    Environmental Issues and RegulationsEnvironmental Issues and Regulations

    with respect to Flyash Managementwith respect to Flyash Management

    Dr. S.K. Paliwal, Scientist

    Central Pollution Control Board, Delhi

  • 7/31/2019 Environmental Issues and Regulations for Fly Ash Management

    2/29

    FlyashFlyash

    Flyash is categorised as high volume low effect

    waste under Hazardous Wastes ( Management,Handling & Transboundary movement ) Rules ,

    2008

    Chemically , flyash mainly consists of oxides of

    silica, aluminium, Iron and calcium., besidestrace of elements like arsenic, beryllium, boron,cadmium, chromium, chromium VI, cobalt, lead,manganese, mercury, molybdenum etc.

  • 7/31/2019 Environmental Issues and Regulations for Fly Ash Management

    3/29

    Coal based plants contribute about 53% of totalcapacity

    Consumed about 355 million tonnesmillion tonnes of coal with ash

    content 35-45% during 20082008--0909 NearlyNearly 140140 million tonnesmillion tonnes perper annumannum coal ash is

    generated.

    Occupied nearly 40,000 hectares,000 hectares of land forconventional disposal of ash.

    Require about 1040 million Mmillion M33 water annually fordisposal of coal ash as in slurry formslurry form, if not utilised

  • 7/31/2019 Environmental Issues and Regulations for Fly Ash Management

    4/29

    Flyash Generation

  • 7/31/2019 Environmental Issues and Regulations for Fly Ash Management

    5/29

    Environmental issues

    Air Pollution ( Dust emission from ash pond) Water Pollution ( Contamination of ground &

    surface water

    Land degradation

  • 7/31/2019 Environmental Issues and Regulations for Fly Ash Management

    6/29

    Environmental Regulations( 1999)

  • 7/31/2019 Environmental Issues and Regulations for Fly Ash Management

    7/29

    Objectives

    To protect the environment, conserve top

    soil and prevent the dumping and disposal offly ash from coal or lignite based thermalpower plants

  • 7/31/2019 Environmental Issues and Regulations for Fly Ash Management

    8/29

    Directions /Notification

    Vide notification No.S.O.763(E), [14/9/1999], Dumping

    and disposal of fly ash discharged from coal or

    lignite based thermal power plants on land

    Use of flyash, bottom ash or pond ash in themanufacture of bricks and other construction activities

    Utilisation of flyash by thermal power plants and

    Specifications for use of flyash based products byGovernment agencies

  • 7/31/2019 Environmental Issues and Regulations for Fly Ash Management

    9/29

    No person shall within a radius of 100 kms from thermalpower plants, manufacture clay bricks, tiles or blockswithout mixing atleast 25% of flyash or pond ash with soil

    Thermal power Plants New Power PlantsNew Power Plants

    30 % flyash utilisation within 3 year30 % flyash utilisation within 3 year

    100 % flyash utilisation within 9100 % flyash utilisation within 9 years

    Existing Power PlantsExisting Power Plants 20 % flyash utilisation within 3 year20 % flyash utilisation within 3 year

    100 % flyash utilisation within 15 years100 % flyash utilisation within 15 years

  • 7/31/2019 Environmental Issues and Regulations for Fly Ash Management

    10/29

    Amendments

    First Amendment

    1. S.O.979(E), [27/8/2003] - Amendments toS.O.763(E) dated 14/9/1999

  • 7/31/2019 Environmental Issues and Regulations for Fly Ash Management

    11/29

    No person shall within a radius of 100 kms from thermal powerNo person shall within a radius of 100 kms from thermal power plants, manufactureplants, manufacture

    clay bricks, tiles or blocks without mixing atleast 25% of flyasclay bricks, tiles or blocks without mixing atleast 25% of flyash or pond ash with soil.h or pond ash with soil.

    Construction Agency including private sector builders shall useConstruction Agency including private sector builders shall use minimum of followingminimum of following

    percentage of ash based products such as : bricks, block & tilespercentage of ash based products such as : bricks, block & tiles in their constructionin their construction

    work:work: 25 % by 31st March, 2004

    50% by 31st December, 2005

    75% by 31st December, 2006

    100% by 31st December, 2007

    Authority sanctioning or renewing mining lease shall not grant oAuthority sanctioning or renewing mining lease shall not grant or extend the lease if ther extend the lease if the

    manufacturer does not use the 25% of the Flyash in the manufactumanufacturer does not use the 25% of the Flyash in the manufacturing of bricks, blocksring of bricks, blocks

    and tiles.and tiles.

    Utilisation of Flyash for reclamation of sea subject to complianUtilisation of Flyash for reclamation of sea subject to compliance of the rules madece of the rules made

    under the EPA, 1986.under the EPA, 1986.

  • 7/31/2019 Environmental Issues and Regulations for Fly Ash Management

    12/29

    Second Amendment

    2.S.O. 2804(E), [ 03.11.2009]- Amendments toS.O. 763 (E) dated 14/09/1999

    [ Flyash means and includes ash collected from ESP, dryflyash, bottom ash, pond ash & mound ash generated from

    coal/lignite based thermal power plants including CPP]

  • 7/31/2019 Environmental Issues and Regulations for Fly Ash Management

    13/29

    Amendment dated 3rd November

    2009 (1A) Every construction agency engaged in the construction

    of buildings within a radius of hundred kilometers (by road)from a coal or lignite based thermal power plant shall use onlyfly ash based products for construction, such as:cement/concrete, fly ash bricks or blocks or tiles or clay fly ash

    bricks, blocks or tiles or cement fly ash bricks or bricks orblocks or similar products or a combination or aggregate ofthem in every construction project.

    (1B) Applicable to all construction agencies of Central or Stateor Local Government and private or public sector. Submitannual returns to the concerned State Pollution Control Board

    or Pollution Control Committee.;

    (2A) State Government or Union territory Government shall be theenforcing and monitoring authority for ensuring compliance of theprovisions of sub-paragraph (1A) and (1B).;

  • 7/31/2019 Environmental Issues and Regulations for Fly Ash Management

    14/29

    (1C) Minimum fly ash content for building materials orproducts to qualify as fly ash based products

    S.

    No.

    Building Materials or Products Minimum % of fly ash by

    weight

    (1) (2) (3)

    1. Fly ash bricks, blocks, tiles, etc. made with

    fly ash, lime, gypsum, sand, stone dust,cement, etc. (without clay).

    50% of total raw

    material.

    2. Paving blocks, paving tiles, checker tiles,

    mosaic tiles, roofing sheets, pre-cast

    elements, etc. wherein cement is used as

    binder.

    Usage of PPC (fly ash)

    or 20% of OPC content.

    3. Cement. 20% of total rawmaterials.

    4. Clay based building materials such as

    bricks, blocks, tiles, etc.

    25% of total raw

    materials.

    5. Concrete, mortar and plaster. Usage of PPC (fly ash)

    or 20% of total raw

    material.

  • 7/31/2019 Environmental Issues and Regulations for Fly Ash Management

    15/29

    (4) Each coal or lignite based thermal power plantshall constitute adispute settlement committee

    Composition:

    General Manager of the thermal power plant

    Representative of the relevant Construction and fly ash BrickManufacturing Industry Association / Body

    TOR

    Ensure unhindered loading and transport of fly ash without anyundue loss of time.

  • 7/31/2019 Environmental Issues and Regulations for Fly Ash Management

    16/29

  • 7/31/2019 Environmental Issues and Regulations for Fly Ash Management

    17/29

    Reclamation and compaction of low-lying areas

    No agency, person or organisation shall within a radius of hundred

    kilometers (by road) of a coal or lignite based thermal power plantundertake or approve or allow reclamation and compaction of low-lying areas with soil. Only fly ash shall be used for compaction andreclamation. They shall also ensure that such reclamation andcompaction is done in accordance with the specifications andguidelines laid down

    Stowing of mine

    No person or agency shall within fifty kilometers (by road) from coal orlignite based thermal power plants, undertake or approve stowing ofmine without using at least 25% of fly ash on weight to weight basis,of the total stowing materials used and this shall be done under theguidance of the DGMS or CMPDIL

    Back Filling of open cast mines

    No person or agency shall within fifty kilometers (by road) from coalor lignite based thermal power plants, undertake or approve withoutusing at least 20% of fly ash on volume to volume basis of the totalmaterials used for external dump of overburden and same percentagein upper benches of back filling of opencast mines and this shall be

    done under the guidance of DGMS or CMPDIL

  • 7/31/2019 Environmental Issues and Regulations for Fly Ash Management

    18/29

    Sale of flyash

    All coal or lignite based thermal power stations would be free to sellfly ash to the user agencies subject to the following conditions:

    The pond ash and mound ash should be made available free of anycharge on as is where is basis to manufacturers of bricks, blocks ortiles including clay fly ash product manufacturing unit(s), farmers, theCentral and the State road construction agencies, Public WorksDepartment, and to agencies engaged in backfilling or stowing ofmines.

    At least 20% of dry ESP fly ash shall be made available free of chargeto units manufacturing fly ash or clay-fly ash bricks, blocks and tileson a priority basis over other users. If the demand from such

    agencies falls short of 20% of quantity, the balance quantity can besold or disposed of by the power station. Provided that the fly ashobtained from the thermal power station should be utilized only for thepurpose for which it was obtained failing which no fly ash shall bemade available to the defaulting users.

  • 7/31/2019 Environmental Issues and Regulations for Fly Ash Management

    19/29

    All coal and, or lignitebased thermal powerstations and, or expansionunits in operation beforethe date of thisnotification are to achievethe target of fly ashutilization as per the table

    The unutilized fly ash inrelation to the target

    during a year, if any, shallbe utilized within next twoyears in addition to thetargets stipulated forthose years. The balanceunutilized fly ashaccumulated during firstfour years (the difference

    between the generationand the utilization target)shall be utilizedprogressively over nextfive years in addition to100% utilization of currentgeneration of fly ash.

    S,No Percentage Utilizationof Fly Ash Target Date

    1. At least 50% of fly ashgeneration

    One year from thedate of issue of this

    notification.

    .2 At least 60% of fly ashgeneration

    Two year from thedate of issue of thisnotification

    3 At least 70% of fly ashgeneration

    Three year from thedate of issue of thisnotification

    4. At least 90% of flyash

    generation

    Four year from the

    date of thisnotification

    5 100 % fly ash generation Five year from thedate of issue of thisnotification

  • 7/31/2019 Environmental Issues and Regulations for Fly Ash Management

    20/29

    New coal and, or lignitebased thermal power stationsand, or expansion units

    commissioned after thisnotification to achieve thetarget of fly ash utilization asper table

    The unutilized fly ash inrelation to the target during ayear, if any, shall be utilizedwithin next two years in

    addition to the targetsstipulated for these years.The unutilized fly ashaccumulated during firstthree years (the differencebetween the generation andutilization target) shall beutilized progressively overnext five years in addition to

    100% utilization of currentgeneration of fly ash.;

    S.No. Fly ash utilizationlevel

    Target date

    1 At least 50% of flyash generation

    One year from

    the date of

    2 At least 70% of flyash generation

    Two years from

    the date of

    commissioning ..

    3 At least 90% of flyash generation

    Three years

    from the date of

    commissioning ..

    3 At least 100% of flyash generation

    Four years from

    the date of

    commissioning.

  • 7/31/2019 Environmental Issues and Regulations for Fly Ash Management

    21/29

    Annual Implementation Report

    Annual implementation report (for the period 1st April to31st March) providing information about the complianceof provisions in this notification shall be submitted by the30th day of April, every year to the Central Pollution

    Control Board, concerned State Pollution Control Boardor Committee and the concerned Regional Office of theMinistry of Environment and Forestsby the coal or lignitebased thermal power plants, and also be made a part ofthe annual report of the thermal power plant as well as

    thermal power plant wise information be provided in theannual report of thermal power producing agency owningmore than one thermal power plant.;

  • 7/31/2019 Environmental Issues and Regulations for Fly Ash Management

    22/29

    Directions to all agencies undertaking construction of roads or fly

    over bridges and reclamation and compaction of low lying areas,including Department of Road Transport and Highways (DORTH),National Highways Authority of India (NHAI), Central Public WorksDepartment (CPWD), State Public Works Departments and otherState Government Agencies,

    a. make provisions in their tender documents, schedules of approvedmaterials and rates as well as technical documents for implementation ofthis notification, including those relating to soil borrow area or pitb. make necessary specifications or guidelines for road or fly overembankments that are not covered by the specifications laid down by theIndian Road Congress (IRC).

    All local authorities shall specify in their respective tender

    documents, building bye-laws and regulations, the use of fly ashand fly ash-based products and construction techniques inbuilding materials, roads embankments or for any usage withimmediate effect.

  • 7/31/2019 Environmental Issues and Regulations for Fly Ash Management

    23/29

    Land for ash disposal for future plants

    The Central Electricity Authority and other approvingagencies may permit the land area for emergency ashpond or fly ash storage area up to 50 hectares for a 500MW unit, based on 45% ash content coal, or in thesame proportion for units in other capacities takinginto account the ash content in coal or lignite to beused.

  • 7/31/2019 Environmental Issues and Regulations for Fly Ash Management

    24/29

    Impact of the directions/ notification

  • 7/31/2019 Environmental Issues and Regulations for Fly Ash Management

    25/29

    Ash Utilisation Trend

  • 7/31/2019 Environmental Issues and Regulations for Fly Ash Management

    26/29

    Sector wise share of flyash utilisation

    Ash Dy keRaising

    15%

    Mine Filling

    Stowing

    6% Land Filling

    22%

    Cement

    Industries

    31%

    Bricks

    6%

    Roads &

    Embankment

    6%

    Agricultural

    1%

    Others

    13%

  • 7/31/2019 Environmental Issues and Regulations for Fly Ash Management

    27/29

    Highlights

    Four fold increase in ash utilisation was achieved during the period of

    10 yrs (from 1999 to 2009), as ash utilsation increased from 12 % (

    1999) to 47% ( 2009)

    Fifteen power plants have achieved hundred percent flyash utilisation Cement sector has taken lead in ash utilsation followed by land

    filing, ash dyke raising & construction of Roads & embankments

    New plants particularly to be located in coastal areas are committed

    for achieving 100% ash utilisation from the commissioning of plants.

    Flyash has become Exportable item as number of plants are

    exporting the flaysh

  • 7/31/2019 Environmental Issues and Regulations for Fly Ash Management

    28/29

    Future strategiesTo achieve the hundred percent ash utilisation, efforts are needed by all theconcerned

    Besides ash utilisation in cement manufacturing, mine backfillingshould be made hassle free through better inter-departmental co-ordination

    Power plants should be linked with dedicated cement plant or coalmines

    Power plants should not encourage third parties/ agencies for supplyof flyash.

    Power Plants should provide Silos for collection and storage of dry

    flyash with proper unloading facility

    Power Plants should provide hassle free entry to the entrepreneurswilling to take up the flyash.

    Consent to operate to the power plants should be issued/ renewedincluding flyash utilisation as per notification as one of the condition