eugm 2011 | jemiai

20
Click to edit Master /tle style 10/26/11 An early look at Confirm Success with East ® Clinical Trial Design Software System on the Architect™ platform 6 1 Europe East UGM2011

Upload: cytel-usa

Post on 11-Aug-2015

10 views

Category:

Health & Medicine


2 download

TRANSCRIPT

Page 1: EUGM 2011 | JEMIAI

ClicktoeditMaster/tlestyle

10/26/11

An early look at 

Confirm Success with East®  Clinical Trial Design Software System 

on the Architect™ platform 

6

1 Europe East UGM2011

Page 2: EUGM 2011 | JEMIAI

•  East today •  Software vision •  Example in hypertension •  East® demo •  Design questions

10/26/11

agenda 

2 Europe East UGM2011

Page 3: EUGM 2011 | JEMIAI

10/26/11 3 Europe East UGM2011

Page 4: EUGM 2011 | JEMIAI

10/26/11

47oftheTop50biopharmaceu4calcompaniesuseCytelso:ware!+alldivisionsoftheFDA

an industry standard 

4 Europe East UGM2011

Page 5: EUGM 2011 | JEMIAI

10/26/11

what East has changed 

5 Europe East UGM2011

Page 6: EUGM 2011 | JEMIAI

10/26/11

Software vision 

6 Europe East UGM2011

Page 7: EUGM 2011 | JEMIAI

•  Can I create designs in batches? •  How should I choose the timing of the interim analysis? •  How would I specify a first interim analysis strictly for futility

followed by a second interim analysis for both efficacy and futility?

•  Can I customize the information I would like to use in a report?

•  Can I specify my futility boundary in terms of conditional power or effect size?

•  What are the true savings in sample size if you consider accrual patterns and overruns?

•  Given observed data at an interim, can I compute the probability of success or simulate the rest of the trial?

10/26/11

Design questions 

7 Europe East UGM2011

Page 8: EUGM 2011 | JEMIAI

•  Phase 3 clinical trial testing superiority of an angiotensin II receptor blocker vs. placebo

•  Primary endpoint: change from baseline to week 6 in the 24-hour mean systolic blood pressure by ambulatory blood pressure monitoring

•  Test the difference of two independent means using a 1-sided a = 0.025

•  Would like the trial to have 90% power to detect an effect size of δ = -1.5 mm Hg when compared to placebo in a 1:1 allocation

•  Can assume a common standard deviation of σ = 6 mm Hg •  Accrual rate of 40 patients per month

10/26/11

Example in hypertension 

8 Europe East UGM2011

Page 9: EUGM 2011 | JEMIAI

East® Demo 

10/26/11 9 Europe East UGM2011

Page 10: EUGM 2011 | JEMIAI

•  Ease of use •  Reliability •  Productivity •  Communication •  Advanced functionality using R •  Breadth of designs available •  Powerful simulation capabilities

10/26/11

benefits of East 

10 Europe East UGM2011

Page 11: EUGM 2011 | JEMIAI

ClicktoeditMaster/tlestyle

Peace of Mind with ACES® Controlled and Secured Trial Execution System

Business Confidential 26 October 2011 11

Page 12: EUGM 2011 | JEMIAI

•  Are interim decision rules pre-specified? •  Are they carried out as pre-specified? •  Who has access to them? •  Who prepares the interim report? •  Who has access to the interim report and how is

confidentiality maintained? •  Can interim results be reverse engineered from

actions taken?

logistical and operational biases 

10/26/11 Europe East UGM2011 12

Page 13: EUGM 2011 | JEMIAI

10/26/11 13 Europe East UGM2011

no problem 

Page 14: EUGM 2011 | JEMIAI

“A well-trusted firewall established for trial conduct beyond those established for conventional group sequential trials can help provide assurance that statistical and operational biases have not been introduced.”

FDA Guidance on Adaptive Design (2010)

what is required? 

10/26/11 Europe East UGM2011 14

Page 15: EUGM 2011 | JEMIAI

•  Web based technology to control flow of information and access to confidential documents

•  Prevents operational bias by including the actual adaptive algorithm only in restricted appendix to Data Monitoring Committee (DMC) charter and tracking access to this document

•  Establishes trustworthiness through secure password protected access to documents, execution of algorithms, and audit trail

ACES: Access Control Execution System 

10/26/11 Europe East UGM2011 15

Page 16: EUGM 2011 | JEMIAI

Create Documents (Protocol, SAP, DMC Charter)

Store/Archive Documents

Enroll Subjects &

Collect Responses

Send Response

Data to ISC

Perform Analysis and

Create Reports

Send Analysis to

DMC

Spo

nsor

IS

C

DM

C

Make Recommendati

on

Send Recommendation to Sponsor/

Steering Committee

Make Decision

about Trial

Ste

erin

g C

omm

ittee

After decision… 1. DMC notified 2. Drug Supply notified 3. IVRS notified

10/26/11 Europe East UGM2011

traditional process 

16

Page 17: EUGM 2011 | JEMIAI

•  Inconsistency •  Insecurity •  Process Enforcement •  Firewall Enforcement •  Lack of Audit Trails

10/26/11 Europe East UGM2011 17

Concerns with Traditional Interim Analysis Processes

why do we need ACES? 

Page 18: EUGM 2011 | JEMIAI

10/26/11 Europe East UGM2011

Create Documents (Protocol, SAP, DMC Charter)

Store/Archive Documents

Enroll Subjects &

Collect Responses

Send Response

Data to ISC

Perform Analysis and

Create Reports

Send Analysis to

DMC

Spo

nsor

IS

C

DM

C

Make Recommendati

on

Send Recommendation to Sponsor/

Steering Committee

Make Decision

about Trial

Ste

erin

g C

omm

ittee

in ACES

in ACES

in ACES

After decision… 1. DMC notified 2. Drug Supply notified 3. IVRS notified

in ACES

ACES process 

18

Page 19: EUGM 2011 | JEMIAI

10/26/11 Europe East UGM2011 19

• Automate Analyses •  Improve Efficiency • Reduce Bias • SAS Integration • R Integration (planned)

Workflow Automation

• Centralized Access • User Security • Audited Access • Categorization

Document Storage

• Protect Data and Information

• Maintain Blind • Protect Study Integrity • Reduce Bias

Secure Firewalls

• 21 CFR Part 11 Compliant

• System and Study Level Reporting

• All Access Recorded • Guarantees “Who Saw

What and When”

Auditing

• Make Better Decisions • Make Earlier Decisions • SAS Integration • R Integration (planned) • Customizable

Reporting

• Supports All Major Browsers

• SaaS Hosted Solution • 128-bit SSL Encryption

Global Access

how can ACES help? 

Page 20: EUGM 2011 | JEMIAI

Thank you Questions about East®? Call +1.617.661.2011 http://www.cytel.com/software/east.aspx

10/26/11

Q&A 

20 Europe East UGM2011