 2 3 5 0.1 1.5 0.01 0.2 2 1 0.1

Absent LIMIT

S Units mg/l mg/l mg/l

mg/l

mg/l

mg/l mg/l mg/l mg/l mg/l mg/l

Findings

5 0.002 BDL 0.01

0 0.050

0.010

NA NA BDL BDL 0.20 BDL Absent

Note : All parameters are within the limit.

BIOASSAY TEST:---

Toxicity factor test study being carried out. Total 10 experiments conducted and observed Tf<2 after 48 hrs.

TREATED EFFLUENT WATER ANALYSIS REPORT

MONTH : OCT-2017

DATE PH TEMP. TSS TDS BOD COD

Ammoni- Phos- D.O. Chlori- Sulph- Oil & Phen

- Sulphi

- Cyani

-

cal phates des ates Grease Olic des des

G.P.C.B. 6.50

to 40°C 150

10000

200 100

0 Nitrogen 5 4 1000 1000 10 5 5 0.2

LIMITS 8.50 MAX. mg/l mg/l mg/l mg/

l 50 mg/l mg/l mg/l mg/l mg/l mg/l mg/l mg/l mg/l

01.10.2017

7.88 30 24 2020 10 56 BDL 3.9 4.4

02.10.2017

8.03 31 28 1850 7 40 BDL 3.9 4.3

03.10.2017

7.96 31 27 1820 6 44 BDL 4.1 4.3

04.10.2017

7.92 31 26 1750 7 48 BDL 3.8 4.4

05.10.2017

7.69 31 29 1880 8 52 BDL 3.0 4.4

06.10.2017

7.70 31 34 1900 28 136 BDL 3.4

4.3

07.10.2017

7.91 31 30 2500 30 152 BDL 3.1

4.3 540 894 1 BDL BDL BDL

08.10.2017

7.26 30 26 2480 32 164 BDL 3.0 4.5

09.10.2017

8.22 30 31 2750 24 132 BDL 3.4 4.5

10.10.2017

7.47 31 33 2100 32 180 BDL 3.5 4.6

11.10.2017

8.02 30 29 2630 28 156 BDL 3.2 4.6

12.10.2017

7.53 31 30 2520 29 160 BDL 3.8 4.7

13.10.2017

7.58 30 28 2880 22 120 BDL 3.6 4.50

14.10.2017

7.77 30 29 3010 24 132 BDL 3.2 4.6 590 938 1 BDL BDL BDL

15.10.2017

7.51 31 28 2350 28 156 BDL 3.0 4.6

16.10.2017

7.62 30 30 2038 36 132 BDL 3.5 4.3

Page 57: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 57 of 71

17.10.2017

7.81 30 32 3213 42 231 BDL 3.4 4.3

18.10.2017

7.90 31 28 2650 43 240 BDL 3.1 4.3

19.10.2017

7.84 30 29 3360 40 220 BDL 3.5 4.4

20.10.2017

7.16 30 30 3920 42 232 BDL 3.2 4.4

21.10.2017

7.75 30 28 3370 45 244 10 3.6 4.3 749 970 BDL BDL BDL BDL

22.10.2017

7.61 31 32 3410 32 188 BDL 3.6

4.6

23.10.2017

7.66 30 28 3610 26 142 4 3.6 4.5

24.10.2017

7.56 30 34 4180 28 160 8 3.8 4.6

25.10.2017

8.10 30 32 4220 27 156 4 4.1 4.6

26.10.2017

7.50 30 29 4060 25 140 BDL 4.2 4.60

27.10.2017

7.95 30 30 3660 28 148 BDL 3.9 4.5

28.10.2017

7.43 30 29 3200 32 180 7 3.6 4.6 730 940 2 BDL BDL BDL

29.10.2017

6.92 30 32 3140 28 152 BDL 3.4 4.5

30.10.2017

7.20 30 30 4136 29 156 1 3.0 4.6

31.10.2017

7.14 30 31 4040 30 168 4 2.9

4.5

PARAM-

PH TEMP. TSS TDS BOD

COD

AMMONI-

PHOSP-

D.O. CHLOR

- SULP- Oil &

Phen-

Sulphi-

Cyani-

ETER CAL N HATE

S IDES

HATES

Grease Olic des des

AVG 7.66 30 30 2924 27 149 1.23 3.5 4.5 652 936 1 BDL BDL BDL

RANGE (MIN-MAX)

6.92 30 24 1750 6 40 BDL 2.9 4.3 540 894 BDL BDL BDL BDL

8.22 31 34 4220 45 244 10 4.2 4.7 749 970 2 BDL BDL BDL

DATE

Colour

(pt/co)

Total Chromi

um

Copper

Nickel

Zinc

Lead

Fluorides

Mercury

Arsenic

Cadmium

Total Resi.

Chlorine

Hexav. Chromi

um

Insecticide/ Pesticides

G.P.C.B.

100 2 3 3 15 0.1 15 0.01 0.2 0.05 1 0.1

Absent LIMIT

S Units mg/l mg/l mg/l

mg/l

mg/l

mg/l mg/l mg/l mg/l mg/l mg/l

Findings

5 BDL BDL 0.01

0 0.020

BDL NA NA BDL BDL 0.40 BDL Absent

Note : All parameters are within the limit.

BIOASSAY TEST:---

Toxicity factor test study being carried out.Total 10 experiments conducted and observed Tf<2 after 48 hrs.

Page 58: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 58 of 71

TREATED EFFLUENT WATER ANALYSIS REPORT

MONTH : NOV-2017 (GPCB Consent Amendment implementation H – 88493)

DATE PH TEMP. TSS TDS BOD

COD

Ammoni-

Phos- Total D.O. Chlori- Sulph- Oil & Phen-

Sulphi- Cyani-

cal phate

s Kjeldahl

des ates Grease Olic des des

G.P.C.B.

6.50 to

40°C 150 10000

200 100

0

Nitroge

n 5

Nitogen

4 1000 1000 10 5 5 0.2

LIMITS 8.50 MAX. mg/l mg/l mg/l

mg/l

50 mg/l mg/l 50

mg/l mg/l mg/l mg/l mg/l

mg/l

mg/l mg/l

1.11.2017

7.61 29 30 3930 24 152 4 3.1 17 4.5

2.11.2017

7.49 30 32 3950 28 200 BDL 2.7 28 4.4

3.11.2017

7.51 30 31 3870 34 244 15 2.9 48 4.3

4.11.2017

7.51 30 34 4200 35 252 7 3.0 49 4.6

5.11.2017

7.89 30 33 4020 37 268 17 3.1 48 4.5

6.11.2017

7.64 30 30 4070 29 204 6 3.2 42

4.6

7.11.2017

7.30 30 31 3590 28 188 8 2.9 46

4.6 651 868 2 BDL BDL BDL

8.11.2017

7.23 29 33 4120 28 184 8 3.0 44 4.5

9.11.2017

7.83 29 31 4090 29 192 4 2.8 49 4.4

10.11.2017

7.34 30 30 4070 32 232 8 3.1 46 4.4

11.11.2017

7.46 30 26 4130 26 168 4 3.0 44 4.7

12.11.2017

7.63 29 29 5000 28 180 7 3.0 45 4.6

13.11.2017

7.40 27 32 3900 29 204 20 3.7 48 4.6

14.11.2017

7.34 28 26 4160 23 144 4 4.0 42 4.6 768 970 1 BDL BDL BDL

15.11.2017

7.38 27 28 4090 22 124 3 4.1 43 4.7

16.11.2017

7.36 27 29 4280 25 160 4 3.9 30 4.7

17.11.2017

7.27 27 28 3780 28 176 17 3.4 46 4.6

18.11.2017

7.36 28 32 4420 23 144 3 3.9 44 4.6

19.11.2017

8.08 27 30 4350 22 136 6 4.0 38 4.7

20.11.2017

8.06 29 34 4900 22 136 9 3.9 32 4.7

21.11.2017

7.36 27 32 4120 24 156 4 4.1 34 4.6 780 910 BDL BDL BDL BDL

22.11.2017

7.60 27 34 4210 24 156 4 3.6 44

4.6

23.11.2017

7.17 27 29 4170 25 164 4 3.2 47 4.5

24.11.2017

7.04 29 31 4190 25 164 4 3.0 47 4.6

25.11.2017

7.23 27 28 4200 27 172 3 2.2 46 4.5

Page 59: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 59 of 71

26.11.2017

7.27 27 33 4090 29 192 6 2.4 49 4.5

27.11.2017

7.33 29 29 4090 30 208 BDL 2.9 48 4.6

28.11.2017

7.56 29 32 4420 28 180 BDL 2.8 39 4.5 809 966 1 BDL BDL BDL

29.11.2017

7.31 29 31 4290 25 160 BDL 3.1 42 4.6

30.11.2017

7.70 26 28 4100 22 124 BDL 3.5 40 4.5

PARAM-

PH TEMP. TSS TDS

BOD

COD

AMMONI-

PHOSP-

TOTAL

D.O. CHLO

R- SULP

- Oil &

Phen-

Sulphi- Cyani-

ETER CAL N HATES

KJL N

IDES HATES

Grease

Olic

des des

AVG 7.48 28 31 4160 27 179

5.77 3.3 42 4.6 752 929 1 BDL BDL BDL

RANGE

(MIN-MAX)

7.04 26 26 3590 22 124

BDL 2.2 17 4.3 651 868 BDL BDL BDL BDL

8.08 30 34 5000 37 268

20 4.1 49 4.7 809 970 2 BDL BDL BDL

DATE

Colour (pt/co)

Total Chromium

Copper

Nickel

Zinc

Lead

Fluorides

Mercury

Arsenic

Selenium

Cadmium

Total Resi. Chlorine

Hexav.

Chromium

Iron

Manganese

Insecticide/ Pesticides

G.P.C.B.

100 2 3 3 15 0.1 15 0.01 0.2 0.05 0.05 1 0.1 3.0 2.0 Absent

LIMITS

Units

mg/l mg/l mg/

l mg/l

mg/l

mg/l mg/l mg/l mg/l mg/l mg/l mg/l mg/l

mg/l

Findings

5 0.152 0.03

3 <0.02

0.849

<0.02

<0.05 BDL BDL BDL <0.01 0.40 BDL 0.24

0.11 Absent

Note : All parameters are within the limit.

BIOASSAY TEST:---

Toxicity factor test study being carried out.Total 10 experiments conducted and observed Tf<2 after 48 hrs.

TREATED EFFLUENT WATER ANALYSIS REPORT

MONTH : DEC-2017

DATE PH TEMP. TSS TDS BOD

COD

Ammoni-

Phos- Total D.O. Chlori- Sulph- Oil & Phen-

Sulphi- Cyani-

cal phate

s Kjeldahl

des ates Grease Olic des des

G.P.C.B.

6.50 to

40°C 150 10000

200 100

0

Nitroge

n 5

Nitogen

4 1000 1000 10 5 5 0.2

LIMITS 8.50 MAX. mg/l mg/l mg/l

mg/l

50 mg/l mg/l 50

mg/l mg/l mg/l mg/l mg/l

mg/l

mg/l mg/l

Page 60: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 60 of 71

01.12.2017

7.48 30 24 4600 8 52 BDL 3.4 42 4.7

02.12.2017

7.38 28 25 4644 17 104 BDL 3.8 45 4.6

03.12.2017

7.30 27 29 4656 16 100 BDL 3.6 40 4.5

04.12.2017

7.30 26 27 4611 8 52 5 3.2 42 4.7

05.12.2017

7.62 26 26 4633 25 140 BDL 3.0 24 4.7

06.12.2017

7.60 26 30 4556 24 156 BDL 3.4 23

4.7

07.12.2017

7.52 24 32 4692 19 104 BDL 3.5 28

4.8 861 933 1 BDL BDL BDL

08.12.2017

8.12 26 29 4756 12 84 BDL 4.0 30 4.5

09.12.2017

7.83 27 31 4833 12 88 BDL 4.1 33 4.7

10.12.2017

7.30 29 33 4722 22 148 3 4.2 41 4.5

11.12.2017

7.34 29 28 5067 34 204 BDL 3.9

40 4.5

12.12.2017

7.25 29 36 4133 27 172 3 3.6

35 4.5

13.12.2017

7.25 29 34 4700 28 176 3 3.8

33 4.5

14.12.2017

7.35 30 38 4778 28 200 4 4.3

38 4.6 902 957 2 BDL BDL BDL

15.12.2017

7.46 26 35 4744 22 144 5 4.0

41 4.5

16.12.2017

7.44 26 37 4400 25 160 8 3.8

45 4.5

17.12.2017

7.43 26 34 4589 21 116 4 3.9

39 4.6

18.12.2017

7.16 28 32 4689 22 148 4 3.2

40 4.6

19.12.2017

7.36 27 36 4722 22 136 14 3.1

42 4.5

20.12.2017

7.16 29 30 4722 29 156 6 2.7

39 4.6

21.12.2017

7.34 28 33 4789 27 172 6 2.9

45 4.5 893 928 BDL BDL BDL BDL

22.12.2017

7.34 29 34 5356 27 172 6 3.0 41

4.6

23.12.2017

7.01 28 30 5410 32 228 12 3.1

44 4.6

24.12.2017

7.35 28 32 4911 32 232 18 3.2 38 4.6

25.12.2017

7.30 27 35 5010 34 530 15 2.9 43 4.6

26.12.2017

7.45 27 34 4056 82 542 24 3.0 45 4.5

27.12.2017

7.14 27 38 2900 94 696 13 3.1 40 4.6

28.12.2017

7.18 24 37 3110 84 624 24 3.6 48 4.6 693 889 1 BDL BDL BDL

29.12.2017

7.50 27 40 3344 92 688 13 3.8 35 4.5

30.12.2017

7.30 28 39 3156 75 560 24 4.0 46 4.6

31.12.2017

6.82 27 42 4600 63 472 13 3.9 41

4.6

Page 61: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 61 of 71

PARAM-

PH TEMP. TSS TDS BOD

COD

AMMONI-

PHOSP-

TOTAL

D.O. CHLO

R- SULP

- Oil &

Phen-

Sulphi- Cyani-

ETER CAL N HATES

KJL N

IDES HATES

Grease

Olic

des des

AVG 7.37 27 33 4513 34 244

7.32 3.5 39 4.6 837 927 1 BDL BDL BDL

RANGE (MIN-MAX)

6.82 24 24 2900 8 52 BDL 2.7 23 4.5 693 889 BDL BDL BDL BDL

8.12 30 42 5410 94 696

24 4.3 48 4.8 902 957 2 BDL BDL BDL

DATE

Colour (pt/co)

Total Chromium

Copper

Nickel

Zinc

Lead

Fluorides

Mercury

Arsenic

Selenium

Cadmium

Total Resi. Chlorine

Hexav.

Chromium

Iron

Manganese

Insecticide/ Pesticides

G.P.C.B.

100 2 3 3 15 0.1 15 0.01 0.2 0.05 0.05 1 0.1 3.0 2.0 Absent

LIMITS

Units

mg/l mg/l mg/

l mg/l

mg/l

mg/l mg/l mg/l mg/l mg/l mg/l mg/l mg/l

mg/l

Findings

10 0.141 0.0314

<0.02

0.826

<0.02

<0.05 BDL BDL BDL <0.01 0.40 BDL 0.229

0.11 Absent

Note : All parameters are within the limit.

BIOASSAY TEST:---

Toxicity factor test study being carried out.Total 10 experiments conducted and observed Tf<2 after 48 hrs.

TOXICITY FACTOR (OUR INTERNAL LAB ANALYSIS REPORTS)

TOXICITY FACTOR MONTH: JUL- 2017

DATE

Parts of Dilution Water To be Added To one Part of

Waste Water (By Volume)

Ratio of Dilution FISH FISH

ANALYSIS OF FINAL OUTLET

FIISH AFTE

R HRS. TOXICITY

OF Waste Factor

(T) TYPE NO. 2 HRS 6 HRS 24

HRS 48

HRS FACTOR

EXP. Water Tf

To test PH COD

Water PPM

(by

Volume)

02.07.17 1 1:2 2 ZEBRA 5 8.20 68 5 5 5 5 Tf =2

05.07.17 1 1:2 2 ZEBRA 5 7.51 68 5 5 5 5 Tf =2

07.07.17 1 1:2 2 ZEBRA 5 7.71 60 5 5 5 5 Tf =2

10.07.17 1 1:2 2 ZEBRA 5 7.50 60 5 5 5 5 Tf =2

Page 62: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 62 of 71

13.07.17 1 1:2 2 ZEBRA 5 7.66 72 5 5 5 5 Tf =2

17.07.17 1 1:2 2 ZEBRA 5 7.80 52 5 5 5 5 Tf =2

21.07.17 1 1:2 2 ZEBRA 5 6.98 76 5 5 5 5 Tf =2

25.07.17 1 1:2 2 ZEBRA 5 7.80 40 5 5 5 5 Tf =2

28.07.17 1 1:2 2 ZEBRA 5 7.11 48 5 5 5 5 Tf =2

31.07.17 1 1:2 2 ZEBRA 5 7.50 68 5 5 5 5 Tf =2

Remark : All parameter passes as per requirement.

TOXICITY FACTOR MONTH: AUG- 2017

DATE

Parts of Dilution Water To be Added To one Part of

Waste Water (By Volume)

Ratio of Dilution FISH FISH

ANALYSIS OF FINAL OUTLET

FIISH AFTE

R HRS. TOXICITY

OF Waste Factor

(T) TYPE NO. 2 HRS 6 HRS 24

HRS 48

HRS FACTOR

EXP. Water Tf

To test PH COD

Water PPM

(by

Volume)

03.08.17 1 1:2 2 ZEBRA 5 7.70 60 5 5 5 5 Tf =2

06.08.17 1 1:2 2 ZEBRA 5 7.33 60 5 5 5 5 Tf =2

10.08.17 1 1:2 2 ZEBRA 5 7.76 56 5 5 5 5 Tf =2

13.08.17 1 1:2 2 ZEBRA 5 6.80 48 5 5 5 5 Tf =2

16.08.17 1 1:2 2 ZEBRA 5 7.83 40 5 5 5 5 Tf =2

20.08.17 1 1:2 2 ZEBRA 5 7.86 44 5 5 5 5 Tf =2

23.08.17 1 1:2 2 ZEBRA 5 7.69 48 5 5 5 5 Tf =2

25.08.17 1 1:2 2 ZEBRA 5 8.05 60 5 5 5 5 Tf =2

28.08.17 1 1:2 2 ZEBRA 5 7.99 48 5 5 5 5 Tf =2

31.08.17 1 1:2 2 ZEBRA 5 8.05 96 5 5 5 5 Tf =2

Remark : All parameter passes as per requirement.

Page 63: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 63 of 71

TOXICITY FACTOR MONTH: SEP- 2017

DATE

Parts of Dilution Water To be Added To one Part of

Waste Water (By Volume)

Ratio of Dilution FISH FISH

ANALYSIS OF FINAL OUTLET

FIISH AFTE

R HRS. TOXICITY

OF Waste Factor

(T) TYPE NO. 2 HRS 6 HRS 24

HRS 48

HRS FACTOR

EXP. Water Tf

To test PH COD

Water PPM

(by

Volume)

02.09.17 1 1:2 2 ZEBRA 5 7.90 68 5 5 5 5 Tf =2

05.09.17 1 1:2 2 ZEBRA 5 7.30 76 5 5 5 5 Tf =2

08.09.17 1 1:2 2 ZEBRA 5 7.48 64 5 5 5 5 Tf =2

11.09.17 1 1:2 2 ZEBRA 5 7.60 68 5 5 5 5 Tf =2

14.09.17 1 1:2 2 ZEBRA 5 7.18 88 5 5 5 5 Tf =2

18.09.17 1 1:2 2 ZEBRA 5 7.21 64 5 5 5 5 Tf =2

22.09.17 1 1:2 2 ZEBRA 5 7.55 72 5 5 5 5 Tf =2

24.09.17 1 1:2 2 ZEBRA 5 7.30 76 5 5 5 5 Tf =2

27.09.17 1 1:2 2 ZEBRA 5 7.84 60 5 5 5 5 Tf =2

30.09.17 1 1:2 2 ZEBRA 5 8.15 80 5 5 5 5 Tf =2

Remark : All parameter passes as per requirement.

Page 64: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 64 of 71

TOXICITY FACTOR MONTH: OCT- 2017

DATE

Parts of Dilution Water To be Added To one Part of

Waste Water (By Volume)

Ratio of Dilution FISH FISH

ANALYSIS OF FINAL OUTLET

FIISH AFTE

R HRS. TOXICITY

OF Waste Factor

(T) TYPE NO. 2 HRS 6 HRS 24

HRS 48

HRS FACTOR

EXP. Water Tf

To test PH COD

Water PPM

(by

Volume)

03.10.17 1 1:2 2 ZEBRA 5 7.96 44 5 5 5 5 Tf =2

06.10.17 1 1:2 2 ZEBRA 5 7.70 136 5 5 5 5 Tf =2

09.10.17 1 1:2 2 ZEBRA 5 8.22 132 5 5 5 5 Tf =2

13.10.17 1 1:2 2 ZEBRA 5 7.58 120 5 5 5 5 Tf =2

16.10.17 1 1:2 2 ZEBRA 5 7.62 132 5 5 5 5 Tf =2

19.10.17 1 1:2 2 ZEBRA 5 7.84 220 5 5 5 5 Tf =2

22.10.17 1 1:2 2 ZEBRA 5 7.61 188 5 5 5 5 Tf =2

25.10.17 1 1:2 2 ZEBRA 5 8.10 156 5 5 5 5 Tf =2

28.10.17 1 1:2 2 ZEBRA 5 7.43 180 5 5 5 5 Tf =2

31.10.17 1 1:2 2 ZEBRA 5 7.14 168 5 5 5 5 Tf =2

03.10.17 1 1:2 2 ZEBRA 5 7.96 44 5 5 5 5 Tf =2

Remark : All parameter passes as per requirement.

TOXICITY FACTOR MONTH: NOV- 2017

DATE

Parts of Dilution Water To be Added To one Part of

Waste Water (By Volume)

Ratio of Dilution FISH FISH

ANALYSIS OF FINAL OUTLET

FIISH AFTE

R HRS. TOXICITY

OF Waste Factor

(T) TYPE NO. 2 HRS 6 HRS 24

HRS 48

HRS FACTOR

EXP. Water Tf

To test PH COD

Water PPM

(by

Volume)

03.11.17 1 1:2 2 ZEBRA 5 7.51 122 5 5 5 5 Tf =2

Page 65: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 65 of 71

05.11.17 1 1:2 2 ZEBRA 5 7.89 134 5 5 5 5 Tf =2

08.11.17 1 1:2 2 ZEBRA 5 7.23 184 5 5 5 5 Tf =2

11.11.17 1 1:2 2 ZEBRA 5 7.46 168 5 5 5 5 Tf =2

14.11.17 1 1:2 2 ZEBRA 5 7.34 144 5 5 5 5 Tf =2

17.11.17 1 1:2 2 ZEBRA 5 7.27 176 5 5 5 5 Tf =2

20.11.17 1 1:2 2 ZEBRA 5 8.06 136 5 5 5 5 Tf =2

23.11.17 1 1:2 2 ZEBRA 5 7.17 164 5 5 5 5 Tf =2

26.11.17 1 1:2 2 ZEBRA 5 7.27 192 5 5 5 5 Tf =2

30.11.17 1 1:2 2 ZEBRA 5 7.70 124 5 5 5 5 Tf =2

Remark : All parameter passes as per requirement.

TOXICITY FACTOR MONTH: DEC- 2017

DATE

Parts of Dilution Water To be Added To one Part of

Waste Water (By Volume)

Ratio of Dilution FISH FISH

ANALYSIS OF FINAL OUTLET

FIISH AFTE

R HRS. TOXICITY

OF Waste Factor

(T) TYPE NO. 2 HRS 6 HRS 24

HRS 48

HRS FACTOR

EXP. Water Tf

To test PH COD

Water PPM

(by

Volume)

03.12.17 1 1:2 2 ZEBRA 5 7.30 100 5 5 5 5 Tf =2

05.12.17 1 1:2 2 ZEBRA 5 7.62 140 5 5 5 5 Tf =2

08.12.17 1 1:2 2 ZEBRA 5 8.12 84 5 5 5 5 Tf =2

11.12.17 1 1:2 2 ZEBRA 5 7.30 204 5 5 5 5 Tf =2

15.12.17 1 1:2 2 ZEBRA 5 7.46 144 5 5 5 5 Tf =2

18.12.17 1 1:2 2 ZEBRA 5 7.16 148 5 5 5 5 Tf =2

21.12.17 1 1:2 2 ZEBRA 5 7.34 172 5 5 5 5 Tf =2

24.12.17 1 1:2 2 ZEBRA 5 7.35 232 5 5 5 5 Tf =2

Page 66: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 66 of 71

28.12.17 1 1:2 2 ZEBRA 5 7.14 624 5 5 5 5 Tf =2

31.12.17 1 1:2 2 ZEBRA 5 6.82 472 5 5 5 5 Tf =2

Remark : All parameter passes as per requirement.

ANNEXURE - 12 NOISE MONITORING REPORT

(OUR INTERNAL LAB ANALYSIS REPORTS) SOUND LEVEL MONITORING REPORT :

( AMBIENT) JUL-2017

SR.NO. LOCATIONS OF MONITORING SOUND LEVEL SOUND LEVEL

DAY TIME NIGHT TIME

Time : 6 AM to 10 PM Time : 10 PM to 6 AM

( AMBIENT) Limit : 75 DBA Limit : 70 DBA

Date : 17.07.2017 Date : 19.07.2017

Time : 16.30 TO 17.30 hrs Time : 00.30 to 01.30

1 MAIN GATE 59.90 54.30

2 WORK SHOP (ENGG.) 55.00 51.40

3 MANCOZEB SOLID 69.40 65.90

4 MANCOZEB LIQUID 69.20 64.20

5 ANTRACOL PLANT 62.30 62.10

6 ELECTRICAL DEPARTMENT 57.90 55.90

7 BOILER HOUSE 70.50 67.80

8 TMP PLANT 69.90 64.20

9 MCP PLANT 72.50 66.70

10 AMMONIA RECOVERY PLANT 73.10 68.50

11 CACL2 PLANT 73.20 65.10

12 ETP PLANT 64.00 62.40

13 Q.A.LAB 61.20 59.80

14 R&D LAB 68.60 61.00

15 FLONICAMID(ULALA) 73.10 68.40

16 IKI-220 PLANT 73.30 68.20

Remarks : All Parameters passes as per requirements.

Page 67: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 67 of 71

SOUND LEVEL MONITORING REPORT :

( AMBIENT) AUG-2017

SR.NO. LOCATIONS OF MONITORING SOUND LEVEL SOUND LEVEL

DAY TIME NIGHT TIME

Time : 6 AM to 10 PM Time : 10 PM to 6 AM

( AMBIENT) Limit : 75 DBA Limit : 70 DBA

Date : 21.08.2017 Date : 22.08.2017

Time : 16.30 TO 17.30 hrs Time : 00.30 to 01.30

1 MAIN GATE 69.80 67.00

2 WORK SHOP (ENGG.) 70.30 68.80

3 MANCOZEB SOLID 72.10 67.10

4 MANCOZEB LIQUID 63.40 60.00

5 ANTRACOL PLANT 73.10 68.20

6 ELECTRICAL DEPARTMENT 73.40 60.10

7 BOILER HOUSE 74.00 68.20

8 TMP PLANT 73.80 68.00

9 MCP PLANT 72.80 67.00

10 AMMONIA RECOVERY PLANT 69.50 62.00

11 CACL2 PLANT 67.60 67.00

12 ETP PLANT 62.00 58.10

13 Q.A.LAB 69.50 60.00

14 R&D LAB 70.00 62.00

15 FLONICAMID(ULALA) 73.70 68.00

16 IKI-220 PLANT 72.90 68.00

Remarks : All Parameters passes as per requirements.

Page 68: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 68 of 71

SOUND LEVEL MONITORING REPORT : ( AMBIENT)

SEP-2017

SR.NO. LOCATIONS OF MONITORING SOUND LEVEL SOUND LEVEL

DAY TIME NIGHT TIME

Time : 6 AM to 10 PM Time : 10 PM to 6 AM

( AMBIENT) Limit : 75 DBA Limit : 70 DBA

Date : 04.09.2017 Date : 15.09.2017

Time : 11.30 TO 12.30 hrs Time : 01.10 to 2.10

1 MAIN GATE 59.70 61.20

2 WORK SHOP (ENGG.) 60.10 58.40

3 MANCOZEB SOLID 70.20 63.10

4 MANCOZEB LIQUID 70.10 67.80

5 ANTRACOL PLANT 73.10 67.40

6 ELECTRICAL DEPARTMENT 63.40 64.00

7 BOILER HOUSE 72.10 68.20

8 TMP PLANT 71.60 67.10

9 MCP PLANT 72.30 68.40

10 AMMONIA RECOVERY PLANT 73.90 68.00

11 CACL2 PLANT 72.10 67.40

12 ETP PLANT 70.50 66.10

13 Q.A.LAB 63.50 65.10

14 R&D LAB 68.10 64.00

15 FLONICAMID(ULALA) 73.20 67.20

16 IKI-220 PLANT 72.90 68.90

Remarks : All Parameters passes as per requirements.

Page 69: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 69 of 71

SOUND LEVEL MONITORING REPORT : ( AMBIENT)

OCT-2017

SR.NO. LOCATIONS OF MONITORING SOUND LEVEL SOUND LEVEL

DAY TIME NIGHT TIME

Time : 6 AM to 10 PM Time : 10 PM to 6 AM

( AMBIENT) Limit : 75 DBA Limit : 70 DBA

Date : 09.10.2017 Date : 10.10.2017

Time : 15.15 TO 16.20 hrs Time : 01.10 to 2.10

1 MAIN GATE 56.40 54.20

2 WORK SHOP (ENGG.) 58.30 55.10

3 MANCOZEB SOLID 67.20 66.20

4 MANCOZEB LIQUID 67.50 65.90

5 ANTRACOL PLANT 72.80 69.10

6 ELECTRICAL DEPARTMENT 64.90 62.40

7 BOILER HOUSE 73.50 67.70

8 TMP PLANT 73.90 67.50

9 MCP PLANT 71.60 66.80

10 AMMONIA RECOVERY PLANT 73.20 68.70

11 CACL2 PLANT 68.50 64.90

12 ETP PLANT 65.30 63.10

13 Q.A.LAB 53.80 52.80

14 R&D LAB 54.10 53.40

15 FLONICAMID(ULALA) 70.30 67.00

16 IKI-220 PLANT 72.80 67.60

Remarks : All Parameters passes as per requirements.

Page 70: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 70 of 71

SOUND LEVEL MONITORING REPORT : ( AMBIENT)

NOV-2017

SR.NO. LOCATIONS OF MONITORING SOUND LEVEL SOUND LEVEL

DAY TIME NIGHT TIME

Time : 6 AM to 10 PM Time : 10 PM to 6 AM

( AMBIENT) Limit : 75 DBA Limit : 70 DBA

Date : 10.11.2017 Date : 10.11.2017

Time : 15:00 TO 16:00 hrs Time : 01.10 to 2.10

1 MAIN GATE 53.40 53.10

2 WORK SHOP (ENGG.) 54.30 52.70

3 MANCOZEB SOLID 63.80 61.90

4 MANCOZEB LIQUID 67.30 64.10

5 ANTRACOL PLANT 73.50 68.80

6 ELECTRICAL DEPARTMENT 66.90 65.10

7 BOILER HOUSE 71.80 67.50

8 TMP PLANT 72.40 66.50

9 MCP PLANT 69.60 66.70

10 AMMONIA RECOVERY PLANT 72.30 64.40

11 CACL2 PLANT 67.50 65.60

12 ETP PLANT 64.80 62.20

13 Q.A.LAB 59.40 57.60

14 R&D LAB 54.40 53.10

15 FLONICAMID(ULALA) 66.30 57.80

16 IKI-220 PLANT 71.40 67.40

Remarks : All Parameters passes as per requirements.

Page 71: Environmental Clearance # J.11011/117/2002-IA.II dated 17 ... · 1 Cl2 0.5 BDL-2.5 2 NH3 25 BDL-10.00 3 CS2 10 BDL-2.5 3 Process emissions (SPM, HCl, SO 2, Methyl Chloride and VOC)

Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003 & Environmental Clearance # J.11011/407/2006-IA.II (I) dated 04.04.2007

issued by Ministry of Environment and Forests, New Delhi for expansion of pesticide unit by UPL Limited, Unit # 01, Ankleshwar, Gujarat

Period from JULY 2017 TO DECEMBER 2017

Page 71 of 71

SOUND LEVEL MONITORING REPORT :

( AMBIENT) DEC-2017

SR.NO. LOCATIONS OF MONITORING SOUND LEVEL SOUND LEVEL

DAY TIME NIGHT TIME

Time : 6 AM to 10 PM Time : 10 PM to 6 AM

( AMBIENT) Limit : 75 DBA Limit : 70 DBA

Date : 12.12.2017 Date :18.12.2017

Time : 12:00 to 13:00 hrs Time : 13:30

1 MAIN GATE 59.70 54.70

2 WORK SHOP (ENGG.) 60.10 58.70

3 MANCOZEB SOLID 70.10 56.10

4 MANCOZEB LIQUID 70.20 66.80

5 ANTRACOL PLANT 73.60 65.10

6 ELECTRICAL DEPARTMENT 63.40 62.70

7 BOILER HOUSE 73.10 67.20

8 TMP PLANT 72.50 65.20

9 MCP PLANT 72.30 68.40

10 AMMONIA RECOVERY PLANT 73.80 68.80

11 CACL2 PLANT 72.10 64.70

12 ETP PLANT 70.50 64.80

13 Q.A.LAB 61.20 58.20

14 R&D LAB 63.50 60.90

15 FLONICAMID(ULALA) 68.30 59.40

16 IKI-220 PLANT 73.90 68.20

Remarks : All Parameters passes as per requirements.