Environmental Monitoring Report Semi-Annual Report July – December, 2017
VIE: Greater Mekong Sub-region Flood And Drought Risk Management and Mitigation Project Prepared by Vietnam Water, Sanitation and Environmental JS Company for the Ministry of
Agriculture and Rural Development and the Asian Development Bank
ASIAN
DEVELOPMENT
BANK
MINISTRY OF RURAL
DEVELOPMENT AND
AGRICULTURAL
CENTRAL OFFICE FOR WATER RESOUCES PROJECT – CPO
BIDDING PACKAGE GMS-4.10
INDEPENDENT ENVIRONMENTAL MONITORING CONSULTANT
SECOND SEMI-ANNUAL ENVIRONMENTAL
MONITORING REPORT
GREATER MEKONG SUBREGION FLOOD AND DROUGHT RISK
MANAGEMENT AND MITIGATION PROJECT (ADB-GMS1)
INVESTOR CONSULTING UNIT
CENTRAL PROJECT OFFICE - CPO VIETNAM WATER, SANITATION AND
ENVIRONMENTAL JS COMPANY
Hanoi December, 2017
CURRENCY EQUIVALENTS
(Up to 16th August, 2013)
Currency unit – Viet Nam Dong (VND)
$1.00 = VND 20.815
ABBREVIATIONS
ADB – Asian Development Bank
PMU – Project Management Unit
BVMT – Environmental protection
CBOs – Community Based Organizations
CEMP – Community Environmental Management Program
CPM – Central Project Management Unit
CPO – Central Project Office
EMP – Environmental Management Plan
GOV – Government
M&E – Monitoring and Evaluation
PPMU – Provincial Project management Unit
PRA – Public Relative Assessment
QLMT – Environmental management
SEMP – Site Environmental Management Program
TN&MT – Natural resources and Environment
TOR – Terms of References
TVGS – Monitoring Consultant
DONRE – Department of Natural Resources and Environment
IEE – Initial Environmental Examination
PMU – Project Management Unit
QCVN – Vietnam National Environmental Standards
UNITS OF MEASUREMENT
ha – Hectare kg – Kilogram km – Kilometer m – Meter t – Ton
NOTES
In this report, "$" refers to US dollars unless otherwise state.
This environmental monitoring report is a document of the borrower. The views
expressed herein do not necessarily represent those of ADB's Board of Directors,
Management, or staff, and may be preliminary in nature.
In preparing any country program or strategy, financing any project, or by making any
designation of or reference to a particular territory or geographic area in this document,
the Asian Development Bank does not intend to make any judgments as to the legal or
other status of any territory or area.
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
62
CONTENT
1.1. PROJECT BACKGROUND ........................................................................................... 63
1.2. PROJECT IMPLEMENTATION PROGRESS .................................................................... 64
2. INSTITUTIONAL SETUP AND RESPONSIBILITIES FOR EMP IMPLEMENTATION
AND SUPERVISON................................................................................................................. 60 3. COMPLIANCE WITH ENVIRONMENT RELATED PROJECT COVENANTS ............. 61
4. ENVIRONMENTAL MITIGATION MEASURES IMPLEMENTED IN THE REPORTING
PERIOD .................................................................................................................................... 60 5. ENVIRONMENTAL EFFECTS MONITORING ................................................................ 67
5.1. PURPOSE, SAMPLING METHOD AND LOCATION ........................................................ 67
5.2. MONITORING RESULT .............................................................................................. 60
6. PUBLIC CONSULTATION, GRIEVANCE REDRESS MECHANISM ............................ 69
6.1. PUBLIC CONSULTATION AND EMP INFORMATION DISSEMINATION ........................ 69
6. PUBLIC CONSULTATION, GRIEVANCE REDRESS MECHANISM ............................ 69
6.1. PUBLIC CONSULTATION AND EMP INFORMATION DISSEMINATION ........................ 69
6.2. GRIEVANCE REDRESS MECHANISM (GRM) ............................................................ 71
7. INSTITUTIONAL STRENGTHENING AND TRAINING ................................................ 71 8. KEY ENVIRONMENTAL ISSUE ....................................................................................... 72 9. CONCLUSION AND RECOMMENDATION .................................................................... 61
9.1. OVERALL PROGRESS OF IMPLEMENTATION OF ENVIRONMENTAL MANAGEMENT
MEASURES ........................................................................................................... 61
9.2. ACTION RECOMMENDED ......................................................................................... 61
APPENDICES ........................................................................................................................... 60
LIST OF TABLES
Table 1: Project implementation progress ......................................................................... 60
Table 2: Responsibilities of environmental management implementation........................ 60
Table 3: Compliance with environmental related project covenants ................................. 60
Table 4: Environmental protection measures to be performed .......................................... 60
Table 5: Purpose, monitoring locations and analysis parameters ...................................... 68
Table 6: Site Status and Key Issues Identified, Actions Taken, Additional Action
Required for Each Construction Item ................................................................................ 60
LIST OF FIGURES
Figure 1. Implementation organization chart ..................................................................... 60
Figure 2: Sampling map of Go Cong subproject ............................................................... 60
Figure 3: Map of air samples (Ba Rai - Phu An subproject) ............................................. 62
Figure 4: Map of surface water samples (Ba Rai - Phu An subproject) ............................ 62
Figure 5: Map of groundwater samples (Ba Rai - Phu An subproject) ............................. 64
Figure 6: Map of soil samples (Ba Rai - Phu An subproject ............................................. 64
Figure 7: Map of air sampling – Dong Thap Muoi subproject (Plain of Reeds) ............... 65
Figure 8: Map of air sampling – Dong Thap Muoi subproject (Plain of Reeds) ............... 67
Figure 9: Map of surface water sampling - Dong Thap Muoi subproject ......................... 68
Figure 10: Map of ground water sampling – Dong Thap Muoi subproject ....................... 68
Figure 11: Map of mud/soil sampling – Dong Thap Muoi subproject (Plain of Reeds) ... 69
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
63
1. INTRODUCTION
1.1. Project background
Greater Mekong flood subregion and drought risk management and mitigation project
(ADB-GMS1) is taken from loans no.2937-VIE (SF) of Asian Development Bank
(ADB). The Agreements was signed from 21 December, 2012 and entered into force on
10 May, 2013.The project includes 04 subprojects located on 02 provinces Tien Giang
and Dong Thap. Construction period of the project expected 03 years. Detail is as
following:
(1) Construction of flood control system in Ba Rai – Phu An region, Tien Giang
province: Construction of 28 medium and small sewers to create a flooding prevention
system protects the safety of people and fruit-growing area for the region between two
channels Ba Rai and Phu An thereby boosting socio-economic sustainable
development for investment area of the project.
(2) Upgrading saline control system of Go Cong region, Tien Giang province:
Construction of 3 new sewers includes Son Quy (B=20m). Nguyen Van Con (B=15m)
and Salisete (B=10m) and 1,9km of embankment connecting 03 existing sewers to
against salt intrusion for Go Cong town and Go Cong freshening area of the project;
(3) Improvement and upgrading irrigation channels and supply irrigation water for
Plain of Reeds include channels and its length: (i) Khang Chien (32,263km),
construction of 20 sluice and culvert system of flood control and drainage,
embankment combining with construction of rural traffic road; (ii) Tan Cong Chi –
Doc Vang Ha (37,370km), construction of 27 new sewers; and (iii) Cai Cai
(19,668km), construction of 5 sewers and 3 bridges which pass over channel.
Embankment and upgrading traffic infrastructure along existing system of channels are
to improve flooding drainage capacity, mitigate the damage of flood caused and
provide irrgation water for Plain of Reeds;
(4) Embankment erosion control in Thuong Thoi Tien Town, Hong Ngu District, Dong
Thap Province: New construction of a ferry terminal in district central and 3.224km of
embankment, which was broken by flood as well as construction of traffic road along
riverbank (7,0m of width with asphalt).
Each subproject includes 04 components:
- Component 1: Enhancing database, information and regional knowledge to
manage floods and droughts. Planning design guidelines for flood and drought
control system and protection works in MeKong Delta region, Cambodia –
Vietnam overflowing flood management;
- Component 2: Improving infrastructure of drainage system;
- Component 3: Strengthening management capacity based on communities;
- Component 4: Project management.
The objective of project is to improve capacity of community to prepare for respond to
and overcomes the risks of flood and drought caused reduces maximum the damages of
prolonged flood and drought to the local economy and society.
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
64
The Project will support GoV to carry out structural and non-structural actions for the
preparation and management of disaster risks related to floods and droughts. Floods and
droughts will be mitigated by positive impacts of the project. Strengthening capacity and
improving management process is one of project’s results. Specifically:
- Upgrading irrigation infrastructures include: Dredging, expanding 77km of
channel; reinforce 60km of embankment and rural road; construct regulator
drainage system, traffic bridge; construction of 3.25km embankment to improve
flooding drainage and to ensure safety of people as well as irrigation water source
providing to 185,872ha of agricultural land;
- Enhance community capacity to manage floods and droughts with the activities
focused on some communes in project area;
- Regional cooperation to manage negative issues such as climate change, sea level
rise and border overflowing flood; building design standards of flood and drought
in the Mekong Delta with the cooperation of MRC and the participartion of
Mekong riparian countries.
1.2. Project implementation progress
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
60
Table 1: Project implementation progress
No Bidding package
Contractor
selection
period
Implementation
period
Begining of
construction period Construction progress to April/2017
1
Civil package GMS 2.6.
Upgrading saline control system
of Go Cong region, Tien Giang
province
Quater
II/2014-
IV/2014
3 years 23, February 2016
- Construction progress of Nguyen Van Con
sewer: 92% workload.
- Currently, the items are being carried out as
following: Making road on the sluice and
administration building
- Construction progress of Saliset Sluice: 95%
workload. Finishing trial operation of water
circulation
- Currently, the items are being carried out as
following: Making road on the sluice and
administration building
- Construction progress of Son Quy sluice: 20%
workload.
- Currently, the items are being carried out as
following: Pouring concrete into holes
2
Civil package GMS 2.7
Construction of flood control
system in Ba Rai – Phu An
region. Tien Giang province
Quater
II/2014-
IV/2014
3 years 6, February 2017
- Construction progress: under construction of 28
sluices
- 04 remaining sluices haven’t been constructed
due to delay in handing over the ground for
contractor
3
Civil package GMS 2.8.
Embankment erosion control in
Thuong Thoi Tien Town, Dong
Thap Province
Quater
II/2014-
IV/2014
3 years 29, December 2015 The construction was completed.
4 Civil package GMS 2.9. Quater 4 years Quater IV/2016 - In association with Petroleum Construction
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
61
Improvement and upgrading
irrigation channels and supply
irrigation water for Plain of
Reeds, Dong Thap province
II/2014-
IV/2014
Investment Joint Stock Company and Hong
Truong Limited Company, Bao Chung Joint
Stock Company are carrying out to construct 3
bridges (Long Son Ngoc, Ca Cap 2, Ca Chap 3,
dredging Cai Cai channel and pumping mud into
Cell no 1,3,4).
- Huyen Minh company are constructing Cell
no.2 and Bau Lut bridge
Workload carried out is as following:
- Completed casting concrete pile of Long Son
Ngoc and Ca Chap 3 bridge (under construction
of spans)
The volumn of Cell no 1 reaches about 95%
The volumn of Cell no 2 reaches about 95%
The volumn of Cell no 3 reaches about 95%
Currently, cell no.4 hasn’t carried out the
construction activities
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
60
2. INSTITUTIONAL SETUP AND RESPONSIBILITIES FOR EMP
IMPLEMENTATION AND SUPERVISON
Institutional responsibilities for environmental management
Figure 1. Implementation organization chart
Task, function of agencies/organizations:
Table 2: Responsibilities of environmental management implementation No Agencies Responsibilities of environmental management
implementation
1 CPO/CPMU Taking responsibilities for management, monitoring, supervision
and preparation of environmental monitoring reports to submit
ADB every 6 months.
Mobilize an independent environmental monitoring consultant
during project implementation process to monitor EMP’s
implementation.
2 PPMU To be responsible for implementing all of environmental
protection activities in the environmental management plan of the
sub-projects (EMP) in the preparation stages of pre-construction
and construction.
Assign environmental staff to supervise environmental protection
activities of contractors as well as CSC’s monitoring activities
Coordinating with local authorities to resolve complaints (if any).
Prepare periodic reports to submit CPMU about implementing
project plan and environmental management plan of sub-project.
3 Construction
contractor
Prepare “Site environmental management plan for construction
area of contractor" to meet the requirements for environmental
management of sub-project. This plan must be approved by the
project owner before proceeding construction.
Perform tasks that defined in the Site Environmental
Management Plan, effectively caring out mitigation measures
ADB CPMU
PPMU
Environmental staff
Contractor CMC Community
IEMC
DONRE
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
61
No Agencies Responsibilities of environmental management
implementation
during construction and other issues relating to the
environmental management plan of sub-project.
Reporting to local authorities and PPMU if occurring the
environmental accidents and coordinating with relevant parties
and stakeholders to resolve it.
Resolve complaints relating to the construction and operation of
the workers.
4 Construction
Supervision
Consultant
Support PMU for the implementation of daily environmental
management plan approved by ADB in contractor’s construction
process
Periodically making the temporary reports on implementation of
EMP at the site including the improved proposals for Contractor’s
synthesis to submit to PPMU
5 Independent
environmental
monitoring
consultant of
project
Strengthen management capacity and environmental monitoring
for contractors thoughout EMP guideline and training class.
Checking, supervise the compliance of contractors with
environmental mitigation measures mentioned in the approved
EMP/EIA
Sampling, analysis and environmental quality assessment to
evaluate project’s influence level to the environment
Prepare periodic reports on implementing environmental
safeguard for subproject as required
6 Local community Residential communities have right and responsibility supervising
activities in the construction process to ensure rights and their
safety policies are protected adequately as well as mitigation
measures are implemented effectively by contractor and PMU. In
case of unexpected problems, they will report to CSC/PMU/CPC.
3. COMPLIANCE WITH ENVIRONMENT RELATED PROJECT COVENANTS
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
60
Table 3: Compliance with environmental related project covenants Implemen
tation
condition
of the
sub-
projects
Environmental covenants
Communit
y
monitoring
UXO Environment Related to bidding document and
contracts
Grievance
redress
mechanism
Set up
monitoring
activities
basing on
community
Removi
ng
unexplo
ded
ordinace
s (UXO)
Complianc
e with
Vietnam
laws and
regulations
on
environme
nt, safety
and health
Complian
ce with
environm
ental
safety
Compliance
with mitigation
measures and
requirements
mentioned in
IEE and EMP
and other
preventing
measures,
which involved
monitoring
report
Priority to
implemena
tion of
ADB
policies if
there are
differences
between
ADB
policies
and
Vietnam
laws/regul
ations
ADB policies
will be applied
if there are
diffrences arised
between ADB
policies and
Vietnam law,
regulations
Contractor
must
comply
with
requiremen
ts and
mitigation
measures
mentioned
in IEE,
EMP and
other
preventing
measures,
which
involved
monitoring
report
Forecast
unforeseen
environmental
risks in IEE, EMP
Restate road,
infrastructure in
case it is damaged
by construction
activities,
transport before
completing the
project
Recover
roads and
infrastructu
re before
completing
the project
in case it is
damaged
Set up
grievance
redress
mechanism
(GRM)
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
61
GMS 2.6.
Upgrading
saline
control
system of Go
Cong region,
Tien Giang
province
Non-
complied1
Being
complie
d
Being
complied
Being
complied
Partly
complied2
Being
complied
– Being
complied
No unforeseen
environmental
risks arised
Not yet
due,
because
Son Quy
sluice is
under
constructio
n
Being
complied
GMS 2.7.
Construction
of flood
control
system in Ba
Rai – Phu
An region,
Tien Giang
province
No
monitoring
activities
carried out
because
Interdisciplin
ary inspection
teams are
performing
cross-
checking3
Being
complie
d
Being
complied
Being
complied
Partly
complied
Being
complied
– Being
complied
No unforeseen
environmental
risks arised
To prepare
detours for
civil traffic
Being
complied
GMS 2.8.
Embankment
erosion
control in
Thuong Thoi
Tien Town,
Dong Thap
Province
Done
Done Done Done Done Done Done Done
Done Done Done
1 In first period of the project, community-based monitoring was set up, however, due to its poor supervision, community-based monitoring has been suspended and now replaced
by Interdisciplinary inspection teams 2 In the monitoring phase, IEMC team found that contractor and CSCs didn’t perform environmental mitigation measures such as sparying water to reduce dust on the
transportation routes as well as cleaning up transportation vehicles. Besides, environmental mitigation measures, which mentioned in EMP report, were performed poorly by
contractors 3 Similar to civil package GMS 2.6, IEMC team asked Tien Giang PPMU and community-based organizations to supervise construction activities tightly in order to ensure
affected people’s benefit and quickly repair incidents (if any)
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
62
GMS 2.9.
Improvemen
t and
upgrading
irrigation
channels and
supply
irrigation
water for
Plain of
Reeds
Being
complied
Being
complie
d
Being
complied
Partly
complied
Non-complied
at Cell no.24
Being
complied
Complied Complied
No unforeseen
environmental
risks arised
Not yet
due,
because it
is under
constructio
n
Being
complied
4 Details will be shown at Table 6, civil package GMS 2.9 – Cell no.2
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
60
4. ENVIRONMENTAL MITIGATION MEASURES IMPLEMENTED IN THE
REPORTING PERIOD
4.1. Monitoring method
In order to assess compliance with environmental protection measures of contractors,
IEMC has carried out monitoring methods as following:
Field survey: In monitoring phases of quarter III, IEMC had carried out field survey (5
November – 14 November, 2017) for each construction site in order to observe and
record compliance with environmental protection measures of contractors.
Composition of site survey included: IEMC team, PPMU’s environmental staff, CSC and
site leader of the civil package. Details of site survey are as follow:
- 6 November, 2017: Meeting with Tien Giang PPMU and conducting the site survey of
civil package GMS 2.6 – Go Cong subproject.
- 7-9 November, 2017: Conducting the site survey of civil package GMS 2.7 – Ba Rai-
Phu An subproject
- 10 November, 2017: Meeting with Dong Thap PPMU
- 11 November, 2017: Conducting the site survey of civil package GMS 2.8 – Thuong
Thoi Tien subproject
- 12-13 November, 2017: Conducting the site survey of cilvil package GMS 2.9 – Cai Cai
channel subproject
CSC monitoring: For each bidding package, IEMC has set up an environmental
monitoring form according to EMP provided for CSC. CSCs have responsibility to carry
out environmental protection measures everyday basing on environmental monitoring
form and synthesize it in monthly reports. In periodically monitoring phases, IEMC will
review those monthly reports to assess compliance with environmental protection
measures of construction contractor.
Community consultation: Recording people’s reflection on environmental issues at
construction site as well as environmental sanitation safeguards of contractors during
construction.
4.2. Environmental protection measures to be performed
IEMC has synthesized Table 4 according to environmental protection measures proposed
by EMP and compliance with environmental mitigation measures of contractors based
on CSC’s monthly environmental monitoring reports (Environmental monitoring forms
of monthly environmental monitoring reports are presented at Appendix 3 in the report).
Detail of Table 4 is as following:
Table 4: Environmental protection measures to be performed
No
Environmental
protection
measures
The implementaion of Environmental protection measures at the
subprojects
GMS 2.6.
Upgrading saline
control system of
Go Cong region,
Tien Giang
GMS 2.7.
Construction of
flood control
system in Ba Rai –
Phu An region,
GMS 2.8.
Embankment
erosion control
in Thuong Thoi
Tien Town,
GMS 2.9.
Improvement and
upgrading
irrigation
channels and
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
61
province Tien Giang
province
Dong Thap
Province
supply irrigation
water for Plain of
Reeds
1 Removing UXO Being complied
Unexploded
ordnance has
been already
removed by
professional unit
before
commencement
of construction
Being complied
Unexploded
ordnance has been
already removed by
professional unit
before
commencement of
construction
Done Being complied
Unexploded
ordnance has
been already
removed by
professional unit
before
commencement
of construction
2 Diclosure of
RAP, EMP5
Done Done Done Done
3 Prepare onsite
environmental
mangement plan
Being complied
On site
environmental
mangement plans
prepared by
contractors have
been submitted to
CSC before
commencement
of construction
Not yet due
On site
environmental
mangement plans
prepared by
contractors have
been submitted to
CSC before
commencement of
construction
Done Being complied
Onsite
environmental
mangement plans
prepared by
contractors have
been submitted to
CSC before
commencement
of construction
4 Disposal site of
excavating
soil/dredging
mud
The amount of
excavated
soil/mud of Go
Cong and Saliset
sluice has been
used for restating
surface road as
well as making
sluice box body
The amount of
soil/mud will be
placed on site and
reuse for restating
surface road and
making sluice box
body. However,
contractors have not
carried out
environmental
protection measures
for the mud
disposal site as
mentioned in EMP
report. IEMC team
has remided
contractors and
PPMU’s
environmental staff
to carry out
environmental
protection
measures. Budget
for environmental
Done Disposal site has
been prepared
according to the
agreement with
local
Vetiver grass was
planted around
embankment of
disposal site
5 PPMU has completed sending RAP and EMP reports to commune/ward PCs in the project area. For EMP report,
contractors have saved one copy on site office in order to facilitate the implementation of environmental mitigation
measures
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
62
protection measures
included in contract
for each
construction item
5 Training labor
safety
Being complied
Contractor carried
out training labor
safety for workers
before
commencement
of construction
Being complied
Contractor carried
out training labor
safety for workers
before
commencement of
construction
Done Being complied
Contractor carried
out training labor
safety for workers
before
commencement
of construction
6 First-aid kit Being complied
First-aid kits in
worker’s camps
have been
equipped fully by
contractor
Partly complied
First-aid kits in
worker’s camps
have been equipped
fully by contractor
However, the
quantity of
medicine and
medical instruments
isn’t enough
Done Partly complied
First-aid kits in
worker’s camps
have been
equipped fully by
contractor
However, the
quantity of
medicine and
medical
instruments isn’t
enough
7 Provide labor
protective
equipment
Partly complied
Gloves, boots and
clothes have been
equipped by
contractor on site
However,
workers rarely
use them
Partly complied
Gloves, boots and
clothes have been
equipped by
contractor on site
However, workers
rarely use them
Done Partly complied
Gloves, boots and
clothes have been
equipped by
contractor on site
However,
workers rarely
use them
8 Increasing
people’s
awareness on
HIV/AIDS6
Being complied
Being complied Done Being complied
9 Provide clean
water, toilets,
trash bins
Being complied
Toilets and trash
bins have been
set up on site
Clean water is
bought from
water supply
facilities or
households
Being complied
Toilets and trash
bins have been set
up on site
Clean water is
bought from water
supply facilities or
households
Done Being complied
Toilets and trash
bins have been
set up on site
Clean water is
bought from
water supply
facilities or
households
10 Using available Being complied Being complied Done Being complied
6 IEMC team will update site images in contractor’s environmental safety document in the upcoming monitoring
phase
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
63
borrow pits
Construction
material from
available borrow
pits have been
bought and
transported to
construction area
of subproject
works
Construction
material from
available borrow
pits have been
bought and
transported to
construction area of
subproject works
Construction
material from
available borrow
pits have been
bought and
transported to
construction area
of subproject
works
11 Do not encroach
on natural forest
No natural forest
located in
construction area
No natural forest
located in
construction area
Done No natural forest
located in
construction area
12 Set up drainage
system on site
Being complied
Contractor has set
up drainage ditch
on site
Being complied
Contractor has set
up drainage ditch
on site
Done Being complied
Contractor has set
up drainage ditch
on site
13 Watering to
reduce dust
Non-complied
Contractor did not
spray water to
reduce dust
during monitoring
phase of quarter
IV
Non-complied
Contractor did not
spray water to
reduce dust during
monitoring phase of
quarter IV
Done Non-complied
Contractor did not
spray water to
reduce dust
during monitoring
phase of quarter
IV
14 Cover up
transport
vehicles
Partly complied
Material transport
vehicles have
been covered up
during
transportation
Partly complied
Material transport
vehicles have been
covered up during
transportation
Done Partly complied
Material transport
vehicles have
been covered up
during
transportation
15 Register
machineries
Partly complied
Contractor has
made the
registration of
construction
machineries in
environmental
safety documents.
However, these
machinery have
been changed by
other machinery
without the
registration or no
longer valid
registry
Partly complied
Contractor has
made the
registration of
construction
machineries in
environmental
safety documents.
However, these
machinery have
been changed by
other machinery
without the
registration or no
longer valid registry
Done Partly complied
Contractor has
made the
registration of
construction
machineries in
environmental
safety documents.
However, these
machinery have
been changed by
other machinery
without the
registration or no
longer valid
registry
16 Driving vehicles
on the right
speed
Being complied
Contractor has
Being complied
Contractor has
Done Being complied
Contractor has
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
64
carried out the
speed controlling
for each driver,
who workes on
civil package,
through courses
of labor safety
training
- In fact, it is hard
to supervise
drivers on route.
This is a
limitation of
contractor
because of not
enough budget to
install GPS
equipment for
each
transportation
vehicles
carried out the
speed controlling
for each driver, who
workes on civil
package, through
courses of labor
safety training
- In fact, it is hard
to supervise drivers
on route. This is a
limitation of
contractor because
of not enough
budget to install
GPS equipment for
each transportation
vehicles
carried out the
speed controll for
each driver, who
workes on civil
package, through
courses of labor
safety training
- In fact, it is hard
to supervise
drivers on route.
This is a
limitation of
contractor
because of not
enough budget to
install GPS
equipment for
each
transportation
vehicles
17 Set up fence
around
construction site
Being complied
Corrugated sheet
fence has been set
up around
construction site
Partly complied
- Fence has been set
up but it were fairly
sketchy, it may
cause risks of
accident for traffic
participants near
construction site
Done Not implementd
No fence set up
around
construction site
18 Install
construction
signs and
warning lights
near
construction area
Partly complied
Constructions
signs and warning
lights have been
set up at
construction area
Partly complied
Construction signs
and warning light
have been set up
but it was fairly
sketchy
construction signs
and warning lights
at some
construction sites
were not installed
Done Being complied
Constructions
signs and warning
lights have been
set up at
construction area
19 Install
construction
signs
Being complied
Constructions
signs have been
set up at area of
contruction site
and near
construction site
Partly complied
Construction signs
have been set up
but it was fairly
sketchy
Some construction
signs missing or
unseen due to trees
at construction site
Done Being complied
Constructions
signs have been
set up at area of
contruction site
and near
construction site
20 Install speed Being complied Being complied Done Being complied
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
65
limit signs and
waring signs as
well as
forbidden signs
Seed limit signs
have been set up
at deserted road.
However, when
the project almost
finished, IEMC
found that
contractor is no
longer pays
attention to
setting up speed
limit signs at
construction site
Forbidden signs
have been set up
at the area of only
authorized
persons allow
Seed limit signs
have been set up at
deserted road
Forbidden signs
have been set up at
the area of only
authorized persons
allow
Seed limit signs
have been set up
at deserted road
Forbidden signs
have been set up
at the area of only
authorized
persons allow
21 Mitigate
construction
activties in
nighttime and
resting hours
Being complied
No night-time
construction
activities arised
Being complied
No night-time
construction
activities arised
Done Being complied
No night-time
construction
activities arised
22 Set up access
roads
Complied
There are no
influences to the
movement of
people
Being complied
Prepare a temporary
road during
construction of
bridge passing over
channel
Done Being complied
There are no
influences to the
movement of
people
23 Restate traffic
roads if it is
damaged by
construction
activties,
transport
Not implemented
yet (because the
project is under
construction
process)
Not implemented
yet (because the
project is under
construction
process)
Done Being complied
(Traffic road has
been restated after
installing culvert
pipeline)
24 Annouce to
community for
the interruption
of services
Being complied
No services
interrupted
Being complied
No services
interrupted
Done Being complied
No services
interrupted
25 Provide barells
to containt oil
waste
Being complied
- Do not store it
on site
Empty barrels
have been stored
in the warehouse
- Barrels have
been provided for
workers in order
to containt oil
waste
Being complied
- Barrels have been
provided for
workers in order to
containt oil waste
Done Being complied
- Barrels have
been provided for
workers in order
to containt oil
waste
- Setting up
concrete ground
to prevent oil
leaking off
26 Do not discharge Being complied Being complied Done Being complied
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
66
domestic
wastewater into
channels, canals
Already set up
toilets/septic
tanks on site
Already set up
toilets/septic tanks
on site
Hire people’s
housing
27 Ensure camp’s
sanitary
condition
Being complied
Toilets and trash
bins have been
set up on site
Being complied
Toilets and trash
bins have been set
up near camps
Done
Being complied
Toilets and trash
bins have been
set up on site
28 Gather
construction
materials away
riverbank or
fenced it up
Being complied
Solid waste,
construction
materials have
been gathered
away riverbank or
fenced it up
Being complied
Solid waste,
construction
materials have been
gathered away
riverbank or fenced
it up
Done Being complied
Solid waste,
construction
materials have
been gathered
away away
riverbank or
fenced it up
29 Set up
sedimentation
ponds of
drainage system
Non complied Non complied Done Non complied
30 Do not discharge
wet concrete into
channels, canals
Being complied
Contractor
reminded workers
for illegally
discharging wet
concrete into
channel, canals
Being complied
Contractor
reminded workers
for illegally
discharging wet
concrete into
channel, canals
Done Being complied
Contractor
reminded workers
for illegally
discharging wet
concrete into
channel, canals
31 Clean up
construction site
at the end of the
day
Being complied
Activities such as
collecting solid
waste, assigning
person to clean up
construction have
been performed
Being complied
Activities such as
collecting solid
waste, assigning
person to clean up
construction have
been performed
Done Being complied
Activities such as
collecting solid
waste, assigning
person to clean up
construction have
been performed
32 Clean up
transport
vehicles
Non-complied
There is no
vehicle cleaning
station set up on
site
Non-complied
There is no vehicle
cleaning station set
up on site
Done Non-complied
There is no
vehicle cleaning
station set up on
site
33 Set up grievance
redress
mechainsm
Being complied Done Being complied
but not good
34 Publicize
people’s
complaints
Being complied
Have not any
complaints
Being complied
People’s complaints
at construction area
of Thong Luu
sewer have been
resolved
Done Being complied
Identified cause.
People’s
complaints at
construction area
of Cell no.3 have
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
67
satisfactorily been resolved
satisfactorily
Remark:
On site, the environmental protection measures in general have been implemented
relatively enough such as daily cleaning up the site, performing labour safety measures
(construction signs, first-aid box on site…). Besides, construction activities of contractor
don’t cause negative impacts to surrounding residential areas – contractor doesn’t
perform construction activities at nighttime and almost no machines with large noise.
- For the bidding package GMS – 2.6: Basically, contractor in charge of the
construction of Nguyen Van Con sewer, Saliset sewer and Son Quy sewer has
carried out well environmental protection measures on site. However, vehicle
washing station has not yet been set up on site.
- For the bidding package ICB GSM -2.7: Construction of flood control system in
Ba Rai – Phu An region, Tien Giang province. It is necessary to strengthen
measures as sparying water to reduce dust and installing more traffic signs as well
as setting up fence at deep pits on construction site
- For the bidding package ICB GSM - 2.8: Thuong Thoi Tien embankment:
construction has been already completed
- For the bidding package ICB GSM - 2.9, “Improvement and upgrading irrigation
channels and supply irrigation water for Plain of Reeds”, in monitoring phase of
quarter IV, IEMC team found that the construction of cell 2 is not match in
comparison with the original design even the contractor has been reminded by
IEMC in the previous monitoring phase. The contractor has cooperated with local
authority to satisfactorily resolve people’s complaints at Cell no.3
5. ENVIRONMENTAL EFFECTS MONITORING
5.1. Purpose, sampling method and location
a. Sampling method of surface water sample
Sampling method of surface water sample bases on Vietnam standards (TCVN) and
International Organization for Standardization (ISO), as following:
- TCVN 6663-1:2011 (ISO 5667-2:2006): Sampling technique
- TCVN 6663-3:2003 (ISO 5667-3:1985): Storage and analysis of sample
- TCVN 5994:1995 (ISO 5667-4:1987): Sampling at natural and artificial lakes
- TCVN 6663-6:2008 (ISO 5667-5:2005): Sampling at channel/canal, stream
Some parameters of surface water sample are directly analyzed at field such as pH,
Salinity, Electricial conductivity, DO. Surface water samples are taken, stored in bottles
and brought to the laboratory for the analysis of remaining parameter.
b. Sampling method of ground water sample
Sampling method of ground water sample bases on Vietnam standards (TCVN) and
International Organization for Standardization (ISO), as following:
- TCVN 6663-1:2011 (ISO 5667-1:2006): Plans program and sampling technique
- TCVN 6663-3:2008 (ISO 5667-3:2003): Storage and analysis of sample
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
68
- TCVN 6663-11:2011 (ISO 5667-11:2009): Ground water sampling
Some parameters of groundwater sample are directly analyzed at field such as pH,
Hardness, salinity,TSS, DO. Groundwater samples are taken, stored in bottles and
brought to the laboratory for the analysis of remaining parameter.
c. Sampling method of air sample
Sampling method of air sample bases on Vietnam standards (TCVN) and International
Organization for Standardization (ISO), as following:
- TCVN 7726:2007 (ISO 10498:2004): Measurement, analysis and sampling of SO2
parameter on the field
- TCVN 5972:1995 (ISO 8186:1989): Measurement, analysis and sampling of CO
parameter on the field TCVN 5067:1995: Measurement, analysis and sampling of
TSP parameter on the field
- TCVN 6137:2009 (ISO 6768:1998): Measurement, analysis and sampling of NO2
parameter on the field
- TCVN 7878-1:2008 (ISO 1996-1:2003): Basic parameters and assessment methods
- TCVN 7878-2:2008 (ISO 1996-2:2003): Determination of sound pressure level and
assessment methods
Some parameters of air samples are directly analyzed at field such as Dust, Noise,
vibration.
d. Sampling method of mud/soil
- TCVN 5297:1995 (ISO 1996-2:2003): General technique requirements of mud/soil
sampling
- TCVN 7538-2:2005 (ISO 10381-2:2002): Technique of mud/soil sampling
- TCVN 6647:2007 (ISO 11464:2006): Preliminary treatment of mud/soil samples for
chemical and physical analysis
Soil/mud samples all are taken, stored in specialized plastic bags and brought to the
laboratory for the analysis.
Purpose, monitoring locations and analysis parameters are presented in the following
table:
Table 5: Purpose, monitoring locations and analysis parameters
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
60
No Environment
al factor
Monitoring location Parameter Basis and sampling purpose
I GMS 2.6. Upgrading saline control system of Go Cong region, Tien Giang province
Air 3 sampling locations:
K 1: On Highway 50, at the bridge passing over Son
Quy ditch (10°24'08"N 106°39'415"E)
K 2: On internal road, in front of Nguyen Van Con
sewer (10°20'42"N 106°39'39"E)
K3: On the embankment construction area of
Salisete sewer and existing road (10°21'55"N
106°40'34"E)
Dust, Noise,
vibration, SO2,
NO2, CO
The number of samples, sampling locations,
analysis parameters are based on proposal of EMP
and meet Independent environmental monitoring
contract signed between VIWASE and CPO
Proposed air sampling locations based on
characteristics are near construction site of
drainage culverts, transport routes and residential
area
Air sampling is to assess how influence level of
construction activities affect air environment and
the efficiency of contractor’s mitigation measures
Surface water 4 sampling locations:
M1: On Vam Giong- Go Cong ditch, faraway
100m of distance from Nguyen Van Con sewer to
the Go Cong town (10°21'14.4"N 106°39'03"E)
M2: On Son Quy ditch, faraway 100m of distance
from Son Quy sewer to the Go Cong sewer
(10°23'01"N 106°40'01"E)
M3: On Salieste channel, faraway 100m of distance
from Salisete sewer to the Go Cong town
(10°21'07"N 106°41'09"E)
M4: On Van Rong – Go Cong ditch, at Long Chanh
bridge (10°21'35"N 106°40'35"E)
pH, Salinity,
Electricial
conductivity, DO,
BOD5, COD, NH4+
; NO2- ; NO3
- PO43-,
Zn, Pb, Hg,
Coliform , Oil and
grease
The number of samples, sampling locations,
analysis parameters are based on proposal of EMP
and meet Independent environmental monitoring
contract signed between VIWASE and CPO
Sampling locations near construction site of
drainage culverts, transport routes and near people
housing
Groundwater 3 sampling locations:
N1: At Mr.Nguyen Van Tai’s hom, new market
village, Long Hoa commune, Go Cong town
(Nguyen Van Con sewer) (10°21'33"N
106°39'82"E)
pH, Hardness,
salinity,TSS, DO,
COD, NH4-N,
NO2-N, NO3-N,
Cl-, Fe, Zn, As,
The number of samples, sampling locations,
analysis parameters are based on proposal of EMP
and meet Independent environmental monitoring
contract signed between VIWASE and CPO
Groundwater sampling is to determine how
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
61
N2: At Ms.Truong Thi Thoi’s home, village 3, ward
5, road 862, Go Cong town (Salisete sewer)
(10°21'44"N 106°41'22"E)
N3: At Mr.Tran Thanh Hoa’s home, Hoang Gia
village, Long Hung commune, Go Cong town (Son
Quy sewer) (10°23'41"N 106°40'66"E)
Ecoli, Coliform. influence levels of construction activties affect
groundwaterquality
Soil/mud 3 sampling locations:
Đ1: On Vam Giong- Go Cong ditch, construction
area of Nguyen Van Con sewer (10°21'14.0"N
106°39'06"E)
Đ2: On Son Quy ditch, construction area of Son
Quy sewer (10°23'15"N 106°40'24"E)
Đ3: On Salisete channel, construction area of
Salisete sewer (10°21'17"N 106°41'09"E)
pHkcl, pHH2O, total
soluble salt, mobile
Al, Total N, Total
P, Zn, Pb, As, Cd
The number of samples, sampling locations,
analysis parameters are based on proposal of EMP
and meet Independent environmental monitoring
contract signed between VIWASE and CPO.
During construction, it is necessary to gather
dredging mud from channels on construction site.
Afterthat, the amount of dredging mud will be
made use of leveling. Soil/mud sampling is to
assess quality of soil/mud and its influence to the
ambient environment during gathering on
construction site
II GMS 2.7: Construction of flood control system in Ba Rai – Phu An region, Tien Giang province
Air 4 sampling locations:
- K1: Giong Tre 1 sewer (10°19'52.9"N
106°03'16.6"E)
- K2: Thong Luu sewer (10°22'12"N
106°03'16.0"E)
- K3. Cai La sewer (10°19'51.1"N 106°03'29"E)
- K4: Ong Ban sewer (10°22'44.0"N
106°05'07.1"E)
Dust, Noise,
vibration, SO2,
NO2, CO
The number of samples, sampling locations,
analysis parameters are based on proposal of EMP
and meet Independent environmental monitoring
contract signed between VIWASE and CPO
Sampling locations are near the construction area,
in order to access air environment status before
construction.
Surface water 7 sampling locations:
Ba Gon sewer (10°20'16.8"N 106°04'51.1"E)
M 2: Rach Giong sewer (10°23'27.2"N
106°03'18.1"E)
pH, Salinity,
Electricial
conductivity, DO,
BOD5, COD, NH4+
; NO2- ; NO3
- PO43-,
The number of samples, sampling locations,
analysis parameters are based on proposal of EMP
and meet Independent environmental monitoring
contract signed between VIWASE and CPO.
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
62
M 3: Ca Nua sewer (10°23'12.1"N 106°05'43.5"E)
M 4. Cai la sewer (10°19'50.0"N 106°03'29.9"E)
M 5: Giong Tre 2 sewer (10°19'52.9"N
106°03'16.6."E)
M 6: Hai Hue sewer (10°19'57.9"N 106°04'45.2"E)
M 7: Khang Chien sewer (10°19'31.4"N
106°04'16.4"E)
Zn, Pb, Hg,
Coliform , Oil and
grease
Sampling locations are near the construction area,
in order to access air environment status before
construction.
Groundwater 4 sampling locations:
N1: At Mr.Cao The Duong’s home, Hoi Xuan
commune (10°19'56.7"N 106°04'44.9"E)
N2: At Mr. Tran Ba Loc’s home, village 6, Phu An
commune (Rach Giong sewer) (10°23'28"N
106°03'20.3"E)
N3: At Mrs. Huynh Thi Nhi’s home, village 1, Cam
Son commune (10°22'48.9"N 106°04'21.6"E)
N4: At Mrs.Tran Thi Dao’s home, village Hiep Phu,
Hiep Duc commune (Cai La sewer) (10°19'46.9"N
106°03'28.0"E)
pH, Hardness,
salinity,TSS, DO,
COD, NH4-N,
NO2-N, NO3-N,
Cl-, Fe, Zn, As,
Ecoli, Coliform.
The number of samples, sampling locations,
analysis parameters are based on proposal of EMP
and meet Independent environmental monitoring
contract signed between VIWASE and CPO
Groundwater sampling is to determine the status of
groundwater quality before implementation, by
dint of that, examing how influence levels of
construction activities to groundwater quality in the
contruction area.
Soil/mud 4 sampling locations:
Đ1: Cai La sewer (10°19'51"N 106°03'29"E)
Đ2:Giong Tre 1 sewer (10°19'52.9"N
106°03'16.6"E)
Đ3: Thong Luu sewer (10°22'12"N
106°03'16.0"E)
Đ4: Rach Giong sewer , village 1, Phu An
commune (10°23'27"N 106°03'19"E)
pHkcl, pHH2O, total
soluble salt, Al,
Total N, Total P,
Zn, Pb, As, Cd
The number of samples, sampling locations,
analysis parameters are based on proposal of EMP
and meet Independent environmental monitoring
contract signed between VIWASE and CPO.
During construction, it is necessary to gather
dredging mud from channels on construction site.
Afterthat, the amount of dredging mud will be
made use of leveling. Soil/mud sampling is to
assess quality of soil/mud and its influence to the
ambient environment during gathering on
construction site
III GMS 2.8. Embankment erosion control in Thuong Thoi Tien Town, Hong Ngu Commune, Dong Thap Province
Air 3 sampling location: Dust, Noise, The number of samples, sampling locations,
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
63
K1: First point of embankment system at Thuong
Phuoc 2 commune, Hong Ngu district
(10°48'50.9"N 105°13'45.8"E)
K2: Tan Chau ferry l, Thuong Thoi Tien commune
(10°48'10.5"N 105°14'55.2"E)
K3: Final point of embankment system, Thuong
Thoi Tien Commune (10°48'22.1"N 105°10’.4"E)
vibration, SO2,
NO2, CO
analysis parameters are based on proposal of EMP
and meet Independent environmental monitoring
contract signed between VIWASE and CPO
Proposed air sampling locations based on
characteristics are near construction site of
drainage culverts, transport routes and residential
area
Air sampling is to assess how influence level of
construction activities affect air environment and
the efficiency of contractor’s mitigation measures
Surface water 4 sampling location:
- M1: First point of embankment system, Thuong
Phuoc commune, Hong Ngu
district(10°48'55.7"N105°13'49.9"E)
- M2: Ngang wharf - Thuong Phuoc commune,
Hong Ngu district (10°48'45"N 105°14'10"E)
- M3: Tan Chau ferry terminal – Thuong Thoi Tien
commune (10°48'24"N 105°14'53")
- M4: Final point of embankment system - Thuong
Thoi Tien commune (10°48'24"N 105°15'10"E)
pH, Salinity,
Electricial
conductivity, DO,
BOD5, COD, NH4+
; NO2- ; NO3
- PO43-,
Zn, Pb, Hg,
Coliform , Oil and
grease
The number of samples, sampling locations,
analysis parameters are based on proposal of EMP
and meet Independent environmental monitoring
contract signed between VIWASE and CPO
Sampling locations near construction site of
drainage culverts, transport routes and near people
housing
Sampling locations are along the embankment and
are to assess how influence level of construction
activities affect air environment and the efficiency
of contractor’s mitigation measures
Groundwater 2 sampling location:
N1: Drilling well at Mr.Nguyen Van Dung. Village
3, Thuong Phuoc 2 commune, Ngang wharf,
Thuong Thoi Tien town (10°48'46.0"N
105°14'08"E)
N2: Drilling well at Mr. Nguyen Van Chuc –
Thuong Thoi Tien commune, Hong Ngu district
(10°48'36.3"N 105°14'54"E)
pH, Hardness,
salinity,TSS, DO,
COD, NH4-N,
NO2-N, NO3-N,
Cl-, Fe, Zn, As,
Ecoli, Coliform.
The number of samples, sampling locations,
analysis parameters are based on proposal of EMP
and meet Independent environmental monitoring
contract signed between VIWASE and CPO
Groundwater sampling is to determine how
influence levels of construction activties affect
groundwater quality
Soil/mud 2 sampling location: pHkcl, pHH2O, total The number of samples, sampling locations,
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
64
B1: Near material gathering area of the first point of
embankment, Thuong Phuoc 2 commune, Hong
Ngu district (10°48'1"N 105°14'00"E)
B2: Final point of embankment– Thuong Phuoc
Tien commune(10°49'10"N 105°15'00"E)
soluble salt, Al,
Total N, Total P,
Zn, Pb, As, Cd
analysis parameters are based on proposal of EMP
and meet Independent environmental monitoring
contract signed between VIWASE and CPO
During construction, it is necessary to gather
dredging mud from channels on construction site.
Afterthat, the amount of dredging mud will be
made use of leveling. Soil/mud sampling is to
assess quality of soil/mud and its influence to the
ambient environment during gathering on
construction site
IV GMS 2.9. Improvement and upgrading irrigation channels, and supply irrigation water for Plain of Reeds, Dong Thap province
Air 3 sampling location:
K1: First point of Ca Chap 2 bridge (10°50'58.1"N
105°34'15.6"E)
K2: Wharf of Ngoc Long Son market (first point of
Cai Cai channel) (10°56'22"N 105°30'22"E)
K3: Point cell no 4 Cai Cai channel
(10°50'29.0"N 105°34'50.1"E )
Dust, Noise,
vibration, SO2,
NO2, CO
The number of samples, sampling locations,
analysis parameters are based on proposal of EMP
and meet Independent environmental monitoring
contract signed between VIWASE and CPO
Proposed air sampling locations based on
characteristics are near construction site of
drainage culverts, transport routes and residential
area
Air sampling is to assess how influence level of
construction activities affect air environment and
the efficiency of contractor’s mitigation measures
Surface water 14 sampling location:
M1: Letfside of Khang Chien channel, faraway
100m of distance from Khang Chien bridge to
the downstream (10°50'44"N105°22'22"E) M2: Letfside of Khang Chien channel,faraway
100m of distance from An Binh channel to the
downstream(10°45'1"N 105°25'37"E) M3: Thong Nhat channel, faraway 100m of
pH, Salinity,
Electricial
conductivity, DO,
BOD5, COD, NH4+
; NO2- ; NO3
- PO43-,
Zn, Pb, Hg,
Coliform , Oil and
grease
The number of samples, sampling locations,
analysis parameters are based on proposal of EMP
and meet Independent environmental monitoring
contract signed between VIWASE and CPO
Sampling locations near construction site of
drainage culverts, transport routes and near people
housing
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
65
distance from An Phong channel to the
downstream(10°36'45"N 105°29'36"E) M4 Thong Nhat channel connecting to Tan Thanh –
Lo Gach channel (10°50'36"N 105°23'45"E) M5: Thong Nhat channel connecting to An Phong –
Tan Phuoc channel (10°47'13"N 105°26'33"E) M6: Thong Nhat channel connecting to Thanh Binh
– Tam Nong channel (10°39'48"N 105°29'34"E) M7: Tan Cong Chi channel connecting to Thanh
Lap channel (10°50'05"N 105°27'21"E) M8: Tan Cong Chi channel,Tam Nong general
hospital (10°42'30"N 105°34'35"E) M9: Tan Cong Chi channel, the segmentconnecting
to Doc Vang Ha channel (10°37'55"N
105°32'29"E) M10: Rightside of Cai Cai channel,faraway 100m
of distance from Tan Thanh – Lo Gach channel to
the downstream (10°54'22"N 105°31'23"E) M11: Cai Cai channel, the segment connecting to
Hồng Ngự-Vĩnh Hưng channel (10°49'52"N
105°35'22"E) M12: Cai Cai channel, the starting point of Tan
Thanh A bridge(10°51'31"N 105°33'25"E) M13: Cai Cai channel, it is expected for no.1 mud
cell (10°54'45"N 105°32'47"E)
M14: Cai Cai channel, segment under the bridge
across Cai Cai channel, it is expected for no.4 mud
cell (10°50'48"N 105°32'22"E)
Groundwater 8 sampling location:
N1: Pumping station at residential area Phu Lam,
Phu Thanh B commune (intersection of Kinh Ca
pH, Hardness,
salinity,TSS, DO,
COD, NH4-N,
The number of samples, sampling locations,
analysis parameters are based on proposal of EMP
and meet Independent environmental monitoring
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
66
No bridge) (10°45'06"N 105°25'39"E) N2: Water supply station no.755, DT844 street, An
Long commune, Tam Nong district (10°40'45"N
105°23'40"E) N3: Mr. Truong Van Xe’s home, village 2, An
Binh B commune, Hong Ngu district (10°48'45"N
105°24'55"E) N4: House no.96, K10, Phu Hiep village, Tam
Nong district, DT843 street, Dong Thap province
(10°45'48"N 105°30'28"E) N5: Mr. An’s home, under footbridge An Phuoc
(10°48'55"N 105°28'26"E) N6: Water supply station, Tra Dam commune, Tan
Cong Sinh district (10°41'45"N 105°34'55"E) N7: At the market near Cai Cai channel, faraway
100m of distance from Tan Thanh – Lo Gach
channel to the downstream (10°54'20"N
105°31'23"E) N8: Near Cai Cai channel, Anh Dung village, Tan
Thanh A commune, Dong Thap province
(10°51'21"N105°33'11"E)
NO2-N, NO3-N,
Cl-, Fe, Zn, As,
Ecoli, Coliform.
contract signed between VIWASE and CPO
Groundwater sampling is to determine how
influence levels of construction activties affect
groundwater quality.
Soil/mud 12 sampling location:
Đ1: Letfside of Khang Chien channel, faraway
100m of distance from Khang Chien bridge to the
downstream (10°50'54"N 105°23'40"E) Đ2: Letfside of Khang Chien channel,faraway
100m of distance from An Binh channel to the
downstream lưu (10°44'18"N 105°25'30"E ). Đ3: Mud cell no 1 of Cai Cai channel
(10°53'49.7"N 105°31'33.0"E)
Đ4: Mud cell no 2 of Cai Cai channel
pHkcl, pHH2O, total
soluble salt, Al,
Total N, Total P,
Zn, Pb, As, Cd
The number of samples, sampling locations,
analysis parameters are based on proposal of EMP
and meet Independent environmental monitoring
contract signed between VIWASE and CPO
During construction, it is necessary to gather
dredging mud from channels on construction site.
Afterthat, the amount of dredging mud will be
made use of leveling. Soil/mud sampling is to
assess quality of soil/mud and its influence to the
ambient environment during gathering on
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
67
(10°53'20.6"N 105°32'48.7"E)
Đ5: Mud cell no 3 of Cai Cai channel
(10°51'48.6"N 105°33'18.3"E)
Đ6: Mud cell no 4 of Cai Cai channel
(10°50'05.3"N 105°35'13.8"E)
Đ7: Tan Cong Chi channel connecting to Thanh
Lap channel (10°50'08"N 105°27'21"E ) Đ8: Tan Cong Chi channel,Tam Nong general
hospital (10°40'36"N 105°33'44"E)
Đ9: Tan Cong Chi channel, the segment
coonecting to Doc Vang Ha channel
(10°38'30"N 105°32'25"E)
Đ10: Rightside of Cai Cai channel, far away
100m of distance from Tan Thanh – Lo Gach
channel to the downstream (10°54'20"N
105°31'21"E)
Đ11: Cai Cai channel, the segment connecting
to Hồng Ngự-Vĩnh Hưng channel (10°49'54"N
105°35'42"E)
Đ12: Cai Cai channel, the segment under Tan
Thanh A bridge (10°51'35"N 105°33'23"E)
construction site
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
60
5.2. Monitoring result
A. Subproject: “Upgrading saline control system of Go Cong region, Tien Giang
province”
Figure 2: Sampling map of Go Cong subproject
Note:
Air sample Ground sample
Surface water sample Mud/soil sample
➢ Air environment
Air sampling locations are linked with construction sites of culverts: Nguyen Van Con,
Salisete, Son Quy.
Analysis result of air quality shows that air environment basically is in good condition,
particle concentration ranges from 0.11-0.19 mg/l, have not exceeded allowable limits
QCVN05:2013/BTNMT– National technical regulation on ambient air quality (Particle <
0.3 mg/l).
Parameters NOx, SO2 and CO in air environment are in allowable limits QCVN05:2013/
BTNMT.
Virbation in monitoring locations is also in allowable limits of QCVN27:2010/BTNMT.
K1
K2
K3
M1
M2
M3
M4
N1
N2
N3 B1 B2
B3
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
61
Noise ranges from 63 to 68dBA. (Noise<70dBA).
The analysis results show that mitigation measures of dust have been carried out fairly
good thereby mitigating negative impacts of dust to ambient air environment. However,
sometimes, gathering construction machineries and equipment had increased noise in
project area but its impact is localized and in the short time.
➢ Surface water quality
Surface water sampling locations are linked with construction sites of culverts: Nguyen
Van Con, Salisete, Son Quy.
Based on analysis result and QCVN08-MT:2015/BTNMT – National technical regulation
on surface water quality, column B1: using for irrigation purpose show that parameter
Coliform exceeds 1,14- 1,96 times allowable limit. The remaining parameters are within
allowable limit. Basically, construction activities have not caused the increase of surface
water pollution on the channel.
➢ Ground water quality
Ground water sampling locations are is to determine how influence levels of construction
activties affect ground water quality.
Based on analysis result of general ground water samples and QCVN 09-
MT:2015/BTNMT – National technical regulation on ground water quality show that:
- pH, hardness, salinity, COD, NH4+, NO2
-,NO3- and heavy metals Fe, Pb, As, Zn,
Pb, Hg of ground water samples are within allowable limits.
- Coliform parameter of samples exceeds allowable limit from 5 to 6.3 times.
- Undergournd water quality is not affected by installing culvert pipeline because
the depth of installed culvert pipeline is insignificant. Nomarly, depth of access to
ground water is about 200m.
➢ Soil environment
Soil sampling locations are linked with construction activities, installation of culverts:
Nguyen Van Con, Salisete and Son Quy.
Analysis result of 03 soil samples will be compared with QCVN03-MT-:2015/BTNMT –
National technical regulation on heavy metal limit. Concentration of some heavy metals
such as Zn, Pb, As, Cd is in allowable limits. Gathering soil/mud does not cause ambient
environmental pollution. However, contractor should be fenced up material gathering
area for environmental sanitation.
B. Subproject: “Construction of flood control system in Ba Rai – Phu An
region. Tien Giang province”
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
62
Figure 3: Map of air samples (Ba Rai - Phu An subproject)
➢ Air and noise quality
Air sampling locations are linked with areas, where are going to construct culverts:
Giong Tre 1, Thong Luu, Cai La, and Tham Ron.
The air sampling locations are connected to materials transportation route of Cai Cai
channel construction site, the Plain of Reeds sub- project.
- Contaminants such as NOx, SO2 and CO are in allowable limits of
QCVN05:2013/BTNMT. The current status of air environment is fairly good
because project hasn’t been constructed.
➢ Surface quality
Figure 4: Map of surface water samples (Ba Rai - Phu An subproject)
K1
K2
K3
K4
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
63
Surface water sampling locations are linked with areas, where are going to construct
culverts: Giong Tre, Rach Giong, Thong Luu, Cai La, Thay Thanh, Tham Ron and Lo
Lang
The air sampling locations are connecting to materials transportation route of Cai Cai
channel construction site, the Plain of Reeds sub- project.
Based on QCVN08-MT:2015/BTNMT - column A2 - National Technical Standards on
surface water quality used for domestic water supply but appropriately applied treatment
technology, shows that:
- pH ranges from 6.4 to 7.8 and in allowable limit of QCVN08-MT:2015/BTNMT,
column A2
- Parameter Dissolve oxygen (DO) of M1, M2, M5, M6 and M7 does not achieve
allowable limit of QCVN08-MT:2015/BTNMT.
- BOD5 parameter of some surface water samples M1, M2, M5, M6 and M7 exceeds
allowable limits from 1.26 to 2.35 times according to QCVN08-MT:2015/BTNMT,
column A2.
- COD parameter some surface water samples M1, M2, M5, M6 and M7 exceeds
allowable limit from 1.19 to 1.36 times according to QCVN08-MT:2015/BTNMT,
column A2
- NO2- parameter of surface water samples M1, M2, M5 and M6 exceeds allowable limit
from 5 to 8 times according to QCVN08-MT:2015/BTNMT, column A2
- Parameters NH4+, NO3-, Pb, Hg, Zn, As are in allowable limits of QCVN08-
MT:2015/BTNMT. Currently, the project has not been constructed so there are no
construction activities affecting surface water quality. Surface water pollution could be
arised by daily activities of local people through littering and discharging domestic
wastewater into the channel.
The results of analysis show that there is not much different compared to the current state
of water environment before construction. That also means the construction activities of
the project do not increase pollution to the water environment, and the constractor
performed the mitigation measures well.
➢ Ground water quality
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
64
Figure 5: Map of groundwater samples (Ba Rai - Phu An subproject)
Ground water sampling locations are is to determine how influence levels of construction
activties will affect ground water quality.
Analysis results show that most parameters are within allowable limit of QCVN09-
MT:2015/BTNMT, however, parameter Coliform exceeds allowable limit from 3,3 to 6,7
times.
➢ Soil quality
Figure 6: Map of soil samples (Ba Rai - Phu An subproject
Soil sampling locations are linked with areas, where are going to construct culverts:
Giong Tre, Cai La, Tham Ron and Giach Rong.
Soil sampling locations Đ10, Đ11, Đ12 are associated with dredging activities of Cai Cai
channel. The remaining soil sampling will be related to dredging activities of the
channels including: Thong Nhat, Tan Cong Chanh anh Khang Chien.
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
65
Concentration of Cu, Zn, Pb, As and Cd achieves allowable limit of QCVN03-
MT:2015/BTNMT– National technical regulations on heavy metal limit in soil.
C. Subproject “Embankment erosion control in Thuong Thoi Tien Town. Hong Ngu
District, Dong Thap Province”
Figure 7: Map of air sampling – Dong Thap Muoi subproject (Plain of Reeds)
Note:
Air sample Groundwater sample
Surface sample Soil/mud sample
➢ Air environment
Air sampling locations are linked with material transport routes, construction area of Cai
Cai channel, the Plain of Reeds subproject.
Analysis results show that air environmental quality in project area is good, all
parameters represent air environment and vibration in construction area of project
achieve allowable limit QCVN05:013/BTNMT– National technical regulation on noise,
QCVN 26:2010/BTNMT National Technical Regulation on noise and
QCVN27:2010/BTNMT– National technical regulation on vibration.
The analysis results show that mitigation measures of dust, noise have been carried out
well thereby mitigating negative impacts of dust, noise to the air environment.
➢ Surface water quality
Air sampling locations are linked with construction area of Thuong Thoi Tien
embankment and road (along Tien riverbank).
K1
K2
K3
M1
M2
M3
M4
B1
B2
N1
N2
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
66
Surface water quality along embankment system applied QCVN08-MT:2015/BTNMT –
National technical regulation surface water (column A2: should apply appropriate
techiques before using for living purpose and water supply) at 04 monitoring locations:
first point of embankment system (M1)., Ngang wharf (M2), Tan Chau ferry terminal
(M3) and final point of embankment system (M4). Specifically:
Parameters such pH, heavy metal, oil and grease are in allowabe limit according to
QCVN08-MT:2015/BTNMT. Tien river water along construction area has signs of a
slight organic pollution with parameter COD at 04 sampling locations exceeds QCVN
from 1.01 to 1.12 times. BOD5 of samples M1, M2, M3 exceeds QCVN08-
MT:2015/BTNMT column A2 from 1.01 to 1.18 times. Water source in those places has
signs of microbiological pollutiom. Parameter Coliform in ¾ the number of samples
exceeds QCVN from 1.1 to 2.2 times. Analysis results show that surface water resource
is polluted by organic matters. Organic pollution is arised by daily acitivities of people
along Tan Chau ferry, Ngang wharf not completely caused by construction activities. The
analysis results aslo show that there is no significant decrease of concentration of
pollutants compared to which mentioned in Quarter IV, 2017.
➢ Ground water quality
Soil sampling locations are linked with construction area of Thuong Thoi Tien
embankment and road (along Tien riverbank)
Based on analysis result and QCVN03-MT:2015/BTNMT – National technical regulation
on heavy metal limit in soil shows that:
Concentration of some heavy metals such as Zn, Pb, As, Cd is not exceed and in
allowable limits. Gathering construction materials wouldn’t cause the increase of soil
environment pollution.
➢ Soil environment
Soil sampling locations Đ10, Đ11, Đ12 are linked with dredging activities of Cai Cai
channel. Remaining soil sampling locations are going to link with dredging activities of
channels: Thong Nhat, Tan Cong Chanh and Khang Chien.
Analysis result shows that all parameters analyzed achieve allowable limit QCVN 03-
MT:2015/BTNMT – National technical regulation on heavy metal limit in soil. Gathering
dredging mud at disposal site on construction site does not cause ambient environmental
pollution
D. Subproject: “Improvement and upgrading irrigation channels and supply
irrigation water for Plain of Reeds”
➢ Air environment
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
67
Figure 8: Map of air sampling – Dong Thap Muoi subproject (Plain of Reeds)
Air sampling locations are linked with material transport routes, construction area of Cai
Cai channel, the Plain of Reeds subproject.
Analysis results show that air environmental quality in project area is good, all
parameters represent air environment and vibration in construction area of project
achieve allowable limit QCVN05:013/BTNMT– National technical regulation on noise,
QCVN 26:2010/BTNMT National Technical Regulation on noise and
QCVN27:2010/BTNMT– National technical regulation on vibration. The analysis results
show that mitigation measures of dust, noise have been carried out well thereby
mitigating negative impacts of dust, noise to the air environment.
➢ Surface water quality
K1
K3
K2
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
68
Figure 9: Map of surface water sampling - Dong Thap Muoi subproject (Plain of
Reeds)
Air sampling locations are linked with material transport routes, construction area of Cai
Cai channel, the Plain of Reeds subproject.
Analysis results show that, surface water samples of 4 channels have polluted by
microorganisms, demand of biological oxygen also exceeds allowable limits according to
QCVN08-MT:2015/BTNMT National technical regulation surface water, column A2:
should apply appropriate techiques before using for living purpose and water supply.
Parameters such as heavy metal, oil and grease, NH4+ are within allowable limits
according to QCVN08-MT:2015/BTNMT, column A2.
Parameter NO2- of samples M6, M9 and M11 exceeds allowable limit from 1,12 to 4
times according to QCVN08-MT:2015/BTNMT, column A2.
Parameter BOD5 of the samples M1, M5, M6, M7, M8, M9, M10, M11, M12, M13 and
M14 exceeds allowable limit from 1.01 to 1.18 times according to QCVN08-
MT:2015/BTNMT, column A2.
Parameter PO43- of the samples M1, M2, M4, M8, M9 and M11 exceeds allowable limit
from 1.25 to 1.65 times according to QCVN08-MT:2015/BTNMT, column A2.
Parameter Coliform of the samples M1, M2, M3, M4, M5, M6, M7, M8, M10, M11,
M12 and M14 exceeds allowable limit from 1,09 to 3,1 times according to QCVN08-
MT:2015/BTNMT, column A2.
Surface water pollution could be arised by daily activities of people along channels such
as discharging domestic wastewater, waterway traffic activities. However, there is no a
significant change on water quality of channel before construction. It can be understood
as mitigation measures of surface water pollution have been carried out fairly good by
contractor.
➢ Ground water quality
Figure 10: Map of ground water sampling – Dong Thap Muoi subproject (Plain of
Reeds)
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
69
Ground water sampling locations are is to determine how influence levels of construction
activties affect ground water quality.
Analysis result of groundwater of 08 drilling wells shows that groundwater quality is
polluted by parameter Coliform, which exceeds allowable limit from 1.3 to 2.33 times
according to QCVN09-MT:2015/BTNMT – National technical regulation on
groundwater quality. Parameter COD exceeds allowable limit from 1.1 to 3.75 times.
➢ Soil environment
Figure 11: Map of mud/soil sampling – Dong Thap Muoi subproject (Plain of Reeds)
Soil sampling locations Đ10, Đ11, Đ12 are linked with dredging activities of Cai Cai
channel. Remaining soil sampling locations are going to link with dredging activities of
channels: Thong Nhat, Tan Cong Chanh and Khang Chien.
Analysis result shows that all parameters analyzed achieve allowable limit QCVN 03-
MT:2015/BTNMT – National technical regulation on heavy metal limit in soil. Gathering
dredging mud at disposal site on construction site does not cause ambient environmental
pollution
6. PUBLIC CONSULTATION, GRIEVANCE REDRESS MECHANISM
6.1. Public consultation and EMP information dissemination
Public consultation and EMP information dissemination for each subporject has been
carried out for 10/July – 23/October/2013.
During on-site monitoring period, independent environmental monitoring consultant
(IEMC) also consults some opinion on environmental issues of people in project
construction process
6. PUBLIC CONSULTATION, GRIEVANCE REDRESS MECHANISM
6.1. Public consultation and EMP information dissemination
Public consultation and EMP information dissemination for each subporject has been
carried out for 6/November – 13/November/2017.
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
70
During on-site monitoring period, independent environmental monitoring consultant
(IEMC) also consults some opinion on environmental issues of people in project
construction process
No Project People’s opinion Mitigation measure
1 Upgrading saline
control system of
Go Cong region,
Tien Giang
province
Nguyen Van Con sewer
Spraying water to reduce dust has
been performed well by
construction contractor
CSC, PMU should
supervise tightly
environmental
sanitation ensuring of
contractors
Son Quy sewer
During the last time, contractor
mainly carried out pile driving,
number of transport vehiles is
decreased so it doesn’t affect too
much people’s living activities
Saliset sewer
Currently, construction site of
Saliset sewer is under rainy season
therefore, dust arised by
construction activities isn’t much
- Workers complied with
regulations set up by contractor
2 Construction of
flood control
system in Ba Rai
– Phu An region,
Tien Giang
province
- Local people are welcome and
willing to support project.
Construction of river embankment
will improve people’s living
environment as well as landscape
- Fence and warning lights must be
set up on construction site in night-
time in order to ensure people’s
safety
- CSC, PMU should
supervise tightly
environmental
mitigation measures of
the contractor
- Contractor must
repair fence
surrounding
construction site to
ensure people’s safety
3 Improvement and
upgrading
irrigation channels
and supply
irrigation water
for Plain of Reeds
region
Cai Cai channel
- Environmental protection
measures have been carried out well
by contractor. Currently, there
haven’t any environmental issues
affecting people’s life
- Workers complied with
CSC, PMU should
supervise tightly
environmental
sanitation ensuring of
contractors
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
71
regulations set up by contractor
6.2. Grievance Redress Mechanism (GRM)
For each subproject, GRM has been already set up to solve people’s complaints.
Specifically:
- On construction site, it has been set up bulletin board with comprehensive information
on subproject, Construction unit, CSC, Investor, Site manager and address, phone
number for Investor communication
- For each subproject, PPMU has already assigned its staff, who always show up on
construction site accompanying with CSC’s staff and Site manager.
- If occurring any complaints, people are able to directly contact with Site manager, CSC
and PMU’s representative through phone number mentioned above. On the other hand,
people can propose their complaints on environmental issues on construction site for
resolving, overcoming and compensation.
- If two parties could not make a deal, people can send their complaints to representative
of Subproject management unit, CSC, Site manager on site or send it to Subproject
management unit’s headquarter. Within one month after receiving complaints, Director
of Subproject management unit will in charge of complaints, apponit staff to reslove
relevant parties including Site manager, representative of Subproject management unit,
CSC and affected people on compensation and overcoming consequences.
- If it is not sastifed, people can pursue their case to the higher level government for
settlement
In 7th monitoring phase 2017, there were some people’s complaints recorded as
following:
1) Bidding package GMS 2.7: Construction of flood control system in Ba Rai –
Phu An region, Tien Giang province
- There are 02 households near construction area of Thong Luu sluice
complained of cracking their housing, however, this issue has already been
addressed by the contractor and no complaints arisen. 2) Bidding package GMS 2.9: Improvement and upgrading irrigation channels,
and supply irrigation water for Plain of Reeds, Dong Thap province
- In construction area of Cell no.3, Thi Son village, Tan Thanh A ward, Tan
Hong district, PMU has received people’s complaints on alum infection in
their paddy farms and aquaculture ponds. On 12 October, 2017, local
authority cooperated with the contractor and affected people for surveying
and identifying causes of the issue. The results show that paddy farms and
aquaculture ponds infected with alumn due to non-regularly checking the
embankment of paddy farm as well as deliberately embankment to change
the flow. Thus, it is considered as not related to the construction unit, the
meeting minutes are attached at Appendix of the report
7. INSTITUTIONAL STRENGTHENING AND TRAINING
Environmental monitoring and training program for CSC and contractors
IEMC found that environmental sanitation issues on construction site have not been
addressed by contactors and CSC and weekly monitoring forms have not updated
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
72
regurlarly. For 5 November to 13 November, 2017, IEMC group has visited to
contractor’s head offices to performe training on 3nd environmental monitoring with
participation of Investor, CSC and contractors. The main contents of environmental
monitoring and training class included:
- Representative of PMU’s leader made a speech, introduced about the project,
project’s implementation and progress as well as stated the reason of traning
course.
- Consultant gave environmental monitoring documents to CSC, contractors and
presented the content of environmenta monitoring and training program
- Beside, consultant also guided on how to use environmental monitoring form and
schedule to submit it to PMU
Comments and results obtained:
Consultant explained clearly objectives, contentson environmental protection and
management measures to CSC and contractors as well as remind them to comply with
management measures, environmental protection during project construction phase.
During construction process, contractors and CSCS will coordinate with PMU to control
the implementation of environmental minimization measure tighly and will be
respobsible to overcome environmental issues arise.
PMU’s hot line has provided already to strengthen effectiveness of risk control,
environmental incidents and collects information, environmental pollution issues arising
during project implementation.
8. KEY ENVIRONMENTAL ISSUE
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
60
Table 6: Site Status and Key Issues Identified, Actions Taken, Additional Action Required for Each Construction Item
No Items Name of
contractor
Environmental
outstanding
issues
Mitigation
measures
Responsibil
ity should
be carried
out
Period for
overcomin
g
consequen
ces
Status images
I Biding packages GMS – 2.6: Subproject “Upgrading saline control system of Go Cong region. Tien Giang province”
1 Nguyen
Van
Con
sewer
Construction
contractor:
Tien Giang
construction
and investment
JS company
CSC:
Infrastructure
development
and
construction
consulting JS
company
- Workers have
non- regularly
used labor
protective
equipment.
Remind
workers for
using labor
protective
equipment
CSC,
contractor
3 days
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
61
2 Salisete
sewer
Construction
contractor:
Tien Giang
construction
and investment
JS company
CSC:
Infrastructure
development
and
construction
consulting JS
company
Transport
vehicles haven’t
been cleaned
before going out
construction site
Set up
vehicle
cleaning
station on site
CSC,
contractor
Immediatel
y
3 Son
Quy
sewer
Construction
contractor:
East Asia
international
corporation
CSC:
Infrastructure
development
and
construction
consulting JS
company
Workers have
not regularly
used labor
protective
equipment.
Remind
workers for
using labor
protective
equipment
CSC,
contractor
3 days
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
62
- IEMC team
saw a streak of
spilling oil on
the river near
the crane hull
- Contractor
should set up
floats around
the crane hull
to avoid
spilling oil
CSC,
contractor
One week
II. Bidding package GSM 2.7: the subproject “Construction of flood control system in Ba Rai – Phu An region, Tien Giang province
1 30 June
sewer
Construction
contractor:
Hai Duong
dyke and rural
development
joint stock
company
CSC: Bac Viet
Consulting and
Construction
JSC
No
environmental
outstanding
arisen
- - -
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
63
2 Ca
Chat
sewer
Construction
contractor:
Huynh Ngoc
commercial
investment and
construction JS
company
CSC: Bac Viet
Consulting and
Construction
JSC
Completely
finish
construction of
sewer wall.
Worker are
waiting for the
next item
construction to
so no
environmental
issues arisen
Contractor
and CSC
should
continuously
supervise
environmenta
l issues for
the next
construction
activities
CSC,
contractor
Before
implementi
ng the next
construction
activity.
3 Ca Nua
sewer
Construction
contractor:
Hai Duong
dyke and rural
development
joint stock
company
CSC: Center
for scientific
and technical
irrigation
deployment
Completely
address odour
by the
construction of
open-air sewer
and existing
channel
Contractor
should carry
out specific
measures,
especially not
changing oil
on
construction
site
- Covering up
channbel
bank with
nylon
CSC,
contractor
Before
implementi
ng the next
construction
activity.
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
64
4 Ong
Ban
sewer
Construction
contractor:
Huynh Ngoc
Trading
Construction
Investment
Joint Stock
Company
CSC: Center
for Scientific
and
Technological
Irrigation
Implementatio
n
Completely
finish
construction of
sewer wall.
Worker are
waiting for the
next item
construction to
so no
environmental
issues arisen
Contractor
and CSC
should
continuously
supervise
environmenta
l issues for
the next
construction
activities
CSC,
contractor
Before
implementi
ng the next
construction
activity.
5 Tham
Rom
sewer
Construction
contractor:
Huynh Ngoc
Trading
Construction
Investment
Joint Stock
Company
CSC: Center
for Scientific
and
Technological
Irrigation
Implementatio
n
- Completed pile
driving
- Contractor has
not implemented
next
construction
activities so no
environmental
issues arisen
Contractor
and CSC
should
continuously
supervise
environmenta
l issues for
the next
construction
activities
CSC,
contractor
Before
implementi
ng the next
construction
activity.
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
65
6 Ong
Kham
sewer
Construction
contractor:
Huynh Ngoc
Trading
Construction
Investment
Joint Stock
Company
CSC: Center
for Scientific
and
Technological
Irrigation
Implementatio
n
No vehicle
cleaning station
set up on
construction site
- Set up
vehicle
cleaning
station on site
CSC,
contractor
3 days
7 Thay
Thanh
sewer
Construction
contractor:
Hai Duong
dyke and rural
development
joint stock
company
CSC: Bac Viet
Consulting and
Construction
Cement bags
and oil tanks
must be
collected
appropriately,
do not litter
indiscriminately
on construction
site
Remind
workers for
cleaning up
construction
site at the end
of each day
CSC,
contractor
Before
implementi
ng the next
construction
activity.
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
66
8 Ba Gon
sewer
Construction
contractor:
VN Industrial
Group Joint
Stock
Company
CSC: Center
for Scientific
and
Technological
Irrigation
Implementatio
n
Fence has been
set up on site
near traffic road
however, it was
fairly sketchy
Contractor
should set
up
corrugated-
iron sheets
and install
night
lighting
system at
area with
deep pits in
order to
warn traffic
participants
CSC,
contractor
Set up
quickly
9 Hai
Hue
sewer
Construction
contractor:
Huynh Ngoc
Trading
Construction
Investment
Joint Stock
Company
CSC: Center
for Scientific
and
Technological
Irrigation
Implementatio
Fence has not
been set up on
site, especially
at material
gathering areas
It is
necessary to
set up fence
and warning
signs near
traffic road
CSC,
Contractor
Immediatel
y
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
67
n
10 Khang
Chien
sewer
Construction
contractor:
Huynh Ngoc
Trading
Construction
Investment
Joint Stock
Company
CSC: Center
for Scientific
and
Technological
Irrigation
Implementatio
n
Contractor has
not set up speed
limit signs and
bulletin board at
the detour near
construction site
Fence up the
area with deep
pits
It is
necessary to
set up two
kinds of sings
CSC,
Contractor
Immediatel
y
11 Cay
Sung
sewer
Construction
contractor:
Hai Duong
dyke and rural
development
joint stock
company
CSC: Bac Viet
Consulting and
Construction
Completed
construction of
Cay Sung
sewer
Prepare to
asphalt the
road on sewer
CSC and
contractor
should
address
environmenta
l sanitation
issues on
construction
site
CSC,
Contractor
Upcoming
time
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
68
12
Cai La
sewer
Construction
contractor:
Hai Duong
dyke and rural
development
joint stock
company
CSC: Bac Viet
Consulting and
Construction
Sometime,
workers did not
use labor
protective
equipment
Remind
workers for
using labor
protective
equipment
CSC,
contractor
After
implementi
ng the next
construction
activity.
Wires and
sockets made
sketchy
CSC should
remind
workers for
carrying out
electricial
safety
measures
CSC Immediatel
y
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
69
13 Giong
Tre 2
sewer
Construction
contractor:
Huynh Ngoc
Trading
Construction
Investment
Joint Stock
Company
CSC: Center
for Scientific
and
Technological
Irrigation
Implementatio
n
Speed limit
signs have been
set up on
construction site
near DT864
road
In monitoring
phase, no
environmental
issues arisen
CSC,
Contractor
14 Dong
Sau Ca
Nua
sewer
Construction
contractor:
VNI group JS
company
CSC: Center
for Scientific
and
Technological
Irrigation
Implementatio
n
- It is hard to
access
construction site
- There were
many
households
living around
construction site
however,
contractor didn’t
set up the
retaining wall or
corrugated
sheets to reduce
dust
Contractor
should set up
the retaining
wall or
corrugated-
iron sheets
with 2m of
height
CSC,
Contractor
3 days
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
70
15 Bo Keo
sewer
Construction
contractor:
VNI group JS
company
CSC: Center
for Scientific
and
Technological
Irrigation
Implementatio
n
Item has not
performed
construction
activities
- - -
16 Thong
Luu
sewer
Construction
contractor:
40
construction
and investment
joint stock
company
CSC: Bac Viet
Consulting and
Construction
02 households
were cracked its
wall and floor
Contractor
compensated
an amount of
cement to fix
people's
housing's
wall and
floor. It has
no longer
complaints
CSC,
Contractor
Restate
damaged
works after
construction
completed
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
71
Under
construction of
road on sewer.
Construction
vehicles should
be cleaned up
before going out
construction site
Set up
vehicle
cleaning
station on site
CSC,
contractor
This issue
has been
reminded
many times
by IEMC
team but
contractor
has not
implemente
d
17 Ap 2
sewer
Construction
contractor:
40
construction
and investment
joint stock
company
CSC: Bac Viet
Consulting and
Construction
Waste soil have
not been
collected
No bulletin
boards set up on
site
Set up
bulletin
boards on site
Gather waste
soil at
designate
area and
fence up for
protecting
and reusing
kind of waste
Not yet due Not yet due
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
72
18 Rach
Giong
sewer
Construction
contractor:
40
construction
and investment
joint stock
company
CSC: Bac Viet
Consulting and
Construction
Under
construction of
sewer gate
No
environmental
issues arisen
CSC and
contractor
should
continuousl
y supervise
construction
site
CSC,
contracor
19 Ghenh
Lang
sewer
Construction
contractor:
40
construction
and investment
joint stock
company
CSC: Bac Viet
Consulting and
Construction
Item has been
already
completed
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
73
20 Rach
Giong
Ba So
sewer
Construction
contractor:
40
construction
and investment
joint stock
company
CSC: Bac Viet
Consulting and
Construction
Item is being
suspended
construction
activities
In monitoring
phase, no
environmental
issues arisen
CSC and
contractor
should
continuousl
y supervise
item when it
commences
again
CSC,
contracor
After
implementi
ng the next
construction
activity
21 Dap
Chua
sewer
Construction
contractor:
40
construction
and investment
joint stock
company
CSC: Bac Viet
Consulting and
Construction
Fence has been
set up at
construction site
near traffic road
but it was fairly
sketchy
Rebuilding
fence
CSC,
contracor
3 days
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
74
22 Cay Me
sewer
Construction
contractor:
40
construction
and investment
joint stock
company
CSC: Bac Viet
Consulting and
Construction
Item is being
suspended
construction
activities
In monitoring
phase, no
environmental
issues arisen
CSC and
contractor
should
continuousl
y supervise
item when it
commences
again
CSC,
contracor
After
implementi
ng the next
construction
activity
23 Giong
Tre 1
sewer
Construction
contractor:
Huynh Ngoc
Trading
Construction
Investment
Joint Stock
Company
CSC: Center
for Scientific
and
Technological
Irrigation
Implementatio
n
Item is being
suspended
construction
activities
In monitoring
phase, no
environmental
issues arisen
CSC and
contractor
should
continuousl
y supervise
item when it
commences
again
CSC,
contracor
After
implementi
ng the next
construction
activity
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
75
24 Lo Hoa
Thuong
sewer
Construction
contractor:
VNI group JS
company
CSC: Center
for Scientific
and
Technological
Irrigation
Implementatio
n
No temporary
access road set
up, affect
people’s
movement
Contractor
must set up
temporary
access road
for people
Contractor,
CSC
2 weeks
25 Khach
Minh
sewer
Construction
contractor:
40
construction
and investment
joint stock
company
CSC: Bac Viet
Consulting and
Construction
Item has been
already
completed
- - -
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
76
26 Lo
Lang
sewer
Construction
contractor:
40
construction
and investment
joint stock
company
CSC: Bac Viet
Consulting and
Construction
Item is being
suspended
construction
activities
In monitoring
phase, no
environmental
issues arisen
CSC and
contractor
should
continuously
supervise
item when it
commences
again
CSC,
contracor
After
implementi
ng the next
construction
activity
27 Kenh
Dung
sewer
Construction
contractor:
40
construction
and investment
joint stock
company
CSC: Bac Viet
Consulting and
Construction
- Workers did
not use labor
protective
equipment
- No speed limit
signs set up
- No fire
extinguisher
arranged at
workers camps
- Waste oil
hasn’t been
collected as
regulations
mentioned in
EMP
Moving
barrels of
waste oil to
warehouse
CSC,
contracor
Immediatel
y
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
77
28 Hai
Lim
sewer
Construction
contractor:
40
construction
and investment
joint stock
company
CSC: Bac Viet
Consulting and
Construction
Item has not
been
implemented
construction
- - -
SIII. Bidding packages ICB GMS – 2.8: Subproject “Embankment erosion control in Thuong Thoi Tien Town. Hong Ngu District. Dong Thap
Province”
(The construction was completed)
IV. GMS 2.9: Improvement and upgrading irrigation channels and supply irrigation water for Plain of Reeds, Dong Thap province
1 Mud
dredgin
g Cai
Cai
channel
into
Cell no
1,3,4
and
constru
cting
Ca
Construction
contractor:
Association
with Bao
Chung JS
company and
Petroleum
Construction
Joint Stock
Company and
Hong Truong
Limited
Lack of fairway
buoy during
construction on
river (Bau Lut
bridge, Ca Chap
2 bridge, Ca
Chap 3 bridge)
Set up
fairway buoy
near
construction
area
Contractor,
CSC
One day for
preparation
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
78
Chap 2
bridge
Liability
Company;
CSC:
Infrastructure
development
and
construction
consulting JS
company
Fencing up
disposal site of
soil/mud is
fairly sketchy
Prepare
warning
signs,
reinforce
fence at
disposal site
of soild/mud
Contractor,
CSC
One day for
preparation
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
79
2 Mud
dredgin
g the
Cai Cai
channel
into
Cell no
2
Construction
contractor:
CSC:
Infrastructure
development
and
construction
consulting JS
company
Top of
embankment is
lower than
original design
(3m at elevation
+6m)
- Currently,
Huyen Minh
contractor are
using canvas to
cover
embankment
- Adjust top of
embankment to
match with
original design
Rebuild top
of
embankment
in line with
original
design
PMU,
Contractor,
CSC
Carry out
immediately
constructed
discharge gate is
not matched
with the original
design
(discharge water
throughout
pipeline)
Prepare
warning
signs,
reinforce
fence at
disposal site
of soild/mud
Contractor,
CSC
One day for
preparation
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
61
9. CONCLUSION AND RECOMMENDATION
9.1. Overall Progress of Implementation of Environmental Management Measures
- The contractors have carried out environmental minimization measures however it
still have had shortcomings. Contractor should follow environmental minimization
measures, which mentioned in environmental management plan (EMP). Environmental
impact assessment and environmental monitoring documents of the Project also were sent
to contractors and CSC thereby strengthening environmental management plan as well as
minimization measures.
- The bidding package GMS 2.6 and 2.7: Contractors and CSC have paid attention
to adjust mitigation measures as menioned in EMP. Contractors have implemented
mitigation measures of dust, however, it is necessary to set up vehicle cleaning
stations on site.
- The bidding package ICB GMS 2.8: Construction almost completed so no
environmental issues arisen in monitoring phase
- The bidding package GMS 2.9: Huyen Minh contractor constructed Cell no.2 not
match with original design. Huyen Minh contractor must quickly implement
corrective measures before conducting next construction activities in order to
ensure communities’ safety as well as preventing the collapse of Cell no.2
- CSC’s periodically environmental monitoring reports have not submitted on
schedule
9.2. Action Recommended
- PMU, CSC and IEMC will continually coordinate construction monitoring and
environmental management. CSC and contractors should follow EMP to carry out
environmental minimization measures on site better.
- Recommends CSC carrying out seriously environmental monioring forms and
submits these forms to the staff of PMU for the preparation of plans to promtly solve
environmental issues as well as incidents.
- Recommends CSC and contractor maintaining and ensuring fully workers’ safety
condition such as camps. labor protective gears. medical kit on site. etc… subproject
PMU should supervise. check and remind contractors to implement those safety
condtions.
- IEMC will conduct environmental monitoring in January, 2018.
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
60
APPENDICES
Appendix 1 – Some on-site pictures in environmental monitoring 2017
No Đồng Tháp
Cai Cai Channel
Cell no.1
Cell no.2
Cell no.4
Cell no.3
Cầu Cả Chấp 2
Thuyền nạo vét sông
Long Son Ngoc bridge Bau Lut
Gò Công - Tiền Giang
Nguyen Van Con sewer
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
61
Saliset sewer
Sơn Quy sewer
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
62
Ba Rài Phú An - Tiền Giang
1 Hai Lim sewer
2 Kênh Đứng sewer
3 Lộ Làng sewer
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
63
4 Khách Minh sewer
5 Lộ Hòa Thượng sewer
6 Giồng Tre 1 sewer
7 Cây Me sewer
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
64
8 Đập Chùa sewer
9 Cống Rạch Giồng Ba Sở
10 Ghềnh Làng sewer
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
65
11 Cống Rạch Giồng
12 Ấp 2 sewer
13 Thông Lưu sewer
14 Bờ Keo sewer
15 Đồng Sau Cả Nứa sewer
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
66
16 Giồng Tre 2 sewer
17 Cái Lá sewer
18 Cây Sung sewer
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
67
19 Kháng Chiến sewer
20 Hai Huệ sewer
21 Ba Gòn sewer
22 Thầy Thanh sewer
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
68
23 Ông Khậm sewer
24 Thâm Rôm sewer
25 Ông Bản sewer
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
69
26 Cả Nứa sewer
27 Cả Chát sewer
28 30/6 sewer
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
70
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
71
Appendix 2 – Analysis result
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
72
Appendix 3 – Environmental monitoring form
Bidding packageGMS – 4.10: IEMC Second Semi-Annual Report 2017
Project: Greater Mekong subregion flood and drought risk management and mitigation (ADB-GSM1)
60
Appendix 4 – Circulars on environmental monitoring
- Circular 28/2011/TT-BTNMT regulated on technical process for monitoring ambient air
environment and noisedated 01/August/2011;
- Circular 29/2011/TT-BTNMT regulated on technical process for monitoring continental
surface waterđịa dated 01/August/2011;
-Circular 30/2011/TT –BTNMT regulated on technical process for monitoring groundwater
dated 01/August/2011;
- Circular 33/2011/TT-BTNMT regulated on technical process for monitoring soil dated
01/August/2011;