EU CCS Demonstration Projects. Giles Dickson. Brussels, 9 February 2009. CCS in Europe is happening now. EoN Karlshamn – Sweden 5 MWth – Chilled Ammonia – Fuel/Gas. Several small scale pilots …. Vattenfall Swartze Pumpe - Germany 30 MWth – Oxy - Lignite. - PowerPoint PPT PresentationTRANSCRIPT
EU CCS Demonstration Projects
Giles Dickson
Brussels, 9 February 2009
Presentation title - 01/01/2007 - P 2ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
CCS in Europe is happening now ....
Presentation title - 01/01/2007 - P 3ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Several small scale pilots ….
We Energies Pleasant Prairie - USA 5 MWth - Chilled Ammonia
– Coal
Statoil Mongstad – Norway 40 MWth – Chilled Ammonia–
Gas
TOTAL Lacq, France 30 MWth – Oxy –
Gas/Fuel
EoN Karlshamn – Sweden 5 MWth – Chilled Ammonia –
Fuel/Gas
Vattenfall Swartze Pumpe - Germany 30 MWth – Oxy - Lignite
AEP Mountaineer - USA 30 MWth– Chilled Ammonia –
Coal
Presentation title - 01/01/2007 - P 4ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Main Partnerships & Projects Portfolio
CHILLED
AMMONIA
OXY COMB
5 MWth
30 MWth>200 MWe
5 MWth
40 MWth
30 MWth
250 MWe
Pleasant Prairie (US) - Coal
Mountaineer (US) - CoalNortheastern (US) - Coal
Karlshamn (Sweden) - Gas
Mongstad (Norway) - Gas
Schwarze Pumpe (Germany) - Coal
Jänschwalde (Germany)
200 MWeTransalta (Canada) - Coal
Feasibility Study
ADVANCED
AMINES
Joint Development Partnership
Belchatow (Poland) - Coal 30 MWth>150 MWe
30 MWtLacq (France) - Gas
Pilot in operation
Presentation title - 01/01/2007 - P 5ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Ready for the next stage …..
• The technology is ready for full scale demonstration.
• A funding mechanism is agreed.
• The EU legal framework is in place.
We can’t afford to wait ………
Presentation title - 01/01/2007 - P 6ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
7 years delay = up to 90 Gt more emissions by 2050 and +10 ppm by 2020
Gt CO2 abated per year
2008 2015 2030 2050
Prompt implementation
Unnecessary emissions
7 year delay
Pilot plants
built
Technology
ready for full
scale testing
Funding and
Legislation
secured for
demo plants
Demo
plants
running
Commercial development Abatement
potential
achieved
Political
decision
taken
olitical support neded7 years 30 years
2020
Delay in CCS would mean unnecessary
emissions
Presentation title - 01/01/2007 - P 7ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Various EMISSION Sources
Various CAPTURE Technologies
Various TRANSPORT Modes
Various STORAGE Settings
To Achieve the Programme’s Goals, the Portfolio Needs to Test...
Presentation title - 01/01/2007 - P 8ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Speed of demonstration now impacts hugely on commercial capacity in 2020
Cumulated CCS installed base based (2010-20*)
Note: *Commissioning yearsSource : Alstom evaluation
0
20
40
60
80
100
EuropeNorth AmericaROW/China
2010 11 12 13 14
8
15 16 17 18 19
59
20
GWe (gross)
First 20 Large- Scale
Demos
We are already running late…let’s get started now !
Full deployment preparation
Presentation title - 01/01/2007 - P 9ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Demonstration Phase Requires Funding to Fill the Economic Gap
0
10
20
30
40
50
60
70
80
90
€/tonne CO2
Ec
on
om
ic
ga
p
DEMO PHASE (~4GW)
EARLY COMMERCIAL PHASE
(~20 GW installed capacity)
MATURE COMMERCIAL PHASE
(~ 80 GW installed capacity)
Demonstration phase:CCS not economically viable. Public contribution necessary for some portion
Carbon price forecast; impact of new policy not included
Estimated costs of CCS Commercial phase:CCS expected to be commercially viable, as costs and CO2 price reach similar levels
Presentation title - 01/01/2007 - P 10ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
What needs to happen now ….
First projects need to be selected this year and before Copenhagen.
National legislation to implement CCS Directive.
Additional EU funding: €1.25bn in EU Economic Recovery Plan.
Other public and private funding.
Above all, industry needs certainty – asap.
Presentation title - 01/01/2007 - P 11ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Oxy
IGCC
Post
3
Are there enough projects out there ?
EU
NAM
RowChina
66%
3 %
11 %
20 %54%
27%
19%
58%
37%
FACT: 64 large-scale CCS projects above 100 MW currently under consideration world-wide
RetrofitCoal
NewCoal
5%New/RetrofitGas
There are enough projects in the pipeline for 20 large demos
Presentation title - 01/01/2007 - P 12ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
What about transport and storage ?
Local, limited EOR projects + Demo
2010 2015 2020 2030
Post-comb.
Pre-comb.
Oxy-comb.
2025
Pilot / Demo Commercialisation
Ramp-up to full scale saline acquifer storage
Pilot / Demo
Progressive pipeline deployment,depending on validated storage sites
Pilot / Demo Commercialisation
Commercialisation
Pre-commercial
2007
EOR + validation of storage sites
Transport
Storage
CapturePre-
commercial
Pre-commercial
Source: Power Systems analysis
2006
Presentation title - 01/01/2007 - P 13ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Source:Team analysis; IEA GHG Emissions database v2006; pathfinder; ECOFYS; Gestco summary report
Regional capture and storage clusters likely
Emission and capture clusterMedium emissionsHigh emissions
Low emissions
Storage clusterILLUSTRATIVE
EXAMPLE
Presentation title - 01/01/2007 - P 14ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
CCS is not yet well known or accepted by the broader public
What responses should be considered to tackle climate change?
−Listen – analyse public opinion in the different regions (e.g. EU)
−Learn from other comparable cases (e.g., Nuclear?)
−Inform/influence public opinion locally, e.g., on needs, jobs
Possible lines of action
1
2
3
Source: MIT Carbon sequestration initiative