epa.ohio.govepa.ohio.gov/portals/28/documents/schedules/2013/columbiana.pdf · oh1500112 butler...
TRANSCRIPT
BUTLER MOBILE CITYOH1500112
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1553394EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: BUTLER MOBILE CITY STU 1
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
BUTLER MOBILE CITYOH1500112
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1560494EP002 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: BUTLER MOBILE CITY STU 2
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
BUTLER MOBILE CITYOH1500112
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: BUTLER MOBILE CITY DISTRIBUTION
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: BUTLER MOBILE CITY DISTRIBUTIONADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
COLUMBIANA CITY PWSOH1500312
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1553396EP001 Facility Source: Ground Water Facility Class: CLASS 2
Facility Name: COLUMBIANA WTP
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
COLUMBIANA CITY PWSOH1500312
Page 1 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: COLUMBIANA, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1
Not RequiredLEAD - 1030 AND COPPER - 1022
Not RequiredASBESTOS - 1094
7 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20137 Sample(s) Required between 2/1/2013 and 2/28/20137 Sample(s) Required between 3/1/2013 and 3/31/20137 Sample(s) Required between 4/1/2013 and 4/30/20137 Sample(s) Required between 5/1/2013 and 5/31/20137 Sample(s) Required between 6/1/2013 and 6/30/20137 Sample(s) Required between 7/1/2013 and 7/31/20137 Sample(s) Required between 8/1/2013 and 8/31/20137 Sample(s) Required between 9/1/2013 and 9/30/20137 Sample(s) Required between 10/1/2013 and 10/31/20137 Sample(s) Required between 11/1/2013 and 11/30/20137 Sample(s) Required between 12/1/2013 and 12/31/2013
7 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20137 Sample(s) Required between 2/1/2013 and 2/28/20137 Sample(s) Required between 3/1/2013 and 3/31/20137 Sample(s) Required between 4/1/2013 and 4/30/20137 Sample(s) Required between 5/1/2013 and 5/31/20137 Sample(s) Required between 6/1/2013 and 6/30/20137 Sample(s) Required between 7/1/2013 and 7/31/20137 Sample(s) Required between 8/1/2013 and 8/31/20137 Sample(s) Required between 9/1/2013 and 9/30/20137 Sample(s) Required between 10/1/2013 and 10/31/20137 Sample(s) Required between 11/1/2013 and 11/30/20137 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: COLUMBIANA, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
COLUMBIANA CITY PWSOH1500312
Page 2 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: COLUMBIANA, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
EAST LIVERPOOL CITYOH1500811
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1553398EP001 Facility Source: Surface Water Facility Class: CLASS 3
Facility Name: EAST LIVERPOOL WTP
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 1/31/2013Sample(s) Required between1 and2/1/2013 2/28/2013Sample(s) Required between1 and3/1/2013 3/31/2013Sample(s) Required between1 and4/1/2013 4/30/2013Sample(s) Required between1 and5/1/2013 5/31/2013Sample(s) Required between1 and6/1/2013 6/30/2013Sample(s) Required between1 and7/1/2013 7/31/2013Sample(s) Required between1 and8/1/2013 8/31/2013Sample(s) Required between1 and9/1/2013 9/30/2013Sample(s) Required between1 and10/1/2013 10/31/2013Sample(s) Required between1 and11/1/2013 11/30/2013Sample(s) Required between1 and12/1/2013 12/31/2013
Not RequiredRADIOLOGICALS
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 and4/1/2013 6/30/2013 Sample for all the analytes listed below:
ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
Paired Sample Set Required betweenTOTAL ORGANIC CARBON (TOC) 1 and1/1/2013 1/31/2013Paired Sample Set Required between1 and2/1/2013 2/28/2013Paired Sample Set Required between1 and3/1/2013 3/31/2013Paired Sample Set Required between1 and4/1/2013 4/30/2013Paired Sample Set Required between1 and5/1/2013 5/31/2013Paired Sample Set Required between1 and6/1/2013 6/30/2013Paired Sample Set Required between1 and7/1/2013 7/31/2013Paired Sample Set Required between1 and8/1/2013 8/31/2013Paired Sample Set Required between1 and9/1/2013 9/30/2013Paired Sample Set Required between1 and10/1/2013 10/31/2013Paired Sample Set Required between1 and11/1/2013 11/30/2013Paired Sample Set Required between1 and12/1/2013 12/31/2013
A paired sample set refers to one source water and one treated water sample. A sourcewater alkalinity is also required at the same time the TOC sample is taken.
EAST LIVERPOOL CITYOH1500811
Page 1 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: EAST LIVERPOOL, CITY OF DISTRIBUTION Facility Class: CLASS 1
Not RequiredLEAD - 1030 AND COPPER - 1022
Not RequiredASBESTOS - 1094
10 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/201310 Sample(s) Required between 2/1/2013 and 2/28/201310 Sample(s) Required between 3/1/2013 and 3/31/201310 Sample(s) Required between 4/1/2013 and 4/30/201310 Sample(s) Required between 5/1/2013 and 5/31/201310 Sample(s) Required between 6/1/2013 and 6/30/201310 Sample(s) Required between 7/1/2013 and 7/31/201310 Sample(s) Required between 8/1/2013 and 8/31/201310 Sample(s) Required between 9/1/2013 and 9/30/201310 Sample(s) Required between 10/1/2013 and 10/31/201310 Sample(s) Required between 11/1/2013 and 11/30/201310 Sample(s) Required between 12/1/2013 and 12/31/2013
10 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/201310 Sample(s) Required between 2/1/2013 and 2/28/201310 Sample(s) Required between 3/1/2013 and 3/31/201310 Sample(s) Required between 4/1/2013 and 4/30/201310 Sample(s) Required between 5/1/2013 and 5/31/201310 Sample(s) Required between 6/1/2013 and 6/30/201310 Sample(s) Required between 7/1/2013 and 7/31/201310 Sample(s) Required between 8/1/2013 and 8/31/201310 Sample(s) Required between 9/1/2013 and 9/30/201310 Sample(s) Required between 10/1/2013 and 10/31/201310 Sample(s) Required between 11/1/2013 and 11/30/201310 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: EAST LIVERPOOL, CITY OF DISTRIBUTIONKWIK KING
Facility Class: CLASS 1
1 Sample(s) Required between 3/8/2013DISINFECTION BYPRODUCTS and 3/14/20131 Sample(s) Required between 6/8/2013 and 6/14/20131 Sample(s) Required between 9/8/2013 and 9/14/20131 Sample(s) Required between 12/8/2013 and 12/14/2013
Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
EAST LIVERPOOL CITYOH1500811
Page 2 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: EAST LIVERPOOL, CITY OF DISTRIBUTIONPLEST HRS FIRE STATION
Facility Class: CLASS 1
1 Sample(s) Required between 3/8/2013DISINFECTION BYPRODUCTS and 3/14/20131 Sample(s) Required between 6/8/2013 and 6/14/20131 Sample(s) Required between 9/8/2013 and 9/14/20131 Sample(s) Required between 12/8/2013 and 12/14/2013
Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS203
Facility Name: EAST LIVERPOOL, CITY OF DISTRIBUTIONSEWER PLANT
Facility Class: CLASS 1
1 Sample(s) Required between 3/8/2013DISINFECTION BYPRODUCTS and 3/14/20131 Sample(s) Required between 6/8/2013 and 6/14/20131 Sample(s) Required between 9/8/2013 and 9/14/20131 Sample(s) Required between 12/8/2013 and 12/14/2013
Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS204
Facility Name: EAST LIVERPOOL, CITY OF DISTRIBUTIONHYDR WITH FEW CUST DOWN STRE
Facility Class: CLASS 1
1 Sample(s) Required between 3/8/2013DISINFECTION BYPRODUCTS and 3/14/20131 Sample(s) Required between 6/8/2013 and 6/14/20131 Sample(s) Required between 9/8/2013 and 9/14/20131 Sample(s) Required between 12/8/2013 and 12/14/2013
Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
EAST PALESTINE CITY PWSOH1500912
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1553399EP001 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: EAST PALESTINE PWS
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
EAST PALESTINE CITY PWSOH1500912
Page 1 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: EAST PALESTINE, CITY OF DISTRIBUTION Facility Class: CLASS 1
20 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
Not RequiredASBESTOS - 1094
5 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20135 Sample(s) Required between 2/1/2013 and 2/28/20135 Sample(s) Required between 3/1/2013 and 3/31/20135 Sample(s) Required between 4/1/2013 and 4/30/20135 Sample(s) Required between 5/1/2013 and 5/31/20135 Sample(s) Required between 6/1/2013 and 6/30/20135 Sample(s) Required between 7/1/2013 and 7/31/20135 Sample(s) Required between 8/1/2013 and 8/31/20135 Sample(s) Required between 9/1/2013 and 9/30/20135 Sample(s) Required between 10/1/2013 and 10/31/20135 Sample(s) Required between 11/1/2013 and 11/30/20135 Sample(s) Required between 12/1/2013 and 12/31/2013
5 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20135 Sample(s) Required between 2/1/2013 and 2/28/20135 Sample(s) Required between 3/1/2013 and 3/31/20135 Sample(s) Required between 4/1/2013 and 4/30/20135 Sample(s) Required between 5/1/2013 and 5/31/20135 Sample(s) Required between 6/1/2013 and 6/30/20135 Sample(s) Required between 7/1/2013 and 7/31/20135 Sample(s) Required between 8/1/2013 and 8/31/20135 Sample(s) Required between 9/1/2013 and 9/30/20135 Sample(s) Required between 10/1/2013 and 10/31/20135 Sample(s) Required between 11/1/2013 and 11/30/20135 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: EAST PALESTINE, CITY OF DISTRIBUTION900 EAST TAGGART STREET
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
EAST PALESTINE CITY PWSOH1500912
Page 2 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: EAST PALESTINE, CITY OF DISTRIBUTION1430 BROOKDALE AVENUE
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
IVYSTONE WATER SYSTEMOH1501212
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1553402EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: IVYSTONE WATER SYSTEM
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
IVYSTONE WATER SYSTEMOH1501212
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: IVYSTONE WATER SYSTEM DISTRIBUTION
5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: IVYSTONE WATER SYSTEM DISTRIBUTIONADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
LEETONIA VILLAGE PWSOH1501412
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: LEETONIA, VILLAGE OF DISTRIBUTION Facility Class: CLASS 2
10 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
2 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013
2 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: LEETONIA, VILLAGE OF DISTRIBUTIONHYDRANT AT COMMERCE AND INDU
Facility Class: CLASS 2
1 Sample(s) Required between 3/22/2013DISINFECTION BYPRODUCTS and 3/28/20131 Sample(s) Required between 6/22/2013 and 6/28/20131 Sample(s) Required between 9/22/2013 and 9/28/20131 Sample(s) Required between 12/22/201 and 12/28/2013
Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
LISBON VILLAGEOH1501512
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1553405EP001 Facility Source: Surface Water Facility Class: CLASS 3
Facility Name: LISBON WATER DEPARTMENT
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 1/31/2013Sample(s) Required between1 and2/1/2013 2/28/2013Sample(s) Required between1 and3/1/2013 3/31/2013Sample(s) Required between1 and4/1/2013 4/30/2013Sample(s) Required between1 and5/1/2013 5/31/2013Sample(s) Required between1 and6/1/2013 6/30/2013Sample(s) Required between1 and7/1/2013 7/31/2013Sample(s) Required between1 and8/1/2013 8/31/2013Sample(s) Required between1 and9/1/2013 9/30/2013Sample(s) Required between1 and10/1/2013 10/31/2013Sample(s) Required between1 and11/1/2013 11/30/2013Sample(s) Required between1 and12/1/2013 12/31/2013
Not RequiredRADIOLOGICALS
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 and4/1/2013 6/30/2013 Sample for all the analytes listed below:
ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
LISBON VILLAGEOH1501512
Page 1 of 1
2013 DISTRIBUTION SCHEDULE04/15/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: LISBON, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1
Not RequiredLEAD - 1030 AND COPPER - 1022
Not RequiredASBESTOS - 1094
4 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20134 Sample(s) Required between 2/1/2013 and 2/28/20134 Sample(s) Required between 3/1/2013 and 3/31/20134 Sample(s) Required between 4/1/2013 and 4/30/20134 Sample(s) Required between 5/1/2013 and 5/31/20134 Sample(s) Required between 6/1/2013 and 6/30/20134 Sample(s) Required between 7/1/2013 and 7/31/20134 Sample(s) Required between 8/1/2013 and 8/31/20134 Sample(s) Required between 9/1/2013 and 9/30/20134 Sample(s) Required between 10/1/2013 and 10/31/20134 Sample(s) Required between 11/1/2013 and 11/30/20134 Sample(s) Required between 12/1/2013 and 12/31/2013
4 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20134 Sample(s) Required between 2/1/2013 and 2/28/20134 Sample(s) Required between 3/1/2013 and 3/31/20134 Sample(s) Required between 4/1/2013 and 4/30/20134 Sample(s) Required between 5/1/2013 and 5/31/20134 Sample(s) Required between 6/1/2013 and 6/30/20134 Sample(s) Required between 7/1/2013 and 7/31/20134 Sample(s) Required between 8/1/2013 and 8/31/20134 Sample(s) Required between 9/1/2013 and 9/30/20134 Sample(s) Required between 10/1/2013 and 10/31/20134 Sample(s) Required between 11/1/2013 and 11/30/20134 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: LISBON, VILLAGE OF DISTRIBUTION40890 SR 154
Facility Class: CLASS 1
1 Sample(s) Required between 6/1/2013DISINFECTION BYPRODUCTS and 6/7/20131 Sample(s) Required between 9/1/2013 and 9/7/20131 Sample(s) Required between 12/1/2013 and 12/7/2013
NEW WATERFORD VILLAGE PWSOH1501722
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1553406EP001 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: NEW WATERFORD - CREEK RD
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 3/31/2013
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 2 1 and4/1/2013 6/30/2013 Sample for all the analytes listed below:
2,4-D - 2105 CARBOFURAN - 2046 OXAMYL (VYDATE) - 2036
PENTACHLOROPHENOL - 2326 PICLORAM - 2040
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 3
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 4
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
NEW WATERFORD VILLAGE PWSOH1501722
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1560496EP002 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: NEW WATERFORD - LINDSAY
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 2 1 and4/1/2013 6/30/2013 Sample for all the analytes listed below:
2,4-D - 2105 CARBOFURAN - 2046 OXAMYL (VYDATE) - 2036
PENTACHLOROPHENOL - 2326 PICLORAM - 2040
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 3
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 4
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
NEW WATERFORD VILLAGE PWSOH1501722
Page 1 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: NEW WATERFORD, VLG. OF DISTRIBUTION Facility Class: CLASS 1
10 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
Not RequiredASBESTOS - 1094
2 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013
2 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: NEW WATERFORD, VLG. OF DISTRIBUTION3383 PINEWOOD DRIVE
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
NEW WATERFORD VILLAGE PWSOH1501722
Page 2 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: NEW WATERFORD, VLG. OF DISTRIBUTION46834 TAYLOR STREET
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
SALEM CITYOH1502011
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1553407EP001 Facility Source: Surface Water Facility Class: CLASS 3
Facility Name: SALEM WTP
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 1/31/2013Sample(s) Required between1 and2/1/2013 2/28/2013Sample(s) Required between1 and3/1/2013 3/31/2013Sample(s) Required between1 and4/1/2013 4/30/2013Sample(s) Required between1 and5/1/2013 5/31/2013Sample(s) Required between1 and6/1/2013 6/30/2013Sample(s) Required between1 and7/1/2013 7/31/2013Sample(s) Required between1 and8/1/2013 8/31/2013Sample(s) Required between1 and9/1/2013 9/30/2013Sample(s) Required between1 and10/1/2013 10/31/2013Sample(s) Required between1 and11/1/2013 11/30/2013Sample(s) Required between1 and12/1/2013 12/31/2013
Not RequiredRADIOLOGICALS
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 and4/1/2013 4/30/2013Sample(s) Required between1 and5/1/2013 5/31/2013Sample(s) Required between1 and6/1/2013 6/30/2013
Sample for all the analytes listed below:
ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and4/1/2013 6/30/2013
Paired Sample Set Required betweenTOTAL ORGANIC CARBON (TOC) 1 and1/1/2013 1/31/2013Paired Sample Set Required between1 and2/1/2013 2/28/2013Paired Sample Set Required between1 and3/1/2013 3/31/2013Paired Sample Set Required between1 and4/1/2013 4/30/2013Paired Sample Set Required between1 and5/1/2013 5/31/2013Paired Sample Set Required between1 and6/1/2013 6/30/2013Paired Sample Set Required between1 and7/1/2013 7/31/2013Paired Sample Set Required between1 and8/1/2013 8/31/2013Paired Sample Set Required between1 and9/1/2013 9/30/2013Paired Sample Set Required between1 and10/1/2013 10/31/2013Paired Sample Set Required between1 and11/1/2013 11/30/2013Paired Sample Set Required between1 and12/1/2013 12/31/2013
A paired sample set refers to one source water and one treated water sample. A sourcewater alkalinity is also required at the same time the TOC sample is taken.
SALEM CITYOH1502011
Page 1 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: SALEM, CITY OF DISTRIBUTION Facility Class: CLASS 2
Not RequiredLEAD - 1030 AND COPPER - 1022
Not RequiredASBESTOS - 1094
20 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/201320 Sample(s) Required between 2/1/2013 and 2/28/201320 Sample(s) Required between 3/1/2013 and 3/31/201320 Sample(s) Required between 4/1/2013 and 4/30/201320 Sample(s) Required between 5/1/2013 and 5/31/201320 Sample(s) Required between 6/1/2013 and 6/30/201320 Sample(s) Required between 7/1/2013 and 7/31/201320 Sample(s) Required between 8/1/2013 and 8/31/201320 Sample(s) Required between 9/1/2013 and 9/30/201320 Sample(s) Required between 10/1/2013 and 10/31/201320 Sample(s) Required between 11/1/2013 and 11/30/201320 Sample(s) Required between 12/1/2013 and 12/31/2013
20 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/201320 Sample(s) Required between 2/1/2013 and 2/28/201320 Sample(s) Required between 3/1/2013 and 3/31/201320 Sample(s) Required between 4/1/2013 and 4/30/201320 Sample(s) Required between 5/1/2013 and 5/31/201320 Sample(s) Required between 6/1/2013 and 6/30/201320 Sample(s) Required between 7/1/2013 and 7/31/201320 Sample(s) Required between 8/1/2013 and 8/31/201320 Sample(s) Required between 9/1/2013 and 9/30/201320 Sample(s) Required between 10/1/2013 and 10/31/201320 Sample(s) Required between 11/1/2013 and 11/30/201320 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: SALEM, CITY OF DISTRIBUTION2491 ST. RT 45 (KSU)
Facility Class: CLASS 2
1 Sample(s) Required between 1/8/2013DISINFECTION BYPRODUCTS and 1/14/20131 Sample(s) Required between 4/8/2013 and 4/14/20131 Sample(s) Required between 7/8/2013 and 7/14/20131 Sample(s) Required between 10/8/2013 and 10/14/2013
Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
SALEM CITYOH1502011
Page 2 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: SALEM, CITY OF DISTRIBUTION1460 BROOKVIEW DR.
Facility Class: CLASS 2
1 Sample(s) Required between 1/8/2013DISINFECTION BYPRODUCTS and 1/14/20131 Sample(s) Required between 4/8/2013 and 4/14/20131 Sample(s) Required between 7/8/2013 and 7/14/20131 Sample(s) Required between 10/8/2013 and 10/14/2013
Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS203
Facility Name: SALEM, CITY OF DISTRIBUTION475 W. SECOND
Facility Class: CLASS 2
1 Sample(s) Required between 1/8/2013DISINFECTION BYPRODUCTS and 1/14/20131 Sample(s) Required between 4/8/2013 and 4/14/20131 Sample(s) Required between 7/8/2013 and 7/14/20131 Sample(s) Required between 10/8/2013 and 10/14/2013
Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS204
Facility Name: SALEM, CITY OF DISTRIBUTION1098N ELLSWORTH
Facility Class: CLASS 2
1 Sample(s) Required between 1/8/2013DISINFECTION BYPRODUCTS and 1/14/20131 Sample(s) Required between 4/8/2013 and 4/14/20131 Sample(s) Required between 7/8/2013 and 7/14/20131 Sample(s) Required between 10/8/2013 and 10/14/2013
Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
TOMAHAWK UTILITIES, INC.OH1502512
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1553411EP001 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: TOMAHAWK UTILITIES INC
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
TOMAHAWK UTILITIES, INC.OH1502512
Page 1 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: TOMAHAWK UTILITIES, INC. DISTRIBUTION Facility Class: CLASS 1
Not RequiredLEAD - 1030 AND COPPER - 1022
Not RequiredASBESTOS - 1094
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: TOMAHAWK UTILITIES, INC. DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
TOMAHAWK UTILITIES, INC.OH1502512
Page 2 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: TOMAHAWK UTILITIES, INC. DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
TOWN AND COUNTRY ESTATESOH1502612
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1553412EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: TOWN & COUNTRY PARK ESTATES
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and10/1/2013 12/31/2013
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
TOWN AND COUNTRY ESTATESOH1502612
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: TOWN & COUNTRY ESTATES DISTRIBUTION
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: TOWN & COUNTRY ESTATES DISTRIBUTIONADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
AUBURN SKILLED NURSING AND REHABILITATIOOH1502712
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1553413EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: AUBURN SKILLED NURSING AND REHABILITATIO
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
AUBURN SKILLED NURSING AND REHABILITATIOOH1502712
Page 1 of 1
2013 DISTRIBUTION SCHEDULE10/11/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: AUBURN SKILLED NURSING AND REHAB DIS
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: AUBURN SKILLED NURSING AND REHAB DISADDRESS NOT KNOWN
1 Sample(s) Required between 11/8/2013DISINFECTION BYPRODUCTS and 11/14/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
WASHINGTONVILLE VILLAGE PWSOH1502812
Page 1 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: WASHINGTONVILLE, VLG. OF DISTRIBUTION Facility Class: CLASS 1
10 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
Not RequiredASBESTOS - 1094
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: WASHINGTONVILLE, VLG. OF DISTRIBUTION865 BOSTON ST.
Facility Class: CLASS 1
1 Sample(s) Required between 2/1/2013DISINFECTION BYPRODUCTS and 2/7/20131 Sample(s) Required between 5/1/2013 and 5/7/20131 Sample(s) Required between 8/1/2013 and 8/7/2013
WASHINGTONVILLE VILLAGE PWSOH1502812
Page 2 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: WASHINGTONVILLE, VLG. OF DISTRIBUTION865 BOSTON ST.
Facility Class: CLASS 1
1 Sample(s) Required between 11/1/2013DISINFECTION BYPRODUCTS and 11/7/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
BUCKEYE WATER DISTRICT - OHIO RIVEROH1502911
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1562275EP001 Facility Source: Surface Water Facility Class: CLASS 3
Facility Name: BUCKEYE WATER DISTRICT-OHIO RIVER
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 1/31/2013Sample(s) Required between1 and2/1/2013 2/28/2013Sample(s) Required between1 and3/1/2013 3/31/2013Sample(s) Required between1 and4/1/2013 4/30/2013Sample(s) Required between1 and5/1/2013 5/31/2013Sample(s) Required between1 and6/1/2013 6/30/2013Sample(s) Required between1 and7/1/2013 7/31/2013Sample(s) Required between1 and8/1/2013 8/31/2013Sample(s) Required between1 and9/1/2013 9/30/2013Sample(s) Required between1 and10/1/2013 10/31/2013Sample(s) Required between1 and11/1/2013 11/30/2013Sample(s) Required between1 and12/1/2013 12/31/2013
Not RequiredRADIOLOGICALS
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 and4/1/2013 6/30/2013 Sample for all the analytes listed below:
ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
Paired Sample Set Required betweenTOTAL ORGANIC CARBON (TOC) 1 and1/1/2013 1/31/2013Paired Sample Set Required between1 and2/1/2013 2/28/2013Paired Sample Set Required between1 and3/1/2013 3/31/2013Paired Sample Set Required between1 and4/1/2013 4/30/2013Paired Sample Set Required between1 and5/1/2013 5/31/2013Paired Sample Set Required between1 and6/1/2013 6/30/2013Paired Sample Set Required between1 and7/1/2013 7/31/2013Paired Sample Set Required between1 and8/1/2013 8/31/2013Paired Sample Set Required between1 and9/1/2013 9/30/2013Paired Sample Set Required between1 and10/1/2013 10/31/2013Paired Sample Set Required between1 and11/1/2013 11/30/2013Paired Sample Set Required between1 and12/1/2013 12/31/2013
A paired sample set refers to one source water and one treated water sample. A sourcewater alkalinity is also required at the same time the TOC sample is taken.
BUCKEYE WATER DISTRICT - OHIO RIVEROH1502911
Page 1 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: BUCKEYE WATER DISTRICT-WELLSVILLE DIS Facility Class: CLASS 1
Not RequiredLEAD - 1030 AND COPPER - 1022
10 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/201310 Sample(s) Required between 2/1/2013 and 2/28/201310 Sample(s) Required between 3/1/2013 and 3/31/201310 Sample(s) Required between 4/1/2013 and 4/30/201310 Sample(s) Required between 5/1/2013 and 5/31/201310 Sample(s) Required between 6/1/2013 and 6/30/201310 Sample(s) Required between 7/1/2013 and 7/31/201310 Sample(s) Required between 8/1/2013 and 8/31/201310 Sample(s) Required between 9/1/2013 and 9/30/201310 Sample(s) Required between 10/1/2013 and 10/31/201310 Sample(s) Required between 11/1/2013 and 11/30/201310 Sample(s) Required between 12/1/2013 and 12/31/2013
10 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/201310 Sample(s) Required between 2/1/2013 and 2/28/201310 Sample(s) Required between 3/1/2013 and 3/31/201310 Sample(s) Required between 4/1/2013 and 4/30/201310 Sample(s) Required between 5/1/2013 and 5/31/201310 Sample(s) Required between 6/1/2013 and 6/30/201310 Sample(s) Required between 7/1/2013 and 7/31/201310 Sample(s) Required between 8/1/2013 and 8/31/201310 Sample(s) Required between 9/1/2013 and 9/30/201310 Sample(s) Required between 10/1/2013 and 10/31/201310 Sample(s) Required between 11/1/2013 and 11/30/201310 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: BUCKEYE WATER DISTRICT-WELLSVILLE DIS17445 ST RT 45 F.H.#153
Facility Class: CLASS 1
1 Sample(s) Required between 2/1/2013DISINFECTION BYPRODUCTS and 2/7/20131 Sample(s) Required between 5/1/2013 and 5/7/20131 Sample(s) Required between 8/1/2013 and 8/7/20131 Sample(s) Required between 11/1/2013 and 11/7/2013
Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
BUCKEYE WATER DISTRICT - OHIO RIVEROH1502911
Page 2 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: BUCKEYE WATER DISTRICT-WELLSVILLE DIS49100 FAIRWAY DR. F.H.#340
Facility Class: CLASS 1
1 Sample(s) Required between 2/1/2013DISINFECTION BYPRODUCTS and 2/7/20131 Sample(s) Required between 5/1/2013 and 5/7/20131 Sample(s) Required between 8/1/2013 and 8/7/20131 Sample(s) Required between 11/1/2013 and 11/7/2013
Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS203
Facility Name: BUCKEYE WATER DISTRICT-WELLSVILLE DIS13280 ECHO DELL RD. F.H.#72
Facility Class: CLASS 1
1 Sample(s) Required between 2/1/2013DISINFECTION BYPRODUCTS and 2/7/20131 Sample(s) Required between 5/1/2013 and 5/7/20131 Sample(s) Required between 8/1/2013 and 8/7/20131 Sample(s) Required between 11/1/2013 and 11/7/2013
Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS204
Facility Name: BUCKEYE WATER DISTRICT-WELLSVILLE DIS49338 EAGLE DRIVE RD. F.H.#342
Facility Class: CLASS 1
1 Sample(s) Required between 2/1/2013DISINFECTION BYPRODUCTS and 2/7/20131 Sample(s) Required between 5/1/2013 and 5/7/20131 Sample(s) Required between 8/1/2013 and 8/7/20131 Sample(s) Required between 11/1/2013 and 11/7/2013
Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
WINONA WATER SUPPLYOH1503012
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1553417EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: WINONA WATER SUPPLY
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 3/31/2013Sample(s) Required between1 and4/1/2013 6/30/2013Sample(s) Required between1 and7/1/2013 9/30/2013Sample(s) Required between1 and10/1/2013 12/31/2013
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 2 1 and4/1/2013 6/30/2013 Sample for all the analytes listed below:
2,4-D - 2105 CARBOFURAN - 2046 OXAMYL (VYDATE) - 2036
PENTACHLOROPHENOL - 2326 PICLORAM - 2040
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 3
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 4
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
WINONA WATER SUPPLYOH1503012
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: WINONA WATER SUPPLY DISTRIBUTION
5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: WINONA WATER SUPPLY DISTRIBUTION32070 CAMERON STREET
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
WHITE STONE MINISTRIES
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1503112 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: WHITE STONE MINISTRIES DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: WHITE STONE MINISTRIESGround Water
1553418
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
FARR HILL MHPOH1503312
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1553419EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: FARR HILL MHP
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
FARR HILL MHPOH1503312
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: FARR HILL MHP DISTRIBUTION
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: FARR HILL MHP DISTRIBUTIONADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
GUILFORD LAKE ESTATESOH1503412
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1553420EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: GUILFORD LAKE ESTATES
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
GUILFORD LAKE ESTATESOH1503412
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: GUILFORD LAKE ESTATES DISTRIBUTION
5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: GUILFORD LAKE ESTATES DISTRIBUTION7443 SPILLWAY ROAD LOT 35 AND 3
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
BREEZEWAY MOBILE MANOROH1503512
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1553421EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: BREEZEWAY MOBILE MANOR
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
BREEZEWAY MOBILE MANOROH1503512
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: BREEZEWAY MOBILE MANOR DISTRIBUTION
5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: BREEZEWAY MOBILE MANOR DISTRIBUTIONADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
GUILFORD HIGHLANDS MOBILE HOME PARK PWSOH1504112
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1560956EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: GUILFORD HIGHLANDS MOBILE HOME PARK
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
GUILFORD HIGHLANDS MOBILE HOME PARK PWSOH1504112
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: GUILFORD HIGHLANDS MOBILE HOME PARK
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: GUILFORD HIGHLANDS MOBILE HOME PARKADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
CENTURY INDUSTRIES CORP.OH1530112
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1553423EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: CENTURY INDUSTRIES CORP 2
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
CENTURY INDUSTRIES CORP.OH1530112
Page 1 of 1
2013 DISTRIBUTION SCHEDULE03/18/2013Effective Date:
Nontransient NoncommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: CENTURY INDUSTRIES CORP. DISTRIBUTION
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: CENTURY INDUSTRIES CORP. DISTRIBUTIONADDRESS NOT KNOWN
Not RequiredDISINFECTION BYPRODUCTS
BETHEL UNITED CHURCH OF CHRIST
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1530812 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BETHEL UN. CH. OF CHRIST DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: BETHEL UNITED CHURCH OF CHRISTGround Water
1553426
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
GRACE CHAPEL - MINERVA
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1531112 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: GRACE CHAPEL - MINERVA DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: GRACE CHAPEL - MINERVAGround Water
1553427
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
HARVEST INN - HOMEWORTH
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1531412 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: HARVEST INN DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: HARVEST INNGround Water
1553428
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
MIDDLE SANDY EVANGELICAL PRESBYT. CHURCH
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1532212 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: MIDDLESANDY EVENGELICALPRESBYT.CH DISTR.Ground Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: MIDDLE SANDY EVANGELICAL PRESBYT. CHURCHGround Water
1553432
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
OHIO DRILL AND TOOL CO.OH1532412
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1553433EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: OHIO DRILL & TOOL CO
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
OHIO DRILL AND TOOL CO.OH1532412
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Minimal Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: OHIO DRILL & TOOL CO. DISTRIBUTION
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013
MINERVA COMMUNITY CHURCH
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1532512 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: MINERVA COMMUNITY CHURCH DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: MINERVA COMMUNITY CHURCHGround Water
1553434
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
READING CHURCH BRETHREN
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1532712 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: READING CHURCH BRETHREN DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: READING CHURCH BRETHRENGround Water
1553435
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
SLEEPY HOLLOW CNTRY CLUB
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1532912 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: SLEEPY HOLLOW CNTRY CLUB DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SLEEPY HOLLOW COUNTRY CLUBGround Water
1553436
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
WEST COMMUNITY CENTER
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1533512 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: WEST COMMUNITY CENTER DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: WEST COMMUNITY CENTERGround Water
1553437
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
WESTVILLE LAKE CAMPGROUND-ST
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1533612 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to4/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: WESTVILLE LK CAMPGRND-ST DISTRIBUTIONGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: WESTVILLE LK CAMPGRND STGround Water
1553438
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
WESTVILLE LAKE CAMPGROUND-BA
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1533622 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to4/1 9/30
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: WESTVILLE LK CAMPGRND-BA DISTRIBUTIONGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: WESTVILLE LK CAMPGRND BAGround Water
1553439
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
WESTVILLE LAKE C. C., INC.
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1533712 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: WESTVILLE LAKE C.C., INC. DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: WESTVILLE LAKE COUNTRYGround Water
1553440
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
7 AND 14 TRUCK STOP
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1533912 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: 7 & 14 TRUCK STOP DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: MARATHON TRUCK STOPGround Water
1553441
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
ANDIS CONVENIENCE STORE PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1534412 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ANDIS CONVENIENCE STORE DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ANDIS CONVENIENCE STOREGround Water Facility Class: CLASS A
1553444
Not RequiredNITRITE - 1041
Sample(s) Required between 10/1/2013NITRATE - 1040 1 and 12/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
CRESTVIEW LOCAL SCHOOLSOH1534512
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1553445EP001 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: CRESTVIEW JR & SR HS
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
CRESTVIEW LOCAL SCHOOLSOH1534512
Page 1 of 2
2013 DISTRIBUTION SCHEDULE03/18/2013Effective Date:
Nontransient NoncommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: CRESTVIEW LOCAL SCHOOLS DISTRIBUTION
10 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
2 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013
2 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: CRESTVIEW LOCAL SCHOOLS DISTRIBUTIONADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
CRESTVIEW LOCAL SCHOOLSOH1534512
Page 2 of 2
2013 DISTRIBUTION SCHEDULE03/18/2013Effective Date:
Nontransient NoncommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: CRESTVIEW LOCAL SCHOOLS DISTRIBUTIONADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
BOJANGLES ROADHOUSE AND HONKY TONK
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1536612 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BOJANGLES ROADHOUSE AND HT DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: BOJANGLES ROADHOUSE AND HONKY TONKGround Water
1553451
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
ROGERS ELEMENTARY SCHOOLOH1537512
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1553456EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: BEAVER LOCAL ROGERS ELEM
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
ROGERS ELEMENTARY SCHOOLOH1537512
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Minimal Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: ROGERS ELEMENTARY SCHOOL DISTRIBUTI
5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013
E FAIRFIELD UNITED METHODIST CHURCH
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1538212 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: E FAIRFIELD UN METH CH DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: E FAIRFIELD UN METHODIST CHURCHGround Water
1553457
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
Y-INN
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1538712 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: Y-INN DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: Y-INNGround Water
1553458
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
EAST PALESTINE COUNTRY CLUB
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1540712 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to3/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: EAST PALESTINE COUNTRY CLUB DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: EAST PALESTINE COUNTRY CLUBGround Water
1553464
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 3/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
EAST ROCHESTER UNITED METHODIST CHURCH
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1540812 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: E ROCHESTER METH. CHURCH DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: E ROCHESTER METH CHURCHGround Water
1553465
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
FIRST BRETHREN CHURCH
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1541312 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: FIRST BRETHREN CHURCH DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: FIRST BRETHREN CHURCHGround Water
1553467
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
FOREST LANES
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1541412 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: FOREST LANES DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: FOREST LANESGround Water
1553468
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
THIRD GENERATION
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1542312 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: THIRD GENERATION DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: THIRD GENERATIONGround Water
1553469
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
LOCK 24 RESTAURANT
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1542812 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: LOCK 24 RESTAURANT DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: LOCK 24 RESTAURANTGround Water
1553470
Not RequiredNITRITE - 1041
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
NEW GARDEN UNITED METHODIST CHURCH
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1543512 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: NEW GARDEN UNITED METHODIST CHURCH DISTRGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: NEW GARDEN UNITED METHODIST CHURCHGround Water
1553473
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
OLD STAGECOACH INN
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1543612 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: OLD STAGECOACH INN DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: OLD STAGECOACH INNGround Water
1553474
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
LAKE PNA SPORTSMAN CLUB PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1543812 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: LAKE PNA SPORTSMAN CLUB DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: LAKE PNA SPORTSMAN CLUBGround Water
1553475
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
PINKYS LOUNGE PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1543912 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: PINKYS LOUNGE DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: PINKYS LOUNGEGround Water
1553476
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
ROGERS ASSEMBLY OF GOD
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1544212 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ROGERS ASSEMBLY OF GODGround Water
1553478
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
ROGERS COMMUNITY AUCTION
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1544312 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ROGERS COMMUNITY AUCTIONGround Water Facility Class: CLASS A
1553479
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
FARMER BILLS CARRY-OUT PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1544412 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: FARMER BILLS CARRY-OUT DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: FARMER BILLS CARRY-OUTGround Water
1553480
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
TRINITY FRIENDS CHURCH
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1544512 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: TRINITY FRIENDS CHURCH DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: TRINITY FRIENDS CHURCHGround Water
1553481
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
UNITED LOCAL HIGH SCHOOLOH1544612
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1553482EP001 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: UNITED HIGH SCHOOL
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
UNITED LOCAL HIGH SCHOOLOH1544612
Page 1 of 1
2013 DISTRIBUTION SCHEDULE03/18/2013Effective Date:
Nontransient NoncommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: UNITED LOCAL HIGH SCHOOL DISTRIBUTION
10 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: UNITED LOCAL HIGH SCHOOL DISTRIBUTIONADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: UNITED LOCAL HIGH SCHOOL DISTRIBUTIONADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
UNITED LOCAL ELEMENTARYOH1544712
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1553483EP001 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: UNITED LOCAL ELEMENTARY
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
UNITED LOCAL ELEMENTARYOH1544712
Page 1 of 1
2013 DISTRIBUTION SCHEDULE03/18/2013Effective Date:
Nontransient NoncommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: UNITED LOCAL ELEMENTARY DISTRIBUTION
10 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: UNITED LOCAL ELEMENTARY DISTRIBUTIONADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: UNITED LOCAL ELEMENTARY DISTRIBUTIONADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
AVALON FAMILY RESTAURANT
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1545312 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: AVALON FAMILY RESTAURANT DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: AVALON FAMILY RESTAURANTGround Water
1553485
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
EAST OHIO MACHINERYOH1545412
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1553486EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: EAST OHIO MACHINERY
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
EAST OHIO MACHINERYOH1545412
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: EAST OHIO MACHINERY DISTRIBUTION
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013
DAMASCUS UNITED METHODIST CHURCHOH1546112
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1553488EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: DAMASCUS UN METHODIST CHURCH
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
DAMASCUS UNITED METHODIST CHURCHOH1546112
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: DAMASCUS UN METH CHURCH DISTRIBUTIO
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: DAMASCUS UN METH CHURCH DISTRIBUTIOADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
HANOVERTON CHURCH OF CHRIST
Page 1 of 1
2013 MONITORING SCHEDULE04/15/2013Effective Date:
OH1546412 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: HANOVERTON CH OF CHRIST DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: HANOVERTON CHURCH OF CHRISTGround Water
1553489
Not RequiredNITRITE - 1041
Sample(s) Required between 4/1/2013NITRATE - 1040 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
HANOVERTON CHRISTIAN CHURCH
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1546612 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: HANOVERTON CHRISTIAN CHURCHGround Water
1553490
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
LOUIS TOBIN CENTER
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1547512 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: LOUIS TOBIN CENTER DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: LOUIS TOBIN CENTERGround Water
1553493
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
GUILFORD LAKE GRILLE PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1547612 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: GUILFORD LAKE GRILLE DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: GUILFORD LAKE GRILLEGround Water
1553494
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
ODNR-BEAVER CREEK/HORSE 1 PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1547812 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ODNR-BEAVER CR/HORSE 1 DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ODNR BEAVER CR PK-HORSEMANS 1Ground Water
1553495
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
ODNR-BEAVER CREEK/FAMILY CAMPGROUND
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1548012 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to4/1 10/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ODNR-BEAVER CR/CAMPGRD DISTRIBUTIONGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ODNR BEAVER CREEK/CAMPGROUNDGround Water
1553497
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
PHILLIPS CHRISTIAN CHURCH
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1548812 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: PHILLIPS CHRISTIAN CHURC DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: PHILLIPS CHRISTIAN CHURCHGround Water
1553501
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
SOUTHERN LOCAL SCHOOL CAMPUS K-12THOH1549412
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1553505EP001 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: SOUTHERN LOCAL SCHOOL CAMPUS
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
SOUTHERN LOCAL SCHOOL CAMPUS K-12THOH1549412
Page 1 of 1
2013 DISTRIBUTION SCHEDULE03/18/2013Effective Date:
Nontransient NoncommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: SOUTHERN L. SCHOOL CAMPUS DISTRIBUTI
10 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: SOUTHERN L. SCHOOL CAMPUS DISTRIBUTIADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: SOUTHERN L. SCHOOL CAMPUS DISTRIBUTIADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
ODOT-LISBON GARAGEOH1549512
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1553506EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: ODOT LISBON GARAGE
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
ODOT-LISBON GARAGEOH1549512
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Minimal Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: ODOT-LISBON GARAGE DISTRIBUTION
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013
WINONA FRIENDS CHURCH
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1549812 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: WINONA FRIENDS CHURCH DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: WINONA FRIENDS CHURCHGround Water
1553507
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
ODNR-GUILFORD LAKE STATE PARK-BEACH
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1550612 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to5/1 9/30
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ODNR-GUILDFORD/BEACH DISTRIBUTIONGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ODNR-GUILFORD/BEACHGround Water
1553509
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
ODNR-GUILFORD LAKE STATE PARK - CAMPGROU
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1550712 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to4/1 10/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ODNR-GUILDFORD/CAMPGRD DISTRIBUTIONGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ODNR-GUILFORD/CAMPGROUNDGround Water
1553510
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
CAMP MCKINLEY BSA DINING PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1551212 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CAMP MCKINLEY,BSA-DINING DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CAMP MCKINLEY, BSA-DININGGround Water
1553511
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
CAMP MCKINLEY BSA-POOL PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1551312 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to6/1 9/30
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CAMP MCKINLEY,BSA-POOL DISTRIBUTIONGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CAMP MCKINLEY, BSA-POOLGround Water
1553512
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
CAFE 24 RESTAURANT
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1551912 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CAFE 24 DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CAFE 24 RESTAURANTGround Water
1553514
Sample(s) Required between 1/1/2013NITRITE - 1041 1 and 5/31/2013
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
CLEWELLS LANDING PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1552012 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to4/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CLEWELLS LANDING DISTRIBUTIONGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CLEWELLS LANDINGGround Water
1553515
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
COPELAND HILLS GOLF
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1552112 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to4/1 9/30
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: COPELAND HILLS GOLF DISTRIBUTIONGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: COPELAND HILLS GOLFGround Water
1553516
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
TIMASHAMIE FAMILY CAMPGROUND
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1552912 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to4/1 10/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: TIMASHAMIE FAMILY CAMPGR DISTRIBUTIONGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: TIMASHAMIE FAMILY CAMPGROUNDGround Water Facility Class: CLASS A
1553517
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
HIST. SANDY AND BEAVER CAMP
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1553512 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to5/1 10/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: HIST. SANDY&BEAVER CAMP DISTRIBUTIONGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: HISTORICAL SANDY AND BEAVERGround Water
1553519
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
RAINBOW LAKES
Page 1 of 1
2013 MONITORING SCHEDULE05/14/2013Effective Date:
OH1553712 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to5/1 9/30
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: RAINBOW LAKES DISTRIBUTIONGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: RAINBOW LAKESGround Water
1553520
Not RequiredNITRITE - 1041
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
VALLEY DRIVE-IN
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1554412 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to3/1 11/30
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: VALLEY DRIVE-IN DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: VALLEY DRIVE-INGround Water
1553521
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
WILDWOOD ACRES FAMILY CAMPGROUND
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1554512 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to5/1 10/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: WILDWOOD ACRES FAMILY CAMPGROUND DISTGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: WILDWOOD ACRES FAMILY CAMPGROUNDGround Water
1553522
Not RequiredNITRITE - 1041
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
DAMASCUS FRIENDS CHURCH
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1554812 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: DAMASCUS FRIENDS CHURCH DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: DAMASCUS FRIENDS CHURCHGround Water Facility Class: CLASS A
1553523
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
ALLEGHENY WESLEYAN COLLEGEOH1555012
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1553524EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: ALLEGHENY WESLEYAN COLLEGE
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
ALLEGHENY WESLEYAN COLLEGEOH1555012
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: ALLEGHENY WESLEYAN COLLE DISTRIBUTIO
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
MINERVA CHRISTIAN SCHOOL
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1555312 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: MINERVA CHRISTIAN SCHOOL DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: MINERVA CHRISTIAN SCHOOLGround Water Facility Class: CLASS A
1553526
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
SPREAD EAGLE TAVERN
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1555912 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: SPREAD EAGLE TAVERN DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SPREAD EAGLE TAVERNGround Water
1553530
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 3/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
PEACE VALLEY ORCHARDS 1 PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1556112 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: PEACE VALLEY ORCHARDS 1 DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: PEACE VALLEY ORCHARDS WELL NO 1Ground Water
1553532
Not RequiredNITRITE - 1041
Sample(s) Required between 4/1/2013NITRATE - 1040 1 and 6/30/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
BIG ARBS CAMPGROUND PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1556312 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to4/1 10/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BIG ARBS CAMPGROUND DISTRIBUTIONGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: BIG ARBS CAMPGROUNDGround Water
1553534
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
CAMP FREDERICK-DINING
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1556412 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CAMP FREDERICK-DINING DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CAMP FREDERICK DINING HALL WELGround Water
1553535
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
CAMP FREDERICK-CAMPGROUND
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1556512 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CAMP FREDERICK-CAMPGRND DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CAMP FREDERICK CAMPGROUND WELLGround Water
1553536
Not RequiredNITRITE - 1041
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
CAUSEWAY CAMPGROUND
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1556612 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to5/1 10/31
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CAUSEWAY CAMPGROUNDGround Water
1553537
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
FLYING FINN FAMILY CAMPGROUND
Page 1 of 2
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1556812 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to5/1 9/30
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: FLYING FINN FAMILY CAMPGROUND STU 1Ground Water
1553539
Not RequiredNITRITE - 1041
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
FLYING FINN FAMILY CAMPGROUND
Page 2 of 2
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1556812 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to5/1 9/30
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP002 Facility Source:
Facility Name: FLYING FINN FAMILY CAMPGROUND STU 2Ground Water
1560499
Not RequiredNITRITE - 1041
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP002
DS000
* If system does not have treatment, EP002 is the first tap after the well.
BUCK RUN GOLF COURSE
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1556912 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BUCK RUN GOLF COURSE DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: BUCK RUN GOLF COURSEGround Water
1553540
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
PARADISE LAKE PARK - A PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1557412 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: PARADISE LAKE PARK - A DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: PARADISE LAKE PARK AREA AGround Water
1553543
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
PARADISE LAKE PARK-CAMPGROUND PWS
Page 1 of 4
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1557512 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to4/1 10/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: PARADISE LAKE PARK-CAMP DISTRIBUTIONGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: PARADISE LAKE PARK CAMPGROUND STU 1Ground Water
1553544
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
PARADISE LAKE PARK-CAMPGROUND PWS
Page 2 of 4
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1557512 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to4/1 10/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: PARADISE LAKE PARK-CAMP DISTRIBUTIONGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP002 Facility Source:
Facility Name: PARADISE LAKE PARK CAMPGROUND STU 2Ground Water
1560500
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP002
DS000
* If system does not have treatment, EP002 is the first tap after the well.
PARADISE LAKE PARK-CAMPGROUND PWS
Page 3 of 4
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1557512 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to4/1 10/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: PARADISE LAKE PARK-CAMP DISTRIBUTIONGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP003 Facility Source:
Facility Name: PARADISE LAKE PARK CAMPGROUND STU 3Ground Water
1560501
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP003
DS000
* If system does not have treatment, EP003 is the first tap after the well.
PARADISE LAKE PARK-CAMPGROUND PWS
Page 4 of 4
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1557512 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to4/1 10/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: PARADISE LAKE PARK-CAMP DISTRIBUTIONGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP004 Facility Source:
Facility Name: PARADISE LAKE PARK CAMPGROUND STU 4Ground Water
1560503
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP004
DS000
* If system does not have treatment, EP004 is the first tap after the well.
STONERIDGE TERRACE
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1558012 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to4/1 10/31
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: STONERIDGE TERRACEGround Water
1553545
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
TERRACE LAKES CAMPGROUND
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1558112 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to4/1 10/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: TERRACE LAKES CAMPGROUND DISTRIBUTIONGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: TERRACE LAKES CAMPGROUNDSGround Water
1553546
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
MARKS LANDING PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1558312 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: MARKS LANDING DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: MARKS LANDINGGround Water
1553547
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
MASONS STEAK HOUSE PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1558512 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: MASONS STEAK HOUSE DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: MASONS STEAK HOUSEGround Water
1553549
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
BY-THE-WAY CAFE PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1558712 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BY-THE-WAY CAFE DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: BY-THE-WAY CAFEGround Water
1553551
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
BARNETTS MOTEL PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1558812 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BARNETTS MOTEL DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: BARNETTS MOTELGround Water
1553552
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
DAIRY QUEEN-LISBON
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1558912 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to4/1 10/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: DAIRY QUEEN-LISBON DISTRIBUTIONGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: DAIRY QUEEN LISBONGround Water
1553553
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
VALLEY GOLF CLUB
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1559112 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to3/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: VALLEY GOLF CLUB DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: VALLEY GOLF CLUBGround Water
1553555
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
GUILFORD LAKE RURITAN CLUB PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1559512 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: GUILFORD LK RURITAN CLUB DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: GUILFORD LAKE RURITAN CLUBGround Water
1553557
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
BEAVER CREEK MEADOWS FARMHOUSE
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1559822 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to4/1 11/30
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BEAVER CK MEADOWS FRMHSE DISTRIBUTIONGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: BEAVER CREEK MEADOWS FARMHOUSEGround Water
1553560
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
AMERICAN LEGION POST 736
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1559912 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: AMERICAN LEGION POST 736 DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: AMERICAN LEGION POST 736Ground Water
1553561
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
VITTLE VILLAGE
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1560012 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: VITTLE VILLAGE DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: VITTLE VILLAGEGround Water
1553562
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
TWIN SPRINGS GOLF COURSE
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1560312 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: TWIN SPRINGS GOLF COURSE DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: TWIN SPRINGS GOLF COURSEGround Water
1553564
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
VICTORY CHRISTIAN CENTER
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1560512 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: VICTORY CHRISTIAN CENTERGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: VICTORY CHRISTIAN CENTERGround Water
1553565
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
SALEM SAXON CLUB
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1560812 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: SALEM SAXON CLUB DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SALEM SAXON CLUBGround Water
1553567
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
CHURCH OF JESUS CHRIST OF LDS - COLUMBIA
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1560912 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CH OF JESUS CHRIST OF LD DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CHURCH OF JESUS CHRIST OF LDSGround Water
1553568
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
CHURCH OF CHRIST - SALEM
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1561412 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CHURCH OF CHRIST DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CHURCH OF CHRISTGround Water
1553570
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
KINGDOM HALL OF JEHOVAH
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1561512 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: KINGDOM HALL OF JEHOVAH DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: KINGDOM HALL OF JEHOVAH WITNSSGround Water
1553571
Not RequiredNITRITE - 1041
Sample(s) Required between 4/1/2013NITRATE - 1040 1 and 6/30/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
LISBON ASSEMBLY OF GOD
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1561812 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: LISBON ASSEMBLY OF GOD DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: LISBON ASSEMBLY OF GOD CHURCHGround Water
1553573
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
ELKTON UNITED METHODIST CHURCH
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1562012 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ELKTON UN METHODIST CH DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ELKTON UNITED METHODIST CHURCHGround Water
1553575
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
CHURCH OF GOD IN CHRIST MENNONITE
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1562812 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CH OF GOD IN CHRIST MENN DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CHURCH OF GOD IN CHRIST MENNONITEGround Water
1553583
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
FRANKLIN SQUARE UNITED METHODIST CHURCH
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1562912 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: FRANKLIN SQUARE UN METHODISTGround Water
1553584
Not RequiredNITRITE - 1041
Sample(s) Required between 7/1/2013NITRATE - 1040 1 and 9/30/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
1ST CHRISTIAN CHURCH OF KENSINGTON
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1563012 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: 1ST CHRISTIAN CH OF KENS DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: 1ST CHRISTIAN CHURCH OF KENSINGTONGround Water
1553585
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
J AND K SUBWAY INC #2312
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1563112 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: J&K SUBWAY INC DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: J & K SUBWAY INCGround Water
1553586
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
MOUNT CALVARY COMMUNITY CHURCH
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1563212 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: MT. CALVARY COM. CHURCH DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: MT CALVARY COMMUNITY CHURCHGround Water
1553587
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
MARANATHA CHAPEL
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1563312 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: MARANATHA CHAPEL DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: MARANATHA CHAPELGround Water
1553588
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
BIBLE BAPTIST MINISTRIES
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1563412 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BIBLE BAPTIST MINISTRIES DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: BIBLE BAPTIST MINISTRIESGround Water
1553589
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
W BRANCH ATHLETIC BOOSTER CLUB
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1563512 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: W BRANCH ATH BOOSTER CLB DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: W BRANCH ATH BOOSTER CLBGround Water
1553590
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
EAGLE PASS GOLF COURSE
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1563612 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to4/1 9/30
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: EAGLE PASS GOLF COURSE DISTRIBUTIONGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: EAGLE PASS GOLF COURSEGround Water
1553591
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
VALLEY GOLF CLUB-HANDPUMP
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1563712 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to3/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: VALLEY GOLF CLUB-HANDPMP DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: VALLEY GOLF CLUB HANDPUMPGround Water
1553592
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
SEVAKEEN COUNTRY CLUB
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1563812 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: SEVAKEEN COUNTRY CLUB DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SEVAKEEN COUNTRY CLUBGround Water
1553593
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
STATE LINE TAVERN
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1564012 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: STATE LINE TAVERN DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: STATE LINE TAVERNGround Water
1553594
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
PEACE VALLEY ORCHARDS 2 PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1564112 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: PEACE VALLEY ORCHARDS 2 DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: PEACE VALLEY ORCHARDS WELL NO 2Ground Water
1553595
Not RequiredNITRITE - 1041
Sample(s) Required between 4/1/2013NITRATE - 1040 1 and 6/30/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
THE ORIGINAL ROADHOUSE II
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1564412 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: THE ORIGINAL ROADHOUSEII DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: THE ORIGINAL ROADHOUSE IIGround Water
1553597
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
SALEM BIBLE CHURCH
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1564712 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: SALEM BIBLE CHURCH DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SALEM BIBLE CHURCHGround Water
1560072
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
EMMANUEL LUTHERAN CHURCH
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1564812 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: EMMANUEL LUTHERAN CHURCH DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: EMMANUEL LUTHERAN CHURCHGround Water
1553598
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
KNOX ELEMENTARY WEST BRANCH PWSOH1565212
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1561774EP001 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: KNOX ELEMENTARY SCHOOL - WEST BRANCH
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 3/31/2013Sample(s) Required between1 and4/1/2013 6/30/2013Sample(s) Required between1 and7/1/2013 9/30/2013Sample(s) Required between1 and10/1/2013 12/31/2013
KNOX ELEMENTARY WEST BRANCH PWSOH1565212
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: KNOX ELEMENTARY WEST BRANCH DISTRIB Facility Class: CLASS 1
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: KNOX ELEMENTARY WEST BRANCH DISTRIBADDRESS NOT KNOWN
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
FELLOWSHIP OF THE BELOVED PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1565512 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: FELLOWSHIP OF THE BELOVED DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: FELLOWSHIP OF THE BELOVEDGround Water
1561922
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
TURKANA GOLF PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1565612 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to4/1 10/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: TURKANA GOLF DISTRIBUTIONGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: TURKANA GOLF
1562048
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
THE WELLSVILLE FOUNDRY INC PWSOH1565712
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1562112EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: THE WELLSVILLE FOUNDRY INC
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
THE WELLSVILLE FOUNDRY INC PWSOH1565712
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: THE WELLSVILLE FOUNDRY INC DISTRIBUTIO
5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013
GLASGOW CARRY OUT INC
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1565912 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: GLASGOW CARRY OUT INC DISTRIBUTION
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: GLASGOW CARRY OUT INCGround Water
1562384
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
DOLLAR GENERAL-ROGERS PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1566012 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: DOLLAR GENERAL STORE DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: DOLLAR GENERAL-ROGERSGround Water
1562428
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
CHURCH OF JESUS CHRIST-NEGLEY PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH1566112 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CHURCH OF JESUS CHRIST-NEGLEY DISTRIBUTIGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CHURCH OF JESUS CHRIST-NEGLEYGround Water
1562450
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
BUCKEYE TRANSFER INCOH1566212
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1562492EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: BUCKEYE TRANSFER INC STU 1
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 3/31/2013Sample(s) Required between1 and4/1/2013 6/30/2013Sample(s) Required between1 and7/1/2013 9/30/2013Sample(s) Required between1 and10/1/2013 12/31/2013
BUCKEYE TRANSFER INCOH1566212
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1562493EP002 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: BUCKEYE TRANSFER INC STU 2
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 3/31/2013Sample(s) Required between1 and4/1/2013 6/30/2013Sample(s) Required between1 and7/1/2013 9/30/2013Sample(s) Required between1 and10/1/2013 12/31/2013
BUCKEYE TRANSFER INCOH1566212
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: BUCKEYE TRANSFER INC DISTRIBUTION
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: BUCKEYE TRANSFER INC DISTRIBUTIONADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
COLUMBIANA COUNTY-COUNTY HOME RD PWSOH1566312
Page 1 of 1
2013 DISTRIBUTION SCHEDULE10/11/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: COLUMBIANA COUNTY-COUNTY HOME RD D Facility Class: CLASS 1
10 Sample(s) Required between 7/1/2013LEAD - 1030 AND COPPER - 1022 and 12/31/2013
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: COLUMBIANA COUNTY-COUNTY HOME RD D8473 COUNTY HOME ROAD
Facility Class: CLASS 1
1 Sample(s) Required between 11/8/2013DISINFECTION BYPRODUCTS and 11/14/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
SHADYBROOK MOBILE HOME PARK PWSOH1566412
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1562496EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: SHADYBROOK MOBILE HOME PARK
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013
Sample(s) Required betweenNITRITE - 1041 1 and1/1/2013 5/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 3/31/2013Sample(s) Required between1 and4/1/2013 6/30/2013Sample(s) Required between1 and7/1/2013 9/30/2013Sample(s) Required between1 and10/1/2013 12/31/2013
Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 3/31/2013Sample(s) Required between1 and4/1/2013 6/30/2013Sample(s) Required between1 and7/1/2013 9/30/2013Sample(s) Required between1 and10/1/2013 12/31/2013
SHADYBROOK MOBILE HOME PARK PWSOH1566412
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Minimal Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: SHADYBROOK MOBILE HOME PARK DIST
5 Sample(s) Required between 1/1/2013LEAD - 1030 AND COPPER - 1022 and 6/30/20135 Sample(s) Required between 7/1/2013 and 12/31/2013
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
1 Sample(s) Required between 0/0/2013DISINFECTION BYPRODUCTS and 0/0/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
2 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013
UTICA EAST OHIO MIDSTREAM LLC PWSOH1566512
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE07/12/2013Effective Date:
Nontransient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1562497EP001 Facility Source: Ground Water
Facility Name: UTICA EAST OHIO MIDSTREAM LLC
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and7/1/2013 9/30/2013Sample(s) Required between1 and10/1/2013 12/31/2013
UTICA EAST OHIO MIDSTREAM LLC PWSOH1566512
Page 1 of 1
2013 DISTRIBUTION SCHEDULE07/12/2013Effective Date:
Nontransient NoncommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: UTICA EAST OHIO MIDSTREAM LLC DISTRIBU
5 Sample(s) Required between 7/1/2013LEAD - 1030 AND COPPER - 1022 and 12/31/2013
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013