epa infrastructure pvt. ltd. company profile
DESCRIPTION
Specialty Construction works as follows: 1. Vacuum Dewatered Flooring 2. Industrial Floorings like Ø PE foam floorings Ø Epoxy floorings 3. Dust proofing of concrete floors with Ø Impregnation chemicals Ø Epoxy coatings 4. Waterproofing works for Basements, Sunken, Terrace Gardens, Terraces, Walls etc using: Ø Polymer modified cementations membranes Ø Polyurethane membranes, Ø Box-type method using Kota/Agra stone Ø Injection Grouting Ø APP modified bituminous membranes/ Tar felt Ø Brickbat Coba Ø EPDM Membranes Ø PVC Membranes 5. Insulation of buildings with Ø Foam concrete Ø Expanded H.D. polystyrene Ø Extruded Polystyrene (XPS) Ø Thermal insulating plaster/ Vermiculite plaster Ø Closed cell-structure PE sheets 6. Core Cutting 7. Structure Strengthening 8. Interior Works for Residences, Showrooms 9. Minor Civil Works 10. Consultancy for Specialized Civil Works 11. Trading of Construction Chemicals 12. Project Management Services 13. Road Work (RCC, SMC, PCC) 14. Expansion Joint WorkTRANSCRIPT
EPA
EPA Infrastructure Pvt. Ltd.
COMPANY PROFILE
Registered office:
COMPANY DETAILS
EPA Infrastructure Pvt. Ltd.
B-267/ 268, North-Ex Mall
Sector-9, Rohini,
Delhi-110085
Phone: +91-11-47068181/51/52
Fax: 011-47068156
Email ID: [email protected]
Website: www.epa-infrastructure.com
Type of Company: Private Limited Business Operation: Specialty Construction works as follows:
1. Vacuum Dewatered Flooring 2. Industrial Floorings like
Ø PE foam floorings
Ø Epoxy floorings
3. Dust proofing of concrete floors with
Ø Impregnation chemicals
Ø Epoxy coatings
4. Waterproofing works for Basements, Sunken, Terrace Gardens, Terraces, Walls etc using:
Ø Polymer modified cementations membranes
Ø Polyurethane membranes,
Ø Box-type method using Kota/Agra stone
Ø Injection Grouting
Ø APP modified bituminous membranes/ Tar felt
Ø Brickbat Coba
Ø EPDM Membranes
Ø PVC Membranes
5. Insulation of buildings with
Ø Foam concrete
Ø Expanded H.D. polystyrene
Ø Extruded Polystyrene (XPS)
Ø Thermal insulating plaster/ Vermiculite plaster
Ø Closed cell-structure PE sheets
6. Core Cutting
7. Structure Strengthening
8. Interior Works for Residences, Showrooms 9. Minor Civil Works 10. Consultancy for Specialized Civil Works 11. Trading of Construction Chemicals 12. Project Management Services 13. Road Work (RCC, SMC, PCC) 14. Expansion Joint Work
VACUUM DEWATERED FLOORING
EPOXY FLOORING
WATERPROOFING
INJECTION GROUTING
FOAM CONCRETE
STRUCTURAL STRENTHENING
ANTI CORROSIVE COATING AT RAIL TRACKS OF RELIANCE METRO NEW DELHI- DHOLA KUAN STATION (DAMEPL)
HEAT AND CHEMICAL RESISTANT PAINT
Company's Turnover For Last Three Years.
Sno. Year Company’s TurnOver (In Lacs)
1 2012-2013 600
2 2011-2012 550
3 2010-2011 200
Promoter:
Mr. Paramjit Singh Sahai, B.Tech(Civil), IIT Delhi, 1977 batch,
promoted this company in 2003. He has over 3 decades of experience in
design, planning, marketing, execution and project management of civil
construction projects/ turnkey chemical process plants/ turnkey waste water
treatment plants.
During his tenure of 25 years with reputed consultancy and construction
companies, Mr. Paramjit Singh Sahai developed great interest in
Protection of Concrete, Specialty Constructions, Consultancy, and Project
Management.
After achieving success in the specialized works, EPA Infrastructure is
adding activities of Civil Works and Interior Works.
He has also initiated the formation of an NGO called Sandeep
Foundation for community welfare and EPA Home Pvt. Ltd for
facilitation of development of mass housing in the country.
Date of Establishment: 01April, 2003
Erstwhile: Sole Proprietor
Bankers: HDFC, Punjab National Bank, S.B.I, I.D.B.I
Auditors: R. P. Narang & Co.
59/1, Janak Palace, New Market (Near Liberty
Cinema) New Rohtak Road, New Delhi-110005
OUR MISSION
EPA Infrastructure Pvt. Ltd. is focused on bringing out the best in all persons involved with it, whether employees, sub-contractors, vendors or customers.
The company constant ly makes an effort to give each employee the maximum freedom and trust possible to perform his or her duties. At appointment stage and at periodic intervals, the company asks employees to take on the role best liked by them to ensure they will enjoy performing their work.
The company takes on new fields of act ivity, whenever an employee/ associate or vendor shows proficiency in that particular activity.
To ensure that more and more people get this opportunity fro m the company, the company believes in fast growth both in terms of employee/ sub-contractor/ vendor base as well as customer base.
The company's vision i s to work at grassroots level and include act ivities which are needed by each person, namely homes, food, healthcare, education etc.
OUR VISION
To be known as a good company to work for
To be known as a provider of excellent quality goods and services
To be known as an organization that walks its talk
To grown into an inst itution that lasts generations
OUR VALUES The company fosters growth of the following values in its employees and seeks customers who have similar value systems:
Ownership: This is our company. We accept personal responsibility and accountability to meet business needs
Passion for Winning: We all are leaders in our area of responsibility, with a deep commitment to deliver results. We are determined to be the best at doing what matters most
People Development: People are our most important asset. We add value through result driven training, and we encourage & reward excellence
Customer Focus: We understand customer needs and build Specialty Construction works to fulfill them better
Team Work: We work together on the principle of mutual trust & transparency in a boundary- less organizat ion. We are intellectually honest in advocating proposals, including recognizing risks
Innovation: Continuous innovation in products & processes is the basis of our success
Integrity: We are committed to the achievement of business success with integrity. We are honest with consumers, with business partners and with each other.
OUR APPROACH TOWARDS WORK
1. Understanding Requirements 2. Developing Correct Strategy 3. Delivering the best of design 4. Work Methodologies 5. Project Management 6. Quality Assurance 7. Client Satisfact ion
ORGANISATIONAL STRUCTURE
FOUNDER & CEO
MARKETING (MANAGER)
MARKETING (EXECUTIVE)
MARKETING (ASST.)
MANAGER (OPERATION)
PROJECT ENGINEER
(FLOORING)
SR. SUPERVISOR
SUPERVISOR SUPERVISOR SUPERVISOR
STORE KEPEER
PROJECT ENGINEER
(WATERPROOFING)
SR. SUPERVISOR
SUPERVISOR SUPERVISOR SUPERVISOR
SECETARY (MD)DIRECTOR
(HRM,F&A)
SR. EXECUTIVE (ACCOUNTS)
ACCOUNT (ASST.)
EXECUTIVE (ADMIN.)
PURCHASE (EXECUTIVE)
EXECUTIVE (HR)
PROJECTS UNDER-EXECUTION
List of Current Work
S.No Description Types of work Status
1 Ansal Proprieties & Infrastructure Ltd. in Barota.
Waterproofing Treatment for deck Slab.
Rs 86.96lacs.Work In Progress.
2 Ansal Proprieties & Infrastructure Ltd. in Barota.
Allied Civil Works for Deck Slab.
Rs.86.63lac Work In Progress.
3 Delhi Airport Metro Express Pvt Ltd
Anti Corrosive Coating Work for Tracks
Rs.110lacs. Work In Progress
4 Dharampal Satyapal Ltd. Kullu (Himanchal)
V.D. Flooring Rs.35lacs.Work in Progress
5 CEC – Soma For DMRC Projects (Race Course , Jorbagh, INA, AIIMS Station)
Grouting with Low Viscosity Arcrylate Polymer Injection Grouting
Work In Progress
6 DLF Utilities Ltd.
Building No 10, Shankar Chowk, Gurgaon
Heat & Chemical resistant painting
Work In Progress
List Of Works Executed in Year 2012-13 S.No Description Types of work Status
1 Nirmal Bharti School in Dwarka, Delhi
Civil &Waterproofing work
Rs. 71.63 lacs. Building handed over in 2013.
2 BSBK Engineers Pvt. Ltd. in Bherod.
140 mm thick Welded wire Mesh Reinforced VD Flooring
Rs 174lacs.Building handed over in 2013.
3 S.C.C.L For Mother son Automotive & Technology in Pathridi (Raj)
Civil & Waterproofing work
Rs.81.70lacs.Building handed over in 2013.
4 SAFEXPRESS Logistic in Ambala (for Assets Max Developer)
150 mm thick Welded wire Mesh Reinforced VD Flooring
Rs.91.31lacs.Building handed over in 2013.
5 Sterling vehicle and general sales private limited
Civil work & Interiors
Rs.165.29.lacs.Building handed over in 2012.
6 Automobile sterling Demolition & Dismantling Works
Rs.37.57.lacs.Building handed over in 2012.
List of Industrial (VD) Flooring Work
S.N. Description Types of work Brief Detail
1 M/s H.S.I for their expansion project at Bahadurgarh.
Vaccum Dewatered Flooring for 75 mm thk PCC floor for
completed work 2004
2 For M/s SeatoEngineering Works Reinforced VD flooring 100 mm thk.
completed work 2004
3 M/s Ahuja Builders at Gurgaon RCC VD Flooring 200
thk with Floor Hardener
completed
work 2004
4 M/s Bridge & Roofthrough M/s
Sana Industries with Sana makes
equipment.at Timarpur.
RCC VD Flooring Completed
work 2005
5 M/s GS Developers & Contractors
Pvt Ltd at Rudrapur.
RCC VD Flooring
completed
work 2005
6 M/s Raj furniture thru’ M/s Uni-
Construction, Gurgaon
PCC, VD flooring completed
work 2005
7 VD Flooring of Floor of Factory
Building of Action Shoes at Baddi
(Himachal)
RCC VD Flooring 125
mm thick for M/s Inder
Construction Co.
completed
work 2005
8 VD Flooring at Kirby factory at
200 mm thk. RCC 18,000 Sqm.
With Hardener for GS Developers
& Contractors Pvt. Ltd.
200 mm thk. RCC
Flooring
completed
work 2006
9 VD Flooring of parking basements
of Aggarwal City Mall, Aggarwal
City Plaza and Fun city.
RCC VD flooring for
M/s Unity group in slope
towards drains.
completed
work 2006
10 VD Flooring of factory of M/s
Euro Solar Systems at Baddi for
M/s Sanghvi Construction.
150 mm thk. RCC VD
Flooring with PP fibers
with groove Filling
completed
work 2006
11 VD Flooring for Vardhman Malls
at Pitampura, Dwarka and
Faridabad.
100 mm thk. RCC
Flooring.
completed
work 2006
12 VD Flooring of 12rd and 14th
floors of Unitech’s Cyber Park at
Sector-39, Gurgaon
VD flooring as specified
in the BOQ
completed
work 2007
13 Olympus (India) Pvt. Ltd V.D.Flooring completed
work 2007
14 Jaksons Buildwell Pvt. Ltd.
V.D.Flooring completed
work 2007
15 Aspire Global V.D.Flooring completed
work 2007
16 Work for INDIA LAND AND
SPACE WAREHOUSE for
SAFEXPRESS AHEMDABAD
V.D. Flooring Groove
cutting, Groove filling
and expansion joint
Treatment
completed
work 2008
17 Work for SAFEXPRESS in
Chennai for SAFEXPRESS Cargo
Pvt. Ltd
V.D. Flooring Groove
cutting, Groove filling
and expansion joint
Treatment
completed
work 2008
18 ATHENA BUSSINESS
SOLUTION Pvt. Ltd. for
GURUBAKSH SINGH B.A.
Builders Pvt. Ltd.
V.D. Flooring Groove
cutting, Groove filling
and expansion joint
Treatment
Completed
work 2008
19 B.K Consortium engineers Pvt.
Ltd For SMCC Location: IMT
Manesar.
V.D. Flooring Groove
cutting, Groove filling
and expansion joint
Treatment.
completed work
2008
20 Client: Jackson Build well Pvt Ltd
Location: V-35 Ring road Mall
V.D. Flooring, Groove
cutting, Groove filling
and expansion joint
Treatment.
completed
work 2008
21 India Land and Space
Warehousing Pvt.Ltd
V.D. Flooring, Groove
cutting, Groove filling
and expansion joint
Treatment.
completed
work 2008
22 B.k Consortium Engineers Pvt Ltd
V.D. Flooring, Groove
cutting, Groove filling
and expansion joint
Treatment.
completed
work 2008
23 Jacksons Developer pvt.Ltd
V.D. Flooring, Groove
cutting, Groove filling
and expansion joint
Treatment.
completed
work 2008
24 Shri Ram Poly Tech
V.D. Flooring, Groove
cutting, Groove filling
and expansion joint
Treatment.
Completed
work 2008
25 Client : BMF Total solution Pvt.
Ltd Location : Holding No.02,
Main Road, Jamshedpur
V.D. Flooring, Groove
cutting, Groove filling
and expansion joint
Treatment.
completed
work 2008
26 Client: Future Warehouse Pvt Ltd
Location: Galan, Reliance Road,
Ghaziabad
V.D. Flooring, Groove
cutting, Groove filling
and expansion joint
Treatment.
completed
work 2009
27 Nile Tech Limited
V.D. Flooring, Groove
cutting, Groove filling
and expansion joint
Treatment.
completed
work 2009
28 Vinayak City Center
V.D. Flooring, Groove
cutting, Groove filling
and expansion joint,
completed
work 2009
29 Gurbakhsh Singh B.A.Builder
Pvt.Ltd
V.D. Flooring, Groove
cutting, Groove filling
and expansion joint
Treatment.
completed
work 2010
30 Classic Engineers
V.D. Flooring, Groove
cutting, Groove filling
and expansion joint
Treatment.
completed
work 2010
31 Dharampal Premchand Ltd. V.D. Flooring, Groove
cutting, Groove filling
and expansion joint
Treatment.
completed
work 2010
32 Sajeev kumar & Bros. V.D. Flooring, Groove
cutting, Groove filling
and expansion joint
Treatment.
completed
work 2011
33 Kicaid Agri Project Pvt.Ltd
Tress Screed RCC
Flooring for CA store
Groove cutting, Groove
filling and expansion
joint Treatment.
completed
work 2011
34 MGF Market Place
V.D. Flooring, Groove
cutting, Groove filling
and expansion joint,
completed
work 2011
35 ISBT Kashmere Gate
V.D. Flooring, Groove
cutting, Groove filling
and expansion joint
Treatment.
completed
work 2011
36 Auto Venture Private Limited
Assets Max Developer
V.D. Flooring, Groove
cutting, Groove filling
and expansion joint
Treatment.
completed
work 2011
37 BSBK Engineers Pvt. Ltd.
V.D. Flooring, Groove
cutting, Groove filling
and expansion joint
Treatment.
completed
work 2011
38 Systematic conscom Ltd. V.D. Flooring, Groove
cutting, Groove filling
and expansion joint
completed
work 2011
Treatment.
39 Shruti Agriculture & Holding Pvt
Ltd For Safexpress in Indore.
V.D. Flooring, Groove
cutting, Groove filling
and expansion joint
Treatment.
completed
work 2011
40 Bharat Industries Agra.
V.D. Flooring, Groove
cutting, Groove filling
and expansion joint
Treatment.
Completed
work 2011
41 RDS Project LTD.
Truss Screed with Steel
Fiber Beaker, Groove
cutting and filling and
Expansion Joint
Treatment.
Completed
work in Aug
2012
List of Waterproofing Works
S.No Description Types of work Brief Detail
1 Waterproofing of Basements For
Silver Estate -– Housing project of
Purvanchal Construction Works at
F- 29, Sector-50, Noida.
Box-type
waterproofing using
Kota/ Agra stone.
completed
work 2006
2 Waterproofing of terrace of Silver
Estate (as above)
Brick Bat Coba. completed
work 2006
3 Waterproofing of Terrace Gardens
of Silver Estate (as above)
3 layer treatment by
polymer modified
cementitious membrane,
brickbat coba, followed by
Kota stone.
completed
work 2006
4 Waterproofing of Water tanks with
injection grouting and
waterproofing plaster for Sumi
Mother son thru’ Aqatec
Electricals Ltd at Noida.
Injection grouting and
waterproofing plaster.
Completed
work 2006
5 Foam Concrete and APP
Membrane waterproofing for
Maruti - Diesel Engine Plant thru’
BL Kashyap & Sons Ltd.
Foam Concrete overlaid
with 3 mm thk Polyester
reinforced APP Membrane.
completed
work 2006
6 Foam Concrete and APP
Membrane waterproofing for
Maruti - Diesel Engine Plant thru’
BL Kashyap & Sons Ltd.
Foam Concrete overlaid
with 3 mm thick Polyester
reinforced APP Membrane.
completed
work 2006
7 Roof waterproofing of Station
buildings of DMRC for JMC
Projects
Brick Bat Coba completed
work 2006
8 Waterproofing of Sunken Toilets,
for Sumi Motherson at E-4. Sector-
59, Noida.
Polymer modified
cementitious membrane/
inject ion grouting
completed
work 2006
9 Waterproofing of construction
joints between buildings of M/s
Nova dairy in Gwalior.
APP modified 3 mm
5Polyester reinforced
membrane.
completed
work 2006
10 Waterproofing of Sunken toilets in
Anand Ashray for M/s Samiah
International Builders Pvt. Ltd.,
Noida.
Polymer modified
cementitious coating Using
Starcrete.
Completed
work 2006
11 Waterproofing of Basements,
Sunken portion, Terrace, Terrace
Box type waterproofing
system using Agra Stone,
completed
Gardens of Vrinda City for M/s
Samiah International Builders Pvt.
Ltd., Noida.
Polymer modified coating
for sunken, box type for
Terrace Gardens.
work 2007
12 Kamakhya Oil Company Waterproofing work
completed
work 2007
13 UNITY INFRA. PROJECT
location: Major Dhyanchand
Stadium Under –C.P.W.D.-
Commonwealth games 2010
Brick Bat Coba and kota
box type
completed
work 2008
14 B.L. KASHYAP For BELSONICA
AUTO COMPONENT Location: I
.M.T Manesar
Brick Bat Coba,Gola
making, plaster, APP
membrane
completed
work 2008
15 Narsi Waterproofing work
completed
work 2008
16 SMCC Construction India Limited Waterproofing work completed
work 2008
17 C& S himoinsa Waterproofing work completed
work 2008
18 Unity Infraproject limited Waterproofing work Completed
work 2008
19 Unity Infraproject limited Waterproofing work Completed
work 2008
20 Unity Infraproject limited Waterproofing work Completed
work 2008
21 BSBK Engineers Pvt. Ltd. Waterproofing work completed
work 2008
22 S.C.C.L For Mother son
Automotive & Technology
Location: B-135,Phase II Noida
Waterproofing work completed
work 2008
23 S.C.C.L For Mother son
Automotive & Technology
Waterproofing work completed
Location: B-135,Phase II Noida work 2008
24 S.C.C.L For Mother son
Automotive & Technology
Location: B-135,Phase II Noida
Waterproofing work completed
work 2008
25 Consolidated Construction
Consortium Ltd. for Infosys, Jaipur
Project
Brick bat coba, APP
Membrane, Inject ion
Grouting, China Mosaic
Tiles work
completed
work 2009
26 S.C.C.L For Mother son
Automotive & Technology
Location: B-135,Phase II Noida
Removing and applying
bitumen, tar felt, APP
Membrane
completed
work 2009
27 Panasonic AVC Networks India
Co. Limited
Waterproofing work completed
work 2009
28 Unity Infraproject limited Waterproofing work completed
work 2009
29 HCL technology Limited Waterproofing work completed
work 2009
30 Simplex Project Limited Waterproofing work completed
work 2010
31 Infosys Limited Waterproofing work completed
work 2010
32 Infosys Limited Waterproofing work completed
work 2010
33 Consolited Construction
Consortium Ltd.
Waterproofing work completed
work 2010
34 Subros Ltd Waterproofing work completed
work 2010
35 Samiah Interational Builder Pvt.
Ltd.
Waterproofing work completed
work 2010
36 S.C.C.L For Mother son
Automotive & Technology
Location: B-135,Phase II Noida
Waterproofing work Completed
work 2010
37 Larson &Turbo Limited Waterproofing work Completed
work 2011
38 Parsvnath ladmark developer pvt.
Ltd.
Waterproofing work Completed
work 2011
39 Rasha India Private Limited Waterproofing work Completed
work 2011
40 S.C.C.L For Mother son
Automotive & Technology
Location: B-135,Phase II Noida
Waterproofing work Completed
work 2011
41 Ansal Proprieties & Infrastructure
Ltd.
Waterproofing work Completed
work 2011
42 Subros Ltd Waterproofing work Completed
work 2011
43 Amba Enterprises Waterproofing work Completed
work 2011
44 Infosys Limited Waterproofing work Completed
work 2011
List of Insulation Works/ Foam Concrete
S.No Description Types of work Brief Detail
1 Heat Insulation of steel Prefab
Building for Bharat Petroleum’s
Retail outlet at Yashwant place,
New Delhi.
Thermal insulation
ofthe building using
ceramic
microsphere
admixed paint.
Completed work
2006
List of Consultancy Works
S.No Description Types of work Brief Detail
1 M/s Malawa Power Pvt. Ltd.
Power project
Advisory services
for management
Completed work
2009
2 Foam concrete on Roof of Diesel
Engine Plant of M/s Maruti Udyog
Ltd. For M/s BL Kashyap & Sons
Ltd at IMT, Manesar.
Foam Concrete Completed work
2006
3 Foam concrete on Roof of Weld
Shop and Assembly Plants of M/s
Maruti Udyog Ltd. for M/s BL
Kashyap & Sons Ltd at IMT,
Manesar.
Foam Concrete Completed work
2006
4
Foam concrete on Roof of
Transmission Plant of M/s Maruti
Udyog Ltd. For M/s BL Kashyap
Sons Ltd at IMT, Manesar.
Foam Concrete
Completed work
2007
5 S.G.Lakhanpal Associates
Foam Concrete
Completed work
2007
6 BSBK Engineers Pvt. Ltd. Foam Concrete
Completed work
2007
7 BSBK Engineers Pvt. Ltd. Foam Concrete
Completed work
2007
8 Consolited Construction
Consortium Ltd.
Foam Concrete
Completed work
2008
9 Consolited Construction
Consortium Ltd.
Foam Concrete
Completed work
2009
10 Bella Vista Hotel & Mall F
Location: Panchkula
Foam Concrete
Completed work
2009
Civil Work
2 M/s Nagode International Pvt. Ltd.
For selection &
Finalization of order
for turnkey
Completed work
2009
3 M/s Delta Robotic Welding
Systems
As a consultancy Completed work
2009
4 Mr. Bharat Singh Yadav
Project &
Construction
Completed work
2009
List of Key Personnel
S.N. Name Designation
1 Mr. Paramjit Singh Sahai Managing Director & CEO
2 Mrs. Kawaljeet Sahai Director ( F&A )
3 Mrs. Ruchi EXECUTIVE/SECETARY (MD)
4 Mr. Arun Bhatia Manager ( Marketing )
5 Mr. Vijay Singh Gangwar Project Manager
6 Mr. Pawan Kumar Asst. Manager ( Finance & Accounts )
7 Mr. Aman Aneja Project Engineer
8 Mr. Devi Lal Sr. Executive (Waterproofing Div.)
9 Miss Amrita Tewari Executive Accounts
10 Mrs. Shilpi Srivastava Executive HR
11 Mr. Bipul Sardar Marketing
12 Mr. Pradeep Gupta Management Trainee (Marketing)
13 Mr. Anees Siddiqui Executive – Interiors
14 Mr. Umesh Chandra Gupta Site Incharge
15 Mr. Brajesh Kumar Sr. Supervisor
16 Mr. Moti Lal Sr. Supervisor
17 Mr. Madan Kumar Mishra Sr. Supervisor
18 Mr. Ashwani Kumar Site Supervisor
19 Mr. Rosan Kumar Supervisor
20 Mr. Jiva Lal Supervisor
21 Mr. Ajay Kumar Supervisor
22 Mr. Inder Kumar Supervisor
23 Mr. Amit Kumar Supervisor
24 Mr. Sandeep Kumar Assistant (Front Office & Accounts)
25 Mr. Sarvesh Driver