ERCOT VRT
Voltage Ride Through Standards
![Page 2: ERCOT VRT Voltage Ride Through Standards. Standards Groups Edison Electric Institute (EEI) National Electrical Manufactures Association (NEMA) American](https://reader035.vdocuments.net/reader035/viewer/2022070414/5697c0211a28abf838cd3080/html5/thumbnails/2.jpg)
Standards Groups
• Edison Electric Institute (EEI) • National Electrical Manufactures Association (NEMA) • American National Standard Institute (ANSI)
![Page 3: ERCOT VRT Voltage Ride Through Standards. Standards Groups Edison Electric Institute (EEI) National Electrical Manufactures Association (NEMA) American](https://reader035.vdocuments.net/reader035/viewer/2022070414/5697c0211a28abf838cd3080/html5/thumbnails/3.jpg)
Standards Groups
• Federal Energy Regulatory Commission (FERC)
• National Electric Reliability Council (NERC)• Western Electricity Coordinating Council
(WECC)• Electric Reliability Council Of Texas
(ERCOT)
![Page 4: ERCOT VRT Voltage Ride Through Standards. Standards Groups Edison Electric Institute (EEI) National Electrical Manufactures Association (NEMA) American](https://reader035.vdocuments.net/reader035/viewer/2022070414/5697c0211a28abf838cd3080/html5/thumbnails/4.jpg)
FERC Wind-Power Connection Standards
• July 2005: Order 661• July 2005: NERC Request for Rehearing
• December 2005: Order 661 -A
![Page 5: ERCOT VRT Voltage Ride Through Standards. Standards Groups Edison Electric Institute (EEI) National Electrical Manufactures Association (NEMA) American](https://reader035.vdocuments.net/reader035/viewer/2022070414/5697c0211a28abf838cd3080/html5/thumbnails/5.jpg)
SPWG Proposal
![Page 6: ERCOT VRT Voltage Ride Through Standards. Standards Groups Edison Electric Institute (EEI) National Electrical Manufactures Association (NEMA) American](https://reader035.vdocuments.net/reader035/viewer/2022070414/5697c0211a28abf838cd3080/html5/thumbnails/6.jpg)
WECC Proposal
![Page 7: ERCOT VRT Voltage Ride Through Standards. Standards Groups Edison Electric Institute (EEI) National Electrical Manufactures Association (NEMA) American](https://reader035.vdocuments.net/reader035/viewer/2022070414/5697c0211a28abf838cd3080/html5/thumbnails/7.jpg)
NERC Possible Proposal
![Page 8: ERCOT VRT Voltage Ride Through Standards. Standards Groups Edison Electric Institute (EEI) National Electrical Manufactures Association (NEMA) American](https://reader035.vdocuments.net/reader035/viewer/2022070414/5697c0211a28abf838cd3080/html5/thumbnails/8.jpg)
FERC Order 661a
• Remain connected for – bolted three phase fault cleared in less than 9
cycles– Single line to ground fault with delayed clearing
(zone 2) plus voltage recovery time
![Page 9: ERCOT VRT Voltage Ride Through Standards. Standards Groups Edison Electric Institute (EEI) National Electrical Manufactures Association (NEMA) American](https://reader035.vdocuments.net/reader035/viewer/2022070414/5697c0211a28abf838cd3080/html5/thumbnails/9.jpg)
GRANDFATHER
• Existing facilities• Signed IAs as of effective date• Commercial within 12 months of effective
date• Can demonstrate to ERCOT that contracting,
engineering, or procurement make compliance commercially infeasible
![Page 10: ERCOT VRT Voltage Ride Through Standards. Standards Groups Edison Electric Institute (EEI) National Electrical Manufactures Association (NEMA) American](https://reader035.vdocuments.net/reader035/viewer/2022070414/5697c0211a28abf838cd3080/html5/thumbnails/10.jpg)
Policy Decision
ERCOT set a standard more stringent than FERC or WECC existing standards
OR
ERCOT adopt FERC standard and wait for NERC standard