eprtm reactors in the world - assolombarda.it

25
EPR TM reactors in the world Rome, January 19, 2010 Marco Graziano – AREVA Vice President Business Development

Upload: others

Post on 26-Oct-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EPRTM reactors in the world - Assolombarda.it

EPRTM reactors in the world

Rome, January 19, 2010

Marco Graziano – AREVA Vice President Business Development

Page 2: EPRTM reactors in the world - Assolombarda.it

Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.2

Outline

EPRTM reactors under-construction

Experience feedback from current EPRTM projects

Upcoming EPRTM projects and corresponding opportunities for suppliers

Page 3: EPRTM reactors in the world - Assolombarda.it

EPRTM reactors under-construction

Page 4: EPRTM reactors in the world - Assolombarda.it

Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.4

4 EPR™ Reactors underconstruction worldwide

Flamanville 3

Taishan 1&2

Olkiluoto 3

Page 5: EPRTM reactors in the world - Assolombarda.it

Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.5

The EPR™ Reactor construction projects

Olkiluoto 3

Flamanville 3

Taishan 1&2

Page 6: EPRTM reactors in the world - Assolombarda.it

Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.6

The OL3 project description

Olkiluoto 3

Where Olkiluoto, Finland

Contract signed Dec 18, 2003

Customer Teollisuuden Voima Oy (TVO) Supplier Consortium formed by AREVA and Siemens AG (73% / 27%)

and led by AREVA

Supply scope 1 EPR™ unit in turnkey construction

First Concrete July 2005

Net electric output 1,600 MWe

Reactor thermal output 4,300 MWth

Page 7: EPRTM reactors in the world - Assolombarda.it

Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.7

Reactor Building & Safeguard buildings view

Page 8: EPRTM reactors in the world - Assolombarda.it

Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.8

Main Control Room lifted & in place

Main Control Room lifting – 20.5.09

Page 9: EPRTM reactors in the world - Assolombarda.it

Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.9

Reactor Pressure Vessel (RPV) and Steam Generators (SG) on site

January 09RPV delivery at OL3

November 09SG delivery at OL3

Page 10: EPRTM reactors in the world - Assolombarda.it

Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.10

The EPR™ Reactor construction projects

Olkiluoto 3

Flamanville 3

Taishan 1&2

Copyright EDF

Page 11: EPRTM reactors in the world - Assolombarda.it

Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.11

The FA3 project descriptionFlamanville 3

Where Flamanville, France

Contract signed Apr 11, 2007

Customer Electricité de France (EDF)

Main Suppliers AREVA & Alstom

AREVA Supply scope 1 EPR™ unit- Nuclear Island – Nuclear Steam Supply System (NSSS)- Nuclear Island Engineering & Procurement (NI EP)

First Concrete Dec 2007

Net electric output 1,630 MWe

Reactor thermal output 4,300 MWth

Copyright EDF Copyright EDF Copyright EDF

Page 12: EPRTM reactors in the world - Assolombarda.it

Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.12

The FA3 Site

On the AREVA perimeter:

70%+ of orders placed

Engineering 65%+ completed

Page 13: EPRTM reactors in the world - Assolombarda.it

Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.13

Steam GeneratorManufacturing ongoing

Machining of the Steam Generators

AREVA Saint-Marcel

Copyright EDF

Copyright EDF

Page 14: EPRTM reactors in the world - Assolombarda.it

Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.14

The EPR™ Reactor construction projects

Olkiluoto 3

Flamanville 3

Taishan 1&2

Page 15: EPRTM reactors in the world - Assolombarda.it

Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.15

Taishan 1&2 Project description

Taishan

Where Taishan, China

Contract signed November 26, 2007

Customer China Guangdong Nuclear Power Holding Corp. Ltd. (CGNPC),

represented by the Taishan Nuclear Power Company (TSNPC)

Main Suppliers AREVA in consortium with two subsidiaries of CGNP, Alstom

AREVA Supply scope NI Design and Procurement for 2 EPR™ units

First Concrete November 2009

Net electric output 1,660 MWe

Reactor thermal output 4,590 MWth

Page 16: EPRTM reactors in the world - Assolombarda.it

Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.16

Main developments

Creation of a New Joint Design Team inShenzhen (October ’09)Creation of “WECAN”, a joint AREVA-CGNPC engineering JVPrimary equipment progress� Forging: launched for heavy components� Manufacturing of the steam generator has started in

AREVA St Marcel for Taishan Unit 1 in November and is ongoing

� Manufacturing of the Reactor Pressure Vessel in MHI has started in November and is in progress

Page 17: EPRTM reactors in the world - Assolombarda.it

Experience feedback fromcurrent EPRTM projects

Page 18: EPRTM reactors in the world - Assolombarda.it

Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.18

Lessons Learned Process

A well defined and continuous Lessons Learned process: over 500 lessons learned so far (captured, analyzed, distributed)including 300 from OL3 Construction Site

A valuable input toward future projects, Standard EPR, Project Management, Procurement, Construction and Engineering Methods

A common and simple tool accessible to all project teams

AREVA NP

�����������������

Page 19: EPRTM reactors in the world - Assolombarda.it

Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.19

Lessons LearnedExperience Feedback

The AREVA experience from four EPRTM under construction is:� systematically taken into account from the beginning� made available for future EPRTM projects� increasing the performance of the AREVA group

Future EPRTM will benefit from these experiences

OLKILUOTO 3 FLAMANVILLE 3 TAISHAN 1&2 FUTURE EPRTM

Page 20: EPRTM reactors in the world - Assolombarda.it

Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.20

12111009080706050403020100Years

ConstructionAuthorization

OperatingLicense

Decisionin Principle

Construction License OperatingLicense

CombinedLicense

Pre-Design Certification

Nuclear Site Licensing

Generic Design Acceptance

Building licensing certainty:A significant asset for future projects

13

ConstructionAuthorization

OperatingLicense

14

Page 21: EPRTM reactors in the world - Assolombarda.it

Upcoming EPRTM projects and corresponding opportunities for suppliers

Page 22: EPRTM reactors in the world - Assolombarda.it

Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.22

660373

2008 2030

262 End of theoretical lifetime549

AREVA targets 1/3 of accessible new build market and the leadership in life extension and power uprates (market worth tens of billions of euros)

359

New builds

GWe nets installed

Lifetime extensions

190

824: WEO1- 2008- 450 ppm Policy Scenario

731: WNA2 - 2007- High Estimate

748: IAEA - 2008 – High Estimate

529: WNA - 2007 - Reference

473: IAEA - 2008 – Low Estimate

433: WEO - 2008 – Reference Scenario

498: DOE3 EIA4 - 2008 Reference Case

AREVA target

684: WEO- 2008- 550 ppm Policy Scenario

Forecasts published

by international

organizations

(AREVA target 2007: 636)

1. World Energy Outlook

2. World Nuclear Association

3. US Department of Energy

4. Energy Information Administration

The nuclear revival is here…

Page 23: EPRTM reactors in the world - Assolombarda.it

Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.23

More than 20 EPR™ reactor projects under development worldwide

Under development

Prospects

Under construction

USA

� EPR™ technology selected by six utilities

� Design Certification Application rulemaking planned for 2012

4

PROSPECTSminimum

� The Netherlands, Czech Republic, Switzerland, Poland, Finland, Brazil, Canada and China

10

� Second EPR™ project for EDF, GDF SUEZ, Total in Penly

� Possible 3rd EPRTM

project under discussion

FRANCE1 + 1

� 4 units announced by EDF

� 4 units targeted with EON/RWE

� Further units with GDF-SUEZ, Iberdrola & SSE

� Industrial partnerships with Balfour Beatty-Vinci and Rolls Royce covering engineering, manufacturing and construction

4 + 4

� OLKILUOTO 3 under construction

1

FRANCE

� FLAMANVILLE 3 under construction

1

FINLANDUK

CHINA

� 2 units (TAISHAN 1&2) under construction

2

� Memorandum of Understanding with NPCIL for 2 EPR™reactors at the Jaitapursite, up to 6 units possible

� Strategic alliance withBharat Forge

� Framework agreement with TCE Consulting Engineers (Tata) for engineering services

2 + 4 INDIA

� ENEL and EDF decided to develop a project for the construction of 4 EPR reactors in Italy

ITALY4

Page 24: EPRTM reactors in the world - Assolombarda.it

Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.24

… be part of the AREVA supply chain and potentially participate in ~10 projects before

the first Italy EPR comes online

By 2020, ~10 EPRs are planned to be already online with current opportunities in:� The UK� The US� France� …

A unique business opportunity to ramp up your skills and increase your business before taking part in the Italian EPR construction

Page 25: EPRTM reactors in the world - Assolombarda.it

Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.25

Summary

Success is in your hands�Company management commitment

�Disseminate safety and quality cultures

�Relation based on trust and transparency

Become part of the EPR™ supply chain on numerous ongoing projects worldwide and build up your capabilitiesLeverage your capabilities and Certified Supplier status to build the EPR™ Italian fleet

1

2