Dist Co Rte PostMile Nickname Type of Project Contract No Location Type of Work Estimate Cost Range (x $1,000) Work Days Range Proposed Ad Comments Hot Mix Asphalt (tons) Rubber HMA (tons) PCC (cy) AB (cy) Steel (lbs) ImportB orrow (cy) Road Excavat ion (cy) 01 HUM 211 R074.4/ 079.2 No Nick MAINTE NANCE 010A1504 IN HUMBOLDT COUNTY FROM FERNDALE TO FERNBRIDGE 900 5/1/2012 01 HUM 299 000.0/R00 5.9 No Nick MAINTE NANCE 010A2004 IN HUMBOLDT COUNTY NEAR ARCATA ON ROUTE 299 FROM ROUTE 101 TO 0.4 MI EAST OF BLUE LAKE UNDERCROSSING AND ON ROUTE 101 AT TRINIDAD ROAD UNDERCROSSING 950 5/1/2012 01 HUM 101 069.9/ 074.8 Replace AC Surfacing MAINTE NANCE 010A2104 IN HUMBOLDT COUNTY NEAR EUREKA FROM 0.7 MILE SOUTH OF FIELDS LANDING OVERHEAD TO HERRICK AVENUE OVERCROSSING 950 4/1/2012 01 MEN 020 R000.0/R0 00.1 Fort Bragg ADA SHOPP 010A2304 IN MENDOCINO COUNTY NEAR FORT BRAGG FROM THE JUNCTION OF ROUTE 1 AND 20 TO 0.1 MI EAST OF THE JUNCTION OF ROUTE 1 AND 20 434 6/23/2012 01 HUM 101 088.2/ 088.3 Arcata Curve Improvemen t SHOPP 010A2504 IN HUMBOLDT COUNTY NEAR ARCATA AT THE ROUTE 101299 JUNCTION 320 10/15/2012 01 HUM 299 019.3/ 019.8 Acorn Curve SHOPP 010A3604 IN HUMBOLDT COUNTY ABOUT 14 MILES EAST OF BLUE LAKE FROM 0.3 MILE EAST TO 0.8 MILE EAST OF BAIR ROAD 2,834 2/1/2014 01 HUM 255 000.2/ 001.3 No Nick SHOPP 010A3804 IN HUMBOLDT COUNTY IN AND NEAR EUREKA AT VARIOUS LOCATIONS FROM EUREKA CHANNEL BRIDGE TO SAMOA CHANNEL BRIDGE Repair Bridge,Rehabilitat e Bridge Deck,Replace Joint Seals 1,894 150 10/17/2012 Polyester Concrete Overlay on all three bridges 01 VAR C09 99 VAR/ No Nick MAINTE NANCE 010A3904 IN DEL NORTE & HUMBOLDT COUNTIES AT VARIOUS LOCATIONS Rehabilitate Bridge Deck,Replace Bridge 686 0 4/15/2013 14 Bridges

Upload: nguyenkiet

Post on 19-Dec-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Dist Co Rte PostMile NicknameType of Project

Contract No

Location Type of Work

Estimate Cost Range (x $1,000)

Work Days Range

Proposed Ad

CommentsHot Mix Asphalt (tons)

Rubber HMA (tons)

PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)

Road Excavation (cy)

01  HUM  211 R074.4/ 079.2 No Nick 

MAINTENANCE 

01‐0A1504 

IN HUMBOLDT COUNTY FROM FERNDALE TO FERNBRIDGE   900 5/1/2012

01  HUM  299 000.0/R005.9 No Nick 

MAINTENANCE 

01‐0A2004 

IN HUMBOLDT COUNTY NEAR ARCATA ON ROUTE 299 FROM ROUTE 101 TO 0.4 MI EAST OF BLUE LAKE UNDERCROSSING AND ON ROUTE 101 AT TRINIDAD ROAD UNDERCROSSING  950 5/1/2012

01  HUM  101 069.9/ 074.8

Replace AC Surfacing 

MAINTENANCE 

01‐0A2104 

IN HUMBOLDT COUNTY NEAR EUREKA FROM 0.7 MILE SOUTH OF FIELDS LANDING OVERHEAD TO HERRICK AVENUE OVERCROSSING   950 4/1/2012

01  MEN  020 R000.0/R000.1

Fort Bragg ADA  SHOPP 

01‐0A2304 

IN MENDOCINO COUNTY NEAR FORT BRAGG FROM THE JUNCTION OF ROUTE 1 AND 20 TO 0.1 MI EAST OF THE JUNCTION OF ROUTE 1 AND 20   434 6/23/2012

01  HUM  101 088.2/ 088.3

Arcata Curve Improvement  SHOPP 

01‐0A2504 

IN HUMBOLDT COUNTY NEAR ARCATA AT THE ROUTE 101‐299 JUNCTION   320 10/15/2012

01  HUM  299 019.3/ 019.8 Acorn Curve  SHOPP 

01‐0A3604 

IN HUMBOLDT COUNTY ABOUT 14 MILES EAST OF BLUE LAKE FROM 0.3 MILE EAST TO 0.8 MILE EAST OF BAIR ROAD   2,834 2/1/2014

01  HUM  255 000.2/ 001.3 No Nick  SHOPP 

01‐0A3804 

IN HUMBOLDT COUNTY IN AND NEAR EUREKA AT VARIOUS LOCATIONS FROM EUREKA CHANNEL BRIDGE TO SAMOA CHANNEL BRIDGE  

Repair Bridge,Rehabilitate Bridge Deck,Replace Joint Seals  1,894 150 10/17/2012

Polyester Concrete Overlay on all three bridges 

01  VAR C0999  VAR/ No Nick 

MAINTENANCE 

01‐0A3904 

IN DEL NORTE & HUMBOLDT COUNTIES AT VARIOUS LOCATIONS  

Rehabilitate Bridge Deck,Replace Bridge  686 0 4/15/2013 14 Bridges 

Dist Co Rte PostMile NicknameType of Project

Contract No

Location Type of Work

Estimate Cost Range (x $1,000)

Work Days Range

Proposed Ad

CommentsHot Mix Asphalt (tons)

Rubber HMA (tons)

PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)

Road Excavation (cy)

01  HUM C0999  VAR/ No Nick 

MAINTENANCE 

01‐0A4004 

IN HUMBOLDT COUNTY ON ROUTES 96, 169, 200 & 299 AT VARIOUS LOCATIONS  

Repair Bridge,Rehabilitate Bridge  190 0 4/26/2012 7 Locations 

01  MEN  101  R089.2/ No Nick MAINTENANCE 

01‐0A4104 

IN MENDOCINO COUNTY NEAR LEGGETT AT CEDAR CREEK CULVERT   Modify Culverts  639 0 5/3/2013

01  MEN C0999  VAR/ No Nick 

MAINTENANCE 

01‐0A4204 

IN MENDOCINO COUNTY ON ROUTES 101 AND 253 AT VARIOUS LOCATIONS  

Repair Bridge,Rehabilitate Bridge  706 50 12/15/2012 14 Structures 

01  LAK C0999  VAR/

Bridge Repair 

MAINTENANCE 

01‐0A4304 

IN LAKE COUNTY ON ROUTES 20 & 29 AT VARIOUS LOCATIONS  

Repair Bridge,Rehabilitate Bridge  345 80 1/1/2013 20 Bridges 

01  MEN C0999  VAR/ No Nick 

MAINTENANCE 

01‐0A4404 

IN MENDOCINO COUNTY ON VARIOUS ROUTES AND AT VARIOUS LOCATIONS  

Clean and Paint Bridge  1,853 200 12/15/2012 10 Bridges 

01  HUM C0999  VAR/ No Nick 

MAINTENANCE 

01‐0A4504 

IN HUMBOLDT COUNTY ON VARIOUS ROUTES AND AT VARIOUS LOCATIONS  

Clean and Paint Bridge  1,763 150 12/15/2012 6 Bridges 

01  VAR C0999  VAR/ No Nick 

MAINTENANCE 

01‐0A4604 

IN HUMBOLDT AND MENDOCINO COUNTIES AT VARIOUS LOCATIONS   377 9/1/2013

01  VAR C0999  VAR/ No Nick 

MAINTENANCE 

01‐0A4704 

IN MENDOCINO AND LAKE COUNTIES AT VARIOUS LOCATIONS   295 9/1/2013

01  HUM  299 025.0/ 025.7

Circle Point Curve  SHOPP 

01‐0A4904 

IN HUMBOLDT COUNTY ABOUT 13 MILES WEST OF WILLOW CREEK FROM 0.4 MILES EAST TO 1.1 MILES EAST OF CHEZEM ROAD   3,800 1/1/2014

01  MEN  001 042.5/ 044.4 No Nick  SHOPP 

01‐0A5904 

IN MENDOCINO COUNTY NEAR ELK AT SALMON CREEK BRIDGE #10‐134 AND AT ALBION RIVER BRIDGE #10‐136  

Repair Bridge,Clean and Paint Bridge  3,731 0 5/1/2012 Clean & Paint 

01  VAR C0099  VAR/ No Nick 

MAINTENANCE 

01‐0A6804 

IN HUMBOLDT AND LAKE COUNTIES AT VARIOUS LOCATIONS   250 9/1/2012

Dist Co Rte PostMile NicknameType of Project

Contract No

Location Type of Work

Estimate Cost Range (x $1,000)

Work Days Range

Proposed Ad

CommentsHot Mix Asphalt (tons)

Rubber HMA (tons)

PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)

Road Excavation (cy)

01  MEN  101 081.4/R084.7 No Nick 

MAINTENANCE 

01‐0A7004 

IN MENDOCINO COUNTY NEAR LEGGETT FROM 0.1 MI SOUTH OF RATTLESNAKE CREEK BRIDGE #10‐0027 TO CUMMINGS ROAD UNDERCROSSING   2,000 2/7/2012

01  MEN  020 007.0/ 017.3 Men 20 

MAINTENANCE 

01‐0A7304 

IN MENDOCINO COUNTY NEAR FORT BRAGG FROM 10.3 MILES WEST OF CHAMBERLAIN CREEK BRIDGE TO CHAMBERLAIN CREEK BRIDGE   2,000 3/1/2012

01  DN  101 012.7/ 015.5 DN 101 

MAINTENANCE 

01‐0A7404 

IN DEL NORTE COUNTY NEAR KLAMATH FROM WILSON CREEK BRIDGE TO 2.8 MILES NORTH OF WILSON CREEK BRIDGE   2,500 3/1/2012

01  HUM  255 000.5/ 008.3

255/101 Bond 

MAINTENANCE 

01‐0A7804 

IN HUMBOLDT COUNTY IN AND NEAR EUREKA AND ARCATA FROM EUREKA CHANNEL BRIDGE TO 0.1 MILE SOUTH OF K STREET   2,690 8/15/2012

01  MEN  128 026.8/ 030.7

Robinson Creek Rubberized Gap 

MAINTENANCE 

01‐0A8004 

IN MENDOCINO COUNTY AT BOONVILLE FROM 0.2 MILE EAST OF PEACHLAND ROAD TO ROBINSON CREEK BRIDGE   1,428 7/1/2012

01  MEN C0999  VAR/ No Nick 

MAINTENANCE 

01‐0A8104 

IN MENDOCINO COUNTY ON ROUTE 1 AT VARIOUS LOCATIONS   347 8/1/2013

01  VAR CO999  VAR/

Men 101, VAR 

MAINTENANCE 

01‐0A8504 

IN HUMBOLDT AND MENDOCINO COUNTIES AT GARBERVILLE MAINTENANCE PARK AND RIDE AND AT EMPIRE CAMP SAFETY ROADSIDE REST AREA   280 6/1/2012

01  LAK  020 013.5/ 031.4

LAK‐20 CAPM  SHOPP 

01‐0B0004 

IN LAKE COUNTY IN & NEAR LUCERNE FROM 0.1 MI WEST OF SAYRE AVE TO 0.2 MI WEST OF JUNCTION ROUTE 53   21,190 2/1/2014

Dist Co Rte PostMile NicknameType of Project

Contract No

Location Type of Work

Estimate Cost Range (x $1,000)

Work Days Range

Proposed Ad

CommentsHot Mix Asphalt (tons)

Rubber HMA (tons)

PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)

Road Excavation (cy)

01  HUM  101 086.3/ 087.8

Arcata Cable Median Barrier  SHOPP 

01‐0B1004 

IN HUMBOLDT COUNTY IN ARCATA FROM THE 11TH STREET OVERCROSSING #2‐424 TO THE ARCATA OVERHEAD #4‐79   772 3/1/2013

01  HUM  101 054.3/ 056.8

Eel River to Van Duzen Median Barrier  SHOPP 

01‐0B1904 

IN HUMBOLDT COUNTY NEAR RIO DELL FROM THE EEL RIVER BRIDGE #4‐16 TO 0.3 MILE SOUTH OF VAN DUZEN RIVER BRIDGE   950 5/1/2013

01  DN  101 012.2/ 040.1 No Nick  SHOPP 

01‐0B2304 

IN DEL NORTE COUNTY AT WILSON CREEK BRIDGE #01‐5, SMITH RIVER BRIDGE #1 ‐20 AND AT ROWDY CREEK BRIDGE #1‐23   1,034 8/1/2013

01  HUM C0999  VAR/ No Nick 

MAINTENANCE 

01‐0B2404 

IN HUMBOLDT COUNTY AT VARIOUS LOCATIONS   571 8/1/2013

01  DN  101 015.1/ 015.3

Last Chance Slips  SHOPP 

01‐0B2704 

IN DEL NORTE COUNTY ABOUT 10 MILES SOUTH OF CRESCENT CITY FROM 1.3 TO 1.5 MILES NORTH OF RUDISILL ROAD   4,390 3/17/2014

01  DN  101  017.5/Historic Log Fill  SHOPP 

01‐0B2804 

IN DEL NORTE COUNTY ABOUT 10 MILES SOUTH OF CRESCENT CITY AT 2.8 MILES NORTH OF MILL CREEK PARK ENTRANCE RD#8068   1,650 3/17/2014

01  DN  101 021.7/ 022.9

Hamilton 2 Slip Repair  SHOPP 

01‐0B2904 

IN DEL NORTE COUNTY NEAR CRESCENT CITY FROM 1 MILE SOUTH TO 0.2 MI NORTH OF HAMILTON ROAD #8070   1,000 9/1/2013

01  DN  101  022.0/

South Hamilton Slipout  SHOPP 

01‐0B3004 

IN DEL NORTE COUNTY NEAR CRESCENT CITY AT 0.6 MI SOUTH OF HAMILTON ROAD #8070   1,500 12/1/2013

Dist Co Rte PostMile NicknameType of Project

Contract No

Location Type of Work

Estimate Cost Range (x $1,000)

Work Days Range

Proposed Ad

CommentsHot Mix Asphalt (tons)

Rubber HMA (tons)

PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)

Road Excavation (cy)

01  DN  199  008.7/

Patrick Creek Slipout  SHOPP 

01‐0B3104 

IN DEL NORTE COUNTY NEAR PATRICKS CREEK AT 2.3 MILES SOUTH OF HARDSCRABBLE CR BR #1‐8 AND AT 0.3 MI SOUTH OF PATRICKS CR CAMPGROUND   1,250 12/1/2013

01  DN  199  024.6/Middle Fork Wall  SHOPP 

01‐0B3204 

IN DEL NORTE COUNTY NEAR PATRICKS CREEK AT 0.6 MI NORTH OF MID FK SMITH RIVER BR #1‐15   3,000 12/1/2013

01  DN  199  026.3/Siskiyou Fork Slipout  SHOPP 

01‐0B3304 

IN DEL NORTE COUNTY NEAR PATRICKS CREEK AT 0.9 MI NORTH OF SISKIYOU FORK RD   850 12/1/2013

01  HUM  036 022.8/ 027.7

Larabe 3 Slip Repair  SHOPP 

01‐0B3404 

IN HUMBOLDT COUNTY NEAR SWAINS FLAT FROM 1.3 MILES WEST TO 3.9 MILES WEST OF VAN DUZEN RIVER BR#4‐293   1,410 9/1/2013

01  HUM  036  030.2/ Maple Wall  SHOPP 01‐0B3504 

IN HUMBOLDT COUNTY NEAR BRIDGEVILLE AT 0.1 MI WEST OF MCCLELLAN MTN RD #7F010   1,350 12/1/2013

01  HUM  036 035.5/ 040.5

Dinsmore Slipouts/Sinks  SHOPP 

01‐0B3604 

IN HUMBOLDT COUNTY NEAR DINSMORE FROM 0.1 MI EAST OF SFK VAN DUZEN RIVER BR#4‐119 TO 0.1 MI EAST OF VAN DUZEN RIVER BR#4‐129   4,630 9/1/2013

01  HUM  036  044.4/ Cobb Slide  SHOPP 01‐0B3704 

IN HUMBOLDT COUNTY NEAR DINSMORE AT 1.2 MILES WEST OF THE HUMBOLDT‐ TRINITY COUNTY LINE   1,600 12/1/2013

01  HUM  096  004.1/Pipeline Slide  SHOPP 

01‐0B3804 

IN HUMBOLDT COUNTY NEAR WILLOW CREEK AT 1.0 MILES EAST OF PIPELINE OC #4‐100   1,600 12/1/2013

01  HUM  096 008.5/ 008.7

Hoopa Vista Point Slide  SHOPP 

01‐0B3904 

IN HUMBOLDT COUNTY NEAR WILLOW CREEK FROM 0.2 TO 0.4 MI EAST OF END SIDEHILL VIADUCT2 #4‐289   8,000 12/1/2013

Dist Co Rte PostMile NicknameType of Project

Contract No

Location Type of Work

Estimate Cost Range (x $1,000)

Work Days Range

Proposed Ad

CommentsHot Mix Asphalt (tons)

Rubber HMA (tons)

PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)

Road Excavation (cy)

01  HUM  101  R015.0/

So. Hum Storm Repairs  SHOPP 

01‐0B4004 

IN HUMBOLDT COUNTY NEAR REDWAY AT 1.5 MILES SOUTH OF HURLBUTT UC# 4‐213 AND AT 1.1 MILES SOUTH OF WILLIFORD RD UC# 4‐117   2,180 12/1/2013

01  HUM  101  R040.9/Redcrest Slide  SHOPP 

01‐0B4104 

IN HUMBOLDT COUNTY NEAR REDCREST AT 1.1 MILES NORTH OF REDCREST NB ONRAMP   1,450 9/1/2013

01  HUM  101  110.6/Lagoons Slip / Slide  SHOPP 

01‐0B4204 

IN HUMBOLDT COUNTY NEAR TRINIDAD AT 1.9 MILES SOUTH OF KANE ROAD AND AT 1.3 MILES NORTH OF KANE ROAD   1,950 3/17/2014

01  HUM  101 111.4/ 111.6

Big Lagoon Wall  SHOPP 

01‐0B4304 

IN HUMBOLDT COUNTY NEAR BIG LAGOON FROM 1.9 TO 2.1 MILES NORTH OF GEORGIA PACIFIC RD   4,500 12/1/2013

01  HUM  169 026.4/ 029.9

Weitchpec Slipouts  SHOPP 

01‐0B4404 

IN HUMBOLDT COUNTY NEAR WEITCHPEC FROM 0.6 MI WEST OF MINERS CREEK BR #4‐299 TO MARTINS FERRY BR#4‐223   2,770 12/16/2013

01  HUM  299 R010.7/R026.1

299 Slip / Slides  SHOPP 

01‐0B4504 

IN HUMBOLDT COUNTY NEAR BLUE LAKE FROM 0.3 MI WEST OF N FORK MAD RIVER BR#4‐194 TO 1.3 MILES WEST OF OLD THREE CR RD#6L250   2,560 12/1/2013

01  HUM  299  032.0/Willow Creek Wall  SHOPP 

01‐0B4604 

IN HUMBOLDT COUNTY NEAR WILLOW CREEK AT 1.2 MILES WEST OF EAST FORK WILLOW CREEK BR#4‐115   1,350 12/1/2013

01  MEN  001  035.7/Satori Gulch Slip  SHOPP 

01‐0B4704 

IN MENDOCINO COUNTY NEAR ELK AT 1.8 MILES NORTH OF PHILO GREENWOOD RD‐ 132   450 12/1/2013

01  MEN  101 003.7/ 005.3

Peregrine Slides  SHOPP 

01‐0B5004 

IN MENDOCINO COUNTY NEAR HOPLAND FROM 0.6 MI NORTH OF COMMINSKY STA RD‐103 TO 0.6 MI NORTH OF PIETA CR BRIDGE #10‐83   7,100 12/1/2013

Dist Co Rte PostMile NicknameType of Project

Contract No

Location Type of Work

Estimate Cost Range (x $1,000)

Work Days Range

Proposed Ad

CommentsHot Mix Asphalt (tons)

Rubber HMA (tons)

PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)

Road Excavation (cy)

01  MEN  101 R087.4/R100.4

MEN 101 Pushup and Slips  SHOPP 

01‐0B5104 

IN MENDOCINO COUNTY ABOUT 18 MILES NORTH OF LAYTONVILLE FROM 0.3 MI SOUTH OF THE ROUTE 101/271 JUNCTION TO RED MOUNTAIN CREEK BR#10‐35   2,550 12/1/2013

01  MEN  128 039.5/ 039.8

Beebe Creek Slip and Slide  SHOPP 

01‐0B5204 

IN MENDOCINO COUNTY NEAR YORKVILLE FROM 0.7 TO 1.0 MILES EAST OF BEEBE CR BR#10‐52   3,800 12/1/2013

01  MEN  162 013.9/ 022.7

Dos Rios Slips  SHOPP 

01‐0B5404 

IN MENDOCINO COUNTY NEAR DOS RIOS FROM 1.2 MILES WEST OF MID FK EEL RIVER #10‐252 TO 2.8 MILES EAST OF SAND BANK CREEK   1,750 12/1/2013

01  MEN  162  016.1/Middle Way Wall  SHOPP 

01‐0B5504 

IN MENDOCINO COUNTY NEAR DOS RIOS AT 0.9 MI EAST OF LAYTONVILLE‐DOS RIOS   2,800 12/1/2013

01  MEN  253 001.5/ 001.8

Boonville Slide  SHOPP 

01‐0B5604 

IN MENDOCINO COUNTY NEAR BOONVILLE FROM 0.2 MI WEST TO 0.1 MI EAST OF SINGLY CATTLE PASS   650 12/1/2013

01  MEN  253  006.8/253 Slip Wall  SHOPP 

01‐0B5704 

IN MENDOCINO COUNTY NEAR BOONVILLE AT 3.4 MILES EAST OF SODA CREEK BR# 10‐229   2,500 12/1/2013

01  DN  101 022.5/ 023.0

Hamilton Road HFST  SHOPP 

01‐0B6304 

IN DEL NORTE COUNTY NEAR CRESCENT CITY FROM 0.2 MI SOUTH TO 0.3 MI NORTH OF HAMILTON ROAD INTERSECTION   1,020 7/1/2012

01  HUM  101 079.9/ 085.5 No Nick  SHOPP 

01‐0B7004 

IN HUMBOLDT COUNTY NEAR EUREKA FROM EUREKA SLOUGH BRIDGES (#4‐22) TO JUST SOUTH OF THE ROUTE 101/255 SEPARATIONS (#4‐49)   460 5/15/2012

01  HUM  096 023.1/ 029.9 No Nick 

MAINTENANCE 

01‐0B7704 

IN HUMBOLDT COUNTY NEAR WEITCHPEC FROM KLAMATH RIVER BRIDGE #4‐144 TO SLATE CREEK BRIDGE   600 5/1/2013

Dist Co Rte PostMile NicknameType of Project

Contract No

Location Type of Work

Estimate Cost Range (x $1,000)

Work Days Range

Proposed Ad

CommentsHot Mix Asphalt (tons)

Rubber HMA (tons)

PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)

Road Excavation (cy)

01  VAR C0999  VAR/ No Nick 

MAINTENANCE 

01‐0B7904 

IN HUMBOLDT AND MENDOCINO COUNTIES AT VARIOUS LOCATIONS   260 7/1/2013

01  MEN  001 040.3/ 043.7 No Nick 

MAINTENANCE 

01‐0B8004 

IN MENDOCINO COUNTY NEAR ALBION FROM NAVARRO RIVER BRIDGE TO ALBION RIVER BRIDGE   1,000 2/1/2013

01  MEN  101 R084.7/T091.3 No Nick 

MAINTENANCE 

01‐0B8104 

IN MENDOCINO COUNTY NEAR LEGGETT FROM CUMMINGS ROAD UNDERCROSSING TO 0.6 MILE SOUTH OF JITNEY GULCH BRIDGE   1,300 2/1/2013

01  MEN  101 R043.1/ 049.0

Willits Bypass  STIP 

01‐262004 

IN AND NEAR WILLITS FROM 1.3 KM SOUTH OF HAEHL OVERHEAD TO 2.9 KM SOUTH OF REYNOLDS HIGHWAY  

Asphalt Concrete Surfacing,Bridge,Bridge Railing,Concrete Barrier,Culverts,Culverts,Drainage,Earthwork,Electrical Facilities,Erosion Control,Expressway,Fence,Flashing Beacons,Reconstruct Freeway,Freeway and Structures,Grading and Paving,Guard Railing,Interchange,Lighting,Overcrossing,Overhead,Pavement Markers,Pavement Markings,Ramp,Re 126,929 520 5/1/2012 82,000 153,000 34,800 120,000 8,000,000 700,000 960,000

01  HUM  255  007.7/

MAD RIVER MITIGATION 1  SHOPP 

01‐296114 

IN HUMBOLDT COUNTY NEAR ARCATA AT MCDANIEL SLU BRIDGE #4‐222   500 6/15/2013

Dist Co Rte PostMile NicknameType of Project

Contract No

Location Type of Work

Estimate Cost Range (x $1,000)

Work Days Range

Proposed Ad

CommentsHot Mix Asphalt (tons)

Rubber HMA (tons)

PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)

Road Excavation (cy)

01  HUM  299  R004.2/

MAD RIVER MITIGATION 2  SHOPP 

01‐296124 

IN HUMBOLDT COUNTY NEAR BLUE LAKE AT MILL CREEK BRIDGE #4‐188   530 5/15/2012

01  HUM  036 R005.8/ 007.6

Carlotta Shoulders  SHOPP 

01‐323304 

IN HUMBOLDT COUNTY AT CARLOTTA FROM WILSON LANE TO 0.5 MILE WEST OF CUMMINGS CREEK ROAD   Widening  350 165 8/1/2012 9,800 20 3,000 5,400

01  HUM  101 079.8/ 087.8

Eureka/Arcata CAPM  SHOPP 

01‐363304 

IN HUMBOLDT COUNTY FROM EUREKA SLOUGH BRIDGE #4‐22 TO ARCATA OVERHEAD BRIDGE #4‐79 (KP 128.4/141.3)   15,340 5/15/2012

01  MEN  128 031.0/ 038.8

CAPM Men‐128 #1  SHOPP 

01‐363604 

IN MENDOCINO COUNTY NEAR BOONVILLE FROM 0.3 MI EAST OF ROBINSON CREEK BRIDGE TO 2.6 MI EAST OF MAPLE CREEK BRIDGE (KP 49.9/62.4)  4,000 5/15/2011

01  MEN  128 038.8/ 050.9

CAPM Men‐128 #2  SHOPP 

01‐363704 

IN MENDOCINO COUNTY NEAR YORKVILLE FROM BEEBE CREEK BRIDGE TO THE SONOMA COUNTY LINE   5,900 5/15/2011

01  MEN  020 013.8/R032.0

50 culverts at various locations  SHOPP 

01‐364324 

IN MENDOCINO COUNTY NEAR WHISKEY SPRING AND WILLITS FROM SOUTH OF SOUTH FORK NOYO RIVER TO WEST OF CROPLEY LANE; ALSO ON ROUTE 1 AND ON ROUTE 101  Replace Culverts  1,883 100 9/1/2012

Rehabilitate 49 drainage systems. Estimated 2350 LF of alternative pipe culvert. 

01  MEN  128 048.6/ 050.3

21 Culverts ‐ Men 128, 253, Minor A Split Project  SHOPP 

01‐378124 

IN MENDOCINO COUNTY NEAR YORKVILLE ON RTE 128 ROM 0.2 TO 1.9 MILES EAST OF MOUNTAIN HOUSE RD AND ON ROUTE 253 FROM 0.2 MI WEST TO 9.9 MI EAST OF SODA CREEK BR #10‐229  Replace Culverts  824 70 6/26/2012

Rehabilitate 21 drainage systems. Estimated 1000 LF of alternative pipe culvert. 

01  MEN  128 030.1/ 048.4

22 Culverts ‐ Men 128 Minor A Split Project  SHOPP 

01‐378134 

IN MENDOCINO COUNTY NEAR BOONVILLE FROM 0.5 MILE EAST OF THE ROUTE 253 /128 JUNCTION TO MOUNTAIN HOUSE RD   Replace Culverts  1,000 70 8/1/2012

Rehabilitate 22 drainage systems. Estimated 1000 LF of alternative pipe culvert. 

Dist Co Rte PostMile NicknameType of Project

Contract No

Location Type of Work

Estimate Cost Range (x $1,000)

Work Days Range

Proposed Ad

CommentsHot Mix Asphalt (tons)

Rubber HMA (tons)

PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)

Road Excavation (cy)

01  MEN  128 010.6/ 023.3

21 Culverts ‐ Men 128 Minor A Split Project  SHOPP 

01‐378144 

IN MENDOCINO COUNTY NEAR PHILO FROM 1.0 MILE WEST OF NAVARRO RIDGE ROAD TO INDIAN CREEK BRIDGE #10‐67   950 2/15/2013

01  MEN  128 014.3/ 040.6

51 Culverts ‐ Middle Navarro River Split  SHOPP 

01‐378164 

IN MENDOCINO COUNTY AT VARIOUS LOCATIONS   Replace Culverts  4,715 170 9/1/2012

Rebabilitate 51 draiinage systems. Estimated 2500 LF of alternative pipe 

01  MEN  128 000.2/ 011.1

76 Culverts ‐ Lower Navarro River Split  SHOPP 

01‐378174 

NEAR NAVARRO FROM EAST TO ROUTE 1 TO WEST OF FLYNN CREEK BRIDGE REHAB CULVERTS   Replace Culverts  3,500 150 9/1/2013

Rehabilitate 76 drainage systems. Estimated 4000 LF of alternative pipe 

01  MEN  001 088.7/ 092.8

Dunn Creek Fish Passage  SHOPP 

01‐385724 

IN MENDOCINO COUNTY NEAR ROCKPORT, 2.0 MILES NORTH OF USAL ROAD  

Replace Culverts,Repair Drainage  3,530

120 ‐ 240 7/15/2012

May involve culvert replacement or bridge structure  150 400 4,000

01  MEN  175 000.0/ 009.9 No Nick  SHOPP 

01‐398704 

IN MENDOCINO & LAKE COUNTIES NEAR HOPLAND FROM THE JUNCTION OF ROUTES 101 & 175 TO 0.6 MI EAST OF THE MENDOCINO/LAKE COUNTY LINE  

Asphalt Concrete Surfacing  6,180 40 5/15/2011 32,000 0 0 0 3,500 0

01  LAK  175 004.9/ 028.0

CAPM Lak‐175  SHOPP 

01‐399404 

IN LAKE COUNTY NEAR KELSEYVILLE FROM 4.9 MI EAST OF THE MENDOCINO/ LAKE COUNTY LINE TO ROUTE 175/29 JUNCTION.  

Asphalt Concrete Surfacing  12,380 30 5/15/2011 24,500 70,100 0 0 900 0

01  MEN  101 046.2/R084.6

36 LOCATIONS  SHOPP 

01‐402804 

IN MENDOCINO COUNTY AT VARIOUS LOCATIONS FROM 0.3 MILES NORTH OF BAECHTEL CREEK BRIDGE TO 0.1 MILES SOUTH OF CUMMUNGS RD UNDERCROSSING   Culverts  1,600 80 10/31/2012

Quantities are for PA&ED phase.  550 1,150

01  HUM  254 006.8/ 042.1

Avenue Culvert Rehab  SHOPP 

01‐409504 

IN HUMBOLDT COUNTY NEAR MIRANDA FROM 2.3 MILES SOUTH OF MIRANDA POST OFFICE TO 0.9 MILE SOUTH OF BEAR CREEK BRIDGE #4‐12   881 8/1/2013

Dist Co Rte PostMile NicknameType of Project

Contract No

Location Type of Work

Estimate Cost Range (x $1,000)

Work Days Range

Proposed Ad

CommentsHot Mix Asphalt (tons)

Rubber HMA (tons)

PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)

Road Excavation (cy)

01  MEN  101  R084.0/Rattlesnake 2  SHOPP 

01‐412214 

IN MENDOCINO COUNTY ABOUT 7.1 MILE SOUTH OF LEGGETT AT RATTLESNAKE CREEK  

Reconstruct Culverts,Erosion Control,Establish Existing Planting,Rock  659

76 to 90 12/24/2012

Repair invert slad of 18' w x 17.5' h x 245' l culvert. Repair upsteam debris rack. Access to the  0 0 0 0 12,000 0 0

01  HUM  299 020.2/ 020.5

Green Point Sink  SHOPP 

01‐423704 

IN HUMBOLDT COUNTY ABOUT 14 MILES EAST OF BLUE LAKE FROM 0.2 TO 0.5 MI WEST OF CHEZEM ROAD #6L200   11,500 8/1/2012

01  HUM  169 033.5/ 033.8

Weitchpec Curve  SHOPP 

01‐430504 

IN HUMBOLDT COUNTY ABOUT 13.6 KM EAST OF PECWAN FROM 0.5 KM TO 0.3 KM WEST OF JUNCTION 96/169 (KP 54.0/54.1)  

Realign Curve,Widening  500 100 4/1/2014

Quantities from preliminary estimate dated 11/06.  780 340 105 2,360

01  HUM  254 000.8/ 043.1

Avenue of the Giants‐Four Bridges Project  SHOPP 

01‐430604 

IN HUMBOLDT COUNTY AT VARIOUS LOCATIONS FROM OHMAN CREEK BRIDGE #4‐7 TO BEAR CREEK BRIDGE #4‐12 (KP 1.3/69.4)   9,510 1/1/2014

01  HUM  101 002.3/ 066.3

10 LOCATIONS (101=6; 254=4)  SHOPP 

01‐431704 

IN HUMBOLDT COUNTY AT VARIOUS LOCATIONS   Culverts  514 50 4/1/2012

Culvert Project (10 locations)‐ AC, striping,earthwork fully compensated into the price of  22 52

01  HUM  299  030.7/Low Gap Buttress  SHOPP 

01‐437404 

IN HUMBOLDT COUNTY ABOUT 8 MI WEST OF WILLOW CREEK AT 2.5 MI WEST OF E FORK WILLOW CREEK BRIDGE  

Repair Slope,Repair Roadway  280 60‐120 10/1/2012

Scope will be defined when geotechnical work is complete. 

01  DN  199 026.3/ 026.5

Washington Curve  SHOPP 

01‐448304 

NEAR PATRICK CREEK FROM 2.3 KM TO 2.5 KM NORTH OF MIDDLE FORK SMITH RIVER BR #1‐16 (KP 42.3/42.6)   1,520 4/1/2013

01  DN  199 022.7/ 023.0 Narrows  SHOPP 

01‐450004 

IN DEL NORTE COUNTY NEAR PATRICKS CREEK FROM 0.6 MI TO 0.9 MI NORTH OF PATRICKS CREEK ROAD (KP 36.5/37.0)   Widening  2,540 120 4/1/2012

Difficult Excavation of rock. Blasting and/or pre‐splitting  750 240 3,000

Dist Co Rte PostMile NicknameType of Project

Contract No

Location Type of Work

Estimate Cost Range (x $1,000)

Work Days Range

Proposed Ad

CommentsHot Mix Asphalt (tons)

Rubber HMA (tons)

PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)

Road Excavation (cy)

01  HUM  169 013.6/ 033.8

Widening and MBGR  SHOPP 

01‐450904 

IN HUMBOLDT COUNTY AT VARIOUS LOCATIONS FROM 0.8 MILES WEST OF PECWAN CREEK BRIDGE TO 1 MILE EAST OF CAPPELL CREEK BRIDGE  

Asphalt Concrete Surfacing,Modify Drainage,Earthwork,Erosion Control,Grading and Paving,Guard Railing,Pavement Markers,Pavement Markings,Realign Curve,Retaining  4,916 350 5/15/2013

Widen and MBGR construction  1,100 0 0 20 56,000 130 280

01  DN  197 003.2/ 004.0 Ruby 2  SHOPP 

01‐454904 

IN DEL NORTE COUNTY NEAR FORT DICK FROM 1.3 MI TO 0.5 MI SOUTH OF RUBY VANDEVENTER COUNTY PARK (PM 3.2/4.0)   Widening  910 65 4/1/2013 4,590 1,060 717 450 720

01  HUM C0999  VAR/ No Nick 

MAINTENANCE 

01‐459104 

IN HUMBOLDT COUNTY FROM DIMMICK RD UNDERCROSSING TO APPROXIMATELY 1 MI NORTH OF ENGLEWOOD PARK UC AT VARIOUS LOCATIONS.   Repair Culverts  300 40 6/15/2013

250 lf 24" pipe liner. 345 lf 36" pipe liner. 

01  HUM  101 098.1/ 100.7

Hum 101 Seismic Retrofit  SHOPP 

01‐459704 

IN HUMBOLDT COUNTY AT VARIOUS LOCATIONS FROM WESTHAVEN DRIVE UC TO TRINIDAD ROAD UNDERCROSSING   8,688 3/1/2013

01  HUM CO999  VAR/

Hum Various MBGR  SHOPP 

01‐463904 

IN HUMBOLDT COUNTY AT VARIOUS LOCATIONS  

Replace Guard Railing  8,200

100‐160 11/1/2012

01  HUM  101 001.1/ 002.2

Richardson Grove STAA  SHOPP 

01‐464804 

IN HUMBOLDT COUNTY NEAR GARBERVILLE FROM 0.5 MI SOUTH TO 0.5 MI NORTH OF RICHARDSON GROVE UC  

Asphalt Concrete Surfacing,Erosion Control,Grading and Paving,Realign Curve,Realignment,Retaining Wall  5,500

170‐190 4/18/2011

01  DN  101 R002.7/ 008.8 Klamath TE  STIP 

01‐465304 

IN DEL NORTE COUNTY NEAR KLAMATH FROM 2.4 MILES NORTH OF NB ON NEWTON B DRURY PARKWAY TO NEW HUNTER CREEK ROAD.   257 5/1/2012

Dist Co Rte PostMile NicknameType of Project

Contract No

Location Type of Work

Estimate Cost Range (x $1,000)

Work Days Range

Proposed Ad

CommentsHot Mix Asphalt (tons)

Rubber HMA (tons)

PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)

Road Excavation (cy)

01  MEN  001 014.9/ 021.7

Pac Coast Bike Trail  STIP 

01‐465804 

IN MENDOCINO COUNTY IN AND NEAR POINT ARENA AT VARIOUS LOCATIONS FROM 0.1 MILE SOUTH OF MILL STREET TO 0.3 MILE NORTH OF KINNEY ROAD   515 2/1/2012

01  MEN  001 021.0/ 024.6

PAC COAST BIKE TRAIL III  STIP 

01‐465904 

IN MENDOCINO COUNTY BETWEEN MANCHESTER AND POMO LAKE DR   532 11/1/2013

01  HUM  299  R008.5/Blue Lake Sink  SHOPP 

01‐474404 

IN HUMBOLDT COUNTY NEAR BLUE LAKE AT 1.8 MI EAST OF BUCKLEY ROAD AND AT 0.1 MILE EAST OF OLD THREE CREEKS ROAD  

Asphalt Concrete Surfacing,Replace Culverts,Culverts,Drainage,Erosion Control,Grading and Paving,Realign Curve,Repair  5,004 200 12/1/2011

Dewater Slide with drainage galleries and horizontal drains.  2,200 1,800 5,000

01  HUM  299  R008.5/ No Nick  SHOPP 01‐474414 

IN HUMBOLDT COUNTY NEAR BLUE LAKE AT 1.8 MILES EAST OF BUCKLEY ROAD   5,000 12/1/2011

01  MEN  001  070.5/Seaside Beach  SHOPP 

01‐474904 

IN MENDOCINO COUNTY NEAR WESTPORT FROM 0.8 MI NORTH OF TEN MILE RIVER BRIDGE TO 4.2 MI SOUTH OF BLUE SLIDE GULCH BRIDGE  

Repair Slope,Repair Storm Damage  3,800 45 12/2/2012 125 125 0 375 1,000 700 800

01  HUM  254 011.0/ 011.1 No Nick  SHOPP 

01‐475024 

IN HUMBOLDT COUNTY NEAR MIRANDA AT 0.2 MILE NORTH OF BRIDGE CREEK  

Asphalt Concrete Surfacing,Replace Culverts,Repair Storm Damage,Reconstr 781 40 8/1/2012 1,100 800

01  MEN  128 034.5/ 035.5 SMOOT Sink  SHOPP 

01‐476604 

IN MENDOCINO COUNTY ABOUT 4.9 MILES EAST OF BOONVILLE FROM SHEARING CREEK BRIDGE #10‐59 TO 0.7 MI WEST OF MAPLE CREEK BRIDGE #10‐55  

Repair Storm Damage  9,485 180 10/1/2012

600 LF of tie‐back wall w/ H = approx. 12'. Also, 150‐foot long RSP buttress.  2,000 0 200 1,500 20,000 0 9,000

01  DN  101  R004.0/

Klamath River ‐ Hinge‐201.110  SHOPP 

01‐476904 

IN DEL NORTE NEAR KLAMATH AT THE KLAMATH RIVER BRIDGE #01‐0028   3,429

180‐200 10/1/2012

This is exclusively structure work  410 61,800

Dist Co Rte PostMile NicknameType of Project

Contract No

Location Type of Work

Estimate Cost Range (x $1,000)

Work Days Range

Proposed Ad

CommentsHot Mix Asphalt (tons)

Rubber HMA (tons)

PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)

Road Excavation (cy)

01  DN  199 020.5/ 025.7

Realignment and Widening at Patrick  STIP 

01‐479404 

IN DEL NORTE COUNTY NEAR PATRICK CREEK FROM 1.5 MI SOUTH OF PATRICK CREEK TO 5 MI NORTH OF PATRICK CREEK.   12,960 10/30/2013

01  DN  197  004.5/ Ruby 1  SHOPP 01‐481104 

IN DEL NORTE COUNTY NEAR FORT DICK AT THE ENTRANCE TO RUBY VAN DEVENTER COUNTY PARK   Widening  480 50 8/15/2012 816 0 1 96 4 130

01  MEN  001 040.1/ 040.9

Albion/Navarro MBGR  SHOPP 

01‐484704 

IN MENDOCINO COUNTY NEAR ALBION ON ROUTE 1 FROM 0.1 MILE SOUTH OF NAVARRO RIVER BRIDGE TO 0.6 MILE NORTH OF NAVARRO RIVER BRIDGE AND ON ROUTE 128 AT NAVARRO RIVER BR 

Asphalt Concrete Surfacing,Guard Railing,Widening  2,500 80 3/15/2013 1,400 1,300 3,000

01  LAK  020 008.1/ 008.6

20/29 Roundabout  SHOPP 

01‐488604 

IN LAKE COUNTY NEAR UPPER LAKE AT THE INTERSECTION OF ROUTES 20/29  

Asphalt Concrete Surfacing,Channelize,Culverts,Drainage,Earthwork,Electrical Facilities,Erosion Control,Flashing Beacons,Grading and Paving,Highway Planting,Lighting,P 3,900 110 12/1/2013

Construct Roundabout or signalize intersection  4,000 300 4,400 2,500 400

01  MEN  020 019.9/ 026.3

James Creek OGFC  SHOPP 

01‐490704 

IN MENDOCINO COUNTY ABOUT 7 MILES WEST OF WILLITS FROM 0.1 MILE WEST TO 6.2 MILES EAST OF JAMES CREEK BRIDGE #10‐102  

Asphalt Concrete Surfacing  3,200 50‐70 3/15/2012

Rubberized hot mix asphalt open graded friction course  100 11,700 0 0 0 300 0

01  LAK  029 011.9/ 019.1 No Nick 

MAINTENANCE 

01‐491214 

IN LAKE COUNTY ON ROUTE 29 FROM COYOTE CREEK BRIDGE TO JUNCTION ROUTE 53   1,000 10/1/2012

01  DN  101 022.5/ 023.0

Hamilton Road Safety Project  SHOPP 

01‐495604 

IN DEL NORTE COUNTY NEAR CRESCENT CITY FROM 0.2 MI SOUTH TO 0.3 MI NORTH OF HAMILTON ROAD   7,300 9/1/2012

Dist Co Rte PostMile NicknameType of Project

Contract No

Location Type of Work

Estimate Cost Range (x $1,000)

Work Days Range

Proposed Ad

CommentsHot Mix Asphalt (tons)

Rubber HMA (tons)

PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)

Road Excavation (cy)

01  HUM  101  060.3/

Fortuna Maintenance  SHOPP 

01‐496504 

IN HUMBOLDT COUNTY IN FORTUNA AT THE FORTUNA MAINTENANCE STATION   1,880 2/1/2014

01  VAR C0999  VAR/ No Nick 

MAINTENANCE 

01‐496604 

IN HUMBOLDT & MENDOCINO COUNTIES ON ROUTES 101 & 271 AT VARIOUS LOCATIONS  

Repair Bridge Railing,Rehabilitate Bridge Deck,Replace Bridge  279 100 2/3/2012 13 Locations 

01  MEN  271  007.2/Leggett Ozone  SHOPP 

01‐497104 

IN MENDOCINO COUNTY NEAR LEGGETT AT THE LEGGETT MAINTENANCE STATION  

Maintenance Station  505 60‐100 6/15/2013

7/13/11 Project has not been desugned yet. Installation of ozone sparging 

01  MEN  001 002.3/ 002.5 Big Gulch  SHOPP 

01‐497714 

IN MENDOCINO COUNTY NEAR GUALALA FROM 0.1 TO 2.5 MI NORTH OF BIG GULCH ROAD RD# 543  

Repair Culverts,Guard Railing,Repair Storm Damage  1,830 160 11/1/2013 Working Days TBD. 

01  DN  101 000.9/ 020.3 No Nick 

MAINTENANCE 

01‐499104 

IN DEL NORTE COUNTY FROM THE HUMBOLDT/DEL NORTE COUNTY LINE TO 3.0 MILES SOUTH OF MILL CREEK ROAD AT VARIOUS LOCATIONS   300 4/1/2013

02  TEH  005  010.5/Corning NB & SB SRRAs  SHOPP 

02‐0E3604 

IN TEHAMA COUNTY NEAR CORNING AT CORNING SAFETY ROADSIDE REST AREA  

Replace Building,Erosion Control,Highway Planting,Replace Irrigation System,Replace  6,000 300 6/18/2012 0 0 650 650 25,000 0 0

02  SHA  005  062.3/

Castella Vista Point‐STIP TE  STIP 

02‐0E4004 

IN SHASTA COUNTY NEAR DUNSMUIR AT CASTELLA VISTA POINT   370 8/15/2012

02  SIS  097 002.5/ 002.9

Carrick Subdivision Two‐Way Left Turn  STIP 

02‐0E4405 

IN SISKIYOU COUNTY NEAR WEED FROM 0.1 MILE SOUTH OF MAPLE AVENUE TO 0.1 MILE NORTH OF FIRST AVENUE.   118 11/12/2012

Dist Co Rte PostMile NicknameType of Project

Contract No

Location Type of Work

Estimate Cost Range (x $1,000)

Work Days Range

Proposed Ad

CommentsHot Mix Asphalt (tons)

Rubber HMA (tons)

PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)

Road Excavation (cy)

02  TEH  005 R000.0/ 042.1

Teh 5 Native Landscaping  STIP 

02‐0E4504 

IN TEHAMA COUNTY AT VARIOUS LOCATIONS FROM 0.2 MILE SOUTH OF LIBERAL AVENUE OVERCROSSING TO 0.1 MILE SOUTH OF BOWMAN ROAD OVERCROSSING  1,400 8/15/2012

02  SIS  003 047.7/ 048.5

Juniper Dr. Left Turn Lane (Yreka)  STIP 

02‐0E8405 

IN SISKIYOU COUNTY IN YREKA FROM 4‐H WAY TO LAWRENCE LANE.   118 9/28/2012

02  MOD  299  022.4/Canby Maint Station HAR  STIP 

02‐1E0004 

IN MODOC COUNTY AT CANBY AT CANBY MAINTENANCE STATION   300 1/20/2014

02  PLU  910  000.0/Plu 36 & 89 SuperHAR,  SHOPP 

02‐1E2404 

IN PLUMAS COUNTY AT VARIOUS LOCATIONS.   658 3/5/2012

02  MOD  299 039.3/ 040.6

Alturas 299 Improvements  STIP 

02‐299714 

IN MODOC COUNTY IN AND NEAR ALTURAS FROM 0.2 MILE WEST OF MILL STREET TO ROUTE 299/395 SEPARATION   2,483 11/19/2013

02  PLU  070 050.3/ 053.0

Spring Garden Br  SHOPP 

02‐2C0904 

IN PLUMAS COUNTY NEAR QUINCY FROM 0.3 MI WEST TO 0.5 MI EAST OF SPRING GARDEN BOH BR #09‐0062   15,400 2/17/2014

02  TEH  099 013.9/ 014.3

North Fork Mill Cr Bridge  SHOPP 

02‐2C1124 

IN TEHAMA COUNTY NEAR LOS MOLINOS AT 0.1 MILE NORTH OF NORTH FORK MILL CREEK.   Replace Bridge  3,860 180 7/23/2012 500 36,000 40

02  TEH  036  091.4/Mill Crk Br Scour  SHOPP 

02‐2C2254 

IN TEHAMA COUNTY ABOUT 8 MILES EAST OF MINERAL AT MILL CREEK BRIDGE   1,090 12/10/2012

02  TRI  299 000.4/ 000.8

Whole Enchilada  SHOPP 

02‐2E3504 

NEAR SALYER FROM 0.7 MILE TO 0.2 MILE WEST OF CAMBEL RIDGE ROAD.  

Culverts,Earthwork,Realign Curve,Retaining  2,385 90 10/15/2012

Proposing 3‐retaining walls ‐ Nail Wall, MSE wall, and  4,000 2,500 10,000 40,000

02  SHA  299 004.3/ 005.5

Twin Gulches Curve Improvemen SHOPP 

02‐2E5104 

IN SHASTA COUNTY ABOUT 17.3 MILES WEST OF REDDING FROM 4.3 TO 5.5 MILES EAST OF TRINITY COUNTY  

Culverts,Earthwork,Guard Railing,Realignment  8,866 240 6/18/2012

Expect pre‐cast culverts under deep fills  7,500 4,500 600,000

02  TEH  036 039.7/ 040.2

Baker Curve Improvement  SHOPP 

02‐2E6204 

IN TEHAMA COUNTY NEAR RED BLUFF FROM BAKER ROAD TO 0.5 MILE EAST OF BAKER ROAD.  

Culverts,Earthwork,Realignment,Rock Slope Protection  2,500 70 11/26/2012 5,500 2,500 15,000 30,000

Dist Co Rte PostMile NicknameType of Project

Contract No

Location Type of Work

Estimate Cost Range (x $1,000)

Work Days Range

Proposed Ad

CommentsHot Mix Asphalt (tons)

Rubber HMA (tons)

PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)

Road Excavation (cy)

02  TEH  032 022.3/ 022.8

Deer Crk Curve Improvement  SHOPP 

02‐2E7304 

NEAR FROEST RANCH FROM EAST OF DEER CREEK BRIDGE #08‐0072 TO DEER CREEK BRIDGE. CURVE IMPROVEMENT AND SHOULDER WIDENING.   1,900 3/11/2013

02  SHA  299 083.0/ 084.0

SR299 Hat Creek Curves  SHOPP 

02‐2E7404 

NEAR BURNEY FROM 1.0 MILE WEST OF HAT CREEK BRIDGE TO HAT CREEK BRIDGE. ________________________________ CURVE IMPROVEMENT.  2,417 4/21/2014

02  SIE  395 000.0/ 000.1

Scott Road Intersection Access  SHOPP 

02‐2E8204 

IN SIERRA COUNTY NEAR HALLELUJAH JUNCTION FROM NEVADA STATE LINE TO 0.1 MILE NORTH OF NEVADA STATE LINE  

Earthwork,Widening  220 20 3/18/2013

I can't believe I wasted my time with this!  100 50 50

02  SHA  005  031.1/

O'Brien SRRA Updated  SHOPP 

02‐2e8704 

IN SHASTA COUNTY ABOUT 9 MILES NORTH OF SHASTA LAKE CITY AT ___ O'BRIEN SAFETY ROADSIDE REST AREA   319 7/30/2012

02  SIS  005  045.7/Truck Wash Rack 

MAINTENANCE 

02‐2E9604 

IN SISKIYOU COUNTY IN YREKA AT 0.7 MILE SOUTH OF OBERLIN ROAD UNDERCROSSING   250 4/2/2012

02  TRI  299 051.4/ 051.8

Weaverville Sidewalk Restoration  SHOPP 

02‐2E9905 

IN TRINITY COUNTY AT WEAVERVILLE FROM COURT STREET TO BREMER STREET   30 3/15/2012

02  SHA  299 030.3/ 040.7 Bella Diddy  SHOPP 

02‐360704 

IN SHASTA COUNTY AT AND NEAR BELLA VISTA FROM 0.3 MILE EAST OF INTERMOUNTAIN DRIVE TO 0.3 MILE WEST OF BACKBONE RIDGE ROAD  

Asphalt Concrete Surfacing,Replace Bridge,Modify Culverts  26,995 240 1/7/2013 71,000 32,000 141,000

02  TRI  299  023.3/FRENCH CR BR  SHOPP 

02‐374304 

IN TRINITY COUNTY NEAR DEL LOMA AT BIG FRENCH CREEK BRIDGE (NO. 5.8)  

Modify Bridge,Replace Bridge  1,196 100 4/27/2012 300,000 7,000 300,000

Dist Co Rte PostMile NicknameType of Project

Contract No

Location Type of Work

Estimate Cost Range (x $1,000)

Work Days Range

Proposed Ad

CommentsHot Mix Asphalt (tons)

Rubber HMA (tons)

PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)

Road Excavation (cy)

02  LAS  395 061.6/ 076.6

Johnstonville PFR  SHOPP 

02‐3C0714 

IN AND NEAR JOHNSTONVILLE FROM 0.4 MILE SOUTH OF BANGHAM LANE TO 0.3 MILE SOUTH OF WENDEL RD.   16,500 11/12/2012

02  LAS  395 056.5/R061.0

Bass Hill CAPM  SHOPP 

02‐3C0724 

IN LASSEN COUNTY AT AND NEAR JOHN STONVILLE FROM 0.1 MILE NORTH OF SUNNYSIDE ROAD TO 0.1 MILE SOUTH OF ROUTE 36.   2,500 4/11/2012

02  PLU  070 000.1/ 035.1

MBGR‐BUTTE CO. LINE TO RT. 89  SHOPP 

02‐3C3004 

IN PLUMAS COUNTY AT VARIOUS LOCATIONS FROM GRIZZLY CREEK BRIDGE TO 0.1 MILE WEST OF SPANISH CREEK BRIDGE.  

Reconstruct Guard Railing  8,000 300 5/14/2012 3,300 450

02  SIS  005 R050.6/R052.1

Yreka Shasta River Bridges  SHOPP 

02‐3C9204 

IN SISKIYOU COUNTY NEAR YREKA FROM 0.6 MILE SOUTH OF SHASTA RIVER BRIDGES TO 0.2 MILE SOUTH OF VISTA POINT  

Modify Bridge,Replace Bridge Railing,Reconstruct Drainage,Earthwork,Freeway and Structures,Replace Guard Railing,Pavement  5,363 360 5/1/2012

Crossovers for traffic handling will be constructed by the Anderson Grade Project. Traffic handling for the first season will be done by the Anderson Grade contractor.  500 200 356,720 500

02  SIS  096 023.2/ 105.0

Jefferson's Culverts  SHOPP 

02‐3E0704 

IN SISKIYOU COUNTY AT VARIOUS LOCATIONS FROM SWILLUP CREEK BRIDGE TO 1.6 MILES EAST OF ROUTE 263   700 4/16/2012

02  SIS  096  068.9/

Hamburg Shoulder Widening  SHOPP 

02‐3E0804 

IN SISKIYOU COUNTY AT HAMBURG AT 2.3 MILES WEST OF SCOTT RIVER BRIDGE   Widening  520 20‐30 11/15/2012 1,500 1,400 4,000

02  TEH  099 012.3/ 012.6

Teh‐99 Bke/Ped Paved Shoulder  SHOPP 

02‐3E5604 

IN TEHAMA COUNTY AT LOS MOLINOS FROM ARAMAYO WAY TO LOS MOLINOS CREEK BRIDGE  

Asphalt Concrete Surfacing,Drainage,Widening  350

100‐150 2/20/2012 4,200 300 3,700 3,500

02  SHA  299 024.0/ 024.8 RDI 2  SHOPP 

02‐3E6004 

IN SHASTA COUNTY AT VARIOUS LOCATIONS.   901 4/16/2012

Dist Co Rte PostMile NicknameType of Project

Contract No

Location Type of Work

Estimate Cost Range (x $1,000)

Work Days Range

Proposed Ad

CommentsHot Mix Asphalt (tons)

Rubber HMA (tons)

PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)

Road Excavation (cy)

02  PLU  070  009.0/

Las/ Plu Bridge Maintenanc

MAINTENANCE 

02‐3E6104 

IN LASSEN AND PLUMAS COUNTIES AT VARIOUS LOCATIONS.   1,405 2/27/2012

02  TEH  005  019.2/

Sha & Teh Cos Br Maint 

MAINTENANCE 

02‐3E6404 

IN SHASTA AND TEHAMA COUNTIES AT VARIOUS LOCATIONS.   2,034 2/21/2012

02  SHA  910  000.1/Beaucoup Bridges  SHOPP 

02‐3E6504 

IN SISKIYOU AND SHASTA COUNTIES AT VARIOUS LOCATIONS. REHABILITATE BRIDGE DECKS.   3,305 1/7/2013

02  MOD  299 035.9/ 036.2

Heard Ranch  SHOPP 

02‐3E6904 

IN MODOC COUNTY NEAR ALTURAS FROM 1.2 MILES TO 0.9 MILES WEST OF CROWDER FLAT ROAD. SHOULDER WIDENING.   1,293 11/26/2012

02  VAR  036 030.4/ 030.7

Blue Pt Curve  SHOPP 

02‐3E7104 

NEAR FOREST GLEN FROM 1.7 MILES TO 2.1 MILES EAST OF ROUTE 3. IMPROVE ROAD ALIGNMENT.   960 3/18/2013

02  TRI  299 036.6/ 036.8

North Fork Curve  SHOPP 

02‐3E8204 

IN TRINITY COUNTY NEAR HELENA FROM 0.3 MILE TO 0.1 MILE WEST OF NORTH FORK TRINITY RIVER BRIDGE   211 4/16/2012

02  SHA  299 018.3/ 020.2

Old Shasta Overlay 

MAINTENANCE 

02‐3E8704 

IN SHASTA COUNTY AT SHASTA FROM 0.1 MILE WEST OF TRINITY ALLEY TO 0.1 MILE WEST OF IRON MOUNTAIN   750 2/27/2012

02  SHA  005 028.8/ 039.2

Pit River to Antlers Overlay 

MAINTENANCE 

02‐3E8904 

IN SHASTA COUNTY ABOUT 6 MILES NORTH OF SHASTA LAKE CITY FROM PIT RIVER BRIDGE TO 0.2 MILE NORTH OF ANTLERS SUMMIT OVERCROSSING   4,700 2/13/2012

02  MOD  299 033.5/ 037.5

Rattlesnake Crk CIR 

MAINTENANCE 

02‐3E9604 

IN MODOC COUNTY NEAR ALTURAS FROM 1.8 MILES WEST OF COUNTY ROAD 75 TO 0.3 MILE WEST OF RATTLESNAKE CREEK BRIDGE.   1,700 3/12/2013

Dist Co Rte PostMile NicknameType of Project

Contract No

Location Type of Work

Estimate Cost Range (x $1,000)

Work Days Range

Proposed Ad

CommentsHot Mix Asphalt (tons)

Rubber HMA (tons)

PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)

Road Excavation (cy)

02  TEH  099 011.6/ 012.6

Los Molinos Phase 2 

99 CORRIDOR 

02‐4C58U4 

IN TEHAMA COUNTY AT LOS MOLINOS FROM 0.1 MILE SOUTH OF PALM STREET TO LOS MOLINOS CREEK.   3,054 2/27/2012

02  TRI  003 007.1/ 007.7

Hayfork II TE Bike Lane  STIP 

02‐4C9604 

IN TRINITY COUNTY AT HAYFORK FROM MAIN STREET TO 0.1 MILE NORTH OF FOREST AVENUE.   970 6/11/2012

02  SIS  005 023.3/ 023.9

Edgewood Chain‐on Area  SHOPP 

02‐4E1404 

IN SISKIYOU COUNTY NEAR WEED FROM 0.3 MILE TO 0.9 MILE NORTH OF EDGEWOOD UNDERCROSSING.   450 10/7/2013

02  SIS  005 025.8/ 025.9

SIS‐5 Monitoring Well  SHOPP 

02‐4E2305 

IN SISKIYOU COUNTY ABOUT 6 MILES NORTH OF WEED AT WEED SAFETY ROAD‐ SIDE REST AREA.   15 2/15/2012

02  SHA  299 083.0/ 083.8

Hat Creek Truck Climbing  SHOPP 

02‐4E2704 

IN SHASTA COUNTY NEAR FALL RIVER MILLS AT 0.2 MILE WEST OF HAT CREEK BRIDGE.   648 4/21/2014

02  SIS  005 046.8/ 062.1

Yreka Chain‐On Areas  SHOPP 

02‐4E2804 

IN SISKIYOU COUNTY IN AND NEAR YREKA FROM YREKA CREEK BRIDGE TO 0.2 MI SO OF MINER ST UNDERCROSSING & FRM 0.8 MI SO TO 0.4 MI SO OF DITCH CREEK ROAD OVERCROSSING.  1,000 7/22/2013

02  TRI  299 045.5/ 046.2

Poison Pond Curve Improvemen SHOPP 

02‐4E3104 

NEAR WEAVERVILLE FROM 2.0 MILES TO 1.2 MILES WEST OF CASTLE ROAD.   945 10/7/2013

02  LAS  395  070.1/

Honey Lake Wetlands Mit Bank  SHOPP 

02‐4E3205 

IN LASSEN COUNTY AT STANDISH AT BUNTINGVILLE ROAD.   30 5/22/2012

02  LAS  147 000.5/ 001.2

Clear Creek 3R  SHOPP 

02‐4E3404 

IN LASSEN COUNTY NEAR WESTWOOD FROM 0.3 MILE NORTH TO 0.5 MILE SOUTH OF SPRING CREEK BRIDGE.   1,000 2/25/2013

02  PLU  070 019.0/ 019.1

PLU 70 Slip‐out  SHOPP 

02‐4E3504 

IN PLUMAS COUNTY AT RICH BAR AT 0.2 MILE EAST OF RICH BAR ROAD.   931 2/25/2014

Dist Co Rte PostMile NicknameType of Project

Contract No

Location Type of Work

Estimate Cost Range (x $1,000)

Work Days Range

Proposed Ad

CommentsHot Mix Asphalt (tons)

Rubber HMA (tons)

PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)

Road Excavation (cy)

02  PLU  070 023.8/ 023.9 Plu 70 RSP  SHOPP 

02‐4E3604 

IN PLUMAS COUNTY NEAR RICH BAR AT 0.1 MILE EAST OF RUSH CREEK ROAD.   575 2/25/2013

02  SHA  151 005.8/ 006.9

Shasta Dam Blvd CAPM  SHOPP 

02‐4E3804 

IN SHASTA COUNTY IN SHASTA LAKE CITY FROM LOCUST AVENUE TO ROUTE 5.   1,000 3/12/2012

02  SHA  005 025.7/ 026.0

Fawndale Drainage Restoration 

MAINTENANCE 

02‐4E4905 

IN SHASTA COUNTY NEAR SHASTA LAKE CITY FROM 0.3 MILE SOUTH OF FAWNDALE OVERCROSSING TO FAWNDALE OVERCROSSING   120 4/15/2012

02  SHA  910 000.1/ 000.2

Waterworks Park Fence Restoration 

MAINTENANCE 

02‐4E5005  120 3/15/2012

02  SIS  005 025.8/ 025.8

Weed SRRA Slurry Seal 

MAINTENANCE 

02‐4E5104 

IN SISKIYOU COUNTY NEAR WEED AT WEED SAFETY ROADSIDE REST AREA.   175 3/15/2012

02  SHA  044 021.1/ 021.3

Black Butte Rd LTL  SHOPP 

02‐4E5204 

IN SHASTA COUNTY ABOUT 10 MILES WEST OF SHINGLETOWN FROM 0.3 MILE TO 0.1 MILE WEST OF BLACK BUTTE ROAD.   530 2/4/2013

02  TRI  003 030.8/ 031.2

Weaverville Elementary School Sidewalks  SHOPP 

02‐4E6004 

IN TRINITY COUNTY AT WEAVERVILLE FROM TRINITY RIVER BRIDGE TO WASHINGTON STREET.   200 1/7/2014

02  SIS  096  056.0/Ft Goff Culvert  SHOPP 

02‐4E6304 

IN SISKIYOU COUNTY NEAR SEIAD VALLEY AT 3.5 MILES EAST OF THOMPSON CREEK BRIDGE   200 1/1/2014

02  TEH  005  034.3/

Herbert Miles SRRA Lighting  SHOPP 

02‐4E6605 

IN TEHAMA COUNTY ABOUT 8 MILES NORTH OF RED BLUFF AT HERBERT MILES SAFETY ROADSIDE REST AREA.   10 8/1/2012

02  SHA  299 018.4/ 018.7

Old Shasta Sidewalks  SHOPP 

02‐4E7004 

IN SHASTA COUNTY AT SHASTA FROM 0.1 MILE WEST OF FRENCH ALLEY TO RED BLUFF ROAD.   524 1/7/2014

Dist Co Rte PostMile NicknameType of Project

Contract No

Location Type of Work

Estimate Cost Range (x $1,000)

Work Days Range

Proposed Ad

CommentsHot Mix Asphalt (tons)

Rubber HMA (tons)

PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)

Road Excavation (cy)

02  SIS  161 009.0/ 011.3 161 Rehab  SHOPP 

02‐4E8004 

IN SISKIYOU COUNTY ABOUT 12 MILES EAST OF DORRIS FROM 2.2 MILES WEST TO 0.2 MILES EAST OF FUGATE ROAD.   80 8/5/2013

02  SHA  911 000.0/ 000.1

Pavement Marker Replacemen

MAINTENANCE 

02‐4E8404 

IN PLUMAS, SHASTA, AND SISKIYOU COUNTIES AT VARIOUS LOCATIONS.   300 2/27/2012

02  TEH  099 017.6/ 018.0

Lassen View Sch Flashing Beacons  SHOPP 

02‐4E9405 

IN TEHAMA COUNTY NEAR DAIRYVILLE FROM 65TH AVENUE TO ANTELOPE CREEK BRIDGE.   15 2/1/2013

03  PLA  267 000.4/ 001.2

Martis Creek Left Turn  SHOPP 

03‐0F0104 

NEAR TRUCKEE AT MARTIS CREEK LAKE ROAD   Widening  970 60 3/1/2012

03  PLA  080 000.8/ 002.3 No Nick  SHOPP 

03‐0F0904 

IN PLACER COUNTY ON ROUTE 80 AT VARIOUS LOCATIONS   200 3/1/2012

03  ED  050  R031.3/

Sly Creek Road UC Replacemen SHOPP 

03‐0F2204 

ABOUT 11.0 MILES EAST OF PLACERVILLE AT SLY PARK ROAD UNDERCROSSING 25‐42   5,807 2/15/2014

03  BUT  099  045.5/

Pine Creek Scour Mitigation  SHOPP 

03‐0F2605 

ABOUT 10 MILES NORTH OF CHICO AT PINE CREEK BRIDGE 12‐28   100 3/1/2013

03  ED  050 017.8/ 019.6

Coloma St. POC and Smith Flat UC Seismic  SHOPP 

03‐0F3004 

IN PLACERVILLE AT COLOMA STREET OVERCROSSING AND AT SMITH FLAT ROAD UNDERCROSSING   4,960 3/15/2013

03  GLE  045 003.1/ 007.5 No Nick  SHOPP 

03‐0F4804 

ON ROUTE 45 AT COUNTY ROAD 61 AND AT JUNCTION ROUTE 162 WEST AND ON ROUTE 162 AT COUNTY ROAD Z   140 3/1/2013

03  SAC  080 M008.1/M011.1

Sac 80 Bridge Rehab  SHOPP 

03‐0F6804 

IN AND NEAR SACRAMENTO AT NORTH AVENUE OVERCROSSING 24‐106 AND AT THE 80/244 SEPARATION BRIDGE 24‐292 R/L   1,500 1/15/2013

03  SUT  099 R019.5/R020.5

SR 99/113 Interchange 

99 CORRIDOR 

03‐1A4644 

NEAR TUDOR FROM 1.8 MILE NORTH OF WILSON ROAD TO 2.1 MILE SOUTH OF OBANION ROAD   15,000 7/18/2012

Dist Co Rte PostMile NicknameType of Project

Contract No

Location Type of Work

Estimate Cost Range (x $1,000)

Work Days Range

Proposed Ad

CommentsHot Mix Asphalt (tons)

Rubber HMA (tons)

PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)

Road Excavation (cy)

03  ED  050 067.6/ 072.9

Gateway to the Tahoe Basin  SHOPP 

03‐1A7314 

NEAR SOUTH LAKE TAHOE FROM JOHNSON PASS ROAD TO INCLINE ROAD   9,000 12/15/2012

03  ED  050 073.7/ 075.4

Airport to "Y" Junction  SHOPP 

03‐1A7324 

IN AND NEAR SOUTH LAKE TAHOE FROM SOUTH TAHOE AIRPORT ENTRANCE ROAD TO ROUTE 89 (KP 118.6/121.3)  

Asphalt Concrete Surfacing,Replace Culverts,Culverts,Repair Drainage,Earthwork,Erosion Control,Pavement Markers,Pavement  9,052 96 10/17/2012 4,400 978 650 1,640

03  ED  089 008.6/ 013.8

EIP ‐ Route 50 to Cascade Rd  SHOPP 

03‐1A8424 

IN AND NEAR SOUTH LAKE TAHOE FROM ROUTE 50 TO CASCADE ROAD  

Asphalt Concrete Surfacing,Modify Culverts,Replace Drainage,Earthwork,Erosion Control,Reconstruct Guard Railing,Pavement Markers,Pavement Markings,Rehabilitate  15,730 110 7/15/2013 14,050 520 5,600

03  ED  089 018.0/ 024.9 Meeks Bay  SHOPP 

03‐1A8444 

ABOUT 8.3 MILES NORTH OF SOUTH LAKE TAHOE FROM NORTH OF THE SIDEHILL VIADUCTS TO MEEKS CREEK  

Asphalt Concrete Surfacing,Replace Culverts,Reconstruct Drainage,Earthwork,Rock Slope  15,400 350 10/15/2012

This is a water quality improvement project which involves, culvert replacement, ditch  19,000 2,000 7,000 18,000

03  PLA  089 013.7/ 021.7

Squaw Valley to Nev Co Line  SHOPP 

03‐1E0004 

NEAR TRUCKEE FROM SQUAW VALLEY ROAD TO THE NEVADA COUNTY LINE   8,136 4/1/2012

03  BUT  070  028.2/

West Branch Feather River bridge  SHOPP 

03‐1E5104 

ABOUT 12.3 MILES EAST OF OROVILLE AT WEST BRANCH FEATHER RIVER BRIDGE #12‐0134  

Reconstruct Bridge  11,333

700‐800 6/15/2012

Temp. work Platforms ~ 200,000 sf  472,000

Dist Co Rte PostMile NicknameType of Project

Contract No

Location Type of Work

Estimate Cost Range (x $1,000)

Work Days Range

Proposed Ad

CommentsHot Mix Asphalt (tons)

Rubber HMA (tons)

PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)

Road Excavation (cy)

03  NEV  020 016.7/ 017.4 No Nick  SHOPP 

03‐1F0404 

IN NEVADA CITY FROM SACRAMENTO STREET OVERCROSSING TO UREN STREET AT JUNCTION ROUTE 49 NORTH   230 7/15/2011

03  SAC  050 007.0/ 007.5

Install guardrail  SHOPP 

03‐1F2504 

IN SACRAMENTO COUNTY AT VARIOUS LOCATIONS   250 3/1/2012

03  SIE  089 000.0/ 002.3

Two Wildlife Undercrossings  STIP 

03‐1F2604 

IN SIERRA COUNTY ON ROUTE 89 FROM NEVADA COUNTY LINE TO LITTLE TRUCKEE RIVER BRIDGE 13‐09   2,055 4/1/2014

03  GLE  005 000.0/ 029.0

GLEN‐5 Native Planting  STIP 

03‐1F2804 

IN GLENN COUNTY ON ROUTE 5 FROM COLUSA COUNTY LINE TO TEHEMA COUNTY LINE   626 11/15/2013

03  COL  005 000.0/ 034.0

COL‐5 Native Planting  STIP 

03‐1F2904 

IN COLUSA COUNTY ON ROUTE 5 FROM YOLO COUNTY LINE TO GLENN COUNTY LINE   626 11/15/2013

03  ED  193 018.6/ 018.8

Super Elevation  SHOPP 

03‐1F3304 

IN EL DORADO COUNTY FROM POSTMILE 18.6 TO 18.8   1,670 4/15/2013

03  SIE  089  015.6/ No Nick  SHOPP 03‐1F4905 

ABOUT 13.0 MILES NORTH OF TRUCKEE AT 0.5 MILE NORTH OF STATE ROUTE 49   130 11/1/2013

03  PLA  193  009.4/

Pla 193, Widen Dutch Ravine  SHOPP 

03‐1F5904 

ABOUT 8.9 MILES EAST OF LINCOLN AT 0.2 MILE WEST OF NEWCASTLE TUNNEL UNDERCROSSING   450 4/1/2013

03  ED  193  023.4/

ED 193 Reconstruct Embankmen SHOPP 

03‐1F6004 

NEAR PLACERVILLE ABOUT 2.0 MILES NORTH OF SOUTH FORK AMERICAN RIVER BRIDGE   880 4/15/2012

03  NEV  049 031.3/ 032.6

NEV 49 embankment repair and overlay  SHOPP 

03‐1F6204 

ABOUT 16 MILES NORTH OF NEVADA CITY FROM 1.3 MILES SOUTH OF MIDDLE YUBA RIVER BRIDGE 17‐09 TO NEVADA/YUBA COUNTY LINE   900 12/1/2012

03  NEV L5729 

Truckee Maintenena SHOPP 

03‐1F6904 

IN TRUCKEE AT THE TRUCKEE MAINTENANCE STATION   525 11/1/2013

Dist Co Rte PostMile NicknameType of Project

Contract No

Location Type of Work

Estimate Cost Range (x $1,000)

Work Days Range

Proposed Ad

CommentsHot Mix Asphalt (tons)

Rubber HMA (tons)

PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)

Road Excavation (cy)

03  COL  020 000.0/ 010.2

Colusa 20 CAPM  SHOPP 

03‐1F7404 

ABOUT 10 MILES WEST OF WILLIAMS FROM LAKE COUNTY LINE TO 6.8 MILES EAST OF ROUTE 16 SOUTH   9,800 8/15/2012

03  BUT L5703  No Nick  SHOPP 

03‐1F9004 

ON ROUTE 32 AT CHICO MAINTENANCE STATION   200 2/1/2013

03  NEV  049 004.5/ 005.8

Nev 49, Right Turn Pockets @ three locations  SHOPP 

03‐1F9104 

9 MILES SOUTH OF GRASS VALLEY AT CARRIAGE ROAD, LADYBIRD DRIVE, AND HOLCOMB/CHERRY CREEK ROAD   780 1/2/2013

03  SAC  104 000.0/ 000.1

104/99 Ped ADA Compliance  SHOPP 

03‐2E9204 

IN SACRAMENTO COUNTY ON SR 104 AT THE INTERSECTION OF EAST STOCKTON AND WEST STOCKTON BLVD   Modify Signals  1,000 TBD 3/29/2012

03  VAR  000 000.0/R022.9

COL 20 Upgrade G.R.  SHOPP 

03‐2F0004 

IN BUTTE,COLUSA,GLENN,SACRAMENTO, SUTTER, YOLO, AND YUBA COUNTIES AT VARIOUS LOCATIONS   7,000 11/1/2013

03  ED  049 031.0/ 031.2

ED 49,Turn Pocket at Rattlesnake  SHOPP 

03‐2F1504 

ABOUT 8.8 MILES SOUTH OF AUBURN AT RATTLESNAKE BAR ROAD   627 6/1/2013

03  COL  005 000.0/ 034.4 No Nick  SHOPP 

03‐2F1804 

IN COLUSA, GLEN, AND YOLO COUNTIES ON ROUTE 5 AT VARIOUS LOCATIONS   193 12/10/2011

03  PLA  080  034.9/Stabilize Cut Slope  SHOPP 

03‐2F2604 

NEAR COLFAX AT 0.1 MILE WEST OF LONG RAVINE UNDERCROSSING BRIDGE #1990   1,030 8/1/2012

03  PLA L5727 

Tahoe City Sandhouse  SHOPP 

03‐2F2804 

IN TAHOE CITY AT TAHOE CITY MAINTENANCE STATION   650 4/30/2012

03  BUT  070 009.2/ 017.0

But 70 Rehab. Pavement  SHOPP 

03‐2F3004 

IN AND NEAR OROVILLE FROM 0.1 MILE EAST OF PALERMO ROAD TO 0.4 MILE EAST OF GARDEN DRIVE OVERCROSSING   9,600 8/1/2012

Dist Co Rte PostMile NicknameType of Project

Contract No

Location Type of Work

Estimate Cost Range (x $1,000)

Work Days Range

Proposed Ad

CommentsHot Mix Asphalt (tons)

Rubber HMA (tons)

PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)

Road Excavation (cy)

03  ED  050  017.1/ No Nick  SHOPP 03‐2F3804 

IN PLACERVILLE AT PLACERVILLE DRIVE AND EASTBOUND ONRAMP TO ROUTE 050   200 4/1/2012

03  YOL  113 R000.3/R010.3

Upgrade ADA Curb Ramps  SHOPP 

03‐2F6704 

AT VARIOUS LOCATIONS IN AND NEAR DAVIS AND IN WOODLAND AT VARIOUS LOCATIONS FROM 0.3 MILE NORTH OF SOLANO COUNTY LINE TO EAST WOODLAND OVERHEAD  430 3/1/2012

03  SAC  051 005.3/ 005.6 No Nick  SHOPP 

03‐2F6904 

IN THE CITY AND COUNTY OF SACRAMENTO FROM 0.2 MILE SOUTH OF MARCONI AVENUE TO 0.1 MILE NORTH OF MARCONI AVENUE   250 5/1/2012

03  YOL  080 002.5/ 002.9

Yolo 80 Embankmen SHOPP 

03‐2F7004 

IN THE CITY OF DAVIS AT MACE BOULEVARD OVERCROSSING   950 5/1/2012

03  PLA  065 R007.7/M008.1 No Nick  SHOPP 

03‐2F8104 

IN AND NEAR ROSEVILLE AT BLUE OAKS BOULEVARD OVERCROSSING ONRAMPS   130 6/1/2012

03  SAC  099 035.4/ 036.0

Elverta Rd./99 Interchange 

99 Corridor 

03‐371504 

NEAR SACRAMENTO AT ELVERTA ROAD   24,876 4/12/2012

03  YOL  005 R006.4/R006.8

I5‐SR113 CONNECTOR  STIP 

03‐374224 

CONSTRUCT NORTHBOUND I‐5 TO SOUTHBOUND SR 113 DIRECT CONNECTOR (YOL‐5 KPR10.3/R10.9) &   37,311 12/1/2012

03  ED  050 075.4/ 077.3

U.S. 50 Phase 2 Water Qlty  SHOPP 

03‐3C3804 

IN SOUTH LAKE TAHOE FROM ROUTE 89 NORTH TO TROUT CREEK BRIDGE #25‐13   22,690 8/15/2013

03  PLA  080 008.1/ 037.8

9 Vertical Clearances for Permit Vehicles  SHOPP 

03‐3E1004 

IN AND NEAR LOOMIS AT VARIOUS LOCATIONS FROM BRACE ROAD OVERCROSSING TO MAGRA ROAD OVERCROSSING   26,000 2/1/2013

03  BUT  099 028.1/ 029.6

Butte Creek Bridge  SHOPP 

03‐3E6204 

NEAR CHICO FROM ESTATES DRIVE TO 0.4 MILE NORTH OF BUTTE CREEK BRIDGE 12‐126R   8,952 8/1/2012

Dist Co Rte PostMile NicknameType of Project

Contract No

Location Type of Work

Estimate Cost Range (x $1,000)

Work Days Range

Proposed Ad

CommentsHot Mix Asphalt (tons)

Rubber HMA (tons)

PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)

Road Excavation (cy)

03  ED  049 009.6/ 010.1

Overlay and Upgrade Drainage  SHOPP 

03‐3E6304 

FROM PLEASANT VALLEY ROAD NORTH TO 0.1 MILE SOUTH OF OAK DELL ROAD  

Replace Culverts,Modify Drainage,Grading  850 40 5/7/2012

Quantities are pre‐Project Report. Overlay is minimal if  74 100 5,000 1,300

03  BUT  032  R009.5/

Chico Complete Signal Modification SHOPP 

03‐3E9104 

IN CHICO AT 9TH AND MAIN STREET, AT 9TH AND OROVILLE STREET, AND AT PARK AVENUE AND HUMBOLDT AVENUE   800 4/15/2012

03  NEV  080 R012.3/ 013.4

Nev 80 Concrete Median Barrier  SHOPP 

03‐3F0304 

IN TRUCKEE FROM 0.9 MILE WEST OF DONNER PARK OVERCROSSING TO 0.1 MILE WEST OF CALIFORNIA AGRICULTURE INSPECTION STATION   712 1/1/2013

03  NEV L5917  15 5/

South Lake Tahoe City Wash Rack  SHOPP 

03‐3F3104 

AT THE SOUTH LAKE TAHOE AND TRUCKEE MAINTENANCE STATIONS   800 2/1/2013

03  SAC  050 014.1/ 023.1 No Nick 

MAINTENANCE 

03‐3M5704 

NEAR SACRAMENTO ON ROUTE 50 FROM 1.6 MILE EAST OF SUNRISE BOULEVARD TO EL DORADO COUNTY LINE AND ON ROUTE 51 FROM CAPITOL AVENUE TO 0.4 MILE NORTH OF EL CAMINO AVENUE  4,600 1/1/2014

03  BUT  099 044.5/ 046.0 No Nick 

MAINTENANCE 

03‐3M5804 

ABOUT 10 MILES NORTH OF CHICO FROM 0.2 MILE NORTH OF BROYLES ROAD TO TO TEHEMA COUNTY LINE   400 12/1/2012

03  SAC  160 005.9/L007.0 No Nick 

MAINTENANCE 

03‐3M7204 

NEAR ISLETON AT THE ISLETON BRIDGE AND AT THE THREE MILE SLOUGH BRIDGE  

Clean and Paint Sign Structure  6,000 280 3/1/2013 0 0 0 0 0 0

03  NEV  020 036.0/ 038.2 No Nick 

MAINTENANCE 

03‐3M8104 

IN NEVADA AND PLACER COUNTIES AT VARIOUS LOCATIONS   500 4/1/2012

03  ED  193 006.0/ 012.7 No Nick 

MAINTENANCE 

03‐3M9204 

FROM 0.2 MILE WEST OF SLIGER MINE ROAD TO GEORGETOWN   2,700 1/1/2014

Dist Co Rte PostMile NicknameType of Project

Contract No

Location Type of Work

Estimate Cost Range (x $1,000)

Work Days Range

Proposed Ad

CommentsHot Mix Asphalt (tons)

Rubber HMA (tons)

PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)

Road Excavation (cy)

03  PLA  049 003.1/ 007.5 No Nick 

MAINTENANCE 

03‐3M9304 

IN AND NEAR AUBURN FROM 0.1 MILE SOUTH OF ROUTE 80/49 SEPARATION TO WISE CANAL BRIDGE AND FROM 0.1 MILE NORTH OF WILLOW CREEK DRIVE TO 0.1 MILE NORTH OF DRY CREEK ROAD  675 3/1/2012

03  PLA  174 001.7/ 002.4 No Nick 

MAINTENANCE 

03‐3M9504 

NEAR COLFAX AT VARIOUS LOCATIONS FROM 0.1 MILE NORTH OF OLD GRASS VALLEY ROAD TO 0.4 MILE SOUTH OF BEAR RIVER BRIDGE   500 4/1/2012

03  SUT  099 000.0/ 001.6

RIEGO ROAD INTERCHANGE 

99 Corridor 

03‐406604 

IN SACRAMENTO AND SUTTER COUNTIES FROM 0.6 MILES SOUTH OF SUTTER COUNTY LINE TO 0.7 MILES NORTH OF RIEGO ROAD MITIGATED NEGATIVE DECLARATION 

Asphalt Concrete Surfacing,Bridge,Bridge Railing,Channelize,Culverts,Drainage,Earthwork,Electrical Facilities,Erosion Control,Establish Existing Planting,Fence,Grading and Paving,Guard Railing,Highway Planting,Interchange,Irrigation  22,000 400 5/1/2012 36,721 1,500 62,248 537,685 243,664 23,648

03  NEV  020 R013.6/R014.8

Dorsey Drive Interchange  STIP 

03‐412404 

NEAR GRASS VALLEY, AT DORSEY DRIVE OVERCROSSING.  

Interchange,Modify Roadway,Widenin 14,226 300 9/1/2012 20,000 0 16,000 100,000 0 50,000

03  SAC  160  L006.9/ No Nick  SHOPP 03‐4E3805 

NEAR ISLETON AT THREE MILE SLOUGH BRIDGE   100 2/1/2012

03  SIE  089 004.5/ 005.5

SIE‐89 Wildlife Crossing (Phase 2)  STIP 

03‐4E5004 

ABOUT 12.0 MILES NORTH OF TRUCKEE FROM 1.6 MILES NORTH OF LITTLE TRUCKEE RIVER BRIDGE TO 1.0 MILE SOUTH OF COTTONWOOD ROAD  

Fence,Rock Slope Protection  440 30 4/1/2013

Construct wildlife barrier channelization, such as fencing, RSP, slippery slope surface, etc. 

Dist Co Rte PostMile NicknameType of Project

Contract No

Location Type of Work

Estimate Cost Range (x $1,000)

Work Days Range

Proposed Ad

CommentsHot Mix Asphalt (tons)

Rubber HMA (tons)

PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)

Road Excavation (cy)

03  SIE  049 048.3/ 049.2

Lemon Canyon Road Culvert Upgrades  SHOPP 

03‐4E5404 

ABOUT 10 MILES SOUTH OF LOYALTON FROM 0.5 MILE TO 1.3 MILES NORTH OF LEMON CANYON ROAD  

Asphalt Concrete Surfacing,Culverts  1,000 50 11/1/2012

03  ED  049 003.7/ 003.9

ED 49 Correct Superelevati SHOPP 

03‐4E5904 

ON ROUTE 49 FROM POSTMILE 3.7 TO 3.9 IN THE VICINITY OF MICA STREET   1,495 2/15/2013

03  SAC  005  024.5/ No Nick  SHOPP 03‐4E7605 

IN SACRAMENTO, YOLO, AND PLACER COUNTIES AT VARIOUS LOCATIONS   90 3/1/2013

03  PLA  049  000.9/ No Nick  SHOPP 03‐4E9704 

NEAR AUBURN AT 1.0 MILE NORTH OF EL DORADO COUNTY LINE   147 4/1/2012

03  BUT  099  026.0/Butt 99 and Neal Rd  SHOPP 

03‐4E9904  NEAR CHICO AT NEAL ROAD   725 6/13/2012

03  NEV  020 027.6/ 038.0 No Nick 

MAINTENANCE 

03‐4M0704 

ABOUT 18 MILES EAST OF NEVADA CITY FROM MISSOURI BAR ROAD TO 0.4 MILE EAST OF EXCELSIOR POINT ROAD   500 5/1/2013

03  ED  050 051.6/ 053.2 No Nick 

MAINTENANCE 

03‐4M0804 

NEAR KYBURZ FROM 0.5 MILE WEST OF WRIGHTS LAKE ROAD TO 0.4 MILE WEST OF 41 MILE TRACT ROAD   500 2/1/2013

03  COL  005 R021.0/R034.4

RAC OVERLAY 

MAINTENANCE 

03‐4M1204 

NEAR WILLIAMS FROM 1.7 MILES NORTH OF FRESHWATER ROAD OVERCROSSING TO THE GLENN COUNTY LINE   6,000 4/1/2012

03  BUT  032 011.7/R023.5

PCC PROFILE GRINDING 

MAINTENANCE 

03‐4M1604 

NEAR CHICO FROM BRUCE ROAD TO 0.4 MILE WEST OF NOPEL AVENUE   3,300 1/1/2014

03  GLE  045 000.0/ 023.2 No Nick 

MAINTENANCE 

03‐4M1804 

AT AND NEAR HAMILTON CITY AT VARIOUS LOCATIONS FROM COLUSA/GLENN COUNTY LINE TO ROUTE 32   700 2/1/2014

03  COL  005  R022.3/

Subscour Mitigation at 7 Locations  SHOPP 

03‐4M2004 

IN COLUSA, BUTTE, AND GLENN COUNTIES ON ROUTES 5, 20, 32,149, AND 162 AT VARIOUS LOCATIONS  

Rock Slope Protection  990 1‐1000 2/1/2014

7/13/11 Project has not been designed yet 

Dist Co Rte PostMile NicknameType of Project

Contract No

Location Type of Work

Estimate Cost Range (x $1,000)

Work Days Range

Proposed Ad

CommentsHot Mix Asphalt (tons)

Rubber HMA (tons)

PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)

Road Excavation (cy)

03  COL  005 007.1/R029.2 No Nick 

MAINTENANCE 

03‐4M2104 

IN COLUSA,GLENN, SUTTER, AND YUBA COUNTIES AT VARIOUS LOCATIONS   1,000 4/1/2012

03  SAC  051  001.4/ No Nick MAINTENANCE 

03‐4M2404 

IN SACRAMENTO COUNTY AT VARIOUS LOCATIONS   3,500 4/1/2012

03  SIE  089 027.8/ 029.6 No Nick 

MAINTENANCE 

03‐4M2604 

NEAR CALPINE FROM SULPHUR CREEK ROAD TO THE SIERRA/PLUMAS COUNTY LINE   600 10/1/2013

03  BUT  191 000.0/ 011.4 No Nick 

MAINTENANCE 

03‐4M2704 

ABOUT 7 MILES NORTH OF OROVILLE FROM JUNCTION ROUTE 70 TO PEARSON ROAD IN PARADISE   2,300 4/1/2013

03  SAC  016 T002.5/R023.9 No Nick 

MAINTENANCE 

03‐4M2804 

IN AND NEAR SACRAMENTO FROM PERKINS JUNCTION AT HOWE AVENUE TO AMADOR COUNTY LINE   3,700 3/1/2013

03  YOL  505 000.0/ 013.2 No Nick 

MAINTENANCE 

03‐4M2904 

IN YOLO COUNTY FROM SOLANO COUNTY LINE TO 0.4 MILE SOUTH OF LONG CREEK BRIDGE 22‐57   3,000 3/1/2012

03  NEV  080 000.0/R002.6 No Nick 

MAINTENANCE 

03‐4M3004 

IN PLACER COUNTY FROM TROY UNDERCROSIING TO NEVADA COUNTY LINE AND IN NEVADA COUNTY FROM PLACER COUNTY LINE TO 0.1 MILE EAST OF SODA SPRINGS UNDERCROSSING  1,600 4/1/2012

03  NEV  174 000.0/ 010.2 No Nick 

MAINTENANCE 

03‐4M3104 

IN AND NEAR GRASS VALLEY FROM PLACER COUNTY LINE TO ROUTE 20   1,900 9/1/2012

03  ED  049 015.6/ 023.9 No Nick 

MAINTENANCE 

03‐4M3404 

ON ROUTE 49 FROM ROUTE 193 TO LOTUS ROAD AND ON ROUTE 153 FROM ROUTE ROUTE 49 TO MARSHALL MONUMENT   820 3/1/2012

Dist Co Rte PostMile NicknameType of Project

Contract No

Location Type of Work

Estimate Cost Range (x $1,000)

Work Days Range

Proposed Ad

CommentsHot Mix Asphalt (tons)

Rubber HMA (tons)

PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)

Road Excavation (cy)

03  PLA  065 R004.9/R009.0 No Nick 

MAINTENANCE 

03‐4M3504 

IN AND NEAR ROSEVILLE FROM ROUTE 80 TO 0.6 MILE SOUTH OF SUNSET BOULEVARD OVERCROSSING   525 4/1/2012

03  SAC  005  001.5/ No Nick MAINTENANCE 

03‐4M3704 

IN EL DORADO, PLACER, SACRAMENTO, AND YOLO COUNTIES AT VARIOUS LOCATIONS   300 12/1/2013

03  YOL  080 008.9/ 011.3 No Nick 

MAINTENANCE 

03‐4M3804 

IN YOLO COUNTY ON ROUTES 50 AND 80   300 3/1/2012

03  SIE  049  031.0/ No Nick MAINTENANCE 

03‐4M4204 

NEAR SIERRA CITY AT 2.5 MILES WEST OF OLD GOLD LAKE ROAD   275 4/1/2012

03  ED  050 049.0/ 052.0 No Nick 

MAINTENANCE 

03‐4M4404 

NEAR KYBURZ FROM SILVER FORK ROAD TO 36 MILE STONE ROAD   500 1/1/2014

03  NEV  020 028.6/ 032.3 No Nick 

MAINTENANCE 

03‐4M4504 

ABOUT 11.2 MILES EAST OF NEVADA CITY FROM WHITE CLOUD ROAD TO 1.0 MILE WEST OF ALPHA ROAD   500 3/1/2014

03  SIE  089 025.9/ 027.9 No Nick 

MAINTENANCE 

03‐4M4604 

NEAR CALPINE AT VARIOUS LOCATIONS FROM CALPINE SUMMIT TO SULPHUR CREEK ROAD   500 12/1/2013

03  COL  005 000.0/R034.4 No Nick 

MAINTENANCE 

03‐4M4804 

IN COLUSA, GLENN, AND SACRAMENTO COUNTIES ON ROUTE 5 AT VARIOUS LOCATIONS   1,150 2/1/2013

03  YOL  113 000.0/ 022.1 No Nick 

MAINTENANCE 

03‐4M4904 

IN SUTTER AND YOLO COUNTIES ON ROUTES 113/45/80 AT VARIOUS LOCATIONS   982 12/1/2012

03  NEV  080  005.0/ No Nick MAINTENANCE 

03‐4M5004 

IN NEVADA, PLACER, AND SIERRA COUNTIES AT VARIOUS LOCATIONS   400 1/1/2013

Dist Co Rte PostMile NicknameType of Project

Contract No

Location Type of Work

Estimate Cost Range (x $1,000)

Work Days Range

Proposed Ad

CommentsHot Mix Asphalt (tons)

Rubber HMA (tons)

PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)

Road Excavation (cy)

03  ED  050 000.0/ 080.4 No Nick 

MAINTENANCE 

03‐4M5104 

IN EL DORADO, SACRAMENTO, AND YOLO COUNTIES AT VARIOUS LOCATIONS ON ROUTES 50, 51, AND 193   1,600 3/1/2013

03  SAC  080 000.0/ 018.0 No Nick 

MAINTENANCE 

03‐4M5204 

IN AND NEAR SACRAMENTO ON ROUTES 80 , 99, AND 160 AT VARIOUS LOCATIONS   4,600 2/1/2013

03  BUT  099 013.0/ 020.6 No Nick 

MAINTENANCE 

03‐4M5304 

ABOUT 10 MILES SOUTH OF CHICO FROM 0.2 MILE SOUTH OF NORTHERN JUNCTION ROUTE 162 TO DRY CREEK BRIDGE   1,300 3/1/2013

03  ED  050 018.1/ 019.1 No Nick 

MAINTENANCE 

03‐4M5404 

IN PLACERVILLE ON ROUTE 50 FROM 0.1 MILE EAST OF BEDFORD AVENUE TO WILTSE ROAD UC AND ON ROUTE 193 NEAR PLACERVILLE FROM SOUTH FORK AMRICAN RV BRIDGE 25‐33 TO ROUTE 49  800 11/1/2012

03  GLE  162 067.2/ 084.6 No Nick 

MAINTENANCE 

03‐4M5504 

NEAR WILLOWS FROM CENTRAL IRRIGATION CANAL BRIDGE 11‐0009 TO BUTTE COUNTY LINE   1,400 3/1/2013

03  GLE  032 L000.0/ 001.3 No Nick 

MAINTENANCE 

03‐4M5604 

IN ORLAND FROM I‐5 TO COUNTY ROAD M 1/2   300 2/1/2013

03  PLA  174 000.0/ 002.9 No Nick 

MAINTENANCE 

03‐4M5704 

IN AND NEAR COLFAX FROM 174/80 SEPERATION BRIDGE 19‐0086 TO NEVADA COUNTY LINE   500 3/1/2013

03  SAC  160 R044.5/ 047.1 No Nick 

MAINTENANCE 

03‐4M5804 

IN THE CITY AND COUNTY OF SACRAMENTO FROM AMERICAN RIVER BRIDGE 24‐001 TO 0.8 MILE NORTH OF TRIBUTE ROAD   1,000 2/1/2013

Dist Co Rte PostMile NicknameType of Project

Contract No

Location Type of Work

Estimate Cost Range (x $1,000)

Work Days Range

Proposed Ad

CommentsHot Mix Asphalt (tons)

Rubber HMA (tons)

PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)

Road Excavation (cy)

03  PLA  080 044.8/ 049.0 No Nick 

MAINTENANCE 

03‐4M6004 

ABOUT 11 MILES EAST OF COLFAX FROM ALTA ROAD UNDERCROSSING 19‐111 TO 0.2 MILE EAST OF DRUM FOREBAY OVERCROSSING 19‐114   6,000 5/1/2012

03  NEV  080  028.0/ No Nick MAINTENANCE 

03‐4M6104 

NEAR FLORISTAN AT TRUCKEE RIVER BRIDGE 17‐0063 R/L   1,000 10/1/2013

Totals: 588756  307425  40201  267179  9700922  974305  221016