ESA Report
Jean-François Kaufeler12th April 2005
Athens
12.04.2005 p. 2CMC - Athens - ESA Report
Content
ECSS – CCSDS cooperationESA level of contributionMeeting locationsOMG organisationCooperation with OMG
12.04.2005 p. 3CMC - Athens - ESA Report
ECSS: European Cooperation of Space Standardisation
Objective: streamline European efforts in standardisationMembers
All Space Agencies in Europe (in particular ASI, BNSC, CNES, DLR, ESA) European Industry coordinated through EuroSpace
Produce standards in following domains Management (for Space Projects) Quality Engineering
If they don’t exist at International level If they are not suitable ►Take International Standards (avoid, minimise changes)
Establish Engineering Standards at ISO (e.g. SC14) Through the National Standardisation Bodies
Why not using this mechanism also for CCSDS ?►Better contribution to CCSDS for everybody’s benefit
12.04.2005 p. 4CMC - Athens - ESA Report
Proposal for an ECSS / CCSDS cooperation
ECSS wants to realise this in a first step by: Establishing focal points for regular contact between both organisations CCSDS: A member of CESG (non-European? CESG Chairman ?) ECSS: A member of the ECSS Executive (to be nominated)
Defining clear interfaces for exchange of information on the different levels of both standardisation life cycles
Plan Resources NWI Review
Working Group selection Identification of projects of common or specific interest, Defining the leading organisation of the standardisation project (in general
CCSDS-WG with ECSS-participants) Participating in the WG, which drafts the standard
Referring directly to CCSDS / ISO standards, if a common developed standard is published by CCSDS or ISO
12.04.2005 p. 5CMC - Athens - ESA Report
CCSDS – ECSS Synergy
ISO SC14
Update ApprovalECSS EPCESGUpdate Approval
Draft UpdateWGWGDraft Update
ECSS-membersAgencies (CCSDS-Members)
Communicate decisions via focal points
Leading SDO *
ECSSCCSDS
ISO-Standard recognised by ECSS
ISO SC13
CMC
CCSDS / ECSS EP
CCSDS
Identification of common interest and set up of a common WG *
Information of NWI via Focal Points and Feedback and agreement of the leading organisation
Responsibilities
ISO-Entry (National Standardisation Bodies)
ISO-Entry (Cover Sheet Method)
SB-Approval and PublicationECSS SBBlue Book (Appr. Doc.)
Panel/Public ReviewAgencies Review
WG-DraftECSS WGWG-Draft (Red Book)
Call for ParticipantsCall for Participants
NWIPNWIP(BOF)
ECSSCCSDS
* in general CCSDS-WG with ECSS participants, incl. Industry
12.04.2005 p. 6CMC - Athens - ESA Report
ESA level of contribution
According plan in 2004 2 my ESA staff 4 my support contractors
Temporary budget difficulties in 2005 Less contractual support (only 3 my) Less missions ►more teleconf / email
Should be nominal again in 2006 possibly strengthened through ECSS participation
12.04.2005 p. 7CMC - Athens - ESA Report
Meeting Location
Initial intent of CCSDS reorganisation Less co-location, more manageable meetings Responsibility and flexibility given to CESG and Areas
However still almost full co-location at Fall and Spring CMC meetingsRequirements / Constraints
CMC needs to meet at other places than OMG (e.g. inviting Agencies) CMC does not need to meet with OMG Meeting with OMG mainly required for CESG and some Areas only
Co-location with OMG is interesting Because they take care of the full organisation Is advantageous if we use it fully If it goes in parallel with a meaningful / fruitful cooperation
Possible continuation with OMG Full CCSDS / CMC co-location as now CMC may meet at other places if needed and would require attendance of
CESG Chair + Co-Chair + (exceptionally) some ADs
12.04.2005 p. 8CMC - Athens - ESA Report
OMG Organisation
For a first time the organisation has been smooth and satisfactoryCCSDS has to pass requirements
Meeting rooms: number, size, dates Supporting facilities: printers, beamers, connections
Should this not be done by CESG and Secretary ?How to handle participation fees ?
Maybe too expensive for most of the participating Agencies (~ 15 – 20 K€) Fees per participant seems more appropriate
How to deal with invitation for some Delegations requiring a visa ?
12.04.2005 p. 9CMC - Athens - ESA Report
Cooperation with OMG
OMG is initiating without consulting CCSDS a number of important RFPs that fall in CCSDS (SE / MOIMS) areaInitiative driven by Industry pushSame Industry is not motivated to participate to CCSDS
CCSDS too Agency dominated ? More freedom for Industry in OMG ?
Watch out cooperation / discussions with OMG in AthensRe-activate CCSDS / OMG WG to address issues and on continuation
Information’s Technology matters by nature in OMGOMG standards are eventually also becoming ISO standards
In which TC ?