erection of transformer and reactor

90
 TRANSFORMER REACTOR  TRANSPORTATION UNLOADING ERECTION BY: Mohd.Kalim.Akhtar 1

Upload: umamaheshwarrao

Post on 03-Jun-2018

298 views

Category:

Documents


1 download

TRANSCRIPT

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 1/90

 TRANSFORMER

REACTOR TRANSPORTATION

UNLOADINGERECTION

BY:

Mohd.Kalim.Akhtar

1

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 2/90

  A transformer is a device that transfers electrical

energy from one circuit to another through

inductively coupled conductors —  the transformer's

coils.

It is based on two principles:1. An electric current can produce a magnetic field 

(electromagnetism)

2. A changing magnetic field within a coil of wire

induces a voltage across the ends of the coil(electromagnetic induction).

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 3/90

CONVERTER

 TRANSFORMER

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 4/90

HVDC Converter

 Transformer The HVDC (high voltage direct current)

converter transformer is a key component in anHVDC transmission system.

It is used to transfer power between two voltagelevels.

It provides galvanic separation between the ACand DC systems.

 A fairly large tapping range permits optimumoperation even for a large variation in loadwithout loss of efficiency.

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 5/90

 TRANSFORMER/ REACTOR

 TRANSPORTATION, UNLOADING,

ERECTION

 Main tank without oil is

transported on

• Ship

•Trailer

•barge in canal/river5

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 6/90

 TRANSPORTATION

ROUTE SURVEY

PERMISSION FROM LOCAL AUTHORITIES

PERMISSION FROM PWD/NHAI

STRENGHTENING OF CULVERTS

SHUT DOWN OF ELECTRICAL LINES

CONSTRUCTION OF DIVERSIONS

CROSSING OF MAJOR TOWNS INNIGHT HOURS

6

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 7/90

 

 A single transformer came on a trailor having 128 wheels

Weights in kg:

Total weight 486 000 kg

Shipping weight 335 000 kg

Oil weight 113 000 kg

Untanking mass 285 000 kg

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 8/90

 

Rated power: 498 000 / 249 000 / 249 000 kVA

Rated voltage ratio:

400 000/√3 V + 19.8 % - 6.6 % in + 24 steps - 8 steps // Number of position-33(33-9-1)

211 100/√3 V / 211 100 V 

Vector group: I i0 i0

 No-load losses:230 000 W

Cooling method: ODAF ( Oil directed air forced)

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 9/90

Transformer being brought on rail-cum-

road

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 10/90

Transformer being brought on rail-cum-

road

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 11/90

UNLOADING

PROPER CAPACITY HYDRAULIC

JACKS

SUFFICIENT QUANTITIES OF

SLEEPERS

GOOD QUALILTY RAILS

EXPERIENCED MANPOWER PULLING TOOLS LIKE FOURESHEEV

PULLY STEEL ROPES

 ARRANGEMENT OF DEAD MAN FOR11

t

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 12/90

n oa ng o onvertertransformer

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 13/90

 Transformer rested on

slippers

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 14/90

 Transformer rested on

slippers

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 15/90

 Trailor being gradually brought

down and taken out

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 16/90

 Trailor ready to move out

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 17/90

 Trailor being taken out

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 18/90

 Trailor completely removed

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 19/90

Additional slippers being put to

bear the weight of transformer

Fi ll t f ti

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 20/90

Finally transformer resting on

few slippers waiting to be moved

to the foundation

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 21/90

REACTOR ON RAIL

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 22/90

ON UNLOADING AT SITE

CHECK THE EQUIPMENTS AS PER

CHECK LIST

IMPACT RECORDER TO BE CHECKED

JOINTLY WITH SUPPLIERS

REPRESENTATIVE AND TO DOWN

LOAD DATA

22

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 23/90

CHECK LIST

23

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 24/90

PRELIMINARY CHECKS OF

TRANSFORMER AFTERUNLOADING

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 25/90

Checking the moisture in the

tank

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 26/90

Check the nitrogen pressure in

the tank

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 27/90

Take the readings of impact recorder to check any

sudden and heavy impact occurred during transportation

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 28/90

IMPACT RECORDER

28

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 29/90

 

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 30/90

Checking the healthiness of insulation

Apply a DC voltage of 500 Volt between the terminal bushings for a period 1 min., until the

insulating resistance is quite stable.and measure the insulating resistance between thecore and frame.,the core and earth and between the frame and earth.

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 31/90

CC-CL-G INSULATION

31

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 32/90

Erection of transformer

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 33/90

Scaffolding is to be prepared

before erection

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 34/90

Ladder erected at first

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 35/90

Bottom side headers being connected

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 36/90

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 37/90

O-ring being glued before putting the header

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 38/90

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 39/90

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 40/90

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 41/90

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 42/90

Oil present from before to avoid rusting

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 43/90

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 44/90

All the headers erected

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 45/90

Supporting pipes of coolers being erected

T b i d f

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 46/90

 Turrets being opened for

erection

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 47/90

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 48/90

Turrets being checked,cleaned and aligned

 before erection

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 49/90

Turrets being taken up to be erected by

chain pulley arrangement

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 50/90

Inside view of the turret

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 51/90

O-ring being put and the turret being

cleaned before erction

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 52/90

This is one step further

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 53/90

Last stage of final fixing the turret

T Y1 b i b h d b

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 54/90

Turret Y1 being brought down to be

opened for preliminary check

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 55/90

After opening the bottom portion

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 56/90

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 57/90

Alignment being checked 

Th i di hi h t t t b i

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 58/90

The core windings which go to turret being

cleaned

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 59/90

Inside view of the transformer from Y1 end

T i l h i ll t f

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 60/90

Typical chain pulley arrangement for

slanting turrets

Y1 t t b i i d t d ti ti b

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 61/90

Y1 turret being carried to destination by

chain –  pulley arrangement

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 62/90

Finally Erected

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 63/90

HV turret on the top of transformer

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 64/90

HV turret being brought for erection

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 65/90

Inside view of the turret

E ti h d d i th t f

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 66/90

Erecting headers and pipes on the top of

transformer

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 67/90

Header in continuation

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 68/90

Pipes being erected

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 69/90

Some other pipes

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 70/90

Few others

Pipes connecting OLTC PRD

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 71/90

Pipes connecting OLTC,PRD

also being connected

Support structures for conservator being

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 72/90

Support structures for conservator being

erected

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 73/90

 Next step

N2 filling to maintain the tank

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 74/90

N2 filling to maintain the tank

pressure during erection

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 75/90

Air cell being connected

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 76/90

Air cell being fitted inside the conservator

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 77/90

 N2 gas being filled in the air cell

Conservator lifted to its position and

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 78/90

Conservator lifted to its position and

erected

Overpressure relief device being examined

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 79/90

Overpressure relief device being examined

 before erection

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 80/90

Overpressure relief device

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 81/90

Overpressure relief device

erected

l b i k f i

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 82/90

Cooler being taken for erection

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 83/90

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 84/90

Th i h h hi h h il ill fl

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 85/90

The pipes through which hot oil will flow

8 l t d

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 86/90

8 cooler groups erected

S i i f l d

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 87/90

Supporting pipes of coolers erected

Transformer erection completed apart from

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 88/90

Transformer erection completed apart from

 bushings which would be done on the foundation

VACCUM & OIL FILLING

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 89/90

VACCUM & OIL FILLING

 Vacuum of main tank

Preparation of oil

Oil filling

Oil Circulation

Vacuum and oil filling in radiator

Mixing of radiator and main tank oil Ready for pre-commissioning test

89

8/12/2019 Erection of Transformer and Reactor

http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 90/90