PERMANENT WETLAND IMPACT AREA SCHEDULE
ID IMPACT DESCRIPTION AREA (SF) AREA (AC) VOLUME (CY) JURISDICTION
PERMANENT OPEN WATER IMPACT AREA SCHEDULE
ID IMPACT DESCRIPTION AREA (SF) AREA (AC) VOLUME (CY) JURISDICTION
TEMPORARY OPEN WATER IMPACT AREA SCHEDULE
ID IMPACT DESCRIPTION AREA (SF) AREA (AC) VOLUME (CY) JURISDICTION
4-01 WORK AREA / E&S CONTROLS 2532.08 0.0581 N/A USACE
4-02 WORK AREA / E&S CONTROLS 274.57 0.0063 N/A USACE
4-03 WORK AREA / E&S CONTROLS 430.58 0.0099 N/A USACE
4-04 WORK AREA / E&S CONTROLS 2443.49 0.0561 N/A USACE
TOTAL TEMPORARY OPEN WATER IMPACTS USACE26.120.0162709.29
4-01 29" X 45" RCP PIPE 191.00 0.0043 16.50 USACE
4-02 WORK AREA / E&S CONTROLS 186.52 0.0043 3.45 USACE
4-03 WORK AREA / E&S CONTROLS 181.33 0.0042 3.39 USACE
USACEN/A0.20689016.44TOTAL TEMPORARY WETLAND IMPACT AREAS
5-01 WORK AREA / E&S CONTROLS 346.45 0.0079 N/A USACE
5-02 WORK AREA / E&S CONTROLS 339.79 0.0078 N/A USACE
5-03 WORK AREA / E&S CONTROLS 1442.06 0.0331 N/A USACE
2-01 WORK AREA / E&S CONTROLS 150.44 0.0034 2.78 USACE
TEMPORARY WETLAND IMPACT AREA SCHEDULE
ID IMPACT DESCRIPTION AREA (SF) AREA (AC) VOLUME (CY) JURISDICTION
2-01 WORK AREA / E&S CONTROLS 289.67 0.0066 N/A USACE
2-02 WORK AREA / E&S CONTROLS 148.75 0.0034 N/A USACE
2-03 WORK AREA / E&S CONTROLS 769.00 0.0176 N/A USACE
9-01 FILL / RIP RAP 34.22 0.0011 0.92 USACE
9-02 FILL / RIP RAP 30.43 0.0004 0.31 DNREC
9-02 FILL 19.08 0.0004 N/A USACE
9-03 FILL 387.05 0.0089 N/A DNREC
9-01 FILL 797.71 0.0183 N/A USACE
9-04 FILL 1456.21 0.0334 N/A DNREC
2-01 FILL 1139.66 0.0262 N/A USACE
2-02 FILL / 36" RCP PIPE 2808.44 0.0645 N/A USACE
2-03 FILL 815.07 0.0187 N/A USACE
4-01 FILL / RIP RAP 1491.44 0.0342 N/A USACE
4-02 RIP RAP 193.47 0.0044 N/A USACE
4-03 RIP RAP 67.62 0.0016 N/A USACE
4-04 FILL / RIP RAP 950.84 0.0218 N/A USACE
5-01 FILL 1154.15 0.0265 N/A USACE
5-02 FILL 332.46 0.0076 N/A USACE
5-03 FILL 912.03 0.0209 N/A USACE
5-04 FILL / RIP RAP 129.02 0.0030 N/A USACE
USACEN/A0.248210810.99TOTAL PERMANENT WETLAND IMPACT AREAS
DNRECN/A0.04231843.26TOTAL PERMANENT WETLAND IMPACT AREAS
2-01 FILL / 36" RCP PIPE 422.11 0.0097 4.12 USACE
4-01 RIP RAP 346.86 0.0079 3.33 USACE
TOTAL PERMANENT OPEN WATER IMPACTS USACE8.370.0188803.19
TOTAL PERMANENT OPEN WATER IMPACTS DNREC0.310.000430.43
COMPLIANCE PLANENVIRONMENTAL
42
CONTRACT
T201200902
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.
\\D
OTFS08\c
add\A
ctiv
e_
Desig
ns\S
US
SE
X\0
24\r
oad\T
201200902\Pla
ns\M
OD
EL P
LA
NS O
NLY\E
C 02.d
gn
10:3
6
5-O
CT-2
021
SR24 AT ANGOLA ROAD ARROW HEAD ROAD ANDHSIP SC, SR24 AT CAMP N/A
W. NAUMAN
C. ESHAM
PD
NOT TO SCALE
MIGRATORY BIRDS - NONE
ENDANGERED SPECIES - NONE
FISHERIES - NO IN-WATER WORK FROM MARCH 1 TO JUNE 30
CONSTRUCTION RESTRICTIONS:B.
PERIOD.
CONSTRUCTION IN THE PERMITTED AREA(S) AND ENSURE THEY ARE DISPLAYED ON-SITE DURING THE ENTIRE CONSTRUCTION
THE CONTRACTOR MUST ENSURE THAT THESE PERMITS/APPROVALS ARE IN THEIR POSSESSION PRIOR TO BEGINNING**
RESPONSIBLE FOR COORDINATING AND/OR OBTAINING THESE APPROVALS.
THE PERMITS/APPROVALS LISTED ARE THOSE REQUIRED FOR THIS PROJECT. THE ENVIRONMENTAL STUDIES SECTION IS*
DNREC - WATER QUALITY (WQC) & COASTAL ZONE CONSISTENCY (CZM): ISSUED NWP 23
DNREC - WETLANDS & SUBAQUEOUS LANDS (WLSL): WETLANDS & SUBAQEOUS LANDS PERMIT
U.S. ARMY CORPS OF ENGINEERS (COE): NATIONWIDE PERMIT NWP 23 WITH PRECONSTRUCTION NOTIFICATION (PCN)
PERMIT REQUIREMENTS/APPROVALS *:A.
NATURAL RESOURCE ISSUES:2.
ENVIRONMENTAL COMPLIANCE NOTES
FORTH IN THE ENVIRONMENTAL STATEMENT AND PERMITS.
USE OF THIS SHEET DOES NOT ALLEVIATE THE CONTRACTOR'S RESPONSIBILITY TO COMPLY WITH ALL CONDITIONS SETC.
AND APPROVAL.
[email protected]) TO ALLOW FOR COORDINATION WITH THE APPROPRIATE RESOURCE AGENCIES
NECESSARY, CONTACT THE ENVIRONMENTAL STUDIES SECTION AT (302-760-2264 OR
IF A DEPARTURE FROM THE APPROVED PLANS (WHICH WOULD AFFECT ANY NATURAL AND/OR CULTURAL RESOURCES) ISB.
PURPOSES.
CALCULATIONS ARE FOR THE AGENCY PERMIT REPORTING PURPOSES ONLY AND ARE NOT TO BE USED FOR BIDDING
THE PURPOSE OF THIS SHEET IS TO IDENTIFY THOSE ITEMS ASSOCIATED WITH ENVIRONMENTAL COMPLIANCE. IMPACTA.
GENERAL NOTES:1.
WILL BE INCIDENTAL TO ITEM 909005 - STREAM DIVERSION.
OCCURS AFTER STREAM DIVERSION REMOVAL, USE A TURBIDITY CURTAIN TO MINIMIZE IN-STREAM SEDIMENTATION. PAYMENT
THE TOPSOIL/SEED/MULCH CAN BE PLACED BEFORE OR AFTER THE REMOVAL OF THE STREAM DIVERSION. IF THE PLACEMENTE.
INCIDENTAL TO THE RIPRAP ITEM. ALL OTHER ITEMS WILL BE PAID FOR UNDER THEIR RESPECTIVE ITEMS.
INITIAL CHOKING WITH TOPSOIL THROUGH THE SEEDING AND MULCHING PRIOR TO ANY RAIN EVENT. DELAWARE #57 STONE IS
ECB AT TOE OF SLOPE CAN BE EITHER TRENCHED IN OR STAPLED AT 6" ON CENTER. COMPLETE ALL WORK, STARTING WITH THE
OPERATION, INSTALL ITEM 908020 - EROSION CONTROL BLANKET (ECB) MULCH, OR OTHER BLANKET AS SHOWN ON THE PLANS.
RIPRAP. SLOPE SEEDING WILL BE DONE WITH ITEM 908019 - STREAMBANK SEED MIX, SEEDING. FOLLOWING THE SEEDING
TOPSOIL SO THAT THE RIPRAP PEAKS ARE BARELY VISIBLE. PLACE AN ADDITIONAL 6-INCH TOPSOIL LAYER ON TOP OF THE
CHOKE MATERIAL TO PREVENT THE LOSS OF TOPSOIL THROUGH THE RIPRAP, AND THEN FINISH FILLING THE VOIDS WITH
CHOKE ALL RIPRAP ON THE STREAM BANK, OUTSIDE THE CHANNEL BED, WITH DELAWARE #57 STONE. PLACE JUST ENOUGHD.
ACTION AT THE CONTRACTOR'S EXPENSE.
RIPRAP OR BENEATH THE STRUCTURE). IF THIS IS NOT ACHIEVED, THE CONTRACTOR WILL BE REQUIRED TO TAKE CORRECTIVE
CONDITIONS, THE FLOW MUST REMAIN ABOVE GROUND AND ABOVE THE RIPRAP (I.E. THE FLOW CANNOT BE "LOST" IN THE
WHEN ALL EROSION AND SEDIMENT CONTROL MEASURES ARE REMOVED AND THE STREAM RETURNS TO ITS NATURAL FLOWC.
PAYMENT UNDER ITEM 707500 - CHANNEL BED FILL.
CONDITIONS. FILL ANY CAVITIES OR SCOUR HOLES RESULTING FROM CONSTRUCTION ACTIVITIES WITH CHANNEL BED FILL.
LOCATION OF SUMP PITS, STABILIZED OUTFALLS, TEMPORARY PIPES AND/OR SANDBAG DIKES AND DIVERSIONS) TO EXISTING
RESTORE OTHER AREAS OF THE CHANNEL BOTTOM AFFECTED BY CONSTRUCTION (INCLUDING, BUT NOT LIMITED TO, THEB.
ELEVATIONS WILL BE AS NOTED ON THE PLANS. PAYMENT UNDER ITEM 707500 - CHANNEL BED FILL.
ELEVATIONS WITH EXISTING ELEVATIONS AT THE UPSTREAM AND DOWNSTREAM PROJECT LIMITS. THROUGH THE STRUCTURE,
209002 - BORROW, TYPE B. COVER THE RIPRAP WITH A MINIMUM OF 12" CHANNEL BED FILL. MATCH THE FINAL CHANNEL
BORROW TYPE 'B' SO THAT ALL OF THE VOIDS IN THE RIPRAP ARE FILLED WITH SPECIFIED MATERIAL. PAYMENT UNDER ITEM
ALL RIPRAP IN THE CHANNEL BOTTOM (I.E. BELOW THE WATER LINE) ONE FOOT BELOW STREAM BED ELEVATION AND CHOKE WITH
NOT EXIST ON-SITE, ANY NEW MATERIAL MUST CONFORM TO THE REQUIREMENTS OF ITEM 707500 - CHANNEL BED FILL. RECESS
STREAM BOTTOM MATERIAL OR THE FURNISHING OF OFFSITE MATERIAL. IF SUFFICIENT SOURCES FOR CHANNEL BED FILL DO
FOLLOW THE SPECIAL PROVISION FOR ITEM 707500 - CHANNEL BED FILL IN REGARDS TO THE SALVAGING OF ON-SITE NATURALA.
STREAM RESTORATION AND RIPRAP TREATMENT:4.
CLEARLY MARK ALL TREES TO BE REMOVED WITH PAINT PRIOR TO THE EROSION AND SEDIMENT CONTROL MEETING.D.
[email protected]) CAN PROVIDE FURTHER GUIDANCE REGARDING THIS METHOD OF INSTALLATION.
THE SILT FENCE IS INCIDENTAL TO ITEM 905001 - SILT FENCE. THE ENVIRONMENTAL STUDIES SECTION (302-760-2259 OR
SANDBAGS AND CFLS (AND CONTENTS) IN THEIR ENTIRETY WHEN NO LONGER NEEDED. SANDBAGS/CFLS USED TO SECURE
WETLANDS IN LIEU OF TRENCHING UNLESS PROPER EROSION AND SEDIMENT CONTROL CANNOT BE MAINTAINED. REMOVE
USE SANDBAGS OR COMPOST FILTER LOG (CFL) TO SECURE SILT FENCE AT AREAS ADJACENT TO WOODED UPLANDS/ ALLC.
ANY CONTRACTOR ACCESS BEYOND THE LIMIT OF CONSTRUCTION IS STRICTLY PROHIBITED.
WATER/WETLANDS EXIST WITHIN 20 FEET OF THE LIMIT OF CONSTRUCTION (AS SHOWN ON CONSTRUCTION PLAN SHEETS).
WETLANDS ARE BEING IMPACTED (AS SHOWN ON ENVIRONMENTAL COMPLIANCE SHEETS), AND ALSO IN ANY AREA WHERE
USE SILT FENCE OR CONSTRUCTION SAFETY FENCE ALONG THE LIMITS OF CONSTRUCTION IN ALL AREAS WHERE WATERB.
TO GRADE AND SEED WITH ITEM 908017 - TEMPORARY GRASS SEEDING (ANNUAL RYEGRASS).
FLUSH WITH THE GROUND (I.E. NO DISTURBANCE OF THE ROOT MAT). RESTORE TEMPORARILY DISTURBED WETLAND AREAS
CONSTRUCT PROJECT COMPONENTS SUCH AS FOUNDATIONS AND RIPRAP PROTECTION IS PERMITTED. CUT VEGETATION
621500 - TEMPORARY TIMBER MAT. IN WETLAND AREAS THAT ARE CLEARED, NO GRUBBING EXCEPT WHERE NECESSARY TO
EQUIPMENT TRAVERSING WETLANDS AND SUBAQUEOUS LAND ON MATS. PAYMENT FOR MATS WILL BE MADE UNDER ITEM
KEEP CLEARING IN WETLAND AREAS TO A MINIMUM ABSOLUTELY NECESSARY FOR CONSTRUCTION ACCESS. SUPPORT ALLA.
PROTECTION OF RESOURCES:5.
NONEA.
CULTURAL RESOURCE ISSUES:3.
108+00 109+00 110+00 111+00 112+00 113+00 114+00
215
+00
216
+00
217
+00
218
+00
50+00
51+00
40774DEC
POLESIGNAL
40775DEC
VER-C (
B)
VER-C (
B)
POLESIGNAL
40776DEC
VER-C (
B)
VER-C (B)
114894DEC
CABINETSIGNAL
POLESIGNAL
102099DEC
VER-C (
B)
POLESIGNAL
40777DEC
118261DEC
40778DEC
118260DEC
32232DEC
32231DEC
12" RCP
VER-C (B)VER-C (B)
15" CMP
102100DEC
NUMBERNO
VER-C (B)
VER-C (B)
WO
ODS
36"
RCP
CORE 6
CORE 5
CORE 7
CORE 8
DEC-E (B)
DEC-E (B)
UNK
TU-W (
B)
SC-S (B)
SC-S (C
) SR 24SR 24
RO
AD
RO
BIN
SO
NVIL
LE
AN
GO
LA R
OA
D
TU-W (
B)
T
23ATP
TP 36A
WELL
TP 19A
WV
I.P.
S
30ATP
PER D 3
394 0
52
TU E
ASE
MENT
25'
25'
25'
25'
45'
40'
45'
45'
45'
40'
45'
PB 74-03D 2926 348
DICK ENNIS, INC234-11.00-56.03
PB 70-304D 2588 113
CARLTON 0. DORMAN234-11.00-60.01
PB 234-51D 4575 167
CARLTON O. DORMAN234-11.00-60.00
D 4276 126DOUBLE DB LP234-11.00-49.00
D 4276 126DOUBLE DB LP234-11.00-49.00
PB 7
4-0
3
D 2
926 3
48
DIC
K E
NNIS, IN
C
234-1
1.00-5
6.03 30'
30'
25'
25'
PE
4
7
8
9
9
AREA (SF) AREA (AC) VOLUME (CY)IMPACT DESCRIPTIONID JURISDICTION
PERMANENT WETLAND IMPACT AREA SCHEDULE
AREA (SF) AREA (AC) VOLUME (CY)IMPACT DESCRIPTIONID JURISDICTION
PERMANENT OPEN WATER IMPACT AREA SCHEDULE
W
03
W
01
O
01
W
02
LEGEND
ORDINARY HIGH WATER / WETLANDOHW/WL
WETLAND BOUNDARYWL
IMPACT AREA TYPE ID. (SEE BELOW)
IMPACT AREA ID. AND/OR NUMBER
XX
?X
O = OPEN WATER IMPACT
W = WETLAND IMPACT
T
03
T = TEMPORARY IMPACT
T
01
T
02
TEMPORARY WETLAND IMPACT AREA SCHEDULE
ID IMPACT DESCRIPTION AREA (SF) AREA (AC) VOLUME (CY) JURISDICTION
2-01 WORK AREA / E&S CONTROLS 289.67 0.0066 N/A USACE
2-02 WORK AREA / E&S CONTROLS 148.75 0.0034 N/A USACE
2-03 WORK AREA / E&S CONTROLS 769.00 0.0176 N/A USACE
USACEN/A0.02761207.42TOTAL TEMPORARY WETLAND IMPACT AREAS
OT
01
2-01 FILL 1139.66 0.0262 N/A USACE
2-02 FILL / 36" RCP PIPE 2808.44 0.0645 N/A USACE
2-03 FILL 815.07 0.0187 N/A USACE
USACEN/A0.10944763.17TOTAL PERMANENT WETLAND IMPACT AREASTEMPORARY OPEN WATER IMPACT AREA SCHEDULE
ID IMPACT DESCRIPTION AREA (SF) AREA (AC) VOLUME (CY) JURISDICTION
2-01 WORK AREA / E&S CONTROLS 150.44 0.0034 2.78 USACE
2-01 FILL / 36" RCP PIPE 422.11 0.0097 4.12 USACE PERMANENT IMPACT AREA
TEMPORARY IMPACT AREA
43
SCALE
0
FEET
30 60 90
N
CONTRACT
T201200902
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.
\\D
OTFS08\c
add\A
ctiv
e_
Desig
ns\S
US
SE
X\0
24\r
oad\T
201200902\Pla
ns\M
OD
EL P
LA
NS O
NLY\E
C 03.d
gn
10:3
6
5-O
CT-2
021
SR24 AT ANGOLA ROADARROW HEAD ROAD AND HSIP SC, SR24 AT CAMP N/A
W. NAUMAN
C. ESHAM
PD
EC-02
COMPLIANCE PLAN
ENVIRONMENTAL
MA
TC
H
LIN
E S
TA 11
4+
50
MATCH LINE STA 214+50
MA
TC
H
LIN
E S
TA 10
8+
00
MATCH LINE STA 218+50
LOC
LOC
R/
W-3
PE-2
R/W-3
TCE-4
TCE-3
TCE-1
PE-1
R/W-1 R/W-1PE-1
R/W-3
R/W
TCE
R/
W
TCE
PE
206+00
207+00
208+00209+00
210+00211+00 212+00
213+00
214+00
32226DEC
WOODS
VER-C (B)
MED-C (B)
SC-SS (
B)
DEC-E (B)
4' W
OO
D
TU-W (C)
WOODS
32224DEC
32227DEC
32228DEC
36" C
PP
MED-C (B)
D120DEC
UNK
VER-C (B)
P120 1
VER-C
VER-C (B)
WOODS
WOODS
CORE 11
TU-W (B)
TU-W (B)
SC-S (B)
SC-S (B)
ANGOLA ROAD
ANGOLA ROAD
F.H.
T
WV
TP 27AWV
TP 28A
TP 50
I.P.
S
T
T
I.P.
T
TP 29A
S
I.P.
S
I.P.
PER D 2082 205
DEC EASEMENT
PER D 2082 205
DEC EASEMENT
PER D 3394 052
TU EASEMENT
30'
40'
30'
30'
30'
30'
40'
40'
40'
45'
40'
45'
40'
3
5
17
4
D 3667 125SUSSEX COUNTY234-11.00-52.01
D 4611 105ELEANOR JOAN BAKER
234-11.00-52.00
D 4617 8DRY DOCK RECOVERY, INC.
234-11.00-55.00
D 3624 1DONALD W. DORMAN AND HELEN G. DORMAN
234-11.00-56.02
PB 74-03D 4031 164
RENDALL WHIBLEY AND ANN MARIE WHIBLEY, H/W234-11.00-56.09
PB 74-03D 2926 348
DICK ENNIS, INC234-11.00-56.03
D 4276 126DOUBLE DB LP234-11.00-49.00
XXX
W
01O
01
W
02
OT
01
W
03
W
04
PERMANENT OPEN WATER IMPACT AREA SCHEDULE
ID IMPACT DESCRIPTION AREA (SF) AREA (AC) VOLUME (CY) JURISDICTION
LEGEND
TEMPORARY IMPACT AREA
ORDINARY HIGH WATER / WETLANDOHW/WL
WETLAND BOUNDARYWL
IMPACT AREA TYPE ID. (SEE BELOW)
IMPACT AREA ID. AND/OR NUMBER
XX
?X
O = OPEN WATER IMPACT
W = WETLAND IMPACT
PERMANENT IMPACT AREA
T = TEMPORARY IMPACT
T
01
T
04
USACEN/A0.13045680.72TOTAL TEMPORARY WETLAND IMPACT AREAS
4-01 WORK AREA / E&S CONTROLS 2532.08 0.0581 N/A USACE
4-02 WORK AREA / E&S CONTROLS 274.57 0.0063 N/A USACE
T
02
OT
02
T
03
OT
03
4-03 WORK AREA / E&S CONTROLS 430.58 0.0099 N/A USACE
4-04 WORK AREA / E&S CONTROLS 2443.49 0.0561 N/A USACETEMPORARY OPEN WATER IMPACT AREA SCHEDULE
ID IMPACT DESCRIPTION AREA (SF) AREA (AC) VOLUME (CY) JURISDICTION
TOTAL TEMPORARY OPEN WATER IMPACTS USACE23.340.0128558.85
4-01 29" X 45" RCP PIPE 191.00 0.0043 16.50 USACE
4-02 WORK AREA / E&S CONTROLS 186.52 0.0043 3.45 USACE
4-03 WORK AREA / E&S CONTROLS 181.33 0.0042 3.39 USACE
4-01 RIP RAP 346.86 0.0079 3.33 USACE
4-01 FILL / RIP RAP 1491.44 0.0342 N/A USACE
4-02 RIP RAP 193.47 0.0044 N/A USACE
4-03 RIP RAP 67.62 0.0016 N/A USACE
4-04 FILL / RIP RAP 950.84 0.0218 N/A USACE
PERMANENT WETLAND IMPACT AREA SCHEDULE
ID IMPACT DESCRIPTION AREA (SF) AREA (AC) VOLUME (CY) JURISDICTION
TEMPORARY WETLAND IMPACT AREA SCHEDULE
ID IMPACT DESCRIPTION AREA (SF) AREA (AC) VOLUME (CY) JURISDICTION
TOTAL PERMANENT WETLAND IMPACT AREAS USACEN/A0.06202703.37
MA
TC
H
LIN
E S
TA 214
+50
44
COMPLIANCE PLAN
ENVIRONMENTAL
EC-04
SCALE
0
FEET
30 60 90
N
CONTRACT
T201200902
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.
\\D
OTFS08\c
add\A
ctiv
e_
Desig
ns\S
US
SE
X\0
24\r
oad\T
201200902\Pla
ns\M
OD
EL P
LA
NS O
NLY\E
C 04.d
gn
10:3
6
5-O
CT-2
021
SR24 AT ANGOLA ROADARROW HEAD ROAD ANDHSIP SC, SR24 AT CAMP N/A
W. NAUMAN
C. ESHAM
PD
TCE-1
TCE-1
TCE-3
TCE-3
R/W-3
TCE
14'13'
12'11'
9'
8'
10'
219+00
220+00
221+00
222+00
223+00224+00 225+00 226+00
52+00 53+00 54+00 55+00 56+00
PO
E 5
6+12.6
6
EXISTING R/W
EXISTING R/W
25'
25'
40'
25'
45'
45'
30'
21
2
3
PB 234-51D 4575 167
CARLTON O. DORMAN234-11.00-60.00
PB 70-304D 2588 113
CARLTON 0. DORMAN234-11.00-60.01
PB 70-304D 2588 113
CARLTON 0. DORMAN234-11.00-60.01
D 4823 308 DOUBLE DP LP,234-11.00-49.00
W
02
W
03
W
01
W
04
T
01
W
02
T
03
LEGEND
TEMPORARY IMPACT AREA
WETLAND BOUNDARYWL
IMPACT AREA TYPE ID. (SEE BELOW)
IMPACT AREA ID. AND/OR NUMBER
XX
?X
O = OPEN WATER IMPACT
W = WETLAND IMPACT
PERMANENT IMPACT AREA
T = TEMPORARY IMPACT
ORDINARY HIGH WATER / WETLANDOHW/WL
TEMPORARY WETLAND IMPACT AREA SCHEDULE
ID IMPACT DESCRIPTION AREA (SF) AREA (AC) VOLUME (CY) JURISDICTION
USACEN/A0.04882128.30TOTAL TEMPORARY WETLAND IMPACT AREAS
5-01 WORK AREA / E&S CONTROLS 346.45 0.0079 N/A USACE
5-02 WORK AREA / E&S CONTROLS 339.79 0.0078 N/A USACE
5-03 WORK AREA / E&S CONTROLS 1442.06 0.0331 N/A USACE
5-01 FILL 1154.15 0.0265 N/A USACE
5-02 FILL 332.46 0.0076 N/A USACE
5-03 FILL 912.03 0.0209 N/A USACE
PERMANENT WETLAND IMPACT AREA SCHEDULE
ID IMPACT DESCRIPTION AREA (SF) AREA (AC) VOLUME (CY) JURISDICTION
5-04 FILL / RIP RAP 129.02 0.0030 N/A USACE
USACEN/A0.05802527.66TOTAL PERMANENT WETLAND IMPACT AREASN
SCALE
0
FEET
30 60 90
45
COMPLIANCE PLAN
ENVIRONMENTAL
EC-05
CONTRACT
T201200902
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.
KENT
ADDENDA / REVISIONS SECTION
SHEET NO.
\\D
OTFS08\c
add\A
ctiv
e_
Desig
ns\S
US
SE
X\0
24\r
oad\T
201200902\Pla
ns\M
OD
EL P
LA
NS O
NLY\E
C 05.d
gn
10:3
6
5-O
CT-2
021
SR24 AT ANGOLA ROADARROW HEAD ROAD ANDHSIP SC, SR24 AT CAMP N/A
W. NAUMAN
C. ESHAM
PD
MA
TC
H
LIN
E S
TA 218
+50
TCE-2R/W-2
TCE-2
R/W-2
TCE-2
TCE-1
TCE-1
PE-3