etimaad presentation (february 2015) - project info

12
ETIMAAD EXPERIENCE

Upload: mazharuddin-ansari

Post on 12-Apr-2017

400 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Etimaad Presentation (February 2015) - Project Info

ETIMAAD EXPERIENCE

Page 2: Etimaad Presentation (February 2015) - Project Info

Client Name Project Description Location StatusSaline Water Conversion Corporation (SWCC) Consortium of Al-Arrab Contracting Co & Sepco III

Mechanical Equipment Installation, Piping, Electrical and I & C Works of complete Natural Gas System and Backup Fuel Oil System for 2400 MW Ras Al-Khair Combined Cycle Power Plant.

Ras Al-Khair,KSA In Progress

General Electric Operation and Maintenance Management of 220 MW GTS based Combined Cycle Power Plant

Muridke,Pakistan

Long Term Contract

General Electric Call out Services for Equipment for all GE Power Plants in PakistanSahiwal, Muridke, Balloki, Bhikki, Pakistan

Long Term Contract

General ElectricOperation and Maintenance Management of 220 MW GTS based Combined Cycle Power Plant

Sahiwal,Pakistan In Progress

Pakistan Atomic Energy Commission

300 MW Chashma Nuclear Power Plants I & II 5 Year Running Annual Maintenance Contract Awarded

Chashma,Pakistan

Long Term Contract

Japan Power EPC Work for Combine Cycle Retrofit Enhancing plant capacity to 182 MWLahore, Pakistan

On Hold by Client

Qatar Petroleum Turnkey set up of new LGO storage tank of capacity 48,984 m3 for LGO service at QP Refinery

Mesaieed, Qatar In Progress

Etimaad projects list

Page 3: Etimaad Presentation (February 2015) - Project Info

Client Name Project Description Location StatusNazaria-e-Pakistan Trust Construction of Awan-e-Quid-e-Azam Lahore,

Pakistan In Progress

Novartis Pharma, Pakistan Limited

Construction of 5 Story Novartis Corporate Office Building Karachi,Pakistan In Progress

Riasat ul Haramain MEP works of Zone-4 in Haram, Makkah Makkah, KSA In Progress

Riasat ul Haramain MEP works for Ajiad AC Plant for Haram, Makkah Makkah, KSA Completed

Riasat ul Haramain Design built MEP construction of 22 story Security Building, Makkah Makkah, KSA In Progress

Riasat ul Haramain Design built MEP works for First Ring Road, Makkah Makkah, KSA In Progress

Riasat ul Haramain MEP works for Pedestrian Tunnel in Haram, Makkah Makkah, KSA In Progress

Etimaad projects list

Page 4: Etimaad Presentation (February 2015) - Project Info

Client Name Project Description Location StatusWartsila 160 MW Attock Gen Power Plant Mechanical and Civil Works Rawalpindi,

Pakistan Commissioned

Skoda Export 220 MW Power Plant Electrical and Mechanical Works Balloki, Pakistan

Commissioned

WartsilaCivil and Mechanical Works for 200 MW Combined Cycle Nishat Power HFO Based Power Plant

Chunian, Pakistan Commissioned

Wartsila 200 MW Mechanical Erection Works at Combined Cycle Nishat Chunian Chunian,Pakistan

Commissioned

Pakistan Atomic Energy Commission 300 MW Chashma Nuclear Power Plant 6th Annual Maintenance Contract Chashma,

Pakistan Completed

AES Ras Laffan Operating Company Shutdown Maintenance Works at 740 MW Combined Cycle Power Plant Ras Laffan,

Qatar Completed

AES Ras Laffan Operating Company

Shutdown Maintenance Works for 36” Pipeline at 740 MW Combined Cycle Power Plant

Ras Laffan,Qatar Completed

AES Ras Laffan Operating Company

Turnkey supply of GT rotor extraction skid along with mounting trolleys and Quality Control and Management Services for rehabilitation of potable water tanks at 740 MW Combined Cycle Power Plant

RasLaffan,Qatar Completed

Iberdrola Middle Eas Mesaieed Power Company

Technical Services for mechanical construction, piping erection, testing and commissioning at 2000 MW Power Plant

Mesaieed, Qatar Completed

AES Ras Laffan Shutdown activities involving the following:36” Pipeline Pressure Reducing AssemblyDe-Aerator Installation of SupportsOther Assorted Works

Ras Laffan, Qatar

Completed

AES Ras Laffan Engineering, Procurement, Excavation, Backfilling, Dewatering, Shoring/Scaffolding, Thrust Boring, Fabrication, Installation, Sand Blasting, Coating, Wrapping, Cathodic Protection, NDT, Commissioning

Ras Laffan, Qatar Completed

Etimaad projects list

Page 5: Etimaad Presentation (February 2015) - Project Info

Client Name Project Description Location StatusPakistan Army Engineering Consultancy for 9 MW Co-Gen Power Plant Rawalpindi,

Pakistan Completed

SEPCO III Electric Power Construction Corporation/Rabigh Electric Company

Installation of ESP Equipment, ID Fan, FGD installation, GHH System Inc Fuel Oil System piping & associated equipment luding Booster Pumps, Aeration Pumps Pre-fabrication of Piping, Pipe Supports, Installation Work, Painting, Hydro Test & Commissioning for 2X660 MW Power Plant.

Rabigh, KSA Completed

Ras Laffan Power Company / Ras Laffan Industrial City, Qatar

Installation of FRP internal of Desal 21 & 24 , during RLPC plant OutageRas Laffan Industrial City, Qatar

Completed

I Ways Project Management Consultancy Services, Kotli Hydro Power Project Kotli, Azad Kashmir CompletedAssociated Group Bhikki Power Plant Civil Works Lahore CompletedQatar Petroleum Engineering, Procurement,

Installation and Commissioning of 24” PipelineDukhan,Qatar

Completed

Qatar Fertilizer Company (QAFCO)

Piping fabrication and erection, NDT, painting, insulation, scaffolding, hydro testing, Pneumatic testing, air blowing, steel structure fabrication and erection, PWHT, Civil Foundations, Equipment erection, equipment internal works, Bolt tensioning, cold tapping

Mesaieed, Qatar Completed

Technip Middle EastPiping fabrication and erection, NDT, painting, insulation, scaffolding, hydro testing, Pneumatic testing, air blowing, steel structure fabrication and erection, Civil Foundations, Vortex breaker removal.

Doha ,Qatar Completed

Qatar Petroleum Settlement Survey of Crude Oil Storage Tanks in Tank Farm; Settlement Survey of Product Storage Tanks in NGL Plant

Doha,Qatar Completed

Hyundai Heavy Industries/Das Oil End Underground Piping works at Das Island , Abu Dhabi Abu Dhabi,

UAE Completed

Etimaad projects list

Page 6: Etimaad Presentation (February 2015) - Project Info

Client Name Project Description Location Status

Qatar Fertilizer Company (QAFCO)

Construction, Installation, Testing, Pre-Commissioning and Commissioning of collection, storage and transfer of waste water system including Civil Design/Engineering, Procurement and Supply of Civil/Structural, Instrumentation, Piping, GRP piping, Rotary equipment installation, Electrical & other associated items

Mesaieed, Qatar Completed

Qatar Petroleum Dismantling and Installation of Normal/Acid Flare Tips at QP Refinery Doha Qatar Completed

Qatar Fertilizer Piping fabrication and erection, NDT, painting, insulation, scaffolding, hydro testing, Pneumatic testing, air blowing, steel structure fabrication and erection.

Mesaieed, Qatar Completed

Qatar Fertilizer Company

Electrical and Instrumentation works Mesaieed, Qatar Completed

Ras Laffan Power Company

Dearator Internal repair by removal of pall rings, cutting / grinding, welding, pickling and passivation and installation of FRP internal of Desal 21 & 24 , during RLPC plant outage scheduled for March 2012

Ras Laffan Industrial City, Qatar

Completed

Dolphin Energy Limited Secure Horizontal Section of LP Stream line to MP Flare-Stream-2 Ras Laffan,

Qatar Completed

Qatar Gas Operating Company Limited Procurement, Survey, Excavation, Cable laying, Backfilling, Termination,

Testing and CommissioningRas Laffan,Qatar Completed

Butec-Degremont JV Electrical and Instrumentation works Barva City,Qatar Completed

Butec-Degremont JV Stainless Steel pipe fabrication( 15,000 Dia Inches)Carbon Steel Pipe Fabrication (10 Tons)

Barva City,Qatar Completed

Dolphin Energy Limited Stabilization of LP steam line (live line) up to 65 meters. Ras Laffan,

Qatar Completed

Etimaad projects list

Page 7: Etimaad Presentation (February 2015) - Project Info

Client Name Project Description Location Status

Qatar Fertilizer

Construction, Installation, Testing, Pre-Commissioning & Commissioning of QAFCO supplied Bulk Flow Coolers and other Auxiliaries including Civil Design/Engineering, Procurement & Supply of Civil/Structural, Instrumentation, Electrical & other associated items

Mesaieed, Qatar Completed

Oryx GTL LtdEngineering, Procurement, Excavation, Backfilling, Dewatering, Shoring/Scaffolding, Thrust Boring, Fabrication, Installation, Sand Blasting, Coating, Wrapping, Cathodic Protection, NDT, Commissioning

Ras Laffan, Qatar Completed

Chiyoda Corporation Modification of existing pipe supports in different construction areas on Pearl GTL – FEED Gas Preparation (C4) Area

Ras Laffan, Qatar Completed

Oryx GTL Ltd. Shutdown activities with manpower of 20 people Ras Laffan, Qatar Completed

Technip Middle East Excavation, Backfilling, Dismantling of existing cable tray, Cable laying, Concreting

Ras Laffan, Qatar Completed

Technip Middle East Excavation, Backfilling, Scaffolding, Internal/External Coating, Concreting, Fabrication, Installation, Coating, Wrapping, Cathodic Protection, NDT

Ras Laffan, Qatar Completed

Chiyoda-Hyundai Consortium Field Pipe Fabrication, Erection, Pressure Testing and Reinstatement Ras Laffan,

Qatar Completed

Iberdrola Middle East Technical Services for Mechanical Construction, Manpower Supply for Piping Erection, Testing and Commissioning Works

Ras Laffan, Qatar Completed

Government of KSA MEP Construction Work Makkah,KSA Completed

TAISEI-TAV MEP works at New Doha International Airport Doha,Qatar Completed

Etimaad projects list

Page 8: Etimaad Presentation (February 2015) - Project Info

Client Name Project Description Location Status

JGC Middle East Support & Pipe Welding Ras Laffan,Qatar Completed

AES Ras Laffan Operating Co. WLL

Design, Supply, Fabrication, Painting, Transportation and Installation of Gas Turbine Generator Rotor Extraction Skid with Two Trolleys

Ras Laffan,Qatar Completed

Technip Middle East Heavy Lifting, Erection and Installation, E&I Works Ras Laffan,Qatar Completed

AES Ras Laffan Operating Co. WLL

Fabrication, Welding, Heat Treatment, NDE, Repairs, Hardness Test, Pressure Testing, Shutdown Activities with manpower of 50 people

Ras Laffan,Qatar

Completed

AES Ras Laffan Operating Co. WLL Services for Rehabilitation of Potable Water Tanks

Ras Laffan,Qatar Completed

Punj Lloyd Ltd. Construction Manpower Supply Ras Laffan,Qatar Completed

AES Ras Laffan Operating Co. WLL

Provision of Quality Control and Management Services through management personnel

Ras Laffan,Qatar Completed

Dodsal Engineering and Construction Pte.

Ltd.Installation of Mechanical Cleaning Equipment, Erection of Static & Rotary Equipment

Ras Laffan,Qatar Completed

GAMA Qatar Co. WLL Provision of Technical Manpower for Civil Works Ras Laffan,Qatar Completed

GAMA Qatar Co. WLL Fabrication and Installation of pressure piping and pipe supports Ras Laffan,Qatar Completed

Etimaad projects list

Page 9: Etimaad Presentation (February 2015) - Project Info

Client Name Project Description Location StatusPakistan Air Force Civil, Electrical and HVAC works for Shahbaz Air Base Jacobabad,

Pakistan Completed

Engro Foods Supply Chain (Private) Limited

Civil and Mechanical Construction of Integrated Rice Processing Complex Muridke,Pakistan Completed

MOL Pakistan Design, Manufacturing, Fabrication, Supply of Gas Vent Knock Out Drum–ASME U Stamp

Mamikhel,Pakistan Completed

British Petroleum now United Energy Pakistan Limited

Turnaround Strategy documents for TURK Facilities Amine System Mirpur Khas,Pakistan

Completed

Fauji Fertilizer Company Ltd

Fauji Fertilizer Company Ltd. Bin Qasim - Annual Turnaround Bin Qasim,Pakistan Completed

Pakistan Air Force Design, Procurement, Fabrication of Exhaust Duct Work for Shahbaz Air Base,

Jaccobabad,Pakistan

Completed

Oil & Gas Development Corporation Limited

Uch Gas Field Annual Turnaround Sohbatpur,Pakistan Completed

Pak Arab Refinery Limited

EPC & Commissioning of Kero Merox Unit at Mid Country Refinery Mahmood Kot,Pakistan Completed

Weatherford Oil Tools M.E. Limited

Electrical, Mechanical and Instrumentation Works at Adam X-1 Hala early Production4Facility

Sanghar,Pakistan

Completed

OMV Pakistan Exploration Ltd.

HAZOP Study of OMV’s Kadanwari Modification and Enhancement Projects Kadanwari,Pakistan Completed

Dawood Hercules Chemicals Limited

Turnkey supply & Commissioning of 4000 Tons Ammonia Storage Tank Sheikhupura Completed

Pak American Fertilizer Limited

Fabrication & Supply of Tube Bundles – 2 Nos. of heat exchangers. Mianwali Completed

Etimaad projects list

Page 10: Etimaad Presentation (February 2015) - Project Info

Etimaad projects listClient Name Project Description Location Status

Al-Tawairqi Steel Mills Ltd.

Project Management Support Services Karachi,Pakistan Completed

Fatima Fertilizer Limited

Overhauling through Hydro Jetting of 117 Heat Exchangers, 100 Pressure Safety Valves and Lapping of 6 Valves During Annual Turnaround 2013

Mukhtar Garh,Pakistan

Completed

Dawood Fertilizer Limited

EPC Construction of 4000 Tons Double Walled Anhydrous Ammonia Storage Tank

Sheikhupura,Pakistan Completed

Dawood Fertilizer Limited

EPC Construction of 2500 Tons Caustic Soda StorageTank and Decanting Facility

Sheikhupura,Pakistan Completed

Procter & Gamble Pakistan

Complete Construction and Equipment Installation of Aerial Dry Powder Detergent Plant

Port Bin Qasim,Pakistan Completed

SEPCO III Field installation of fuel oil system at 1260 MW Power Plant Rabigh,KSA Completed

SEPCO III Erection of Electrostatic Precipitator and Flue Gas Desulphurization at 1260 MW Power Plant

Rabigh,KSA Completed

Pall Corporation Pipe prefabrication and field installation, equipment & steel structure installation, E & I works of Black Powder Filter Station

Ma’aden,KSA Completed

Technip Pipe Erection of approximately 50,000 dia inches of piping works Jubail,KSA

Completed

JGC Erection of 4000 meters SS Steam Tracing Line Jubail,KSA Completed

SULZER Column Nozzle Modification during Annual Turnaround Jubail,KSA Completed

SULZER Retrofit and Turnaround in November 2013 Yanbu,KSA Completed

Fives Solios Fabrication of Injection Ducts Ras Al Khair,KSA Completed

Fives Solios Pre-assembly of Equipment for Gas Treatment Centers 3 & 4 Ras Al Khair,KSA Completed

Page 11: Etimaad Presentation (February 2015) - Project Info

Client Name Project Description Location Status

Juffali Chemicals Engineering, Procurement, Construction & Commissioning of Polyurethane System Housing Project

Jeddah,KSA Completed

Arabian Chemical Company Limited (Latex)

Engineering, Procurement, Construction & Commissioning of styrene monomer 8 Km pipeline from Jubail Chevron Phillips Plant to ACCL premises through Royal Commission Corridor

Jubail,KSA Completed

Jubail Chevron Phillips Company

Design, procurement & Construction (Civil, Mechanical & E&I) including commissioning of insulated Styrene Pipeline from Tank form to Royal Commission Corridor

Jubail,KSA Completed

Daelim Piping (2”-24”) Fabrication Work s at Site, covering CS, SS and Alloy Steel Pipe (48,000 dia inches)

Jubail,KSA

Completed

Arabian Chemical Company Limited (LATEX)

Painting, inspection & Revalidation of Butadiene Pipe Line Jubail,KSA Completed

CTCI Manufacturing and Supply of 23 Nos. of Stainless Steel Storage Tanks. Jubail,KSA Completed

Technip / Nesma Field installation of 3 Nos. Carbon Steel Acid Tanks Jubail,KSA Completed

Westech Engineering Supply, Fabrication & Installation of Bio Sludge Treatment Plant Jubail,KSA Completed

Fives Solios Manufacturing of 4 Nos. Stacks with diameter of 7.8m, height 52m and weight 600 tons for Ras Az Zawr Aluminum Smelter Project.

Ras Al Khair,KSA Completed

Etimaad projects list

Page 12: Etimaad Presentation (February 2015) - Project Info

Client Name Project Description Location Status

GE Oil & Gas, Italy Replacement of UCPS And Upgrading Of F & G System At Sui Gas Field At Unit-C, D, E and F for Compressor Station (PPL) Pakistan Sui, Balochistan Completed

CNPP, PAEC Annual Turnaround at CNPP Unit 1 & 2 CNPP, Mianwali Completed

Etimaad projects list