ENVIRONMENTAL PERFORMANCE REPORT AND MANAGEMENT PLAN

(EPRMP) SUMMARY FOR THE PUBLIC

EAGLE CEMENT EXPANSION PROJECT SAN ILDEFONSO, BULACAN

October 2017

Eagle Cement Expansion Project EPRMP Summary for the Public San Ildefonso, Bulacan

LCI Envi Corporation Page 2

Tungkol sa Proyekto 1. Pangalan ng Proyekto: Eagle Cement Expansion Project

2. Lokasyon ng Proyekto: Brgy. Akle, San Ildefonso, Bulacan

3. Klase ng Proyekto: Panukalang Konstruksyon at Operasyon ng Ikatlong Pagawaan ng Semento

4. Sukat ng Proyekto: Karagdagang 2.0 Million Metric Tons Per Year (MMTPY), para sa kabuuang 6.0 MMTPY matapos ang konstruksyon. Ang kasalukuyang limestone extraction rate o bilis ng pagmimina ng Line 1 at Line 2 ng Eagle Cement Corporation ay 4.2 MMTPY. Para sa Line 3 expansion, ang kabuuang extraction capacity o dami ng batong miminahin kada taon ay 7.1 MMTPY.

5. Components ng Proyekto: Ang mga Pangunahing Components ay nasa Table 1.

6. Proseso/teknolohiya: Ang buod ng proseso ng pag gawa ng semento ay nasa Figure 1. Mula sa quarrying, ang limestone ay pupunta sa pagdurog at pre-blending. Ang mga materyales ay pinupulbo sa pamamagitan ng raw mill grinding. Ang pulbos ay hinahalo gamit ang aeration. Ang hinalong materyales ay pinapasok sa kiln, na nagpoproseso ng pulbos para maging ganap itong clinker. Pagkatapos ay pinalalamig ang clinker. Ang mga karagdagang sangkap tulad ng pozzolan at gypsum ay idinagdag sa finish grinding and classification. Pagkatapos ay ilalagay sa bag ang semento at ihahatid sa mga end-user.

7. Walang nakalalasong kemikal ang magbubunga sa proseso. Gayunpaman, ang mga gas tulad ng carbon monoxide, oxides of nitrogen, oxides of sulfur, at particulate matter ay ilalabas ng mga stack.

8. Walang alternatibong site na iminungkahi dahil ang pinakamagandang lugar upang buuin ang Line 3 ay sa loob ng kasalukuyang planta ng semento dahil sa iba't ibang mga dahilan. Ang pagbuo ng Line 3 sa loob ng kasalukuyang lugar ay mas matipid dahil ang ilang mga pasilidad tulad ng mga crushers at clay crushers ay hindi kailangang itayo para sa Line 3; ang mga pasilidad na ito mula sa Line 1 at Line 2 ay maaaring magamit para sa Line 3. Bukod dito, magkakaroon ng mas kaunting epekto sa kapaligiran kung ang pasilidad ay itatayo sa loob ng kasalukuyang pabrika. Ang transportasyon ng mga materyales ay mas maginhawa dahil ang paghahatid ay nakatuon lamang sa isang lugar. Hindi kailangang magsagawa ng land clearing kung ang Line 3 ay ititaayo sa loob ng kasalukuyang pagawaan ng semento. Dahil dito, mababawasan ang mga epekto sa lupa, tubig, at hangin. Gayundin, ang mga tao sa lugar ay maalam na tungkol sa pagkakaroon ng pagawaan ng semento sa lugar.

9. Pag-gamit ng Kuryente: Ang kabuuang pangangailangan sa kuryente ay 82.93 MW. Ang pagtatayo ng 6.11MW Waste Heat Recovery ay magpapababa ng konsumo hanggang 30%.

10. Pag-gamit ng Tubig: Ang kabuuang inaasahang pangangailangan ng tubig para sa mga pasilidad ng Eagle Cement Corporation ay 4,830 m3 / araw. Kabilang na dito ang supply ng tubig para sa komunidad, na nagkakahalagang 300 m3 / araw. Ang dalawang deep well ay magtustos sa pangangailangan ng tubig. Isang ikatlong deep well ay bubuuin bilang backup. Ang pinagsamang kapasidad ng mga deep well ay 9,984 m3 / araw. Kung isasaalang-alang ang inaasahang pangangailangan ng tubig at ang magagamit na supply, ang sobrang kapasidad ay 5,154 m3 / araw.

11. Mungkahing Lokasyon: Ang ipinanukalang proyekto ay matatagpuan sa loob ng kasalukuyang pagawaan ng semento ng Eagle Cement Corporation sa Brgy. Akle, San Ildefonso, Bulacan. Ipinakikita ng Figure 2 ang kasalukuyan at gagawing pasilidad sa loob ng planta.

Eagle Cement Expansion Project EPRMP Summary for the Public San Ildefonso, Bulacan

LCI Envi Corporation Page 3

Table 1: Components ng Line 1, Line 2, at Line 3

Component Existing Line 1

(2.0 MMTPY)

Existing Line 2

(2.0 MMTPY)

Proposed Line 3

(2.0 MMTPY)

Quarry Operations

Limestone crushing system

1,000 tons per hour (tph) capacity with an impact hammer crusher

1,500 tons per hour (tph) capacity with a double rotor hammer crusher

No additional Limestone crusher

Stacker Circular 1,000tph capacity Rectangular store with 1,500tph capacity

Rectangular store with 600tph capacity

Clay Crusher 300tph with hammer crusher 400tph with double-toothed roller crusher

No additional Clay Crusher

Reclaimer 1 unit 1 unit

1 additional unit and for future expansion

Additional 24x90 meters additive storage

Storage Bins 280 m3 limestone; 280 m3 shale, 300 m3 silica and 280 m3 pyrite

500 m3 limestone; 250 m3 shale, 250 m3 silica and 100 m3 pyrite

Additional 500 m3 limestone; 250 m3 shale, 250 m3 silica and 100 m3 pyrite

Cement Plant Operations

Ball mill 380tph 400tph or 2x 200tph roller press system

Additional 400tph or 2x 200tph roller press system

Homogenizing Silo 15,000mt Raw meal silo 15,000mt Additional raw meal silo 15,000mt

Clinker 4,000 TPD clinker with grate cooler

5,000 TPD, and existing grate cooler will be replaced by an IKN Pendulum Grate Cooler

Additional 5,000 TPD clinker with IKN Pendulum Grate Cooler

Clinker Silo 2 units with capacity of 25,000 mt each and 800mt for the off-spec clinker storage

2 x 25,000 MT clinker silo 1 x 25,000 MT clinker and 800mt for the off-spec clinker storage (For future expansion)

Cement Proportioning Station

CPS with 4 bins use for clinker, limestone, pozzolan and gypsum/enhancer storage (400t, 250t, 250t and 200t for each material respectively)

Cement proportioning station with same specifications

Additional cement proportioning station with same specifications

Cement Grinder Ball mill capacity of 130-135tph and roller press capacity of 675-780tph

Cement grinder with ball mill system with O-SEPA400 separator and PPDC (Pulse-Plenun Bag Dust Collector) system

2 unit Vertical Roller Mill with 270tph and >300tph capacity

Cement Silo 15,000mt capacity 15,000mt storage capacity 15, 000MT storage capacity (For future expansion)

Waste Heat Recovery

None 6.11 MW Waste Heat Recovery System per line

Additional 6.11 MW Waste Heat Recovery

Water Source 2 existing deep well 2 existing deep well 1 additional deep well

Air Pollution Control Cyclone separators and bag house filters

Another set of cyclone separators and bag house filters

Another set of cyclone separators and bag house filters

Wastewater Pollution Control

Siltation ponds Same system Same system

Eagle Cement Expansion Project EPRMP Summary for the Public San Ildefonso, Bulacan

LCI Envi Corporation Page 4

Figure 1: Buod ng Proceso ng Pag-gawa ng Semento

LEGEND:

For standard cement dry

production

For optional/special process

From QUARRYING OPERATIONS

Pre-blending

Raw Mill Grinding

Shale

Silica

Pyrite cinder

Utility Water

(minimal)

Homogenization

Heating, Calcining, and Burning (Kiln Operation)

Clinker Cooling and Storage

Finish Grinding and Classification

Cement Bagging

To DELIVERY

Air

Air

Standard Fuel

Gypsum

Pozzolan

Eagle Cement Expansion Project EPRMP Summary for the Public San Ildefonso, Bulacan

LCI Envi Corporation Page 5

Figure 2: Location of Proposed Project Components

Eagle Cement Expansion Project EPRMP Summary for the Public San Ildefonso, Bulacan

LCI Envi Corporation Page 6

Buod ng mga Maaaring Epekto, Mitigating Measures, at Residual

Impacts 12. Ang sumusunod ay buod ng mga maaaring epekto ng proyekto sa kapaligiran, kasama ng naaangkop

na mitigating measures at residual impacts. Ang mitigating measures ay mga isasagawa ng Eagle Cement Corporation para mabawasan ang epekto ng konstruksyon at operasyon sa kapaligiran at kalusugan ng tao. Ang residual impacts naman ay ang mga epekto sa kapaligiran at kalusugan matapos isagawa ang mitigating measures.

Table 2: Buod ng mga maaaring epekto , Mitigating Measures, at Residual Impacts

Module Epekto Mitigating/Enhancement Measures Residual Impact

Lupa Magkakaron ng basura dahil sa konstruksyon at operasyon ng Line 3

May waste management procedure ang Eagle Cement Corporation, na kaakibat ng kanilang environmental management plan.

Inaasahang walang basurang itatambak sa lugar dahil pinapadala ito sa Clark Sanitary Landfill.

Pagkawala ng halaman at hayop sa quarry areas.

Kasalukuyang ipinapatupad ng Eagle Cement Corporation ang Final Mine Rehabilitation and Decommissioning Plan (FMRDP) at Environmental Protection and Enhancement Program (EPEP). Gagawa ng karagdagang mga plano matapos makuha ang Environmental Compliance Certificate para sa Line 3 at quarry expansion. Maigting na pinapatupad ng Eagle Cement Corporation ang greening program.

Ang progressive rehabilitation sa Parcel 15 ay nagsimula na. May mga naitanim na sa mga lugar na tapos na minahin.

Tubig Konsumo ng tubig May water sustainability program na naglalayon ng 10% na tipid sa tubig.

Ang tubig ay di maiiwasang gamitin para sa operasyon.

Hangin Alikabok Para mabawasan ang alikabok, pinagawa ng Eagle Cement Corporation ang 1.2-km kalsada papuntang Sitio Narra. Palagi rin tinutubigan ang mga kalsada.

Maraming mababawas na alikabok

Stack emissions Pag gamit ng pollution control devices tulad ng bag filters. Regular na pag monitor ng stacks gamit ang COMS.

Pinapatunayan ng COMS data na isinusumite sa EMB na ang emissions galing sa planta ay malayong mababa sa DAO 2000-81 NESSAP values.

Ingay Kontrolado ang ingay ng heavy equipment. Gumagamit ang mga trabahador ng personal protective equipment. Ang maiiingay na Gawain ay ginagawa lamang sa umaga. May mga sound barriers at sound proofing na inilagay.

May ingay pa rin na galing sa planta.

Mga tao Mga panaganib sa trabaho May Safety and Health Program ang Eagle Cement Corporation na isinasagawa sa buong planta.

Maaaring may mga aksidenteng mangyari, ngunit pinabababa ng safety and health program ang posibilidad na mangyari ang mga ito.

Mas mataas na pondo para sa social development programs

Isinasagawa ng Eagle Cement Corporation IEC activities kasama ang mga kinatawan ng barangay para mag isip ng SDMP activities.

Patuloy na makukuha ng komunidad ang mga benepisyo ng mga programa ng Eagle Cement Corporation

Trabaho Binibigyan ng Eagle Cement Corporation ng prioridad ang mga lokal na manggagawa.

Mas mataas na employment rates sa komunidad

Mas mataas na local tax dahil sa mas malaking kita ng kumpanya

Patuloy ng magbabayad ng tamang buwis ang Eagle Cement Corporation.

Mas mataas na local tax

Eagle Cement Expansion Project EPRMP Summary for the Public San Ildefonso, Bulacan

LCI Envi Corporation Page 7

Kinikilalang Stakeholders 13. Ang sumusunod ay ang mga identified stakeholders, o ang mga taong maaaring maapektuhan ng

ipinapanukalang pagpapalawak ng operasyon ng Eagle Cement Corporation.

- San Ildefonso LGU

o Munisipal na Gobyerno

o Barangay Akle (Direct Impact Area)

o Barangay Alagao (Indirect Impact Area)

o Barangay Talbak (Indirect Impact Area)

- Sector Representatives sa Brgy. Akle

o Edukasyon

o Kalusugan

o Kabuhayan

o Relihiyoso

o Negosyante

o Mga nakatatanda

o Mga kababaihan

- Non-Government Organization: Apo Sibaao

Eagle Cement Expansion Project EPRMP Summary for the Public San Ildefonso, Bulacan

LCI Envi Corporation Page 8

Pahayag ng Eagle Cement Corporation ukol sa pangako sa kakayahan

nito na magpatupad ng mga hakbang upang maiwasan ang negatibong

epekto ng Proyekto

14. Gagawin ng Eagle Cement Corporation ang sumusunod:

Sumunod sa mga kondisyon na itinakda sa ECC at iba pang kaugnay na mga batas sa kapaligiran;

Magpatibay ng kapaki-pakinabang na pakikipagtulungan at kooperasyon sa mga komunidad;

Itaguyod ang sustainable use at responsible development ng kapaligiran sa pamamagitan ng paggamit ng mga angkop na teknolohiya

Magkaroon ng mga programa sa kabuhayan at mag-upgrade ng mga kasanayan sa mga komunidad upang mag-ambag at mapahusay ang kalidad ng buhay; at

Bumuo ng mga programang pagsasanay para sa mga empleyado upang matiyak na patuloy silang handa para sa mga gawain na itinalaga sa kanila.

15. Ang institutional organization na nasa Figure 3 ay naglalaman ng mga taong magpapatupad ng mga sumusunod:

Ligtas na pagpapatakbo ng planta;

Pagpapatupad ng mga patakaran ng kumpanya;

Pagpapanatili ng kapaligiran; at

Pagpapahusay ng social acceptability proyekto. 16. Ang institutional organization ay pamamahalaan ng nakatataas na management ng Eagle Cement

Corporation dahil ang grupong ito ang may pananagutan sa pagbibigay ng direksyon at patakaran ng

kumpanya. Ang mga patakaran ay dapat na ipalaganap sa mga pinuno ng departamento at mga

tagapamahala para ipaalam sa mga tauhan ng kumpanya, kabilang ang mga nagtatrabaho sa

kasalukuyang operasyon at bagong proyekto.

Figure 3: Organizational Chart for the Institutional Plan

Eagle Cement Corporation

Board of Directors

Plant Manager

Environmental, Health & Safety Officers

Operation Personnel

Environmental, Health &

Operations Manager

Plant Supervisors

Non-Operation Personnel

Eagle Cement Expansion Project EPRMP Summary for the Public San Ildefonso, Bulacan

LCI Envi Corporation Page 9

17. Para sa karagdagang impormasyon tungkol sa Eagle Cement Corporation Expansion Project,

maaaring kausapin ang sumusunod:

PROPONENT: Medel L. Justiniano, EM, MBM Manager, Mining and Sustainability Eagle Cement Corporation Tel: (02) 301-3453 loc. 237 E-mail: [email protected] EIA PREPARER: Engr. Jose Marie U. Lim, MSc.

Managing Director LCI ENVI Corporation Tel: (02) 442-2830 E-mail: [email protected]