envision sustainability in the bay area: vta’s bart...
TRANSCRIPT
![Page 1: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/1.jpg)
Envision Sustainability in the Bay Area:
VTA’s BART Silicon Valley
APWA NorCal Conference
November 7, 2019
![Page 2: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/2.jpg)
Envision and BART Silicon Valley
• VTA’s BART Silicon Valley Extension Project
• Overview of Envision Sustainability Framework
• Sustainability Highlights: Berryessa Station
• Envision Self Assessment Results: Berryessa Station
• Application to other infrastructure projects
2
![Page 3: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/3.jpg)
3
VTA’s BART Silicon Valley
Extension (SVBX)
![Page 4: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/4.jpg)
Project Example:
VTA’s BART Silicon Valley ProgramPhase I Extension
• 10-mile extension
• 2 stations
• Construction essentially complete
• Anticipated opening: Late 2019
Phase II Extension
• 6-mile extension (5-mile tunnel)
• 4 stations
• Newhall Yard Maintenance Facility
4
![Page 5: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/5.jpg)
Benefits and Transit Connections
VTA’s BART Phase I
11 Grade Separations
Habitat
Restoration
Flood Control
Noise and Vibration Mitigation
New and Enhanced Roadways
Major Utilities
Relocated
5
![Page 6: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/6.jpg)
Transit Centers With BART Stations
6
![Page 7: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/7.jpg)
Phase I Redevelopment
Milpitas Station Area: October 2016 Milpitas Station Area: December 2018
The Milpitas Transit Specific Area
Plan allows for:
• 191,000+ sq. ft. of retail space
• 9,000+ sq. ft. of office
development
• 9,000+ housing units
• 7,000 units already entitled
Berryessa Station: November 2016 Berryessa Station: Today
The Berryessa Urban Village
Plan allows for:
• 4.2M sq. ft. of commercial
development (or 14,000 jobs)
• 5,100 housing units
7
![Page 8: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/8.jpg)
8
Overview of Envision
Sustainability Framework
![Page 9: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/9.jpg)
THE ENVISION RATING SYSTEM®
![Page 10: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/10.jpg)
Are we Building the project right?
ARE we building the RIGHT PROJECT?
ENVISION
![Page 11: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/11.jpg)
• Envision is a sustainability framework
• Verification program with award levels (optional)
• Envision can be used
– ALL Infrastructure
– ALL phases of project
ENVISION
Fourth Ward Park | Envision Gold
![Page 12: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/12.jpg)
ENERGYGeothermal
Hydroelectric
Nuclear
Coal
Natural Gas
Oil/Refinery
Wind
Solar
Biomass
WATERPotable water distribution
Capture/Storage
Water Reuse
Storm Water
Management
Flood Control
WASTESolid waste
Recycling
Hazardous Waste
Collection & Transfer
TRANSPORTAirports
Roads
Highways
Bikes
Pedestrians
Railways
Public Transit
Ports
Waterways
LANDSCAPEPublic Realm
Parks
Ecosystem Services
INFORMATIONTelecommunications
Internet
Phones
Satellites
Data Centers
Sensors
What Types Of Infrastructure Will EnvisionTM Rate?
![Page 13: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/13.jpg)
Envision Components• Professional Credential
• Guidance Manual
• Self-Assessment Checklist
• Online Scoresheet
• Optional Verification and Award Program
![Page 14: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/14.jpg)
64 Credits in 5 Categories
Purpose, Community, Wellbeing
Siting, Land & Water, Biodiversity
Materials, Energy, Water
Collaboration, Management, Planning
Emission, Resilience
14
![Page 15: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/15.jpg)
Levels of Achievement
0
5
10
15
20
25
30
Improved Enhanced Superior Conserving Restorative
Po
ints
QL1.1 IMPROVE COMMUNITY QUALITY OF LIFE
No Negative Impact
15
![Page 16: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/16.jpg)
Using Envision
![Page 17: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/17.jpg)
Verification – Envision v3
Path A: Verification at or after 95% Design Completion
Created RegisteredIn
VerificationFirst Review
Second Review
AwardPost-
Construction Review
Complete
Path B: Verification after 95% Construction Completion
Created RegisteredIn
VerificationFirst Review
Post-Construction
ReviewAward Complete
![Page 18: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/18.jpg)
18
Sustainability Highlights:
Berryessa Station
![Page 19: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/19.jpg)
• Creek Restoration
• Native plants in landscaping
• Variable speed escalators
• Solar Power
• EV Charging
• Recycled Water
Berryessa Station: Sustainability Highlights
19
![Page 20: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/20.jpg)
• Creek Restoration
• Upper Penitencia restored
from a degraded channel
to a braided channel with
floodplain, including native
habitat with a gravel
lenses for recharging
ground water.
Berryessa Station: Sustainability Highlights
20
![Page 21: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/21.jpg)
• Creek Restoration
• Native seed from the
same watershed was
propagated at a local
nursery and planted in the
Upper Penitencia
mitigation area, ensuring
the native genetic
diversity is preserved in
this watershed.
Berryessa Station: Sustainability Highlights
21
![Page 22: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/22.jpg)
• Water-wise Planting
• Landscape designers
selected water-wise species
including a varied range of
perennials which all bloom
in varied colors, plug
grasses for the bioretention
facilities, and street trees
both evergreen and
deciduous such as Black
Oak and Western Redbud.
Berryessa Station: Sustainability Highlights
22
![Page 23: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/23.jpg)
• Variable speed escalators
• The escalators inside the
station have two speed
settings. During its idle time
the speed is reduced to 1/3 to
minimize energy use. When
the sensor is triggered the
elevator speed increases to
its normal escalator speed.
This will save roughly
217kWh/yr.
Berryessa Station: Sustainability Highlights
23
![Page 24: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/24.jpg)
• Solar Power
• The parking structure
has a 152kW system
offsetting half of the
parking structures
lighting and elevators
during daytime
operations.
Berryessa Station: Sustainability Highlights
24
![Page 25: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/25.jpg)
• EV Car Charging Stations
• The parking structure has a 24
220volt electric car chargers.
These chargers have priority
parking on the first floor of the
garage. The chargers are
equipped with the –chargepoint+®
RFID card payment system.
Berryessa Station: Sustainability Highlights
25
![Page 26: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/26.jpg)
• Recycled Water
In October 2019 the
Berryessa Station
Campus irrigation mains
were converted to
recycled water when the
mainline became
available, saving 148,356
Gallons of potable water
annually.
Berryessa Station: Sustainability Highlights
26
![Page 27: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/27.jpg)
Envision Self-Assessment
Results: Berryessa Station
27
27
![Page 28: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/28.jpg)
Envision and Berryessa - Ratings
28
![Page 29: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/29.jpg)
0
5
10
15
20
25
30
QL1.1Improve
CommunityQuality of Life
QL1.2Enhance Public
Health &Safety
QL1.3Improve
ConstructionSafety
QL1.4MinimizeNoise &
Vibration
QL1.5Minimize Light
Pollution
QL1.6Minimize
ConstructionImpacts
QL2.1Improve
CommunityMobilityAccess
QL2.2EncourageSustainable
Transportation
QL2.3ImproveAccess &
Wayfinding
QL3.1Advance Equity& Social Justice
QL3.2Preserve
Historic &Cultural
Resources
QL3.3Enhance Views
& LocalCharacter
QL3.4Enhance Public
Space &Amenities
Quality of Life
Points Scored Total Assessed Points Total Maximum Points
![Page 30: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/30.jpg)
0
5
10
15
20
25
LD1.1 ProvideEffective
Leadership &Commitment
LD1.2 FosterCollaboration& Teamwork
LD1.3 Providefor Stakeholder
Involvement
LD1.4 PursueByproductSynergies
LD2.1Establish a
SustainabilityManagement
Plan
LD2.2 Plan forSustainable
Communities
LD2.3 Plan forLong-Term
Monitoring &Maintenance
LD2.4 Plan forEnd-of-Life
LD3.1StimulateEconomic
Prosperity &Development
LD3.2 DevelopLocal Skills &Capabilities
LD3.3Conduct a Life-
CycleEconomicEvaluation
Leadership
Points Scored Total Assessed Points Total Maximum Points
![Page 31: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/31.jpg)
0
5
10
15
20
25
30
RA1.1 SupportSustainable
ProcurementPractices
RA1.2 UseRecycledMaterials
RA1.3 ReduceOperational
Waste
RA1.4 ReduceConstruction
Waste
RA1.5 BalanceEarthwork On
Site
RA2.1 ReduceOperational
EnergyConsumption
RA2.2 ReduceConstruction
EnergyConsumption
RA2.3 UseRenewable
Energy
RA2.4Commission &
Monitor EnergySystems
RA3.1Preserve Water
Resources
RA3.2 ReduceOperational
WaterConsumption
RA3.3 ReduceConstruction
WaterConsumption
RA3.4 MonitorWater Systems
Resource Allocation
Points Scored Total Assessed Points Total Maximum Points
![Page 32: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/32.jpg)
0
5
10
15
20
25
30
NW1.1Preserve Sites
of HighEcological
Value
NW1.2Provide
Wetland &Surface Water
Buffers
NW1.3Preserve Prime
Farmland
NW1.4Preserve
UndevelopedLand
NW2.1Reclaim
Brownfields
NW2.2Manage
Stormwater
NW2.3Reduce
Pesticide &FertilizerImpacts
NW2.4Protect Surface& Groundwater
Quality
NW3.1Enhance
FunctionalHabitats
NW3.2Enhance
Wetland &Surface Water
Functions
NW3.3Maintain
FloodplainFunctions
NW3.4ControlInvasiveSpecies
NW3.5Protect Soil
Health
Natural World
Points Scored Total Assessed Points Total Maximum Points
![Page 33: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/33.jpg)
0
5
10
15
20
25
30
CR1.1 Reduce NetEmbodied Carbon
CR1.2 ReduceGreenhouse Gas
Emissions
CR1.3 Reduce AirPollutant Emissions
CR2.1 AvoidUnsuitable
Development
CR2.2 Assess ClimateChange Vulnerability
CR2.3 Evaluate Riskand Resilience
CR2.4 EstablishResilience Goals and
Strategies
CR2.5 MaximizeResilience
CR2.6 ImproveInfrastructure
Integration
Climate and Resilience
Points Scored Total Assessed Points Total Maximum Points
![Page 34: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/34.jpg)
Applicability to Other
Local Projects
34
![Page 35: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/35.jpg)
Levels of Achievement
0
5
10
15
20
25
30
Improved Enhanced Superior Conserving Restorative
Po
ints
QL1.1 IMPROVE COMMUNITY QUALITY OF LIFE
No Negative Impact
35
![Page 36: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/36.jpg)
Levels of Achievement
0
5
10
15
20
25
30
Improved Enhanced Superior Conserving Restorative
Po
ints
QL1.1 IMPROVE COMMUNITY QUALITY OF LIFE
No Negative Impact
36
![Page 37: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/37.jpg)
Levels of Achievement
0
5
10
15
20
25
30
Improved Enhanced Superior Conserving Restorative
Po
ints
QL1.1 IMPROVE COMMUNITY QUALITY OF LIFE
No Negative Impact
37
![Page 38: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/38.jpg)
Levels of Achievement
0
5
10
15
20
25
30
Improved Enhanced Superior Conserving Restorative
Po
ints
QL1.1 IMPROVE COMMUNITY QUALITY OF LIFE
No Negative Impact
38
![Page 39: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/39.jpg)
Envision and Other Projects
Other projects currently in submittal:
• Southport Levee Improvement Project (Sacramento)
• Biosolids Digester Facilities Project (San
Francisco)
And submitting soon…
• Berryessa Station (San Jose)
39
![Page 40: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/40.jpg)
Questions?
40
![Page 41: Envision Sustainability in the Bay Area: VTA’s BART ...northernca.apwa.net/Content/Chapters/northernca... · Envision and BART Silicon Valley •VTA’s BART Silicon Valley Extension](https://reader036.vdocuments.net/reader036/viewer/2022071010/5fc7e8178aca9329c16e00f5/html5/thumbnails/41.jpg)
Thank you!
Hassan BasmaEngineering Transportation Manager, VTA
(408) 321-5974
Rachael Keish, CEOPE, QSD/P, QISP, CGP & IGP ToR, ENV SP, ISI Verifier
(408) 592-0223www.keish-env.comDBE, WBE, WOSB, SBE (Micro)