EU Energy R&D Funding David McAuley R&D Programme Manager, SEAI 13th June 2011 HMRC. Agenda. NER300 FP7 Further Information Q&A. Path to Commercialisation. NER300 DG Climate Action / EIB. FP7. ENERGY-1 DG Research and Innovation. ENERGY-2 DG Energy. - PowerPoint PPT PresentationTRANSCRIPT
EU Energy R&D FundingDavid McAuleyR&D Programme Manager,SEAI
13th June 2011HMRC
Agenda
• NER300
• FP7
• Further
Information
• Q&A
Path to Commercialisation
Basic ResearchDevelopment
/ Applied Research
DemonstrationDeployment /
Commercialisation
FP7 NER300DG Climate Action / EIB
ENERGY-2DG Energy
ENERGY-1DG Research and
Innovation
NER300 - OceanDavid McAuleyR&D Programme Manager, SEAI
13th June 2011HMRC
NER300 Funding
• EU Emissions Trading Scheme
• NER - New Entrants Reserve
• 300 – 300 Million Carbon Credits
• Approx €4.5 Billion
What’s Included
“Pre-commercial demonstration of renewable technologies“
• Innovation is an eligibility criteria: projects must
be innovative in nature.
• Ranking is based on cost per unit performance
• Projects expected to produce energy by end of 2015.
What’s Included?• 8 CCS projects
• 34 RES projects, of which: • 9 Bio-energy• 5 CSP• 3 PV• 6 Wind• 4 Geothermal• 3 Ocean• 1 Hydro• 3 Distributed Renewables Management
(SmartGrids)
NER300 – OCN Category
3 Ocean (OCN) Sub Categories:
• Wave energy devices with nominal capacity 5 MW
• Marine/tidal currents energy devices with nominal capacity 5 MW
• Ocean thermal energy conversion (OTEC) with nominal capacity 10 MW
Terminology• Reference Plant: Alternative plant on which
extra Investment and operation costs are measured.
• Relevant Costs: Extra investment costs + extra operating costs – extra operating benefits
• NER300 will finance 50% of relevant costs
• Financing under NER300 can be combined with Structural Funds, EEPR and RSFF.
• Payments. Financing to be disbursed on a yearly basis during 1st 5 years of operation by the MS, as a function of the amount of energy produced.
Relevant Costs
-500
-400
-300
-200
-100
0
100
200
300
400
ReferencePlant
DemoPlant
RelevantCosts
Invest Costs
OperatCosts
OperatBenefits
ExtraCosts
(negative)Extra
Benefits
Relevant Costs
-500-400-300-200-100
0100200300400500
Ref PlantDemoPlant
RelevantCosts
Invest Costs
OperatCosts
OperatBenefits
ExtraCosts
(positive)Extra
Benefits
Pre-existingSupport
Schemes
Cost Per Unit Performance(CPUP)
02468
101214161820
y1 y2 y3 y4 y5
EnergyProduced
NER300(MS)
“Cost” per(projected) Unit Performance
Pre-existingSupportSchemes
Application Process
• 9th Nov 2010 - Call announced
• 9th Feb 2011 - Submit to Member State (DCENR)
• 9th May 2011 – Forward to EIB
• 20th June 2011 – EIB 6-Week Report
• 9th Aug 2011 – EIB 3-month report
• 9th Nov 2011 – EIB 6-month report
• 9th Feb 2012 – EIB 9-month report
• Decision – Mid 2012
Application Process
Commission
Member State
Project Sponsor
EIB
6-w
eek
repo
rt
3-m
onth
rep
ort
6-m
onth
rep
ort
9-m
onth
rep
ort
MS
Sub
mis
sion
Dev
elop
Pro
posa
l
Fin
al D
ecis
ion
Stage 1 SubmissionsEU:
• 13 CCS Projects
• 65 RES Projects
Ireland:
• 2 RES Projects
• 1 Ocean
• 1 Bioenergy
More information
EU Website:
http://ec.europa.eu/clima/funding/ner300/index_en.htm
FP7 Energy 2012David McAuleyR&D Programme Manager, SEAI
13th June 2011HMRC
FP7 Energy
• Annual calls for proposals 2007 – 2013• 2011 Call closed• 2012 Call launch July 2011
• Collaborative Projects• Shared Cost• €260 Million for 2012
FP7 ENERGY 2.6: OCEAN
ENERGY 2012.2.6-1: Demonstration of first ocean energy farms (two projects)3MW or over, devices of the same type, grid connected, reduce cost, improved reliability and efficiency, lower O&M costs.
Call Launch: 20th July 2011Deadline: 8th March 2012Single stage evaluation
Note scale: €24 Million for “Renewable Electricity Generation” – across 12 projects
DemonstrationProject
FP7 ENERGY 2012
Call for Tenders: Study on the environmental impacts of noise, vibrations and electromagnetic emissions from marine renewables.
€1,000,000Q3 2011, 12 Months Duration
Coordination and supporting action
Energy Research Portal
HMRC13th June2011
Energy Research Portal
• 21 academic institutions surveyed
• Over 250 Principal Investigators
• 700+ projects
• €174 million funding
• 14 collaborative clusters
Research Funding
Main Funding Categories:
Total €174 million
• Irish Government*
• European Union:
• FP6 & FP7
• EURATOM
• INTERREG
• UK Government (NI)
• Industry
• International
*Irish Government:
Total €128 million
• Science Foundation Ireland (SFI)
• Enterprise Ireland (EI)
• Sustainable Energy Authority of Ireland (SEAI)
• Environmental Protection Agency (EPA)
• Marine Institute (MI)
• HEA, IRCHSS, IRCSET
• DEHLG, DAFF, COFORD, COMHAR
• Teagasc
Irish Energy Research Map - Low Carbon Technologies13 main categories
Carbon Capture & Storage
Marine Energy
Wind EnergySolar Energy
Energy Storage
Geothermal
Bioenergy
Waste to Energy
Energy Efficiency
Electrical Grid
Transport, Fuel Cells &
Hydrogen
Energy Policy & Analysis
Other
Energy Research Low
Carbon Technologies
Funding => University => Technology
Source
University
Funding => Universities => Technology
Sources
Academic Energy ResearchFunding by Technology Category over 2004 –
2010
Academic Energy ResearchFunding by Institution 2004 – 2010
Total €174 million
Research Portal
http://research.seai.ie
Cluster Technology
PRECISION Nuclear Energy
CLARITY Electricity Grid / ICT
Solar Energy Cluster (SEC) Solar Energy
ITOBO Energy Efficiency – Built Environment and ICT
NEMBES Energy Efficiency - ICT
IRUSE Energy Efficiency – Built Environment and ICT
Electricity Research Centre (ERC) Electrical Grid / Wind integration / energy storage
CCBB Competence Centre for biorefining and bioenergy
CRANN Nanotech / Energy Storage
MERC3 Marine Energy
HMRC Marine Energy
I2E2 Energy Efficiency - Industry
BuildWise Energy Efficiency – Built environment
IERC Energy efficiency / Smartgrid
Questions?