esa space telescopes

40
ICSO 2014 D.Doyle ESA-ESTEC SPACE TELESCOPES (DREAMS AND DETAILS) Dominic Doyle Optical Engineer ESTEC The Netherlands @opto_domo 1 My favourite telescope selfie!

Upload: esaesoc-darmstadt-germany

Post on 18-Dec-2014

201 views

Category:

Science


2 download

DESCRIPTION

Presentation by Dominic Doyal at #SpaceOptics, 8 Oct, 2014, on ESA's space telescopes, especially Herschel.

TRANSCRIPT

Page 1: ESA Space Telescopes

ICSO 2014 D.Doyle ESA-ESTEC

SPACE TELESCOPES

(DREAMS AND DETAILS)

Dominic Doyle Optical Engineer

ESTEC

The Netherlands

@opto_domo

1

My favourite telescope selfie!

Page 2: ESA Space Telescopes

ICSO 2014 D.Doyle ESA-ESTEC

WHY?

HOW?

WHAT?

Space Telescopes

2

Page 3: ESA Space Telescopes

ICSO 2014 D.Doyle ESA-ESTEC

Space Telescopes – Why ? (1)

3

Page 4: ESA Space Telescopes

ICSO 2014 D.Doyle ESA-ESTEC

Space Telescopes – Why ? (2)

Astronomy: Optics adapt to the whole sky Brent Ellerbroek and François Rigaut Nature 403, 25-26(6 January 2000) doi:10.1038/47369

4

Page 5: ESA Space Telescopes

ICSO 2014 D.Doyle ESA-ESTEC

Space Telescopes – nice idea, but NEVER forget the details

http://hubblesite.org/the_telescope/nuts_.and._bolts/optics/ 5

Page 6: ESA Space Telescopes

ICSO 2014 D.Doyle ESA-ESTEC

A DREAM + LOTS OF DETAILS = REALITY

Space Telescopes – How ?

Reality 2009 - 2013 3.5 m monolithic (Still largest optical space telescope to date)

The dream 1984 8 m Deployable mirror & sunshield

Herschel Space Telescope as example 6

Page 7: ESA Space Telescopes

ICSO 2014 D.Doyle ESA-ESTEC

Space Telescopes – How ?

Get approval! Design Build Test Launch Operate Dispose

This can take up to 30 years from first idea to completion of the mission ! Lots of patience, expertise* and determination are needed ! Let’s have a look some details to understand why ! * Technological, Scientific, Engineering, Financial, management, Administration and Political!

7

Page 8: ESA Space Telescopes

ICSO 2014 D.Doyle ESA-ESTEC

Space Telescopes – How ?

Design Build Test Launch Operate Dispose

8

Page 9: ESA Space Telescopes

ICSO 2014 D.Doyle ESA-ESTEC

Space Telescopes – How ?

Design Build Test Launch Operate Dispose From SiC powder

to a cryogenic 3.5 m diameter Telescope !

9

Page 10: ESA Space Telescopes

ICSO 2014 D.Doyle ESA-ESTEC

Space Telescopes – How ?

Design Build Test Launch Operate Dispose

?

10

Page 11: ESA Space Telescopes

ICSO 2014 D.Doyle ESA-ESTEC

Space Telescopes – How ?

Design Build Test Launch Operate Dispose

?

11

Page 12: ESA Space Telescopes

ICSO 2014 D.Doyle ESA-ESTEC

Space Telescopes – How ?

Design Build Test Launch Operate Dispose

Theodo lite

WF S

12

Page 13: ESA Space Telescopes

ICSO 2014 D.Doyle ESA-ESTEC

Space Telescopes – How ?

Design Build Test Launch Operate Dispose

Theodo lite

WF S

13

Page 14: ESA Space Telescopes

ICSO 2014 D.Doyle ESA-ESTEC

Space Telescopes – How ?

Design Build Test Launch Operate Dispose

14

Page 15: ESA Space Telescopes

ICSO 2014 D.Doyle ESA-ESTEC

Space Telescopes – How ?

Design Build Test Launch Operate Dispose

15

Page 16: ESA Space Telescopes

ICSO 2014 D.Doyle ESA-ESTEC

Space Telescopes – How ?

Design Build Test Launch Operate Dispose

16

Page 17: ESA Space Telescopes

ICSO 2014 D.Doyle ESA-ESTEC

Space Telescopes – How ?

Design Build Test Launch Operate Dispose

17

Page 18: ESA Space Telescopes

ICSO 2014 D.Doyle ESA-ESTEC

Space Telescopes – How ?

Design Build Test Launch Operate Dispose

15:12 CEST 14 May 2009

18

Page 19: ESA Space Telescopes

ICSO 2014 D.Doyle ESA-ESTEC

Space Telescopes – Where/Why ?

Design Build Test Launch Operate Dispose

Herschel (&Planck) Trajectory to L2 (L2 = Lagrange point #2) 1.5 million km anti-sunward NO repair capability !

19

Page 20: ESA Space Telescopes

ICSO 2014 D.Doyle ESA-ESTEC

Space Telescopes – What is L2 ?

Design Build Test Launch Operate Dispose

20

Sun

Presenter
Presentation Notes
Lunar distance 384,400 km
Page 21: ESA Space Telescopes

ICSO 2014 D.Doyle ESA-ESTEC

Space Telescopes – In focus ?

Design Build Test Launch Operate Dispose

Telescope WFE Predicted PSF* Observed PSF

Huge relief for entire team – telescope is in focus * PSF = Point Spread Function 21

Page 22: ESA Space Telescopes

ICSO 2014 D.Doyle ESA-ESTEC

Space Telescopes – What ?

Design Build Test Launch Operate Dispose

22

Page 23: ESA Space Telescopes

ICSO 2014 D.Doyle ESA-ESTEC

Space Telescopes – What ?

Design Build Test Launch Operate Dispose

5.4”

8.0”

12.2”

17”

24”

35”

Hubble Res. 0.05” (@500nm)

Field size 15’ Herschel FOV PACS 1.75 x 3.5’ SPIRE 4 x 8’ HIFI 11’’ to 44’’

Herschel Beam sizes on sky

PACS

SPIRE

HIFI

Hubble

PACS 60 - 210 µm Photo-detector Array Camera and Spectrometer

SPIRE 200 - 670 µm Spectral and Photometric Imaging Receiver

HIFI 157 – 625 µm Heterodyne Instrument for Far Infrared

Hubble (115nm - 1µm)

5.4”

8.0”

12.2”

17”

24”

35”

Herschel Beam sizes on sky

23

1 Deg = 60 arc mins (’) 1 Arc min = 60 arc sec (”) e.g. Moon = 30’

Presenter
Presentation Notes
Busy chart, but pay attention to the details
Page 24: ESA Space Telescopes

ICSO 2014 D.Doyle ESA-ESTEC

Space Telescopes – What ?

Design Build Test Launch Operate Dispose http://herschel.esac.esa.int/TheUniverseExploredByHer

schel/HerschelTheMovie4noMusic.mp4 24

Page 25: ESA Space Telescopes

ICSO 2014 D.Doyle ESA-ESTEC

Space Telescopes – What ?

Design Build Test Launch Operate Dispose “Herschel planetary nebula survey (HerPlaNS). First detection of

OH+ in planetary nebulae,” by I. Aleman et al., and “Herschel spectral-mapping of the Helix Nebula (NGC 7293): extended CO photodissociation and OH+ emission,” by M. Etxaluze et al., are published in Volume 566, June 2014 Astronomy & Astrophysics. 25

Page 26: ESA Space Telescopes

ICSO 2014 D.Doyle ESA-ESTEC

Space Telescopes – What ?

Design Build Test Launch Operate Dispose

Kappa Coronae Borealis and its dust disc. 1.5 MSun @ 100 ly "Spatially Resolved Images of Dust Belt(s) Around the Planet-hosting Subgiant κ CrB", by A. Bonsor et al. Monthly Notices of the Royal

Astronomical Society, April 2013. http://sci.esa.int/jump.cfm?oid=51648

(distance 25 LY, 7.7 pc, 2x10^14 km) Thermal dust emission from destruction of 2000 comets per day.

Acke, B., et al., "Herschel Images of Fomalhaut – An extrasolar Kuiper Belt at the height of its dynamical activity", 2012, Astronomy & Astrophysics, 540, A125. DOI:10.1051/0004-6361/201118581

http://sci.esa.int/jump.cfm?oid=50252 26

Page 27: ESA Space Telescopes

ICSO 2014 D.Doyle ESA-ESTEC

Space Telescopes – How ?

Design Build Test Launch Operate Dispose

Herschel last command 17 June 2013 “Mission controllers sent the final command to the Herschel satellite today at 12:25 GMT (14:25 CEST), marking the end of operations for ESA’s hugely successful space observatory.

Total 23,500 hours of observing over 1447 days Very large no. of results published at a high rate

27

Herschel was sent into a Heliocentric graveyard orbit. ~ 300Y to get back into vicinity of Earth. It’s now space debris!”

Page 28: ESA Space Telescopes

ICSO 2014 D.Doyle ESA-ESTEC

Space Telescopes – What’s next ?

GAIA … (Astrometry) launched 2013 JWST … (Hubble successor, Astrophysics) 2018 Euclid … (Dark energy) 2020 PLATO … (Exoplanets & stellar, 32 telescopes!) 2024 ATHENA … (X-Ray astrophysics) 2028 CHEOPS … (Exoplanet characterisation) 2017 20m deployable … ? 2035+

http://sci.esa.int/home/51459-missions/ 28

Page 29: ESA Space Telescopes

ICSO 2014 D.Doyle ESA-ESTEC

Space Telescopes – What’s next ?

GAIA

JWST

20m deployable … ?

29

Presenter
Presentation Notes
M1 segment 1.3m diam, 25m^2 total area of 18 segments
Page 30: ESA Space Telescopes

ICSO 2014 D.Doyle ESA-ESTEC

Space Telescopes – What’s next ?

GAIA

JWST

20m deployable … ?

30

“Telescope Origami challenge”

James Webb Space Telescope

Presenter
Presentation Notes
M1 segment 1.3m diam, 25m^2 total area of 18 segments
Page 31: ESA Space Telescopes

ICSO 2014 D.Doyle ESA-ESTEC

TALC – Thin Aperture Light Collector

Proceedings of the 2nd International Conference "Advanced Lightweight Structures and Reflector Antennas", 1 – 3 October 2014, Sheraton Metechi Palace Hotel, Tbilisi, Georgia 31

Page 32: ESA Space Telescopes

ICSO 2014 D.Doyle ESA-ESTEC

Space Telescopes – Not easy & Always a huge team effort over many years!

32

Page 33: ESA Space Telescopes

ICSO 2014 D.Doyle ESA-ESTEC

Space Telescopes – Herschel famous at last … spot the “deliberate” mistake?

33

Page 34: ESA Space Telescopes

ICSO 2014 D.Doyle ESA-ESTEC

WHY … TO SEE BETTER, FASTER, FURTHER ETC! HOW … PATIENCE, EXCELLENCE, TEAM WORK AND GREAT ATTENTION TO DETAIL WHAT …MANY NEW DISCOVERIES, BETTER UNDERSTANDING AND MORE QUESTIONS FOR THE NEXT MISSION!

THANKS FOR YOUR ATTENTION, FOR YOUR COMMITMENT TO BE HERE AND ENJOY THE REST OF THE EVENT BUT WAIT, THE ANSWER IS …

Space Telescopes - Recap

34

Page 35: ESA Space Telescopes

ICSO 2014 D.Doyle ESA-ESTEC

AND THE ANSWER IS … 42 (OF COURSE)

35

Page 36: ESA Space Telescopes

ICSO 2014 D.Doyle ESA-ESTEC

AND THE ANSWER IS … 42 (OF COURSE)

36

Page 37: ESA Space Telescopes

BACKUP SLIDES

37

Page 38: ESA Space Telescopes

THE HERSCHEL SPACECRAFT

Instruments inside the Cryostat

( - 253°C to -271°C) & Detectors cooled at 0.3°C

above the absolute zero ! (0.3K)

Sunshield and solar array

3.5 m Telescope

He II Cryostat

Service Module (20 °C)

7.2 m

4 m

Launch Mass ~ 3400 kg - Electrical Power ~ 1300 W 3 axis stabilisation

38

Page 39: ESA Space Telescopes

THE HERSCHEL PAYLOAD MODULE AND ITS INSTRUMENTS

Herschel Scientific Instruments

• Three scientific instruments (HIFI, PACS, SPIRE)

• Each provided by Principal Investigators on

behalf of international consortia

• Focal Plane Units on top of the He tank

• State of the art detector technology

• Designed to cover observations in the infrared

(60 µm) to submillimetre (700 µm)

• Daily data production above 10 Gbit retrieved

within 3 hours daily link

39

Page 40: ESA Space Telescopes

The Herschel Instruments

SPIRE

HIFI

PACS

40