es(tim)
DESCRIPTION
TRANSCRIPT
![Page 1: Es(tim)](https://reader035.vdocuments.net/reader035/viewer/2022080209/54c2d91b4a79597a368b4672/html5/thumbnails/1.jpg)
Flood Prevention
![Page 2: Es(tim)](https://reader035.vdocuments.net/reader035/viewer/2022080209/54c2d91b4a79597a368b4672/html5/thumbnails/2.jpg)
The idea of flood prevention
• Drainage Channels
• Flood Pumping
• Flood Storage
![Page 3: Es(tim)](https://reader035.vdocuments.net/reader035/viewer/2022080209/54c2d91b4a79597a368b4672/html5/thumbnails/3.jpg)
The major drainage chan-nels in NNT• Sham Chun River
• Ng Tung River
• Sheung Yue River
![Page 4: Es(tim)](https://reader035.vdocuments.net/reader035/viewer/2022080209/54c2d91b4a79597a368b4672/html5/thumbnails/4.jpg)
The function of the flood pump-ing station and floodwater storage pond• Collect rainwater within the village
• Pump out the water collected in the pond
• Convey the water to a floodwater from storage pond
![Page 5: Es(tim)](https://reader035.vdocuments.net/reader035/viewer/2022080209/54c2d91b4a79597a368b4672/html5/thumbnails/5.jpg)
Before the improvement•
Flood
ing
is alw
ays
ap
pearin
g in
NN
T
•
![Page 6: Es(tim)](https://reader035.vdocuments.net/reader035/viewer/2022080209/54c2d91b4a79597a368b4672/html5/thumbnails/6.jpg)
After the improvement
• The trained Shenzhen River section has attained the required drainage capacity of a 50-year return period.
• The flooding problems in San Tin, Fanling, Sheung Shui and Ta Kwu Ling area can be resolved.
![Page 7: Es(tim)](https://reader035.vdocuments.net/reader035/viewer/2022080209/54c2d91b4a79597a368b4672/html5/thumbnails/7.jpg)
Before Rehabilitation Works at River IndusBefore Rehabilitation Works at River Beas
![Page 8: Es(tim)](https://reader035.vdocuments.net/reader035/viewer/2022080209/54c2d91b4a79597a368b4672/html5/thumbnails/8.jpg)
The efficiency of the food preven-tion