erera forum 2013 arrec...erera forum 2013 arrec november 20 - 21 novembre banjul - the gambia c that...
TRANSCRIPT
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
Presented by: BABATUNDE ADEYEMO DIRECTOR WAPP ICC
Banjul , November 2013
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
WAPP Mandate WAPP Priority Program
Preparation for Regional Market Implementation Road Market
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
INTRODUCTION
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
1. Vision of WAPP: To integrate the national power systems into an unified regional electricity market – with the expectation that such mechanism would over the medium to long term, ensure the citizens of ECOWAS Member States with a stable and reliable electricity supply at competitive costs Mission of WAPP: To promote and develop infrastructure for power generation and transmission, as well as, to assure the coordination of electric power exchanges between ECOWAS Member States
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
REGIONAL ELECTRICITY
MARKET
WAPP PRIORITY
PROJECTS
WAPP OPERATIONAL
MANUAL
MARKET DESIGN & MARKET
RULES
M&E REPORTING SYSTEM
ICC PROJECTS
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
WAPP Priority Projects
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
7
1. Coastal Transmission Backbone Subprogram (Côte d’Ivoire, Ghana, Benin/Togo, Nigeria).
2. Inter-zonal Transmission Hub Sub-program (Burkina Faso, OMVS via Mali, Mali via Côte d’Ivoire, LSG via Côte d’Ivoire).
3. North-core Transmission Sub-program (Nigeria, Niger, Burkina Faso, Benin).
4. OMVG/OMVS Power System Development Subprogram (The Gambia, Guinea, Guinea Bissau, Mali, Senegal)
5. Côte d’Ivoire-Liberia-Sierra Leone-Guinea Power System Re-development Subprogram (Côte d’Ivoire, Liberia, Sierra Leone, Guinea).
6. WAPP Strategic Generation Subprogram (Emergency Power Supply Security Plan).
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
NIGERIA
NIGER
LIBERIA
TOGO
BENIN
CÔTE D’IVOIRE
GHANA
BURKINA FASO
Coastal Backbone
North-Core
Inter Zonal Hub
OMVG-OMVS
CLSG
SENEGAL
MALI
GAMBIE
GUINEE BISSAU
SIERRA LEONE
GUINEE
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
• Felou (Mali) 66MW • Maria Gleta (Benin) 450MW - WAPP Program • Domunli (Ghana) 450MW - WAPP Program • OMVS Region 450MW - WAPP Program • Souapiti Hydro 515 MW • Kassa ‘B’ Hydro 118 MW • Charbon (Senegal) 875MW • Sambangalou (Senegal/ Guinea) 433MW • Biu Hydro (Ghana) 600MW • NIPP (Nigeria) 3,000MW • Mount Coffee (Liberia) 66MW • Adjarala (CEB) 147MW
Expected Additional Generation by 2017 7170MW
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
WAPP Market Operation Manual
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
• WAPP Operation Manual was developed
with the support of a consultant from EDF
under USAID Technical Assistant in 2008.
• The WAPP Operation Manual contains
policies for operations security and mitigation
plan.
• The WAPP Operation Manual governs the
operation of WAPP interconnected network
(Grid Code)
• A Gap Analysis of the Manual identified
programs required for unified regional
integration
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
• P1: Load Frequency Control
• P2: Interchange Scheduling and Accounting
between Control Areas
• P3: Security of Interconnected System
• P4: System Operational Planning
• P5: Emergency Procedures and Measures
• P6: Communication Infrastructures
• P7: Information Exchange between Control
Areas
• P8: Training of Operators of the
Interconnected Systems
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
– WAPP Board Resolution
51/RES.20/20/04/09
– Defined and adopted the
modalities for the
implementation of WAPP
Operation Manual for the
WAPP interconnected
system.
– During the eighth meeting
of WAPP Executive Board
held in Cotonou on April
26th, 2009
REGULATORY APPROVAL
– Submitted to ERERA for
review and approval
– ERERA Consultant has
presented draft final
report to EOC
– ERERA final approval
expected in the first
quarter of 2014
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
OSMP Manual
Identified Projects
Capacity
Building
Operating
Instruction
&
Procedure
ICC Project
Synchronization
Project
Market
Design &
Rules
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
Justification for Regional Market
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
•There is a political decision and instruments
for the development of the regional market
•Resources are complementary in the region
which suggests strongly the benefits of an
integration in a regional market (oil and gas in
the east mainly and hydro in the west)
Political
Willingness
Regional
Planning
• There are trades already ongoing in the
region which demonstrates the capacity and
willingness of countries to trade
• There is infrastructure being developed for
regional trading
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
The ECOWAS Treaty
Economic
Cooperation
Energy Act
Reforms
Regulation
Regional
Planning
The ECOWAS Energy Protocol
Establish legal framework for securing competitive market
Unbundling of the large Utilities:
Nigeria, Ghana, Senegal
ERERA established by Supplementary Act A/SA.2/1/08
ECOWAS Master Plan implemented as WAPP Priority
Projects
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
• Open access to the spare capacity in the
transmission systems – Electricity exchange
between WAPP Utilities
• Agreement on a method for payment of
wheeling services – Power Purchase
Agreement (PPA) between WAPP Utilities
Technical
Requirement
Market
Governance
• Operation Rules
• Trading Rules
• Regional Regulations
• Minimum Requirement for Regional Market
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
– Develop a Road Map required to transit from the
present technical and commercial status to a
regional electricity market and competitive
wholesale market including time frame, resources.
– Appropriate model for actualizing the WAPP
Regional Electricity Market.
– Develop electricity market rules such as: bidding
process, physical spot market, financial market,
clearing and settlement, and power balance
mechanisms, including roles, responsibilities and
interfaces between organizations.
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
WAPP Market Design
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
• Market Development is phased in accordance with
Implementation Road Map that include condition
precedent for the next Market Phase
• Phase 1: From now and 2015 approximately when most
regional generation and transmission infrastructure are
expected to be commissioned.
– Appoint System Market Operator: which will begin
developing market operation functions
• Phase 2: Formalized market - Short & Medium term
electricity exchanges through day ahead market (DAM)
• Phase 3: a long term vision of a liquid and competitive
market
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
WAPP Market Rules
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
• 9 Chapters & 45 Articles
Containing
Technical Commercial
Financial
Settlement
Regulation
Legal
• Role & Responsibilities:
• WAPP ICC- >
• Control Area Center -> • National Control
Chapter I: Introduction and Objectives Chapter II: General Conditions Chapter III: The SMO Chapter IV: The Control Areas Chapter V: The Domestic TSOs Chapter VI: Market Phase 1 Chapter VII: Market Phase 2 Chapter VIII: Governance Chapter IX: Miscellaneous
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
– WAPP Board Resolution
120/RES/.04/10/12
– Adopted the WAPP Market
Design and WAPP Market
Rules, Implementation
Road Map
– Directive to submit the
documents to ERERA for
approval
– During WAPP Executive
Board Meeting held in
Cotonou on October 4th,
2012
REGULATORY APPROVAL
– WAPP Market Design and
WAPP Market Rules
Implementation Road Map
have submitted to ERERA
for review and approval
– ERERA has approved the
Market documents
– ERERA has presented the
Implementation Road Map
to ECOWAS Ministers of
Energy Meeting held in
Yamoussoukro , May 2013
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
TRAINING PLAN
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
• Compulsory Training : subjects that are compulsory for
professional staff from WAPP Secretariat as well as
staff from utilities involved in power trading in one
manner or another should know in detail the subjects
included in this category.
• Additional Training Needs: the subjects included in this
category are basic and somehow necessary for a
better comprehension of power trading in general
terms and power trading at regional level.
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
Compulsory Training
– Implementation Road map
– WAPP Market Design
– WAPP Market Rules
– Operation Procedures
– WAPP Operation Manual
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
• Additional training contents:
– Selected topics of Microeconomics: approaches
concepts which are later used in planning,
decision making of investments, optimisation,
balance of supply / demand, pricing of electricity,
– International experience: describes other
regional markets, the manner they have evolved,
their organisation and how trade is carried out in
those markets..
– Power markets: approaches several issues such
as: wholesale electricity markets, the reform
process, particular aspects of treating electricity
as a commodity, marginal pricing in electricity,
organisation models of power markets, market
power & price volatility, etc.
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
• Model 1 - Establishment of an Independent Stand-
alone Regional Centre for Training: it is imperative that
targeted capacity building begins without delay.
• Model 2 - Adding on a “Power Sector Trade Capacity
Building Program” to an Existing Entity in the Region:
could potentially offer the opportunity to start the
implementation of the capacity building program
relatively quickly.
• Model 3 - Starting the “Capacity Building Program” as
a Specific Program: Specifically, under this approach,
the WAPP should design a training
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
WAPP ICC PROJECT
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
ICC Project involves the deployment of infrastructure for data (SCADA) and telecommunication equipment to facilitate :
1. Regional coordination of cross-border exchanges;
2. Monitoring the regional WAPP System Operation
Alert and advise the Control Areas if risk in the security
of the regional system. Quality of service: frequency parameters within the
limits, voltage levels within the limits.
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
ICC Project
ICC main system will be housed in the WAPP ICC Headquarters in Calavi
Redundant SCADA LAN (Local Area Network)
Redundant servers for (SCADA/EMS, ICCP, Historical, Market, Metering, Time synchronisation, email…)
Large wall display (mimic board), operator and engineer workstations.
Servers and communication facilities for remote RTUs
Web server for remote monitoring
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
ICC Project
ICC Main System
Scada
EMS
Servers
Internet
Connexion
Market
Application
Servers
Video
Controler
Mimic
Board
6x2.5m
Operator
Workstations
Com.
Servers
Historical
Servers
Network
Time
Servers
(GPS)
ICCP
Servers
Printers
Local
RTU
Back-up
Archiving
Server
Web
Server
Mainteance
Workstation
Firewall
SCADA LAN
WAPP LAN
Com. LAN
Firewall
E.mail
Servers
Or separate
LAN
Router
VPN
VPN
Router
GPRS modem
RTU
NAWEC
RTU
LEC
Meter with
GSM modem
xDSL
Modem
GPRS Server
(Telecom.Operator) GPRS
Network RTU
NIGELEC
GPRS modem GPRS modem GPRS modem
GPRS modem
VPN VPN VPN VPN
Router Router Router Router
Router
Metering
Servers
GSM
PSTN
RTU
NPA
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
Telecommunication Backbone
SYSTEM
Bianud
Mbao
ICC
Volta Abobo
Conakry
Bamako
Ouaga-
dougou
Niamey
Oshogbo
Banjul
Bissau
Freetown
Monrovia
Lome
Sakete
Lome C
Aboadze Prestea
Vedoko
Aflao
Patte-d’Oie
Kumasi
Han
Bogaltanga
Bembereke
Ferkesse
dougou
Sikasso
Taabo
Kosso
Bouake2
Kayes
Kaolack
Matam
Dakar
Soma
Tanaf
Mansoa
Tamba-
counda
Boke
Linsan
Mali
Labe
Bumbuna
Mano
River
Pa
Zagtouli
Man
Buchanan
Parakou
Onigbolo
Akosombo
Manantali
OMVS
Kaleta
OMVG Mom.
Avak.
MGL
Zabori
Dosso Birnin
Kebbi
Jebba
Niger
Nigeria
Togo-Benin
Ghana Cote
d’Ivoire
Burkina
Faso
Mali Tobene
Sakal Dagana
Mbour
Gambia
Senegal
Banba
dinca
Guinea
Bissau
Guinea
Sierra
Leone
Liberia
Tamale
Kainji
Tafo
Nikaw.
Konongo
Elubo
Old
Obuasi
New
Ob. Dunkwa
Buyo
Soubre
Mount
Coffee
Grande
Chutte
Salthino
Brikama
Kita
Kitampo
Techiman
Alyetoro
Achi. Winn. Taka.
Tako.
Kodialani
Samban-
galou
Bobo-
dioulasso
(Kodeni)
Sanneq.
(Yekepa)
ICC
CAC
NCC
SDH STM-4 link
SDH STM-1 link
SDH 2*STM-1 link
Existing SDH Mux upgraded STM-1 to
STM-4
New STM-4 Mux
New STM-1 Mux
Existing SDH microwave upgraded
STM-1 to 2*STM-1
Riviera
Ikeja
BICC
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
Bidding documents for
SCADA and Communication for ICC & CACs;
hardware and software for ICC & CACs;
WAPP ICC Headquarters
Finalization of approval process for 30 million euros by
European Commission
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
Implementation of Market Road Map
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
Gencos IPP
REGIONAL ELECTRICITY MARKET
Large Consumers DISCOs
RSMO
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
WAPP – Information
& Coordination
Center
TCN
NIGELEC
CIE
SONABEL
VRA
CEB
SENELEC
EAGB
NAWEC
EDM
LEC
EDG
NPA
WAPP Information & Coordination Center
Control Area Center
National Control Center
Legend
Communication Link
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
Data
Collection
and Processing Scheduling Contracting Dispatching
Billing and
Settlement Market
Reports
Info from Discos,
Gencos, Bulk Buyers
Matching and
tabulating offers from
market participants
Confirmation of
Agreements by market
participants
Transmission of
contract requirements
to Control Area
Centers for execution
by market participants
Verification of actual
transactions followed
by invoicing and
payments
Generation of periodic
activity reports on
market performance
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
Regional Markets
Participant Register
Contracts
Billing & Financial Systems
Market Reports Settlements
Technical Standard
System
Coordination
Emergency Procedure
Metering System
System Reserve
Scheduling & Dispatching
WAPP Datacenter
c
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
• The Regional Electricity Market concept, structure
and organization was presented for the approval of:-
• WAPP Executive Board, WAPP General Assembly
and submitted to ERERA
• ERERA has considered and approved the Regional
Market Rules
• The Regional Electricity Market concept, structure
and organization was presented to ECOWAS
Ministers of Energy and subsequently to the
ECOWAS Council of Ministers
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
– WAPP Board Resolution
120/RES/.04/10/12
– Adopted Resolution
relating to ‘Transition of
WAPP Information &
Coordination Centre to
Regional System Market
Operator’
– At nineteenth WAPP
Executive Board Meeting
held in Abuja on
November 2, 2012
– General Assembly Decision
WAPP/45/DEC.02/11/12
– Made a Decision relating to
‘Transition of WAPP
Information & Coordination
Centre to Regional System
Market Operator’
– At the Seventh Session of
General Assembly held in
Abuja on 2nd November,
2012
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
– ECOWAS Ministers of
Energy a Resolution No 6
– Resolution to commence
organization of the
ECOWAS Electricity
Market
– At the eighth meeting of
ECOWAS Ministers of
Energy held in
Yamoussoukro on 24th
May, 2012.
– Recommended to Council
of Ministers
– Council of Ministers
Directive C/DIR.1/06/13
– Gave a Directive to
commence organization of
the ECOWAS Electricity
Market
– At the seventh Session of
Council of Ministers of
ECOWAS held in Abidjan on
21st June 2012
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
PREPARATORY ACTIVITIES - Activities from now to 2015
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
From now to 2015
1. ICC has been officially appointed to cover the market operation
functions (for this phase) and has a work plan for its
implementation
2. Market Rules for Phase 1 have been officially approved
3. ICC has a precise work plan to develop during phase 1.
– Infrastructure (ICC Project)
– Human resources (Additional Staff employed)
– Training (Center of Excellence, SAPP, GIZ)
4. Contract templates will develop procedures for ERERA approval
5. ICC (as market operator) will develop procedures for ERERA
approval:
– Administration of contracts
– Registration of market participants
– Allocation of transmission capacity
ERERA FORUM 2013 ARREC November 20 - 21 Novembre
Banjul - The Gambia
ER
ER
A
FO
RU
M 2
01
3 A
RR
EC
No
ve
mb
er 2
0- 2
1 N
ov
em
bre
, B
an
jul-
Th
e G
am
bia
WAPP: Lighting up West Africa
WAPP Secretariat
06 BP 2907 Cotonou – République du Bénin Tel : + (229) 21 37 41 95 / 21 37 71 44 Fax : + (229) 21 37 41 96 / 21 37 71 43
Email: [email protected] Site: www.ecowapp.org
Thank You for
Your Attention