Page 1: Environmental Commitments/Tracking. Environmental Commitments Federal Agencies Shall –Use all practicable means consistent with the requirements of

Environmental Commitments/Tracking

Page 2: Environmental Commitments/Tracking. Environmental Commitments Federal Agencies Shall –Use all practicable means consistent with the requirements of
Page 3: Environmental Commitments/Tracking. Environmental Commitments Federal Agencies Shall –Use all practicable means consistent with the requirements of

Environmental Commitments

• Federal Agencies Shall– Use all practicable means consistent with the requirements of

the NEPA and other essential considerations of nation policy, to restore and enhance the quality of the human environment and avoid or minimize any possible adverse effects of their actions on the quality of the human environment.

-- 40 CFR 1500.2(f)

• Mitigation of impacts must be considered whether the impacts are significant or not.

• Agencies are required to identify and include in the action all relevant and reasonable mitigation measures that could improve the action.

Page 4: Environmental Commitments/Tracking. Environmental Commitments Federal Agencies Shall –Use all practicable means consistent with the requirements of

Environmental Commitments

The NEPA process is intended to help public officials make decisions that are based on understanding of environmental consequences, and take actions that protect, restore, and enhance the environment.

-- 40 CFR § 1500.1(b): Purpose

For the vast majority of capital projects: ODOT will “take action”, or in other words, make environmental commitments to protect, restore, or enhance the environment

What are they, what do they mean, why are the important?

Page 5: Environmental Commitments/Tracking. Environmental Commitments Federal Agencies Shall –Use all practicable means consistent with the requirements of

Environmental Commitments

For all ODOT Projects we strive to:

MAXIMIZE POSITIVE IMPACT

MINIMIZE NEGATIVE IMPACT

Page 6: Environmental Commitments/Tracking. Environmental Commitments Federal Agencies Shall –Use all practicable means consistent with the requirements of

Environmental Commitments

Environmental commitments are developed based upon the need to:

1. Avoid the impact altogether by not taking a certain action or parts of an action.

2. Minimize impacts by limiting the degree or magnitude of the action and its implementation.

3. Rectify the impact by repairing, rehabilitating, or restoring the affected environment.

4. Reduce or eliminate the impact over time by preservation and maintenance operations during the life of the action.

5. Compensate for the impact by replacing or providing substitute resources or environments.

 

Any action that does one of the conditions above rises to an environmental commitment.  ODOT may incorporate these by design or integral components of contracting methodology.  These types of commitments need to have appropriate methods of documenting them as commitments and have methods in place for ensuring compliance and success. 

Page 7: Environmental Commitments/Tracking. Environmental Commitments Federal Agencies Shall –Use all practicable means consistent with the requirements of

Environmental Commitments

1. ECs come from 1. Federal, state, and local laws

2. Public outreach

3. Context specific needs

2. ECs are often multidisciplinary, on multiple timelines, and can require action before, during, and after construction.

Page 8: Environmental Commitments/Tracking. Environmental Commitments Federal Agencies Shall –Use all practicable means consistent with the requirements of

Environmental Commitments

Common Types of Environmental Commitments• Timing Considerations

– In water work restrictions, tree clearing restrictions, noise and timing, seasonal restrictions (school bus impacts, etc)

• Location/spatial Considerations– Avoiding certain areas (wetlands, trees, habitats, buildings, parks, etc)

• Retaining Access/Use– Trails, businesses, residences, EMS, school buses, etc

• Notification requirements– Prior to construction, during construction, after construction, etc

• Survey Requirements– Assess presence or absence surveys for species, pre-construction, as built, etc

• Restoration actions– Natural resource replacement, cultural resource

improvements/protections/relocations, social or economics restoration (connectivity, livability, etc)

Page 9: Environmental Commitments/Tracking. Environmental Commitments Federal Agencies Shall –Use all practicable means consistent with the requirements of

Environmental Commitment Project Implications

1. Must be in the plans as a standard specification, note, or special provisions

2. Can affect project staging, schedule, and design

3. All parties working on the project are responsible to know and ensure compliance of environmental commitments

4. Failure to implement ECs has consequences

Page 10: Environmental Commitments/Tracking. Environmental Commitments Federal Agencies Shall –Use all practicable means consistent with the requirements of

Environmental Commitment Implementation

1. Not our strongest area

2. ECs can be easily non-performed, or inadvertently forgotten

Page 11: Environmental Commitments/Tracking. Environmental Commitments Federal Agencies Shall –Use all practicable means consistent with the requirements of

Environmental Commitment Documentation

Our near future is the comprehensive documentation of how ECs are implemented successfully

Page 12: Environmental Commitments/Tracking. Environmental Commitments Federal Agencies Shall –Use all practicable means consistent with the requirements of
Page 13: Environmental Commitments/Tracking. Environmental Commitments Federal Agencies Shall –Use all practicable means consistent with the requirements of

Take Away

1. Environmental Commitments (ECs) can be created throughout the PDP

2. Once made, ECs are required to be met

3. Non performance of ECs devalues, undermines, and makes worthless the Planning and NEPA process1. Result in immediate work stoppages, delay claims,

fines, jail time, removal of federal funding from this and future projects, and will substantially slow down the delivery of your next project

4. Performance of ECs results in minimizing negative impacts, and maximizing positive impacts

Page 14: Environmental Commitments/Tracking. Environmental Commitments Federal Agencies Shall –Use all practicable means consistent with the requirements of

Environmental Commitments

Matt Perlik, M.S.Assistant Environmental Administrator

Ohio Department of Transportation

Office of Environmental Services

1980 West Broad Street, Mail Stop 4170

Columbus, OH 43223

[email protected]

614-466-1937

Matt Perlik, M.S.Assistant Environmental Administrator

Ohio Department of Transportation

Office of Environmental Services

1980 West Broad Street, Mail Stop 4170

Columbus, OH 43223

[email protected]

614-466-1937

Page 15: Environmental Commitments/Tracking. Environmental Commitments Federal Agencies Shall –Use all practicable means consistent with the requirements of

Project Development Process