eu sustainable energy week 24-28 june 2013 · eu sustainable energy week 24-28 june 2013 energy...
TRANSCRIPT
EU SUSTAINABLEENERGY WEEK24-28 JUNE 2013
Energy
Peter D. SchellinckEOTA Secretary General
26 June 2013
2
How to support innovation to enter the market?
Performance Paradigm Shift.
Expertise
Product manufacture
Plant
Construction Work
Contract
Regulations
- European
- National
Stakeholders
Certification:
Attestation of the
conformity of … against
a set of defined and
stated requirements ,
according to a defined
scheme, and in a well
specified context.
Assessment of construction process: in a defined context, determining
technical recommendations allowing guidance to the stakeholders in their
decisions on the reliable construction of a defined work.
3
How to support innovation to enter the market?
• All/each ETA issued on the basis of an EAD (or ETAG as EAD)
• ETA is no more a Harmonised Technical Specification (EAD is now the HTS)
• EAD developed and adopted by the Organisation of TABs = EOTA
• ETA issued by a TAB acting on its own
• Use conditioned by change in the product or in the assessment methods + criteria (EAD)
• Agreement on characteristics related to the intended use of the product
• Focus on the performances + on assessment and verification of constancy of performance
European technical assessment: ETA
4
General assembly(+ 50 member bodies)
Executive Board(7 or 8 members, incl. President
Yannick Lemoigne)(= old Management Team)
EOTA SecretariatSecretary General: Peter Schellinck
Project Manager: Andrea Oel-BrettschneiderSecretary: Karina Lens
NEW STRUCTURE
Technical Board
Technical BoardProject team
Technical BoardProject team
Technical BoardProject team
Technical BoardProject team
Technical BoardWorking group
(all TABs designated for relevant product area)
Technical BoardWorking group
(all TABs designated for relevant product area)
Technical BoardWorking group
(all TABs designated for relevant product area)
5
New Regulation (CPR) from 1/07/2013?
• No longer Directive but Regulation: uniform application in all MSs
• Clearer description of responsibilities of all players
• Enhanced control on NBs
• Enhanced market surveillance
• Simplified systems for SMEs
• Clarification of meaning of CE marking
• CE marking mandatory when hEN exists
• CE marking voluntary through ETAG and CUAP replaced by EAD
(European Assessment Document) as basis for ETA (European
Technical Assessment)
• Stricter procedures for making EADs
6
CPR - Meaning of CE Marking (Art. 8(2))
By affixing or having affixed the CE marking, manufacturers indicate that they take
responsibility for the conformity of the construction product with the declared performance
as well as the compliance with all applicable requirements laid down in this Regulation and in other relevant Union
harmonisation legislation providing for its affixing.
7
CE Marking will be accepted in 33 countries (from 1/7/2013)
Austria (EU)Belgium (EU)Bulgaria (EU)Croatia (from 1/7/2013)Cyprus (EU)Czech Republic (EU)Denmark (EU)Estonia (EU)Finland (EU)France (EU)Germany (EU)Greece (EU)Hungary (EU)Ireland (EU)Italy (EU)Latvia (EU)Lithuania (EU)
Luxembourg (EU)Malta (EU)the Netherlands (EU)Poland (EU)Portugal (EU)Rumania (EU)Slovak Republic (EU)Slovenia (EU)Spain (EU)Sweden (EU)United Kingdom (EU)Iceland (EFTA)Liechtenstein (EFTA)Norway (EFTA)Switzerland (MRA)Turkey (EC-Turkey agreement)
8
ETAREG vs ETADIR
• ETADIRECTIVE 89/106/EEC: A European Technical Approval is a favourable technical assessment of the fitness for use of a product for an intended use, based on fulfillment of the essential requirements for building works for which the product is used.
• ETAREGULATION 305/2011 : documented assessment of the performance of a construction product, in relation to its essential characteristics, in accordance with the respective European Assessment Document
9
Legal character: mandatory/ voluntary
Directive 89/106/EEC +
national implementationRegulation
Published ETAG →CE+ETADIR mandatory or voluntary,
dependent of the Member state where the
product is placed on the market
ETAREG → voluntary,
but if an ETAREG has
been issued,
CE marking is an
obligationWithout ETAG (CPD art.9.2) →voluntary, independent of the member state
where the product is placed on the market
10
New ETAs issued (cumulative) (excluding renewals 20/6/2013)
11
EAD – ETA – DOP process
ETA Request
Manufacturer’s technical file
European Assessment
Document (EAD)
European Technical
Assessment (ETA)
ETA Content
• Legal bases
• Definition of product-type(s) and intended use(s)
• Performance of product-type(s) and assessment methods
• Assessment and verification of constancy of performance
Declaration of Performance
Assessment and verification
of the constancy of performance
(AVCP)
CE marking + instructions and safety info
12
Sim
plifie
d p
roced
ure
s
(Art. 3
6 to
38)
hE
N
Different ways to EU marketing
Market
Declaration of Perf.
CE marking
Regulation (EU) No 305/2011 (of 9 March 2011)
Regulation (EC) No 764/2008 (of 9 July 2008)
Mu
tual R
eco
gn
ition
of
Natio
nal T
ech
nic
al D
ocu
men
t
ET
Assessm
en
t
13
CPR as a Performance Paradigm Shift
EOTA Added Value
14
The world’s first 3D-printed house
a performance paradigm shift
THANK YOU