0 ENVIRONMENTAL STATEMENT OF JHARKHAND PROJECT For 2013-14 CENTRAL COALFIELDS LIMITED ENVIRONMENT DIVISION CENTRAL COALFIELDS LIMITED

Upload: others

Post on 06-Apr-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ENVIRONMENTAL STATEMENT - Central Coalfields Limited · Environment Dept., CCL Jharkhand OCP Page 1 EXECUTIVE SUMMARY E-1 This Annual Environmental Statement has been prepared as

0

ENVIRONMENTAL

STATEMENT

OF

JHARKHAND PROJECT

For

2013-14

CENTRAL COALFIELDS LIMITED

ENVIRONMENT DIVISION

CENTRAL COALFIELDS LIMITED

Page 2: ENVIRONMENTAL STATEMENT - Central Coalfields Limited · Environment Dept., CCL Jharkhand OCP Page 1 EXECUTIVE SUMMARY E-1 This Annual Environmental Statement has been prepared as

Environment Dept., CCL Jharkhand OCP Page 1

EXECUTIVE SUMMARY

E-1 This Annual Environmental Statement has been prepared as per gazette

notification no.G.S.R. 329 (E) dated 13th March 1992 laid down by Ministry of

Environment and Forest. The Environmental Audit has been subsequently

renamed to “Environmental Statement " vide MOEF gazette notification no.

G.S.R. 386 (E) dated 22nd April 1993.

E-2 Jharkhand Opencast Project of Central Coalfields Limited is located in the West

Bokaro Coalfields of Ramgarh distt. Of Jharkhand State

E-3 Jharkhand Colliery is a working opencast mine of producing medium coking coal

from a number of quarries.

E-4 The Environmental Monitoring was carried out quarterly as per the guidelines of

Ministry of Environment & Forest (MOEF). The Environmental Monitoring

results for four quarter of 2013-14 are appended as Annexure.

E-5 Ambient air quality is monitored to study the level of air pollution. The main air

pollutant is Suspended Particulate Matter (SPM). It is difficult to quantify the

amount of air pollutants generated due to opencast mining. However , the results

show that SPM , SOx , NOx values are generally below permissible limits

prescribed by Ministry of Environment and Forest (MOEF).

E-6 Water is not directly used during mining for coal production. It percolates into the

working area during mining operation. However, water is consumed for other

purposes, mainly for haul road dust suppression and domestic purposes.

E-7 The noise levels recorded are generally below the permissible limits prescribed by

Ministry of Environment and Forest. There is no continuous high level sound.

E-8 Hazardous Waste is not produced either from mining operation or from any

pollution control facility. Solid waste produced from mining activities is

overburden material.

E-9 Regular measures are being taken to control air, water & noise pollutions

discussed in detail in part G, H & I of the Statement Form.

Page 3: ENVIRONMENTAL STATEMENT - Central Coalfields Limited · Environment Dept., CCL Jharkhand OCP Page 1 EXECUTIVE SUMMARY E-1 This Annual Environmental Statement has been prepared as

Environment Dept., CCL Jharkhand OCP Page 2

Chapter - 1

1.1 Introduction:

Jharkhand Colliery is a working opencast mine producing medium coking coal from a number of

quarries. Feasibility report was prepared in 1976 to produce 0.2 MTY of coal. Accordingly a semi

- mechanised mine was opened .The HEMMs have already reached their economic life. Also

coking coal demand of CCL has increased. Keeping this in view, a new project report has been

prepared by CMPDI to produce1.0 MTY of coal by opencast mining.

1.2 Location & Communication:

Jharkhand Block is located between latitude 230 46' 53" to 230 48' 29" N and longitude 850 36'

26" to 850 37' 23" E. The Laiyo Block is on the eastern side, Kedla Block on western side, Hurdag

Block on Northern side and Kedla south & Goes Block on Southern side.

Jharkhand Project is connected by 22 km long Charhi to Laiyo road joining NH - 33 at Charhi.

Another approach is through 12 km long all-weather road connecting Gidi Washery to Kedla and

crosses NH-33 near Kuju. The nearest railway station Danea on Gomoh- Barkakana loop line of

Eastern Railway, is 6 km by weather Kutcha road .

1.3 SALIENT FEATURES:

Jharkhand block is located in the north eastern part of West-Bokaro coalfields and lies on the

southern limb of the northern syncline. The total area of the block is 3.5 Sq. km. under different

leasehold.

The total mineable reserve in this sector has been estimated as 21.5 MT and total volume of OB to

be removed has been estimated to be 47.0 Mm³with stripping ratio of 2.19 m³/Te.

The life of the project has been estimated as 25 years. Overall quality of product is W-IV. Kedla

washery is to be fed from this project.

Total estimated land for this project is 323.88 Ha. This includes 68.22 Ha. Of forest land in safety

zone which will not be degraded hence not to be acquired.

1.4 TOPOGRAPHY & DRAINAGE

Chutua nalla flowing from west to east divides the Jharkhand block in two parts. South of chutua

nallah, where the proposed quarry has been identified is gently undulating with occasional

sandstone ridges and mounds. The maximum and minimum elevations are + 374m and + 318 m

above m.s.l. respectively, in south chutua nalla. The area north of Chutuah nalla is more or less flat

with thick alluvium deposits.

Bokaro river flows from west to east at distance of 2 Km. from southern boundary of the block.

Eastern flowing Chutuah nallah, a prominent tributary, joins the Bokaro River at 1.6 Km, east of

Laiyo. Several small nallah traversing the area , joins the Bokaro river & Chutuah nallah.

Chutuah nallah is more or less perennial for the greater part of the year excepting in the hot

summer days.

1.5 EMP STATUS

A comprehensive Environmental management Plan (EMP) for this project was formulated by RI-

III of CMPDIL in Dec`92 and submitted to the Ministry of Environment & Forest (MOEF) . The

EMP is approved by Ministry of Environment & Forest (MOEF) in June `95 subjected to

compensatory afforestation.

Page 4: ENVIRONMENTAL STATEMENT - Central Coalfields Limited · Environment Dept., CCL Jharkhand OCP Page 1 EXECUTIVE SUMMARY E-1 This Annual Environmental Statement has been prepared as

Environment Dept., CCL Jharkhand OCP Page 3

CHAPTER - II

ENVIRONMENTAL STATEMENT FORM - V

Environmental Statement for the financial year ending March 2014

PART - A

(i) Name and Address of the Mine : JHARKHAND-LAIYO PROJECT

: PROJECT OFFICER

Place : Jharkhand

Post : Rahawan

Distt. : Ramgarh, Jharkhand

(ii)Industry Category : Primary

(iii)Production Capacity : 1.0 MTY

(iv) Date of last Env. Statement Report: Sept 2013

Submitted

PART - B

WATER AND RAW MATERIAL CONSUMPTION

I. WATER CONSUMPTION (M3/ day) A Mining :

i. Haul road dust suppression : 59

ii. Workshop : 09

iii. Fire fighting : NIL

iv. Others( service building etc ) : 14

b. Cooling : NIL

c. Domestic : 480

Name of product Water consumption per unit of product

During financial year (2013-14) During financial year (2012-13)

1. ROM coal 0.17 Cum./te 0.17 Cum./te

Note- There is no direct relation between water consumption and coal production.

II. :RAW MATERIAL CONSUMPTION:

Name of raw material Name of products Consumption of raw materials

(per unit of output)

During financial

year (2013-14)

During financial year

(2012-13)

NIL

Page 5: ENVIRONMENTAL STATEMENT - Central Coalfields Limited · Environment Dept., CCL Jharkhand OCP Page 1 EXECUTIVE SUMMARY E-1 This Annual Environmental Statement has been prepared as

Environment Dept., CCL Jharkhand OCP Page 4

JHARKHAND OC PROJECT

PRODUCTION CHART FOR LAST 5 YEARS

FY Coal (te) OBR (m3)

2013-14 501748 1267304

2012-13 491205 1175025

2011-12 411850 1193755

2010-11 606335 1312920

2009-10 600015 1686740

Page 6: ENVIRONMENTAL STATEMENT - Central Coalfields Limited · Environment Dept., CCL Jharkhand OCP Page 1 EXECUTIVE SUMMARY E-1 This Annual Environmental Statement has been prepared as

Environment Dept., CCL Jharkhand OCP Page 5

PART – C

POLLUTION DISCHARGED TO ENVRONMENT/UNIT OF OUTPUT

(PARAMETERS SPECIFIED IN THE CONSENT ISSUED)

Pollutions Quantity of pollution generated Percentage variation from prescribed standards with

reasons

Water i.About 169 lts/day mine effluent discharged

outside.

ii.Workshop 7.0 lts/day

iii.Colony 90.00 lts./day.The analysis results

are given in Annexure

The analysis results reveal that most of the

parameters are below permissible limits prescribed

by MoEF as General Standards for Class 'A' effluent

(Effluent discharged into inland surface water).

Air It is difficult to quantify the amount of air

pollutants. The main air pollutant is

suspended particulate matter (SPM). The air

quality results are appended as Annexure.

Ambient air quality results show that SO2, NOx

values were within prescribed limits.

Noise The high noise in mining area owes its

origin in and around excavation & material

handling sites. There is no continuous sound

frequency of impulsive nature. Ambient

noise quality report is appended as

Annexure.

Noise Quality Report shows the results are within

permissible limits.

PART - D

HAZARDOUS WASTES

(As specified under Hazardous Waste Management and Handling Rules (1989)

Hazardous Waste Total Quantity

During financial year

(2013-14)

During financial

year (2012-13)

(a) From process Nil Nil

(b) From pollution control facilities Nil Nil

PART – E

SOLID WASTES

Total Quantity in million cubic metre.

During financial year

(2013-14)

During financial year

(2012-13)

(a)From Process(Mining) Overburden 1.27 M m3 1.85 M. m3

(b) From pollution control facilities Nil Nil

(c)Quantity recycled or reutilized During both financial year, the entire

volume of OB has been used for

refilling the decoaled area of the

quarry.

Page 7: ENVIRONMENTAL STATEMENT - Central Coalfields Limited · Environment Dept., CCL Jharkhand OCP Page 1 EXECUTIVE SUMMARY E-1 This Annual Environmental Statement has been prepared as

Environment Dept., CCL Jharkhand OCP Page 6

PART - F

PLEASE SPECIFY THE CHARACTERISTICS (IN TERMS OF

CONCENTRATION AND QUANTUM) OF HAZARDOUS AS WELL AS SOLID

WASTES AND INDICATE THE DISPOSAL PRACTICE ADOPTED FOR BOTH

THESE CATEGORIES OF WASTES

1. HAZARDOUS WASTES: Hazardous wastes are not being produced either from mining operation or from any pollution

control facilities.

2. SOLID WASTES : During opencast mining, overburden produced as solid wastes temporarily as these materials are

used for land reclamation. During the year 2013-14, 1.27 Million cubic meter of overburden was

generated. The overburden materials are more or less homogeneous comprising mainly shale,

sand, silt and clay, & gravel.

3. DISPOSAL PRACTICE

Presently, the O.B. material is being filled in de-coaled area of quarry and as external dump.

PART – G

IMPACT OF POLLUTION CONTROL MEASURES ON CONSERVATION OF NATURAL RESOURCES

AND CONSEQUENTLY ON COST OF PRODUCTION

In order to carry out mining in an eco-friendly manner, following pollution control measures have

been implemented.

1.0 AIR POLLUTION CONTROL MEASURES :

The following measures have been taken to control air pollution:

(i) Regular sprinkling of water on haul roads and other roads.

(ii) Water sprinkling on coal stock.

(iii) Plantation along the haul road and in other vacant space.

(iv) All necessary precautions will be taken during drilling, blasting, loading & transporting operations.

2.0 WATER POLLUTION CONTROL MEASURES:

The following measures have been taken to control water pollution from the mine:

i. The mine water is allowed to settle in sump before pumping to natural drains. Some of

mine water is also used for haul road dust suppression, in workshop & in fire fighting in

the mine.

ii. The catch drains has been constructed around the foot of the O.B. dumps in order to

collect surface run-off water from the dumps and convey them to the settling ponds.

(iii) An Oil & grease trap and settling ponds are proposed in the workshop to prevent water

pollution.

(iv) Colony & other service building are provided with septic tank & soak pit.

(v) A garland drain is provided around the quarry to collect the surface run-off. This also prevents

storm water to enter in to the quarry area.

(vi) Blasting operation is carried out between 12.30 PM to 3.00 PM.

(vii) Regular maintenance of HEMMs, CHP, and other equipments

viii Use of HEMMs with sound proof cabin.

(ix) Providing green belt around noise generating centers.

Page 8: ENVIRONMENTAL STATEMENT - Central Coalfields Limited · Environment Dept., CCL Jharkhand OCP Page 1 EXECUTIVE SUMMARY E-1 This Annual Environmental Statement has been prepared as
Page 9: ENVIRONMENTAL STATEMENT - Central Coalfields Limited · Environment Dept., CCL Jharkhand OCP Page 1 EXECUTIVE SUMMARY E-1 This Annual Environmental Statement has been prepared as

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested 2) This Report cannot be reproduced in part or full without written permission of the management.

3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Job No. : 094313025 Date of Issue: 29/04/13

Name of the Customer : CCL

Customer Letter Ref. No. (if any): CCL/Env-Monitoring/13-14/ 2013/823-828 dt. 16/05/13

Sample Description : Air Product Specification (BIS) : Gazette Notification no. G.S.R 742(E) dt.25th Sept.’2000

Test Required : As per Gazette Notification no. G.S.R 742(E) dt.25th Sept.’2000 Date of receipt of sample : 22/04/13 Date of performance of Test: 22/04/13 to 29/04/13

TEST RESULT

The sample has been tested with the following results:- Area : Hazaribagh Year 2013 Project : Jharkhand Laiyo Project Quarter Ending June '2013

Name of the Sampling Station DAV School Jharkhand

Date of Sampling SPM RPM SO2 NOx Remarks

17/04/2013 - 18/04/2013

225 83 10 43

Name of the Sampling Station P.O.Office

Date of Sampling SPM RPM SO2 NOx Remarks

17/04/2013 - 18/04/2013

229 80 11 44

G.M (Chemist) Analysed By Checked By Env. Lab., CMPDI(HQ)

H - 5 (Authorized Signatory)

TEST REPORT

Page 10: ENVIRONMENTAL STATEMENT - Central Coalfields Limited · Environment Dept., CCL Jharkhand OCP Page 1 EXECUTIVE SUMMARY E-1 This Annual Environmental Statement has been prepared as

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested 2) This Report cannot be reproduced in part or full without written permission of the management.

3) Liability for return of samples ceases as samples cannot be retained for retests.

Job No. : 094313025 Date of Issue: 22/04/13

Name of the Customer : CCL

Customer Letter Ref. No. (if any): CCL/Env-Monitoring/13-14/ 2013/823-828 dt. 16/05/13

Sample Description : Noise Product Specification (BIS) : Gazette Notification no. G.S.R 742(E) dt.25th Sept.’2000

Test Required : As per Gazette Notification no. G.S.R 742(E) dt.25th Sept.’2000 Date of receipt of sample : 22/04/13 Date of performance of Test: -

TEST RESULT

The sample has been tested with the following results:- Area : Hazaribagh Year 2013 Project : Jharkhand Laiyo Project Quarter Ending June '2013

Sampling Stations 1 DAV School Jharkhand 2 P.O.Office

Station Name Date of Sampling Noise Level

DAV School Jharkhand 17/04/2013 49.3

P.O.Office 17/04/2013 50.5

Permissible Limit of Noise Level vide Gazette Notification G.S.R. 742(E) Dt. 25th Sep '2K

Noise Level

G.M (Chemist) Checked By Env. Lab., CMPDI(HQ)

H - 6 (Authorized Signatory)

TEST REPORT

6.00 AM to 10.00 PM

10.00 PM to 6.00 AM

Leq 75 dB(A)

Leq 70 dB(A)

Page 11: ENVIRONMENTAL STATEMENT - Central Coalfields Limited · Environment Dept., CCL Jharkhand OCP Page 1 EXECUTIVE SUMMARY E-1 This Annual Environmental Statement has been prepared as

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested 2) This Report cannot be reproduced in part or full without written permission of the management.

3) Liability for return of samples ceases as samples cannot be retained for retests.

Job No. : 094313025 Date of Issue: 09/05/13

Name of the Customer : CCL

Customer Letter Ref. No. (if any) : CCL/Env-Monitoring/13-14/ 2013/823-828 dt. 16/05/13

Sample Description : Effluent Water Product Specification (BIS) : MoEF Sch VI Class ‘a’ std. Test Required : 26 items as per MoEF Sch VI Class ‘a’ std.

Date of receipt of sample : 22/04/13 Date of performance of Test: 22/04/13 to 09/05/13

TEST RESULT

The sample has been tested with the following results:- Area : Hazaribagh Year 2013 Project : Jharkhand Laiyo Project Quarter Ending June '2013

Sampling Stations 1 Lagoon Discharge 18-April-13 2 LU Mine Discharge 18-April-13

All parameter are in mg/l unless specified BDL - Below Detectable Limit

Sl.No. Parameter Sampling Stations Below Detection

Limit

MOEF -SCH-VI STANDARDS

Remarks

1 2 3

1 Colour & Odour Acceptable Acceptable - Acceptable

2 Total Suspended Solids 62 34 5.00 100.0

3 pH value 8.14 7.94 0.01 5.5 to 9.0

4 Temperature (o C ) 28.4 28.3 - Shall not exceed 5 C above the receiving

temp.

5 Oil & Grease BDL BDL 1.00 10.0

6 Total Residual Chlorine BDL BDL 0.04 1.0

7 Ammonical Nitrogen 0.20 0.22 0.02 50.0

8 Total Kjeldahl Nitrogen 2.40 2.25 0.02 100.0

9 Free Ammonia BDL BDL 0.02 5.0

10 B.O.D (3 days 27oC) 1.00 1.00 1.00 30.0

11 COD 75 45 5.00 250.0

12 Arsenic BDL BDL 0.01 0.2

13 Lead BDL BDL 0.05 0.1

14 Hexavalent Chromium BDL BDL 0.01 0.1

15 Total Chromium 0.47 0.47 0.10 2.0

16 Copper 0.07 0.07 0.02 3.0

17 Zinc 0.04 0.05 0.02 5.0

18 Selenium BDL BDL 0.01 0.05

19 Nickel 0.12 0.12 0.10 3.0

20 Fluoride 0.38 0.44 0.05 2.0

21 Dissolved Phosphate 0.17 0.10 0.01 5.0

22 Sulphide 0.04 0.03 0.01 2.0

23 Phenolic Compounds BDL BDL 0.001 1.0

24 Manganese 0.05 0.06 0.05 2.0

25 Iron 0.18 0.19 0.05 3.0

26 Nitrate Nitrogen 2.00 2.20 0.01 10.0 G.M (Chemist) Analysed By Checked By Env. Lab., CMPDI(HQ)

H - 7 (Authorized Signatory)

TEST REPORT

Page 12: ENVIRONMENTAL STATEMENT - Central Coalfields Limited · Environment Dept., CCL Jharkhand OCP Page 1 EXECUTIVE SUMMARY E-1 This Annual Environmental Statement has been prepared as

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested 2) This Report cannot be reproduced in part or full without written permission of the management.

3) Liability for return of samples ceases as samples cannot be retained for retests.

Job No. : 094313025 Date of Issue: 09/05/13

Name of the Customer : CCL

Customer Letter Ref. No. (if any): CCL/Env-Monitoring/13-14/ 2013/823-828 dt. 16/05/13 Sample Description : Surface Water Product Specification (BIS) : IS: 2296 Inland Surface Water Class 'C' Test Required : 18 items as per IS: 2296

Date of receipt of sample : 22/04/13 Date of performance of Test: 22/04/13 to 09/05/13

TEST RESULT

The sample has been tested with the following results:- Area : Hazaribagh Year 2013 Project : Jharkhand Laiyo Project Quarter Ending June '2013

Sampling Stations 1 Chutua Nala after conf. With Kedla Nala 18-April-13 2 Chutua Nala d/s after LU Mine Discharge Point 18-April-13

All parameter are in mg/l unless specified BDL - Below Detectable Limit Sl.No. Parameter Sampling Stations Below

Detection Limit

IS : 2296 INLAND

SURFACE WATER [1982] Class 'C'

Remarks

1 2 3

1 Colour, Hazen unit,Max 14 12 1.00 300

2 Total Suspended Solids 88 62 5.00 $

3 Disolved Oxygen 4.70 4.60 0.10 4

4 pH value 8.35 8.20 0.01 6.5-8.5

5 Iron 0.24 0.20 0.05 5

6 Chlorides 32 28 0.25 600 7 BOD (3 days 27oC) 2.60 2.80 1.00 3

8 Total Dissolved Solids 238 230 1.00 1500

9 Copper 0.08 0.08 0.02 1.5

10 Sulphate 38 36 1.00 400

11 Nitrate 9.30 8.41 0.01 50

12 Fluoride 0.48 0.44 0.05 1.5 13 Selenium BDL BDL 0.01 0.05 14 Arsenic BDL BDL 0.01 0.2

15 Lead BDL BDL 0.05 0.1

16 Zinc 0.04 0.04 0.02 15

17 Hexavalent Chromium BDL BDL 0.01 0.05

18 Phenolics BDL BDL 0.001 0.005 Class-C: Tolerance Limit for surface water used for drinking water source with conventional treatment followed by disinfection $ represents limits not specified G.M (Chemist) Analysed By Checked By Env. Lab., CMPDI(HQ)

H - 8 (Authorized Signatory)

Page 13: ENVIRONMENTAL STATEMENT - Central Coalfields Limited · Environment Dept., CCL Jharkhand OCP Page 1 EXECUTIVE SUMMARY E-1 This Annual Environmental Statement has been prepared as

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested 2) This Report cannot be reproduced in part or full without written permission of the management.

3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Job No. : 094313025 Date of Issue: 25/07/13

Name of the Customer : CCL

Customer Letter Ref. No. (if any): CCL/Env-Monitoring/13-14/ 2013/823-828 dt. 16/05/13

Sample Description : Air Product Specification (BIS) : Gazette Notification no. G.S.R 742(E) dt.25th Sept.’2000

Test Required : As per Gazette Notification no. G.S.R 742(E) dt.25th Sept.’2000 Date of receipt of sample : 18/07/13 Date of performance of Test: 18/07/13 to 25/07/13

TEST RESULT The sample has been tested with the following results:- Area : Hazaribagh Year 2013 Project : Jharkhand Laiyo Project Quarter Ending Sept. '2013

Name of the Sampling Station DAV School Jharkhand

Date of Sampling SPM RPM SO2 NOx Remarks

15/07/2013 - 16/07/2013

165 89 <25 23

Name of the Sampling Station P.O.Office

Date of Sampling SPM RPM SO2 NOx Remarks

15/07/2013 - 16/07/2013

208 77 <25 25

G.M (Chemist) Analysed By Checked By Env. Lab., CMPDI(HQ)

H - 5 (Authorized Signatory)

Page 14: ENVIRONMENTAL STATEMENT - Central Coalfields Limited · Environment Dept., CCL Jharkhand OCP Page 1 EXECUTIVE SUMMARY E-1 This Annual Environmental Statement has been prepared as

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested 2) This Report cannot be reproduced in part or full without written permission of the management.

3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Job No. : 094313025 Date of Issue: 18/07/13

Name of the Customer : CCL

Customer Letter Ref. No. (if any): CCL/Env-Monitoring/13-14/ 2013/823-828 dt. 16/05/13

Sample Description : Noise Product Specification (BIS) : Gazette Notification no. G.S.R 742(E) dt.25th Sept.’2000

Test Required : As per Gazette Notification no. G.S.R 742(E) dt.25th Sept.’2000 Date of receipt of sample : 18/07/13 Date of performance of Test: -

TEST RESULT

The sample has been tested with the following results:- Area : Hazaribagh Year 2013 Project : Jharkhand Laiyo Project Quarter Ending Sept. '2013

Sampling Stations 1 DAV School Jharkhand 2 P.O.Office

Station Name Date of Sampling Noise Level

DAV School Jharkhand 15/07/2013 46.5

P.O.Office 15/07/2013 50.2

Permissible Limit of Noise Level vide Gazette Notification G.S.R. 742(E) Dt. 25th Sep '2K

Noise Level

G.M (Chemist) Checked By Env. Lab., CMPDI(HQ)

H - 6 (Authorized Signatory)

6.00 AM to 10.00 PM

10.00 PM to 6.00 AM

Leq 75 dB(A)

Leq 70 dB(A)

Page 15: ENVIRONMENTAL STATEMENT - Central Coalfields Limited · Environment Dept., CCL Jharkhand OCP Page 1 EXECUTIVE SUMMARY E-1 This Annual Environmental Statement has been prepared as

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested 2) This Report cannot be reproduced in part or full without written permission of the management.

3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Job No. : 094313025 Date of Issue: 25/07/13

Name of the Customer : CCL

Customer Letter Ref. No. (if any) : CCL/Env-Monitoring/13-14/ 2013/823-828 dt. 16/05/13

Sample Description : Effluent Water Product Specification (BIS) : MoEF Sch VI Class ‘a’ std. Test Required : 27 items as per MoEF Sch VI Class ‘a’ std.

Date of receipt of sample : 18/07/13 Date of performance of Test: 18/07/13 to 25/07/13

TEST RESULT

The sample has been tested with the following results:- Area : Hazaribagh Year 2013 Project : Jharkhand Laiyo Project Quarter Ending Sept. '2013

Sampling Stations 1 Lagoon Discharge 17-Jul-13 2 LU Mine Discharge 17-Jul-13

All parameter are in mg/l unless specified BDL - Below Detectable Limit

Sl.No. Parameter Sampling Stations Below

Detection Limit

MOEF -SCH-VI

STANDARDS Remarks

1 2 3

1 Colour & Odour Acceptable Acceptable 5.0 Cannot be

quantified

Acceptable

2 Total Suspended Solids 58 36 25.00 100.0

3 pH value 8.08 8.10 0.01 5.5 to 9.0

4 Temperature (o C ) 26.8 26.7 - Shall not exceed 5 C above the receiving

temp.

5 Oil & Grease BDL BDL 2.00 10.0

6 Total Residual Chlorine BDL BDL 0.02 1.0

7 Ammonical Nitrogen 0.22 0.24 0.01 50.0

8 Total Kjeldahl Nitrogen 2.20 2.30 1.00 100.0

9 Free Ammonia 0.01 0.01 0.01 5.0

10 B.O.D (3 days 27oC) 2.00 2.00 2.00 30.0

11 COD 65 45 4.00 250.0

12 Arsenic BDL BDL 0.005 0.2

13 Lead BDL BDL 0.005 0.1

14 Cadmium BDL BDL 0.0005 2.0

15 Hexavalent Chromium 0.01 BDL 0.01 0.1

16 Total Chromium BDL BDL 0.06 2.0

17 Copper BDL BDL 0.03 3.0

18 Zinc 0.01 0.01 0.01 5.0

19 Selenium BDL BDL 0.005 0.05

20 Nickel BDL BDL 0.10 3.0

21 Fluoride 0.40 0.42 0.02 2.0

22 Dissolved Phosphate 0.18 0.12 0.30 5.0

23 Sulphide 0.007 0.005 0.005 2.0

24 Phenolic Compounds BDL BDL 0.002 1.0

25 Manganese BDL BDL 0.02 2.0

26 Iron BDL BDL 0.06 3.0

27 Nitrate Nitrogen 1.2 2.2 0.50 10.0 G.M (Chemist) Analysed By Checked By Env. Lab., CMPDI(HQ)

H - 7 (Authorized Signatory)

Page 16: ENVIRONMENTAL STATEMENT - Central Coalfields Limited · Environment Dept., CCL Jharkhand OCP Page 1 EXECUTIVE SUMMARY E-1 This Annual Environmental Statement has been prepared as

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested 2) This Report cannot be reproduced in part or full without written permission of the management.

3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Job No. : 094313025 Date of Issue: 25/07/13

Name of the Customer : CCL

Customer Letter Ref. No. (if any): CCL/Env-Monitoring/13-14/ 2013/823-828 dt. 16/05/13 Sample Description : Surface Water Product Specification (BIS) : IS: 2296 Inland Surface Water Class 'C' Test Required : 19 items as per IS: 2296

Date of receipt of sample : 18/07/13 Date of performance of Test: 18/07/13 to 25/07/13

TEST RESULT

The sample has been tested with the following results:- Area : Hazaribagh Year 2013

Project : Jharkhand Laiyo Project Quarter Ending Sept. '2013

Sampling Stations 1 Chutua Nala after conf. With Kedla Nala 17-Jul-13 2 Chutua Nala d/s after LU Mine Discharge Point 17-Jul-13

All parameter are in mg/l unless specified BDL - Below Detectable Limit Sl.No. Parameter Sampling Stations Below

Detection Limit

IS : 2296 INLAND

SURFACE WATER [1982] Class 'C'

Remarks

1 2 3

1 Colour, Hazen unit,Max 12 10 5.0 300

2 Total Suspended Solids 84 56 25.00 $

3 Disolved Oxygen 4.80 4.70 0.10 4

4 pH value 8.24 8.12 0.01 6.5-8.5

5 Iron BDL BDL 0.06 5

6 Chlorides 34 30 2.00 600 7 BOD (3 days 27

oC) 2.80 2.40 2.00 3

8 Total Dissolved Solids 236 232 25.00 1500

9 Copper BDL BDL 0.03 1.5

10 Sulphate 34 40 2.00 400

11 Nitrate 8.41 9.74 0.50 50

12 Fluoride 0.45 0.42 0.02 1.5 13 Cadmium BDL BDL 0.0005 0.01 14 Selenium BDL BDL 0.005 0.05

15 Arsenic BDL BDL 0.005 0.2

16 Lead BDL BDL 5.00 0.1

17 Zinc BDL 0.01 0.01 15

18 Hexavalent Chromium BDL BDL 0.01 0.05

19 Phenolics BDL BDL 0.002 0.005 Class-C: Tolerance Limit for surface water used for drinking water source with conventional treatment followed by disinfection $ represents limits not specified G.M (Chemist) Analysed By Checked By Env. Lab., CMPDI(HQ)

H - 8 (Authorized Signatory)

Page 17: ENVIRONMENTAL STATEMENT - Central Coalfields Limited · Environment Dept., CCL Jharkhand OCP Page 1 EXECUTIVE SUMMARY E-1 This Annual Environmental Statement has been prepared as
Page 18: ENVIRONMENTAL STATEMENT - Central Coalfields Limited · Environment Dept., CCL Jharkhand OCP Page 1 EXECUTIVE SUMMARY E-1 This Annual Environmental Statement has been prepared as
Page 19: ENVIRONMENTAL STATEMENT - Central Coalfields Limited · Environment Dept., CCL Jharkhand OCP Page 1 EXECUTIVE SUMMARY E-1 This Annual Environmental Statement has been prepared as
Page 20: ENVIRONMENTAL STATEMENT - Central Coalfields Limited · Environment Dept., CCL Jharkhand OCP Page 1 EXECUTIVE SUMMARY E-1 This Annual Environmental Statement has been prepared as
Page 21: ENVIRONMENTAL STATEMENT - Central Coalfields Limited · Environment Dept., CCL Jharkhand OCP Page 1 EXECUTIVE SUMMARY E-1 This Annual Environmental Statement has been prepared as
Page 22: ENVIRONMENTAL STATEMENT - Central Coalfields Limited · Environment Dept., CCL Jharkhand OCP Page 1 EXECUTIVE SUMMARY E-1 This Annual Environmental Statement has been prepared as