Erne Pedestrian Footbridge 38 & 10Kv Grid crossing Acres Grid Connection

Upload: thomas-dillon

Post on 13-Apr-2017

64 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: erne footbridge

Erne Pedestrian Footbridge 38 & 10Kv Grid crossing

Acres Grid Connection

Page 2: erne footbridge

Erne Footbridge crossing

Page 3: erne footbridge

The risks reverse Weir

Page 4: erne footbridge

Upstream Cathleen Falls Dam

Page 5: erne footbridge

Downstream Atlantic Ocean

Page 6: erne footbridge

Rescue Team

Page 7: erne footbridge

Installing rope across Tail Race

Page 8: erne footbridge

Start scaffold bay on north bank

Page 9: erne footbridge

Phase 1

Page 10: erne footbridge

Phase 1 complete

Page 11: erne footbridge

Spanning scaffold lattice

Page 12: erne footbridge

Phase 2 spanning

Page 13: erne footbridge

Phase 2 spanning

Page 14: erne footbridge

Phase 2 complete

Page 15: erne footbridge

Phase 3 complete work platform

Page 16: erne footbridge

Phase 4 Installing Access

Page 17: erne footbridge

Phase 4 Access

Page 18: erne footbridge

Phase 4 Access

Page 19: erne footbridge

Phase 4 Access Complete

Page 20: erne footbridge

Scaffold complete platform

Page 21: erne footbridge

Scaffold complete north bank view

Page 22: erne footbridge

Scaffold complete north bank view

Page 23: erne footbridge

Scaffold complete south bank view

Page 24: erne footbridge

Scaffold complete south bank view

Page 25: erne footbridge

Project: Acres Grid Connection Client: Element Power/ESBN Main Contractor: Denis Moriarty Scope:

5500m of 38Kv single circuit ducting 300m of 10kv double circuit ducting 7 nr. joint bays and C2 chambers