![Page 1: Establishing a Capacity Roadmap - CANSO CAAS... · SRQ. ROT (Seconds) Airlines (n>9) Average and Variance ROT 2012 Average ROT 65.62s 2013 ... Coordinate timing and duration of runway](https://reader034.vdocuments.net/reader034/viewer/2022042322/5f0c71827e708231d4356d7f/html5/thumbnails/1.jpg)
Establishing a Capacity Roadmap
ATC Manager Michael Shee
![Page 2: Establishing a Capacity Roadmap - CANSO CAAS... · SRQ. ROT (Seconds) Airlines (n>9) Average and Variance ROT 2012 Average ROT 65.62s 2013 ... Coordinate timing and duration of runway](https://reader034.vdocuments.net/reader034/viewer/2022042322/5f0c71827e708231d4356d7f/html5/thumbnails/2.jpg)
2
• 1300 Hectares • 2 Runways • 4 Terminals • 40% Heavy traffic • 53.7m pax movement (4.9%) • 343,800 commercial aircraft movements (5.9%)
Changi Today
![Page 3: Establishing a Capacity Roadmap - CANSO CAAS... · SRQ. ROT (Seconds) Airlines (n>9) Average and Variance ROT 2012 Average ROT 65.62s 2013 ... Coordinate timing and duration of runway](https://reader034.vdocuments.net/reader034/viewer/2022042322/5f0c71827e708231d4356d7f/html5/thumbnails/3.jpg)
3
Scheduled Commercial Movements at Changi
![Page 4: Establishing a Capacity Roadmap - CANSO CAAS... · SRQ. ROT (Seconds) Airlines (n>9) Average and Variance ROT 2012 Average ROT 65.62s 2013 ... Coordinate timing and duration of runway](https://reader034.vdocuments.net/reader034/viewer/2022042322/5f0c71827e708231d4356d7f/html5/thumbnails/4.jpg)
4
Building Blocks for Capacity Enhancements
Runway
Terminal Area
En-route
• Consideration: Airspace
complexities Air Traffic Control
(ATC) work processes
ATC workload and performance
![Page 5: Establishing a Capacity Roadmap - CANSO CAAS... · SRQ. ROT (Seconds) Airlines (n>9) Average and Variance ROT 2012 Average ROT 65.62s 2013 ... Coordinate timing and duration of runway](https://reader034.vdocuments.net/reader034/viewer/2022042322/5f0c71827e708231d4356d7f/html5/thumbnails/5.jpg)
5
Approach to Capacity Building • Determine the current capacity • Identify measures to be implemented to enhance
capacity • Develop action plan to implement measures
• Take phased approach to increase scheduling rate • Formulate and design enablers • Increase ATCO manpower and enhance training • Expose ATCOs to an environment of high intensity
operations • Measure performance to determine effectiveness
![Page 6: Establishing a Capacity Roadmap - CANSO CAAS... · SRQ. ROT (Seconds) Airlines (n>9) Average and Variance ROT 2012 Average ROT 65.62s 2013 ... Coordinate timing and duration of runway](https://reader034.vdocuments.net/reader034/viewer/2022042322/5f0c71827e708231d4356d7f/html5/thumbnails/6.jpg)
Capacity Roadmap
6
64
35
45
55
65
75
85
200000
300000
400000
500000Annual ATM
85 80 75 70 65 60 55
2018
![Page 7: Establishing a Capacity Roadmap - CANSO CAAS... · SRQ. ROT (Seconds) Airlines (n>9) Average and Variance ROT 2012 Average ROT 65.62s 2013 ... Coordinate timing and duration of runway](https://reader034.vdocuments.net/reader034/viewer/2022042322/5f0c71827e708231d4356d7f/html5/thumbnails/7.jpg)
Capacity Enhancement Approach
7
• Route restructuring • Reduction in Horizontal
Separation
• No Pre-departure Clearance
• Streamlining departure clearance
• Reconfiguration of Approach Sector
• Continuous Descent Operations
• Gate-hold Procedures • Pushback procedures • 1-minute departure
separation
![Page 8: Establishing a Capacity Roadmap - CANSO CAAS... · SRQ. ROT (Seconds) Airlines (n>9) Average and Variance ROT 2012 Average ROT 65.62s 2013 ... Coordinate timing and duration of runway](https://reader034.vdocuments.net/reader034/viewer/2022042322/5f0c71827e708231d4356d7f/html5/thumbnails/8.jpg)
Enhancing Capacity Surface
8
![Page 9: Establishing a Capacity Roadmap - CANSO CAAS... · SRQ. ROT (Seconds) Airlines (n>9) Average and Variance ROT 2012 Average ROT 65.62s 2013 ... Coordinate timing and duration of runway](https://reader034.vdocuments.net/reader034/viewer/2022042322/5f0c71827e708231d4356d7f/html5/thumbnails/9.jpg)
9
Factors affecting Runway Capacity
20R
Wake Vortex
Separation Minima
Runway Occupancy
Sequencing
Runway Configuration
Airport Layout Scheduling & Traffic Mix Weather Airspace & ATC Procedures Environmental Constraints
![Page 10: Establishing a Capacity Roadmap - CANSO CAAS... · SRQ. ROT (Seconds) Airlines (n>9) Average and Variance ROT 2012 Average ROT 65.62s 2013 ... Coordinate timing and duration of runway](https://reader034.vdocuments.net/reader034/viewer/2022042322/5f0c71827e708231d4356d7f/html5/thumbnails/10.jpg)
Runway Capacity Enhancement • Optimising pushback procedures to enhance capacity
through flexibility • Mixed-mode runway operations to maximize both
Runways utilization • Gate-hold procedures, pushback time varied to reduce
waiting time and congestion on the taxiway, as well as to reduce fuel burn.
• Enhancements to ATC sequencing to minimize overall separation intervals: Move away from first-come-first-served basis
![Page 11: Establishing a Capacity Roadmap - CANSO CAAS... · SRQ. ROT (Seconds) Airlines (n>9) Average and Variance ROT 2012 Average ROT 65.62s 2013 ... Coordinate timing and duration of runway](https://reader034.vdocuments.net/reader034/viewer/2022042322/5f0c71827e708231d4356d7f/html5/thumbnails/11.jpg)
Maximising Runway Occupancy Time • Fostering awareness among stakeholders on need to
improve performance • Publish ROT recommendations in AIP • Set performance target for major airlines according to
fleet mix
11
![Page 12: Establishing a Capacity Roadmap - CANSO CAAS... · SRQ. ROT (Seconds) Airlines (n>9) Average and Variance ROT 2012 Average ROT 65.62s 2013 ... Coordinate timing and duration of runway](https://reader034.vdocuments.net/reader034/viewer/2022042322/5f0c71827e708231d4356d7f/html5/thumbnails/12.jpg)
30
50
70
90
110
130
150
BO
X
SQ
C
EV
A
CC
A
AA
R
AN
A
CA
L
JAL
BA
W
BK
P
QTR
AH
K
THY
CR
K
CE
S
MD
L
PA
L
MA
S
AIC
BTV
CS
N
HV
N
ALK GIA
SLK
VLU FI
N
JAI
JSA
JST
SR
Q
TGW
TSE
RO
T (S
econ
ds)
12
30
50
70
90
110
130
150
NC
A
DLH KA
L
JAL
FDX
BV
T
AH
K
QTR
AN
A
THY
KLM
FFM
CA
D
ETD
SC
O
PA
L
FIN
CE
B
RB
A
CP
A
CS
N
ALK GIA LN
I
AIC
SLK
VLU
TGW
JSA
UP
S
SR
Q
RO
T (S
econ
ds)
Airlines (n>9)
Average and Variance ROT
2012 Average
ROT 65.62s
2013 Average
ROT 64.84s
![Page 13: Establishing a Capacity Roadmap - CANSO CAAS... · SRQ. ROT (Seconds) Airlines (n>9) Average and Variance ROT 2012 Average ROT 65.62s 2013 ... Coordinate timing and duration of runway](https://reader034.vdocuments.net/reader034/viewer/2022042322/5f0c71827e708231d4356d7f/html5/thumbnails/13.jpg)
Collaboration with the Airport Operator
13
Increase Runway availability Periodic closures for runway maintenance, inspection and FOD retrieval Coordinate timing and duration of runway closures to maximise runway availability
Airport Collaborative Decision Making (A-CDM) Dynamic information sharing across airport community Enhance decision making, response to changes and deployment of resources
![Page 14: Establishing a Capacity Roadmap - CANSO CAAS... · SRQ. ROT (Seconds) Airlines (n>9) Average and Variance ROT 2012 Average ROT 65.62s 2013 ... Coordinate timing and duration of runway](https://reader034.vdocuments.net/reader034/viewer/2022042322/5f0c71827e708231d4356d7f/html5/thumbnails/14.jpg)
Enhancing Capacity Departure & Arrival
14
![Page 15: Establishing a Capacity Roadmap - CANSO CAAS... · SRQ. ROT (Seconds) Airlines (n>9) Average and Variance ROT 2012 Average ROT 65.62s 2013 ... Coordinate timing and duration of runway](https://reader034.vdocuments.net/reader034/viewer/2022042322/5f0c71827e708231d4356d7f/html5/thumbnails/15.jpg)
Enhancing Capacity with Departure Spacing • Minimising ground delay with reduction in
departure separation for same wake category 90 seconds 60 seconds
45°
Simultaneous Departures
15°
![Page 16: Establishing a Capacity Roadmap - CANSO CAAS... · SRQ. ROT (Seconds) Airlines (n>9) Average and Variance ROT 2012 Average ROT 65.62s 2013 ... Coordinate timing and duration of runway](https://reader034.vdocuments.net/reader034/viewer/2022042322/5f0c71827e708231d4356d7f/html5/thumbnails/16.jpg)
16
Airspace Design with PBN
Changi Airport
![Page 17: Establishing a Capacity Roadmap - CANSO CAAS... · SRQ. ROT (Seconds) Airlines (n>9) Average and Variance ROT 2012 Average ROT 65.62s 2013 ... Coordinate timing and duration of runway](https://reader034.vdocuments.net/reader034/viewer/2022042322/5f0c71827e708231d4356d7f/html5/thumbnails/17.jpg)
Before
17
After
![Page 18: Establishing a Capacity Roadmap - CANSO CAAS... · SRQ. ROT (Seconds) Airlines (n>9) Average and Variance ROT 2012 Average ROT 65.62s 2013 ... Coordinate timing and duration of runway](https://reader034.vdocuments.net/reader034/viewer/2022042322/5f0c71827e708231d4356d7f/html5/thumbnails/18.jpg)
Enhancing Capacity Enroute
18
![Page 19: Establishing a Capacity Roadmap - CANSO CAAS... · SRQ. ROT (Seconds) Airlines (n>9) Average and Variance ROT 2012 Average ROT 65.62s 2013 ... Coordinate timing and duration of runway](https://reader034.vdocuments.net/reader034/viewer/2022042322/5f0c71827e708231d4356d7f/html5/thumbnails/19.jpg)
Enhancing En-route Capacity
• Utilizing Performance Based Navigation (PBN) to optimise route design
• Profile segregation, separate arrivals and departures against overflights
• Enhancing surveillance and communications to enable separation reduction ADS-C / CPDLC ADS-B
• Collaboration with neighbouring ANSPs
19
![Page 20: Establishing a Capacity Roadmap - CANSO CAAS... · SRQ. ROT (Seconds) Airlines (n>9) Average and Variance ROT 2012 Average ROT 65.62s 2013 ... Coordinate timing and duration of runway](https://reader034.vdocuments.net/reader034/viewer/2022042322/5f0c71827e708231d4356d7f/html5/thumbnails/20.jpg)
20
RNP10 50NM Longitudinal Spacing with Manila
SIN
MNL
![Page 21: Establishing a Capacity Roadmap - CANSO CAAS... · SRQ. ROT (Seconds) Airlines (n>9) Average and Variance ROT 2012 Average ROT 65.62s 2013 ... Coordinate timing and duration of runway](https://reader034.vdocuments.net/reader034/viewer/2022042322/5f0c71827e708231d4356d7f/html5/thumbnails/21.jpg)
Before Restructuring
21
![Page 22: Establishing a Capacity Roadmap - CANSO CAAS... · SRQ. ROT (Seconds) Airlines (n>9) Average and Variance ROT 2012 Average ROT 65.62s 2013 ... Coordinate timing and duration of runway](https://reader034.vdocuments.net/reader034/viewer/2022042322/5f0c71827e708231d4356d7f/html5/thumbnails/22.jpg)
After Restructuring
22
![Page 23: Establishing a Capacity Roadmap - CANSO CAAS... · SRQ. ROT (Seconds) Airlines (n>9) Average and Variance ROT 2012 Average ROT 65.62s 2013 ... Coordinate timing and duration of runway](https://reader034.vdocuments.net/reader034/viewer/2022042322/5f0c71827e708231d4356d7f/html5/thumbnails/23.jpg)
23
Reduction of Longitudinal Separation between SIN-CGK
40NM spacing implemented in Aug 2012 20NM spacing implemented in Dec 2013
SIN
CGK
![Page 24: Establishing a Capacity Roadmap - CANSO CAAS... · SRQ. ROT (Seconds) Airlines (n>9) Average and Variance ROT 2012 Average ROT 65.62s 2013 ... Coordinate timing and duration of runway](https://reader034.vdocuments.net/reader034/viewer/2022042322/5f0c71827e708231d4356d7f/html5/thumbnails/24.jpg)
24
RNAV5 Routes over Peninsula Malaysia
SIN
KUL
![Page 25: Establishing a Capacity Roadmap - CANSO CAAS... · SRQ. ROT (Seconds) Airlines (n>9) Average and Variance ROT 2012 Average ROT 65.62s 2013 ... Coordinate timing and duration of runway](https://reader034.vdocuments.net/reader034/viewer/2022042322/5f0c71827e708231d4356d7f/html5/thumbnails/25.jpg)
25
ADS-B Implementation • Implementation in South China Sea area
Exclusive ADS‐B operations at FL290 and above – Dec 2013
![Page 26: Establishing a Capacity Roadmap - CANSO CAAS... · SRQ. ROT (Seconds) Airlines (n>9) Average and Variance ROT 2012 Average ROT 65.62s 2013 ... Coordinate timing and duration of runway](https://reader034.vdocuments.net/reader034/viewer/2022042322/5f0c71827e708231d4356d7f/html5/thumbnails/26.jpg)
RADAR
Capacity Enhancement with ADS-B
• Enhancing surveillance coverage beyond the conventional radar
• Optimising capacity and increase opportunity for ADS-B equipped & approved flights to cruise at optimum levels • Implemented on 12 December 2013
• Benefit departure on ATS Routes M753 & M771
10 minutes 10 minutes
10 minutes Delay*
40 NM (5 mins)
5 minutes Delay*
40 NM (5 mins)
ADS-B
WITHOUT ADS-B
RADAR
WITH ADS-B
![Page 27: Establishing a Capacity Roadmap - CANSO CAAS... · SRQ. ROT (Seconds) Airlines (n>9) Average and Variance ROT 2012 Average ROT 65.62s 2013 ... Coordinate timing and duration of runway](https://reader034.vdocuments.net/reader034/viewer/2022042322/5f0c71827e708231d4356d7f/html5/thumbnails/27.jpg)
Enhancing Capacity Process Enhancement
27
![Page 28: Establishing a Capacity Roadmap - CANSO CAAS... · SRQ. ROT (Seconds) Airlines (n>9) Average and Variance ROT 2012 Average ROT 65.62s 2013 ... Coordinate timing and duration of runway](https://reader034.vdocuments.net/reader034/viewer/2022042322/5f0c71827e708231d4356d7f/html5/thumbnails/28.jpg)
Enhancing of ATC Processes
• No Pre-Departure Coordination with adjacent ATC centres, reduce coordination workload
• Streamlined pre-departure clearance and reduce R/T clutter
• Maximising ATC productivity with technologies and advanced ATM Tools ATC Clearance through Data Link New ATC System - LORADS III
28
![Page 29: Establishing a Capacity Roadmap - CANSO CAAS... · SRQ. ROT (Seconds) Airlines (n>9) Average and Variance ROT 2012 Average ROT 65.62s 2013 ... Coordinate timing and duration of runway](https://reader034.vdocuments.net/reader034/viewer/2022042322/5f0c71827e708231d4356d7f/html5/thumbnails/29.jpg)
Capacity Roadmap
29
64
35
45
55
65
75
85
200000
300000
400000
500000Annual ATM
Phase 1
Phase 2
Phase 3
85 80 75 70 65 60 55 50
2018
![Page 30: Establishing a Capacity Roadmap - CANSO CAAS... · SRQ. ROT (Seconds) Airlines (n>9) Average and Variance ROT 2012 Average ROT 65.62s 2013 ... Coordinate timing and duration of runway](https://reader034.vdocuments.net/reader034/viewer/2022042322/5f0c71827e708231d4356d7f/html5/thumbnails/30.jpg)
Conclusion
• Taking a phased approach in growing capacity • Identify measures that can support capacity
enhancement • Plan and prepare implementation, taking into
considerations procedures, resources, training, etc. • Measure effectiveness of initiatives using metrics such
as ROT performance, delay, workload and feedback from users
• Collaboration with stakeholders to work together on capacity building journey.
30
![Page 31: Establishing a Capacity Roadmap - CANSO CAAS... · SRQ. ROT (Seconds) Airlines (n>9) Average and Variance ROT 2012 Average ROT 65.62s 2013 ... Coordinate timing and duration of runway](https://reader034.vdocuments.net/reader034/viewer/2022042322/5f0c71827e708231d4356d7f/html5/thumbnails/31.jpg)