eres 2012 infrastructure and development colin elliot school of the built environment heriot-watt...

21
ERES 2012 INFRASTRUCTURE AND DEVELOPMENT Colin Elliot School of the Built Environment Heriot-Watt University [email protected] www.sbe.hw.ac.uk

Upload: morris-cross

Post on 30-Dec-2015

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ERES 2012 INFRASTRUCTURE AND DEVELOPMENT Colin Elliot School of the Built Environment Heriot-Watt University c.j.elliot@hw.ac.uk

ERES 2012 INFRASTRUCTURE AND DEVELOPMENTColin Elliot

School of the Built Environment

Heriot-Watt University

[email protected] www.sbe.hw.ac.uk

Page 2: ERES 2012 INFRASTRUCTURE AND DEVELOPMENT Colin Elliot School of the Built Environment Heriot-Watt University c.j.elliot@hw.ac.uk

Agenda• Infrastructure definitions and parameters • relationship with development • Key UK delivery models with examples• What are Attributes matrix:

time/risk/cost/phasing/fundability• Matrix of funding and risk• Future challenges

Page 3: ERES 2012 INFRASTRUCTURE AND DEVELOPMENT Colin Elliot School of the Built Environment Heriot-Watt University c.j.elliot@hw.ac.uk

Infrastructure defined

…………………. the technical structures that support a society, such as roads, water supply, sewers, electrical grids, telecommunications, and so forth, and can be defined as "the physical components of interrelated systems providing commodities and services essential to enable, sustain, or enhance societal living conditions.

Fulmer, Jeffrey (2009). "What in the world is infrastructure?”

Page 4: ERES 2012 INFRASTRUCTURE AND DEVELOPMENT Colin Elliot School of the Built Environment Heriot-Watt University c.j.elliot@hw.ac.uk

Infrastructure types and relevance to development

• weak

• Strong • medium

financial physical

otherSocial

Page 5: ERES 2012 INFRASTRUCTURE AND DEVELOPMENT Colin Elliot School of the Built Environment Heriot-Watt University c.j.elliot@hw.ac.uk

Infrastructure dependence?

physical

institutional

development

Page 6: ERES 2012 INFRASTRUCTURE AND DEVELOPMENT Colin Elliot School of the Built Environment Heriot-Watt University c.j.elliot@hw.ac.uk

Infrastructure in relation to development

lead

Lag/‘drag’

Synchronised?

Page 7: ERES 2012 INFRASTRUCTURE AND DEVELOPMENT Colin Elliot School of the Built Environment Heriot-Watt University c.j.elliot@hw.ac.uk

Going Dutch…..but with boats, buses, bikes, trams, trains, underground

Page 8: ERES 2012 INFRASTRUCTURE AND DEVELOPMENT Colin Elliot School of the Built Environment Heriot-Watt University c.j.elliot@hw.ac.uk

Infrastructure spatial contexts

Spatial • Point e.g. building• Area e.g. town• band e.g. motorway

Page 9: ERES 2012 INFRASTRUCTURE AND DEVELOPMENT Colin Elliot School of the Built Environment Heriot-Watt University c.j.elliot@hw.ac.uk

Development and infrastructurethe Parallels• Construction cost focussed• Deficit financing character• Long term• Form capital asset class

Page 10: ERES 2012 INFRASTRUCTURE AND DEVELOPMENT Colin Elliot School of the Built Environment Heriot-Watt University c.j.elliot@hw.ac.uk

Section 106 agreement (planning)

• Example: Westfield Stratford

• Scale: £150 M • Funding: developer• Risk: developer

Page 11: ERES 2012 INFRASTRUCTURE AND DEVELOPMENT Colin Elliot School of the Built Environment Heriot-Watt University c.j.elliot@hw.ac.uk

Tax Increment Finance

Example: Buchanan Quarter, Glasgow.• Scale: £80 million• local authority finance

• Recoupment through uplift in property tax.

• Risk likely to be with local auth.

Page 12: ERES 2012 INFRASTRUCTURE AND DEVELOPMENT Colin Elliot School of the Built Environment Heriot-Watt University c.j.elliot@hw.ac.uk

Community infrastructure levyExample: Crossrail*, London• Funding: Government,

private sector, local authority

• Payback and justification: business (BRS) and econ/social benefits

• Risk: limited/sunk cost

• *multiple funding structure

Page 13: ERES 2012 INFRASTRUCTURE AND DEVELOPMENT Colin Elliot School of the Built Environment Heriot-Watt University c.j.elliot@hw.ac.uk

Planning (Section106) agreement

• Example: King’s Cross, London

• Scale: significant• Funding: developer• Risk: developer

Page 14: ERES 2012 INFRASTRUCTURE AND DEVELOPMENT Colin Elliot School of the Built Environment Heriot-Watt University c.j.elliot@hw.ac.uk

Private Finance Initiative

• Example: Edinburgh Royal Infirmary

• Scale: £190 M• Funding: private sector• Risk: private sector

Page 15: ERES 2012 INFRASTRUCTURE AND DEVELOPMENT Colin Elliot School of the Built Environment Heriot-Watt University c.j.elliot@hw.ac.uk

Single Estate Strategy

Example: Canary Wharf• Scale: significant• Funding: developer • Risk: developer• Developer benefits fully from value enhancement

Page 16: ERES 2012 INFRASTRUCTURE AND DEVELOPMENT Colin Elliot School of the Built Environment Heriot-Watt University c.j.elliot@hw.ac.uk

Funding and risk matrix

PFI TIF/CIL

planning agreement

single estate

Debt Equity Pr

ivat

e

Pu

blic

Page 17: ERES 2012 INFRASTRUCTURE AND DEVELOPMENT Colin Elliot School of the Built Environment Heriot-Watt University c.j.elliot@hw.ac.uk

Other UK techniques• Business improvement districts• Local asset backed vehicles

Page 18: ERES 2012 INFRASTRUCTURE AND DEVELOPMENT Colin Elliot School of the Built Environment Heriot-Watt University c.j.elliot@hw.ac.uk

“Prime” Property

Page 19: ERES 2012 INFRASTRUCTURE AND DEVELOPMENT Colin Elliot School of the Built Environment Heriot-Watt University c.j.elliot@hw.ac.uk

Kinnaird Park

Existing

Parking Shops

Infrastructure opportunities

solar

housing

Green space shops

parking

Page 20: ERES 2012 INFRASTRUCTURE AND DEVELOPMENT Colin Elliot School of the Built Environment Heriot-Watt University c.j.elliot@hw.ac.uk

Edinburgh Conference CentreThe final piece……….• ….but 25 years in the making.

Page 21: ERES 2012 INFRASTRUCTURE AND DEVELOPMENT Colin Elliot School of the Built Environment Heriot-Watt University c.j.elliot@hw.ac.uk

Come back in 2014 and catch the tram!