esa report on esa eo missions ceos beijing, wgiss sep. 2004 h. laur, yl desnos,

13
CEOS WGISS 18, Beijing , Sep. 2004 Slide 1 ESA Report on ESA EO missions ESA Report on ESA EO missions CEOS CEOS Beijing, Beijing, WGISS WGISS Sep. 2004 Sep. 2004 H. Laur, H. Laur, YL Desnos, YL Desnos, I. Petiteville I. Petiteville

Upload: jewel

Post on 18-Jan-2016

33 views

Category:

Documents


0 download

DESCRIPTION

ESA Report on ESA EO missions CEOS Beijing, WGISS Sep. 2004 H. Laur, YL Desnos, I. Petiteville. Topics. ENVISAT DRAGON NRSCC-ESA Joint Programme Earth Explorer Missions 3 rd Party missions: ALOS. ENVISAT. DRAGON Programme. EARTH EXPLORERS. goce. cryosat. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: ESA Report on ESA EO missions CEOS   Beijing,  WGISS  Sep. 2004 H. Laur,  YL Desnos,

CEOS WGISS 18, Beijing , Sep. 2004 Slide 1

ESA Report on ESA EO missionsESA Report on ESA EO missions CEOS CEOS Beijing, Beijing,

WGISSWGISS Sep. 2004Sep. 2004

H. Laur, H. Laur, YL Desnos,YL Desnos,I. PetitevilleI. Petiteville

Page 2: ESA Report on ESA EO missions CEOS   Beijing,  WGISS  Sep. 2004 H. Laur,  YL Desnos,

CEOS WGISS 18, Beijing , Sep. 2004 Slide 2

Topics

ENVISAT

DRAGON NRSCC-ESA Joint Programme

Earth Explorer Missions

3rd Party missions: ALOS

Page 3: ESA Report on ESA EO missions CEOS   Beijing,  WGISS  Sep. 2004 H. Laur,  YL Desnos,

CEOS WGISS 18, Beijing , Sep. 2004 Slide 3

ENVISAT

Observing the Earth from space:

the ENVISAT Mission

Henri LAUREnvisat Mission Manager

“Big Science” in Geology, 32nd Int. Geological Congress, August 2004

Page 4: ESA Report on ESA EO missions CEOS   Beijing,  WGISS  Sep. 2004 H. Laur,  YL Desnos,

CEOS WGISS 18, Beijing , Sep. 2004 Slide 4

DRAGON Programme

Dragon Programmeand Organisation

Dragon programme coordinators

Li Zengyuan for NRSCC

Yves-Louis Desnos for ESA

Page 5: ESA Report on ESA EO missions CEOS   Beijing,  WGISS  Sep. 2004 H. Laur,  YL Desnos,

CEOS WGISS 18, Beijing , Sep. 2004 Slide 5

cryosat

smos

adm

goce

EARTH EXPLORERS

Page 6: ESA Report on ESA EO missions CEOS   Beijing,  WGISS  Sep. 2004 H. Laur,  YL Desnos,

CEOS WGISS 18, Beijing , Sep. 2004 Slide 6

Earth Explorer MissionsCore missions:

GOCE: Gravity and Ocean Circulation.

ADM-Aeolus: Measuring the winds at all altitudes.

Opportunity missionsCRYOSAT: Sea-Ice Monitoring

SMOS: Soil Moisture and Ocean Salinity.

Floating sea ice NOAA

Salinity in the Mediterranean

Page 7: ESA Report on ESA EO missions CEOS   Beijing,  WGISS  Sep. 2004 H. Laur,  YL Desnos,

CEOS WGISS 18, Beijing , Sep. 2004 Slide 7

Earth Explorer missions (1/3)

• CRYOSAT: – ESA contract, Prime Contractor ACS (I) – Some delays with satellite. Launch

planned for 1st quarter of 2005– Kiruna Ground Station ready– About 60 Scientific projects accepted in

Category 1 (data provided by ESA for free)

Page 8: ESA Report on ESA EO missions CEOS   Beijing,  WGISS  Sep. 2004 H. Laur,  YL Desnos,

CEOS WGISS 18, Beijing , Sep. 2004 Slide 8

CRYOSAT Ground Station

Kiruna Salmijarvi

CRYOSAT equipment

Page 9: ESA Report on ESA EO missions CEOS   Beijing,  WGISS  Sep. 2004 H. Laur,  YL Desnos,

CEOS WGISS 18, Beijing , Sep. 2004 Slide 9

Earth Explorer missions (2/3)• ADM Aeolus:

– GS PDS development KO in Jul. 2005,

– PDS completed in 2007. – Launch in October 2007.

• SMOS:– Ground Segment Phase B

on-going until end 2004 then C/D phase

Page 10: ESA Report on ESA EO missions CEOS   Beijing,  WGISS  Sep. 2004 H. Laur,  YL Desnos,

CEOS WGISS 18, Beijing , Sep. 2004 Slide 10

Svalbard Ground Station

Page 11: ESA Report on ESA EO missions CEOS   Beijing,  WGISS  Sep. 2004 H. Laur,  YL Desnos,

CEOS WGISS 18, Beijing , Sep. 2004 Slide 11

Earth Explorer missions (3/3)

• GOCE:– ESA contract, Prime Contractor ACS (I) – Ground Segment (PDS) V2 kick-off in Sep. 2003– Launch in summer 2006

Page 12: ESA Report on ESA EO missions CEOS   Beijing,  WGISS  Sep. 2004 H. Laur,  YL Desnos,

CEOS WGISS 18, Beijing , Sep. 2004 Slide 12

3rd Party mission: ALOS

Page 13: ESA Report on ESA EO missions CEOS   Beijing,  WGISS  Sep. 2004 H. Laur,  YL Desnos,

CEOS WGISS 18, Beijing , Sep. 2004 Slide 13

ALOS

• 3 sensors: 1 SAR L-band and 2 optical

• ALOS Data European Node (ADEN): – ESA contract, Prime VEGA (UK). – GS development kicked-off end of July 2002. – Subsystem Factory Acceptance Tests (Sep.

2003 to Jun. 2004)– Launch (summer 2005)– Full deployment by mid 2005