TRANSFORMER
REACTOR TRANSPORTATION
UNLOADINGERECTION
BY:
Mohd.Kalim.Akhtar
1
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 2/90
A transformer is a device that transfers electrical
energy from one circuit to another through
inductively coupled conductors — the transformer's
coils.
It is based on two principles:1. An electric current can produce a magnetic field
(electromagnetism)
2. A changing magnetic field within a coil of wire
induces a voltage across the ends of the coil(electromagnetic induction).
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 3/90
CONVERTER
TRANSFORMER
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 4/90
HVDC Converter
Transformer The HVDC (high voltage direct current)
converter transformer is a key component in anHVDC transmission system.
It is used to transfer power between two voltagelevels.
It provides galvanic separation between the ACand DC systems.
A fairly large tapping range permits optimumoperation even for a large variation in loadwithout loss of efficiency.
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 5/90
TRANSFORMER/ REACTOR
TRANSPORTATION, UNLOADING,
ERECTION
Main tank without oil is
transported on
• Ship
•Trailer
•barge in canal/river5
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 6/90
TRANSPORTATION
ROUTE SURVEY
PERMISSION FROM LOCAL AUTHORITIES
PERMISSION FROM PWD/NHAI
STRENGHTENING OF CULVERTS
SHUT DOWN OF ELECTRICAL LINES
CONSTRUCTION OF DIVERSIONS
CROSSING OF MAJOR TOWNS INNIGHT HOURS
6
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 7/90
A single transformer came on a trailor having 128 wheels
Weights in kg:
Total weight 486 000 kg
Shipping weight 335 000 kg
Oil weight 113 000 kg
Untanking mass 285 000 kg
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 8/90
Rated power: 498 000 / 249 000 / 249 000 kVA
Rated voltage ratio:
400 000/√3 V + 19.8 % - 6.6 % in + 24 steps - 8 steps // Number of position-33(33-9-1)
211 100/√3 V / 211 100 V
Vector group: I i0 i0
No-load losses:230 000 W
Cooling method: ODAF ( Oil directed air forced)
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 9/90
Transformer being brought on rail-cum-
road
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 10/90
Transformer being brought on rail-cum-
road
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 11/90
UNLOADING
PROPER CAPACITY HYDRAULIC
JACKS
SUFFICIENT QUANTITIES OF
SLEEPERS
GOOD QUALILTY RAILS
EXPERIENCED MANPOWER PULLING TOOLS LIKE FOURESHEEV
PULLY STEEL ROPES
ARRANGEMENT OF DEAD MAN FOR11
t
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 12/90
n oa ng o onvertertransformer
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 13/90
Transformer rested on
slippers
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 14/90
Transformer rested on
slippers
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 15/90
Trailor being gradually brought
down and taken out
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 16/90
Trailor ready to move out
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 17/90
Trailor being taken out
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 18/90
Trailor completely removed
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 19/90
Additional slippers being put to
bear the weight of transformer
Fi ll t f ti
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 20/90
Finally transformer resting on
few slippers waiting to be moved
to the foundation
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 21/90
REACTOR ON RAIL
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 22/90
ON UNLOADING AT SITE
CHECK THE EQUIPMENTS AS PER
CHECK LIST
IMPACT RECORDER TO BE CHECKED
JOINTLY WITH SUPPLIERS
REPRESENTATIVE AND TO DOWN
LOAD DATA
22
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 23/90
CHECK LIST
23
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 24/90
PRELIMINARY CHECKS OF
TRANSFORMER AFTERUNLOADING
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 25/90
Checking the moisture in the
tank
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 26/90
Check the nitrogen pressure in
the tank
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 27/90
Take the readings of impact recorder to check any
sudden and heavy impact occurred during transportation
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 28/90
IMPACT RECORDER
28
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 29/90
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 30/90
Checking the healthiness of insulation
Apply a DC voltage of 500 Volt between the terminal bushings for a period 1 min., until the
insulating resistance is quite stable.and measure the insulating resistance between thecore and frame.,the core and earth and between the frame and earth.
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 31/90
CC-CL-G INSULATION
31
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 32/90
Erection of transformer
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 33/90
Scaffolding is to be prepared
before erection
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 34/90
Ladder erected at first
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 35/90
Bottom side headers being connected
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 36/90
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 37/90
O-ring being glued before putting the header
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 38/90
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 39/90
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 40/90
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 41/90
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 42/90
Oil present from before to avoid rusting
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 43/90
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 44/90
All the headers erected
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 45/90
Supporting pipes of coolers being erected
T b i d f
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 46/90
Turrets being opened for
erection
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 47/90
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 48/90
Turrets being checked,cleaned and aligned
before erection
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 49/90
Turrets being taken up to be erected by
chain pulley arrangement
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 50/90
Inside view of the turret
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 51/90
O-ring being put and the turret being
cleaned before erction
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 52/90
This is one step further
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 53/90
Last stage of final fixing the turret
T Y1 b i b h d b
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 54/90
Turret Y1 being brought down to be
opened for preliminary check
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 55/90
After opening the bottom portion
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 56/90
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 57/90
Alignment being checked
Th i di hi h t t t b i
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 58/90
The core windings which go to turret being
cleaned
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 59/90
Inside view of the transformer from Y1 end
T i l h i ll t f
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 60/90
Typical chain pulley arrangement for
slanting turrets
Y1 t t b i i d t d ti ti b
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 61/90
Y1 turret being carried to destination by
chain – pulley arrangement
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 62/90
Finally Erected
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 63/90
HV turret on the top of transformer
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 64/90
HV turret being brought for erection
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 65/90
Inside view of the turret
E ti h d d i th t f
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 66/90
Erecting headers and pipes on the top of
transformer
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 67/90
Header in continuation
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 68/90
Pipes being erected
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 69/90
Some other pipes
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 70/90
Few others
Pipes connecting OLTC PRD
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 71/90
Pipes connecting OLTC,PRD
also being connected
Support structures for conservator being
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 72/90
Support structures for conservator being
erected
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 73/90
Next step
N2 filling to maintain the tank
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 74/90
N2 filling to maintain the tank
pressure during erection
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 75/90
Air cell being connected
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 76/90
Air cell being fitted inside the conservator
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 77/90
N2 gas being filled in the air cell
Conservator lifted to its position and
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 78/90
Conservator lifted to its position and
erected
Overpressure relief device being examined
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 79/90
Overpressure relief device being examined
before erection
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 80/90
Overpressure relief device
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 81/90
Overpressure relief device
erected
l b i k f i
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 82/90
Cooler being taken for erection
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 83/90
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 84/90
Th i h h hi h h il ill fl
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 85/90
The pipes through which hot oil will flow
8 l t d
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 86/90
8 cooler groups erected
S i i f l d
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 87/90
Supporting pipes of coolers erected
Transformer erection completed apart from
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 88/90
Transformer erection completed apart from
bushings which would be done on the foundation
VACCUM & OIL FILLING
8/12/2019 Erection of Transformer and Reactor
http://slidepdf.com/reader/full/erection-of-transformer-and-reactor 89/90
VACCUM & OIL FILLING
Vacuum of main tank
Preparation of oil
Oil filling
Oil Circulation
Vacuum and oil filling in radiator
Mixing of radiator and main tank oil Ready for pre-commissioning test
89