ETAEnvironmental Health and Safety Monthly Metrics
July, 2015
ETA Accidents- 7/15
Type Date Div Description Severity Status
Chemical Contact
7/2/15 ESDR Electrolyte solution came in contact with student’s left wrist during stress/strain test in 70-263.
First Aid Visit to clinic. Accident investigation completed. Set-up modified.
ETA Accidents- By Type
Jul '14 Aug '14 Sep '14 Oct '14 Nov '14 Dec '14 Jan '15 Feb '15 Mar '15 Apr '15 May '15 Jun '15 Jul '15
Strain-Arm/Hand NaN NaN NaN NaN NaN NaN NaN NaN 1 NaN NaN NaN NaN
Strain-Back/Leg NaN 1 NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN
Repetitive NaN NaN NaN 1 NaN NaN NaN NaN NaN NaN NaN NaN NaN
Fracture/Break NaN NaN NaN NaN NaN NaN NaN NaN 1 NaN NaN NaN NaN
Chem Contact NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN 1
Burn NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN
Contusion NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN
Cut/Abrasion NaN NaN NaN 1 NaN NaN NaN 1 NaN NaN NaN NaN NaN
Eye NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN
Respiratory NaN NaN 1 NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN
Other NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN
0.5
1.5
2.5
Strain-Back/LegRespiratory Repetitive
Cut/Abrasion
Cut/AbrasionStrain-Arm/Hand; 1
Fracture/Break
Chem Contact
ETA Accidents- Severity
Jul '
14
Aug
'14
Sep
'14
Oct
'14
Nov
'14
Dec
'14
Jan
'15
Feb
'15
Mar
'15
Apr
'15
May
'15
Jun
'15
July
'150
1
2
3
First Aid Recordable Lost Work
Emergency Incidents- 7/15
Date Incident Area Status
There were no ETA-related emergency incidents in July 2015.
Ergonomic Assessments- By Month
Jun '14 Jul '14 Aug '14 Sep '14 Oct '14 Nov '14 Dec '14 Jan '15 Feb '15 Mar '15 Apr '15 May '15 Jun '15 Jul '15
Completed 7 6 6 3 4 6 3 3 4 2 1 2 0 2
Open 0 0 0 0 0 0 0 0 0 0 1 0 0 2
0.5
1.5
2.5
3.5
4.5
5.5
6.5
7.5
8.5
9.5
Ass
essm
ents
Open EETD Ergonomic Assessments
Date Requested
Dept. Type Status
7/28/15 EAEI Discomfort Actions Pending
7/27/15 EAEI Discomfort Assigned
4/14/15 EAEI Preventative Actions Pending
3
Open Assessments by Dept.
EAEIBTUSESDRETA
ETA Incomplete Training Assignments
Jul '13
Aug '13
Sep '13
Oct '13
Nov '13
Dec '13
Jan '14
Feb '14
Mar '14
Apr '14
May '14
Jun '14 Jul
'14Aug
'14Sep
'14Oct '1
4Nov
'14Dec '
14Jan
'15Feb
'15Mar '
15Apr '
15
May '15
Jun '15 Jul
'150
50
100
150
78
66 64
92
73
48
89 88
78
52
93
81
65
9297
69
84
75
91
73
4236
79
66
89
Incomplete Assignments
Training % Completion Status
Jul '14 Aug '14 Sep '14 Oct '14 Nov '14 Dec '14 Jan '15 Feb '15 Mar '15 Apr '15 May '15 Jun '15 Jul '1580
82
84
86
88
90
92
94
96
98
10099
98.5 98.599
98.599
98.599
99.5 99.599 99
98.5
95 95 9594
93 93 9394 94 94 94
93 93
ETA % LBNL %
%
Incomplete Training by Course Type(Total Incomplete Assignments = 89 )
Ergonomics; 19
Cyber Security; 16
Electrical/LOTO; 14
Fire Extinguisher; 13
Hosting Foreign; 6
First Aid/CPR; 6
GERT; 5
Chemical; 4
ISM Principles; 3Ladder; 1 Pressure; 1 Supervisor; 1
Training Assignments Due (Total = 89)
Open Assignments by Division Open Assignments by Hire Date
< 1 Month 2 to 6 Months > 6 Month0
10
20
30
40
50
60
70
80
15
5
69
Assignments
EAEI; 45BTUS;
22
ESDR; 20
ETA; 2
ETA Training Assignments Due
Career
Affiliate
Term Appt.
Student A
sst.
Reh RetireGSR
A
Facu
lty
Limite
d
Post Doc.
Visit R
esearch
Contracto
r0
5
10
15
20
25
30
35
40
45
39
26
95 5
2 2 1 0 0 0
Assignments due by Job Type
<1 Month
1-2 Months
>2 Months
0 2 4 6 8 10 12 14 16 18 20
18
12
4
Renewal Training Assignments- 34 Total
ETA “Activity Manager” Set-up Status(104 Total Work Activities)
Developing EHS Collaboration Approvals Active0
10
20
30
40
50
60
70
80
90
100
17
1
37
33
24
Risk 3Risk 2Risk 1
ETA “Activity Manager” AssignmentsETA Total Personnel- 698
Unassigned3
0%
Assigned Not Accepted101%
Opt Out11316%
Assigned Accepted57282%
Electrical Equipment Inspection Failure Status (Red Dot)
Nov '14 Dec '14 Jan '15 Feb '15 Mar '15 Apr '15 May '15 Jun '15 July '110
2
4
6
8
10
12
14
16
18
16 17 1715 15 16 16
1311
# Failed Items
# Failed Items
Equipment listed in the EEIP database as “failed” and requires repair prior to use.
ETA Failed Electrical Equipment Status (7/31/15)
Barcode Building Room Equipment Name Responsible Person DIV
41961 70 289 Pump Destaillats, Hugo EAEI
48472 51F 101 MFC Pump Hotchi, Toshifumi EAEI
45082 71 210 Emitters Iain Walker BTUS
39288 70 278 Power Source Maddalena, Randy EAEI
39289 70 278 AC Line Conditioner Maddalena, Randy EAEI
39304 70 278 Transistorized Power Supply Maddalena, Randy EAEI
28735 70 278 AC Power Source 400-5D Maddalena, Randy EAEI
38777 70 289 Blower Maddalena, Randy EAEI
2444 51F 101 Aethalometer Singer, Brett EAEI
38881 70 173 Turbine Meter Readout Therkelsen, Peter BTUS
2892 70 173 Power Supply Therkelsen, Peter BTUS
Corrective Action Reports (CATS)- 7/15
CAT # Date Description Lead Status
9675 7/29/14 Seismically secure the laser table near the 70-157 entrance. DOE assessment follow-up item.
X. Mao Facilities work request submitted for installation. Waiting for brackets to be installed.
9819 4/17/15 Transfer of ownership for existing radiation authorization when PI retires
M. Foure/R. Scholtz
Determining if HR exit checkout sheet can be modified to more clearly account for change in ownership for safety items. Need DSC sign-off.
3862 7/31/15 Waste acid container not properly labeled or capped. SAA inspection item.
G. Liu Bottle properly labeled, capped, and placed into SAA. Need to have picked up for disposal.
3863 7/31/15 Bag of contaminated wipes/gloves not properly identified as hazardous waste. SAA inspection item.
E. Cairns Safety Alert issued regarding proper identification of wastes. Extra training planned.
Audits and Inspection Status- 7/15
Type Date Lead Status
Quarterly SAA Inspections
7/30/15 R. Scholtz Completed
City of Berkeley Hazardous Waste Inspection
6/8/15 Waste Management Group
Completed
SAA Overall Compliance
Jan '12 Apr '12 Jul '12 Oct '12 Jan '13 Apr '13 Jul '13 Oct '13 Jan '14 Apr '14 Jul '14 Oct '14 Jan '15 Apr '15 Jul '1580
90
100
93.996.9 95.6 95.9
97.594.8
99 98.1 97.1 96.199 99.1 99.1 98.8 98.5
% Compliance
% Compliance
SAA Issues by Quarter
Jan '12 Apr '12 Jul '12 Oct '12 Jan '13 Apr '13 Jul '13 Oct '13 Jan '14 Apr '14 Jul '14 Oct '14 Jan '15 Apr '15 Jul '150
2
4
6
8
10
12
14
16
18
20
SAA ID Sign Incorrect SAA Location IncorrectRaw Materials in SAA Waste Label Not CompletedFlammable Waste Container Wrong No Secondary ContainmentIncompatible Waste Containers Not ClosedAccumulation >275 Days Self-Inspection Outdated
Cumulative SAA Issues(FY Q1 ’12 – Q4 ‘15)
59
51
12
11
67 2
12
Lab Inspection Logs Outdated
Waste Labelling Issues
Accumulation >275 Days
Flammable Waste Container Wrong
SAA ID Sign Incorrect
Containers Not Closed and Sealed
Incompatible Waste Storage
Raw Materials in SAA
No Secondary Containment
SAA Location Incorrect
Significant Safety Achievements- 7/15• Activity Manager system implementation is basically complete.
– A total of 104 work activities have been generated for ETA.– Zero ETA personnel remain in the old JHA system– All Activity Hazard Documents (AHD) have been closed– 7 work activities remain in EHS collaboration. All relate to ETA lab work that is not yet being
performed.
• The quarterly Satellite Accumulation Area hazardous waste inspections were completed on 7/30/15.
• Lab area chemical clean-outs continue. This month’s activity was in 70-264.• Chemicals in 62-348 and 70-123 were relocated to the new B33 JCESR lab
area. • The B62-105 solvent closet chemical storage cabinet upgrade was
completed. Storage quantities were also greatly reduced.• The following Safety Alerts were issued:
– Compressed gas cylinder storage– Fluorescent light bulb disposal– Non-hazardous wipe disposal
Short Term Safety Outlook 8/15
• Complete the final 7 Work Activities pending in EHS collaboration.• Complete the Glove Box Operation Self-Assessment project report
for submittal.• Complete an old chemical/sample clean-out in the 70-264 lab
area. Work has started.• Continue to address ETA equipment on the electrical equipment
“fail” list• Assist with the set-up for new lab areas B33 JCESR, and B60 test
chambers.• Start the chemical spill cleanup self-assessment project. A proto-
type spill kit has been developed for review.