euref'03: national report of switzerland · euref'03: national report of switzerland new...

8
EUREF'03: National Report of Switzerland New Developments in Swiss National Geodetic Surveying B. Vogel 1 , E. Brockmann 1 , P. Kummer 1 , U. Marti 1 , D. Schneider 1 , A. Schlatter 1 , A. Wiget 1 and U. Wild 1 , W. Gurtner 2 1 swisstopo (Swiss Federal Office of Topography); Geodesy Division, Seftigenstrasse 264, CH-3084 Wabern, Switzerland, Phone: ++41 31 963 22 56, Fax: ++41 31 963 24 59, e-mail: [email protected], Web-Site: http://www.swisstopo.ch 2 AIUB (Astronomical Institute of the University of Berne); Sidlerstrasse 5, CH-3012 Berne, Switzerland. Phone: ++41 31 631 85 99, Fax: ++41 31 631 38 69, e-mail: [email protected] 1 Introduction Beginning in 1988 the Federal Office of Topography (swisstopo) has conceived a new national geodetic reference system CHTRS95 which should replace the existing frames LV03 (position) and LN02 (height) with its new reference frames CHTRF95 (global) and LV95 (local). CHTRS95, which is closely related by a geometric transformation to ETRS89, also consists of a new height system, a geoid model on the cm level and a kinematic model. After 15 years most elements of the new system have been realized and most of the data is available to the user. The fundamental station Zimmerwald together with 5 EUREF stations links the national networks to the European and worldwide reference frames. Various geodetic measuring techniques such as SLR, GPS and gravimetry are already collocated at Zimmerwald. As a contribution to the ECGN initiative, the number of measuring techniques is presently being increased. The Automated GPS Network (AGNES) with 29 permanently operating GPS stations is used for various applications such as real-time positioning and GPS meteo. It is optimally integrated into the EUREF permanent network. The national GPS network LV95 has been densified and includes 206 well-monumented control points. A large effort has been undertaken to establish a new height reference frame LHN95 which, together with the new geoid, is compatible with the 3D frame of LV95. Presently geodetic work is focused on the following tasks: - Connecting geodetic networks (AGNES, LV95, LHN95 etc.) with the objective of making them compatible (GPS– leveling) - Completing the combined kinematic adjustment of LHN95 - Improving the geoid model - Developing a local–regional kinematic model describing tectonic motion - Improving the access to geodetic data by the user (Internet services) - Making available procedures for the transformation between old and new reference frames (position and height) - Linking the Swiss Positioning Service swipos to those of the neighboring countries (e.g. SAPOS) - Practical application of GPS humidity measurements to meteorology 2 Fundamental Station Zimmerwald The fundamental station Zimmerwald is jointly operated by the Astronomical Institute of the University of Berne (AIUB) and the Swiss Federal Office of Topography (swisstopo). 2.1 SLR observations Since 1997, when the first SLR observations were performed with the new SLR system in Zimmerwald, a continuously increasing number of observed passes could be submitted to the International Laser Ranging Service (ILRS). Although there was an almost two-month shutdown of the station due to maintenance (re-coating of the primary mirror), Zimmerwald ranked # 9 out of about 40 stations regarding the total number of collected passes, and # 5 in the rating with respect to the number of Lageos normal points. From March 16 to 22, 2003, Zimmerwald collected the largest number of passes for that week worldwide. Thanks to the possibility of automated and unattended operation or remote control during limited times (typically a few hours per day), a nearly 24-hour tracking coverage can be realized with only two shifts per day. Zimmerwald was the first ILRS station to submit dual-color range observations on a regular basis between mid-August and December 2002. 2.2 GNSS observations Presently the following GNSS receivers are operating in Zimmerwald: - Trimble 4000 SSI receiver (main receiver, providing tracking data to the IGS) - Ashtech Z18 (combined GPS/GLONASS receiver) - Javad Legacy receiver (combined GPS/GLONASS receiver) The Trimble receiver runs with the GPS Base Station Software and provides daily files to the IGS data centers. Furthermore, hourly files are generated and distributed with a time delay of a few minutes, and are used for near real-time applications by the IGS and other institutions. The delivery rate of the daily observation files was very high during the last three years: 99% for 2000, and nearly 100% for 2001 and 2002. In addition, the Trimble receiver provides epoch- wise GPS data in real-time to the central AGNES server, which is one of the currently 29 AGNES stations (see chap. 3).

Upload: others

Post on 17-Mar-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EUREF'03: National Report of Switzerland · EUREF'03: National Report of Switzerland New Developments in Swiss National Geodetic Surveying B. Vogel1, ... (AIUB) and the Swiss Federal

EUREF'03: National Report of Switzerland New Developments in Swiss National Geodetic Surveying

B. Vogel1, E. Brockmann1, P. Kummer1, U. Marti1, D. Schneider1, A. Schlatter1, A. Wiget1 and U. Wild1, W. Gurtner2

1 swisstopo (Swiss Federal Office of Topography); Geodesy Division, Seftigenstrasse 264, CH-3084 Wabern, Switzerland, Phone: ++41 31 963 22 56, Fax: ++41 31 963 24 59, e-mail: [email protected], Web-Site: http://www.swisstopo.ch 2 AIUB (Astronomical Institute of the University of Berne); Sidlerstrasse 5, CH-3012 Berne, Switzerland. Phone: ++41 31 631 85 99, Fax: ++41 31 631 38 69, e-mail: [email protected]

1 Introduction Beginning in 1988 the Federal Office of Topography (swisstopo) has conceived a new national geodetic reference system CHTRS95 which should replace the existing frames LV03 (position) and LN02 (height) with its new reference frames CHTRF95 (global) and LV95 (local). CHTRS95, which is closely related by a geometric transformation to ETRS89, also consists of a new height system, a geoid model on the cm level and a kinematic model.

After 15 years most elements of the new system have been realized and most of the data is available to the user. The fundamental station Zimmerwald together with 5 EUREF stations links the national networks to the European and worldwide reference frames. Various geodetic measuring techniques such as SLR, GPS and gravimetry are already collocated at Zimmerwald. As a contribution to the ECGN initiative, the number of measuring techniques is presently being increased.

The Automated GPS Network (AGNES) with 29 permanently operating GPS stations is used for various applications such as real-time positioning and GPS meteo. It is optimally integrated into the EUREF permanent network. The national GPS network LV95 has been densified and includes 206 well-monumented control points. A large effort has been undertaken to establish a new height reference frame LHN95 which, together with the new geoid, is compatible with the 3D frame of LV95.

Presently geodetic work is focused on the following tasks: - Connecting geodetic networks (AGNES, LV95, LHN95 etc.)

with the objective of making them compatible (GPS–leveling)

- Completing the combined kinematic adjustment of LHN95 - Improving the geoid model - Developing a local–regional kinematic model describing

tectonic motion - Improving the access to geodetic data by the user (Internet

services) - Making available procedures for the transformation

between old and new reference frames (position and height)

- Linking the Swiss Positioning Service swipos to those of the neighboring countries (e.g. SAPOS)

- Practical application of GPS humidity measurements to meteorology

2 Fundamental Station Zimmerwald The fundamental station Zimmerwald is jointly operated by the Astronomical Institute of the University of Berne (AIUB) and the Swiss Federal Office of Topography (swisstopo).

2.1 SLR observations Since 1997, when the first SLR observations were performed with the new SLR system in Zimmerwald, a continuously increasing number of observed passes could be submitted to the International Laser Ranging Service (ILRS).

Although there was an almost two-month shutdown of the station due to maintenance (re-coating of the primary mirror), Zimmerwald ranked # 9 out of about 40 stations regarding the total number of collected passes, and # 5 in the rating with respect to the number of Lageos normal points. From March 16 to 22, 2003, Zimmerwald collected the largest number of passes for that week worldwide.

Thanks to the possibility of automated and unattended operation or remote control during limited times (typically a few hours per day), a nearly 24-hour tracking coverage can be realized with only two shifts per day.

Zimmerwald was the first ILRS station to submit dual-color range observations on a regular basis between mid-August and December 2002.

2.2 GNSS observations Presently the following GNSS receivers are operating in Zimmerwald: - Trimble 4000 SSI receiver (main receiver, providing

tracking data to the IGS) - Ashtech Z18 (combined GPS/GLONASS receiver) - Javad Legacy receiver (combined GPS/GLONASS

receiver) The Trimble receiver runs with the GPS Base Station Software and provides daily files to the IGS data centers. Furthermore, hourly files are generated and distributed with a time delay of a few minutes, and are used for near real-time applications by the IGS and other institutions. The delivery rate of the daily observation files was very high during the last three years: 99% for 2000, and nearly 100% for 2001 and 2002. In addition, the Trimble receiver provides epoch-wise GPS data in real-time to the central AGNES server, which is one of the currently 29 AGNES stations (see chap. 3).

Page 2: EUREF'03: National Report of Switzerland · EUREF'03: National Report of Switzerland New Developments in Swiss National Geodetic Surveying B. Vogel1, ... (AIUB) and the Swiss Federal

In addition to the main GPS receiver, two combined GPS/GLONASS receivers are installed at Zimmerwald, both providing data for the IGLOS-PP. This International GPS Service Pilot Project is a follow-up project of the former IGEX-98 campaign and maintains a global station network and provides precise orbits for the GLONASS satellites.

2.3 Contribution to ECGN Switzerland contributes to the ECGN project with various observations in Zimmerwald [Brockmann et al., 2003].

3 Permanent GPS network AGNES and positioning service

The Automated GPS Network of Switzerland (AGNES) reached its final configuration of 29 stations by the end of 2001. During 2002 the last refinements of the station installations were done, including an improved lightning protection unit and a remote-accessible power switch for the station computers. In addition, local ties and the connection to the old national first order network LV03 were measured at 23 stations in order to contribute to the determination of the transformation parameters between the old (LV03) and the new reference frame (LV95).

The overall performance of AGNES was excellent, and the availability of the RINEX data files on the Web server was 99.1% (mean value over all stations). At 20 stations the station outages were below the indicator of 3 days/year, at 9 stations this value could not be attained. These "critical stations" were identified, and organizational and technical ac-tions were taken in order to improve the availability of the data.

For the real-time positioning service swipos-GIS/GEO, a new version of the Virtual Reference Station (VRS) software was installed, which performed better with respect to stability, initialization times and accuracy. In addition, the new software version allows the storage of real-time estimates of the troposphere. Comparisons of these "real-time" tropospheric parameters with those of our geodetic post-processing showed a good agreement of the two methods (see chap.4).

Parallel to the software updates, the server architecture was enhanced. The VRS computation was separated from the data communication and the data storage on the Web server. In addition, a new software tool allowing the VRS computation for post-processing applications was installed on the AGNES Web server. The new configuration provides a maximum flexibility for data communication (e.g. data exchange over the Internet, see below).

The real-time service swipos-GIS/GEO and the cor-responding SAPOS service in Baden-Württemberg (Germany) were connected over a direct phone line, which will be replaced by an Internet connection as soon as possible. The data of 9 stations are exchanged on a real-time basis, allowing an improvement of the quality of VRS processing in the region along the border between Germany and Switzerland. Connections to SAPOS in Bavaria (Germany) and to Austria are planned and will be realized within the next year.

The developments of EUREF-IP were followed closely. First tests were performed in August 2002 and showed good results even for RTK applications over Internet. Swisstopo

would therefore like to become an "Internet Broadcaster" within EUREF-IP for DGPS correction data. The installation of the corresponding server infrastructure is planned for the end of 2003.

4 Analysis of permanent GPS networks The permanent GPS networks analyzed at swisstopo are shown in Tab. 4-1.

Network Stations Analysis interval; Delay

EUREF subnet 20 (1 AGNES) daily; after 21 days

AGNES + EUREF subnet

65 (29 AGNES) daily; after 21 days

AGNES + EUREF subnet

63 (29 AGNES) hourly; after 0.5 hours

Tab. 4-1: Routine GPS data analysis at swisstopo

The data of the AGNES sites have been monitored since the end of 1998 on a daily basis. In addition to the 29 AGNES sites, 40 EUREF permanent sites are processed with the Bernese GPS Software Version 4.2 [Hugentobler et al., 2001] using the final IGS orbit products with a time delay of 3 weeks. This monitoring allows the detection of possible site movements. An updated multi-year solution, where the site coordinates and velocities are solved for, is automatically generated after having processed an additional week of data. The results are e.g. estimated velocity and repeatability plots. As an example, the horizontal velocities relative to Zimmerwald are shown in Fig. 4-1.

Fig. 4-1: Horizontal site velocities in ITRF00 (relative to Zimmerwald. The time span of the sites with the longest “history” is summer 1998 till May 2004).

Since 1999 swisstopo has been active in the European project COST-716 (exploitation of ground-based GPS for climate and numerical weather prediction application). After a successful benchmarking [van der Marel et al., 2001], swisstopo has been contributing zenith total delay estimates in near real-time (NRT-ZTD) since December 2001. 95-98% of the solutions arrive at the data archive of the UK met office within 1 hour and 45 minutes.

Page 3: EUREF'03: National Report of Switzerland · EUREF'03: National Report of Switzerland New Developments in Swiss National Geodetic Surveying B. Vogel1, ... (AIUB) and the Swiss Federal

MeteoSwiss used the NRT-ZTD estimates in a test study for numerical weather prediction. The numerical forecast models were computed for the different test periods (summer, autumn, winter) in two different schemes: a run with assimilated GPS-derived ZTD estimates and a run without assimilated ZTDs. A comparison of the results showed a positive impact of GPS [Guerova et al., 2002] for summer and a slightly negative impact for winter. A by-product of the hourly processing is the monitoring of the site coordinates. Cumulative solutions averaging 12-24 hourly solutions allow the detection of coordinate changes of the order of 2 cm.

Swisstopo will also be active in the follow-up European project TOUGH "Targeting Optimal Use of GPS Humidity Measurements in Meteorology" (2003-2005).

Since January 2003, ZTD values can also be extracted from the real-time positioning software GPSNet 2.0 with accumulation intervals of 1 minute with a negligible time delay.

The results of the different analyses are available on http://www.swisstopo.ch/en/geo/pnac.htm.

5 National reference frame LV95 and its relation to the old networks

5.1 The national reference frame LV95 The densification of the GPS network LV95 has been completed on the national level. There are a total of 206 well-monumented control stations serving as the basis for the reference frame. In order to ensure the transition between the old and the new reference frame, transformation programs were developed, one each for height and position. These control points together with the AGNES stations serve as a reliable basis for the determination of the transformation check points.

5.2 Transformation LV03 LV95 As in many other countries, the transformation between the old reference frame (LV03), determined mainly by triangulation, and the new GPS reference frame (LV95) still

has to be realized. Due to the distortions of the triangulation network in the order of more than 1.5 m (see Fig. 5-1), a simple modeling of the differences by means of a 4-parameter similarity transformation does not give adequate results. A possible solution would be to divide the country into sub-regions and to use individual transformation parameters for each sub-region. But this would result in ambiguous coordinates along the boundaries. Another possibility that was chosen by several countries was to model the differences by polynomials of a certain degree. This method causes the problem of reversibility of the transformation and can lead to unrealistic results in regions without known common points.

Switzerland has chosen another method which is called FINELTRA (finite element transformation), whereby the whole territory is covered with triangles. For each of these triangles an affine transformation with 6 parameters is defined. This method has the following advantages: - the transformation is continuous - no ambiguous

coordinates at the boundaries - the transformation is reversible and works in both directions - the common points which are used as transformation check

points in both networks transform exactly to the coordinates of the other network

Up to now the mesh of triangles has been defined on the level of the 1st and 2nd order triangulation points (Fig. 5-2) which allows a transformation in the order of about 5 to 20 cm, depending on the region and the quality of the old triangulation. Presently the cantonal surveying authorities are working on further densifying the triangles.

Since FINELTRA is a rather special solution which cannot be implemented easily in GPS receivers, an approximation of this method had to be developed, where the differences between LV03 and LV95 are calculated in a regular grid of 1-km spacing. This grid can be stored directly in the GPS receivers and the surveyors obtain the still official LV03 coordinates in real-time. For a 1-km grid maximal differences are usually better than 1 cm compared to the solution of FINELTRA.

Page 4: EUREF'03: National Report of Switzerland · EUREF'03: National Report of Switzerland New Developments in Swiss National Geodetic Surveying B. Vogel1, ... (AIUB) and the Swiss Federal

1 m 2 m 3 m

0 km 20 km 40 km 60 km 80 km 100 km

Fig. 5-1 Differences LV95 minus LV03

Fig. 5-2 Triangles defined by 1st and 2nd order triangulation points

5.3 Transformation LN02 LHN95 A similar problem as the one for the position is the transformation of heights between the old leveling network LN02, which was adjusted without taking into account the influence of the gravity field, and the new orthometric height system LHN95. Due to the special structures of leveling networks, an approach with triangles, as it was used for position, is not recommendable. In addition, the differences between LN02 and LHN95 show a strong correlation with the height. Therefore, an approach was chosen that splits the differences into one part that is a function of only the horizontal position and into a second part that is a function of

the elevation as well. The first part (Fig. 5-3) is identical to the differences between LN02 and normal heights, and reaches amounts between -20 and +10 cm. This part includes the distortions of LN02, the influence of vertical movements and a part of the influence of the gravity field. It shows practically no correlation with height.

The second part of the differences, which is identical to the difference between normal heights and orthometric heights, works like a local scale factor. It reaches amounts between -40 and +220 ppm. The Bouguer anomalies are a very good approximation for this scale factor.

Therefore, the total of the differences are modeled by the function

Hg

)y,x(g)y,x(f+H=H

Boug

02LN95LHN

The transformation calls for one grid that represents the differences between LN02 and normal heights f(x,y), and another grid of the Bouguer anomalies. Near the leveling lines and in flatter areas, the accuracy of the transformation is in the order of ±2 mm. In mountainous regions the accuracy is decreased and can reach amounts of up to 2 cm.

Fig. 5-4 shows the total of the differences between LN02 and LHN95, which are between -20 and +60 cm. The correlation with the height is clearly visible.

Page 5: EUREF'03: National Report of Switzerland · EUREF'03: National Report of Switzerland New Developments in Swiss National Geodetic Surveying B. Vogel1, ... (AIUB) and the Swiss Federal

AG 42

BE J 20

BE O 127

BE O 448

BL 19a

BL 42

BS 41

FR 277

FR 352

GE 1

GE 52

G L 146

GR 1 34a

GR 2 37

G R 2309

G R 3318

JU 170

NE 97

SG 293

SG 660

SH 62

S H 78

SZ 91

SZ 150

TG 3

TG 47

TG 249

TI 512

UR 286

UR 308 UR 309

VD E300a

VD O 40

V S D 96

VS D366

ZH 85

ZH 317

VD O 12

SO 85

G R 1410

U R 97

SG 207

AG 2AG 3AG 10

AG 24AG 29

AG 36AG 37 KAG 38 K

AG 62

AG 73

AG 82AG 83

AG 95

A G 103

AG 104

AG 115AG 120AG 122AG 145AG 148AG 149

AG 166

AG 171

AG 178A G 182AG 185

AG 191AG 201AG 202

AG 205

AG 218

AG 224

AG 233

AG 245AG 255AG 256

A G 290

AG 298

AG 309

AG 321

AG 326A G 330

AG 339

AG 349

A G 357

AG 388

AG 405

AG 416 A G 425AG 429a

AG 440

AG 446

AG 476

AG 486

AG 497AG 498

AG 521

AG 534

AG 537

AG 540

AG 552A G 553AG 554

A G 562AG 563

AG 571

AG 591

BE J 3

BE J 5BE J 9

BE J 12

BE J 16B E J 18B E J 19

BE J 37

BE J 39

BE J 42

BE J 49BE J 50BE J 51BE J 60

BE J 67

BE J 96BE J 109

BE J111

BE J 130BE J 134BE J135

B E J138

BE N 4

BE N 24

BE N 36

BE N 42

BE N 46

BE N 65BE N 68

BE N 70

BE N 79

BE N135

BE N 142

B E N 149B E N156

BE N168

BE N172

BE N196

BE N218

BE N222

BE N 300

BE N329

BE N347

BE N373BE N374

BE N 431BE N433

BE O 3BE O 4BE O 12

BE O 33

BE O 37

BE O 45BE O 49

BE O 68

B E O 82BE O 83

B E O 93BE O 95

BE O 130BE O134

BE O 143

BE O 147BE O156

B E O167 BE O168BE O 170BE O178

BE O191

BE O 194

B E O213BE O215

BE O220BE O221

BE O 233

B E O237

BE O 243

BE O268

BE O 282BE O286

BE O289

BE O314

BE O 324BE O327

BE O 330BE O 334

BE O 340

BE O343 BE O 346BE O349

BE O352

BE O 356B E O358

BE O362BE O 364BE O 366

BE O368B E O 369

BE O 405

BE O 422

BE O423aBE O 424a

BE O441BE O442

BE O455BE O 457BE O459

B E O 470

BE O493BE O 511

BE O520

BE O522

BE O531

BE O 541

BE O546

BE O556BE O559BE O560

BE O 561

BE O563BE O564

BE S 3BE S 9BE S 20

BE S 83BE S 85

BE S 95

BE S 104

BE S112

BE S215

BE S218

BE S234

BE S251BE S252

BE S263

BE S273

BE S286

BE S313

BE S 322

BE S 339

BL 4a

BL 9BL 10BL 12

BL 15

BL 32

BL 38

BL 44BL 46BL 47

BL 66BL 67

B L 71

BL 79

BL 85

BL 89

BL 96

BL 105BL 106

BL 112

BL 119

BL 121BL 127

BL 135

BL 142

B L 151BL 152

BS 1BS 3

BS 16

BS 18

BS 36

BS 39

D EU 132

DEU 137

D EU 140

DE U 151

FL 101

FR 5

FR 7

FR 24

FR 29

FR 32

FR 47FR 48

FR 54

FR 80

FR 87

FR 96

FR 106FR 108

FR 134

FR 145

FR 153

FR 175

FR 185

FR 250

FR 265

FR 283FR 284

FR 315

FR 321

FR 351

FR A 114

G E 2GE 6G E 7

G E 30GE 32

G E 37

GE 44

G L 4GL 5G L 6

GL 16

G L 18G L 23

GL 30GL 58

G L 68

G L 87

GL 104

G L 118G L 124

G OTT327

GO TT332

GO TT337

G OTT341

G OTT634

GOTT639

G R 1 6GR 1 12

G R 1 14

GR 1 17

G R 1 19

GR 1 33G R 1 33a

GR 1 41GR 1 43

GR 1 46G R 1 47a

G R 1 54

G R 1 61

G R 1 81

G R 1 96

GR 1136GR 1144

G R 1149

GR 1218

G R 1230

GR 1246

G R 1251G R 1256

GR 1261

G R 1293

GR 1300

GR 1308GR 1309

G R 1318

GR 1324

G R 1330

GR 1346

GR 1353

GR 1356

GR 1364G R 1365G R 1380

G R 1391

G R 1414GR 1418

GR 1431

GR 1436

G R 1457

GR 1476

G R 1479G R 1482

G R 1486GR 1490

G R 1493

G R 1498

GR 2 5

G R 2 19

GR 2 24

G R 2 29

G R 2 50

G R 2 53

G R 2 59

GR 2 61G R 2 63GR 2 64

GR 2 69

G R 2 73

G R 2 84

GR 2 85

GR 2 89

G R 2180GR 2183

GR 2196GR 2197G R 2200

GR 2208

G R 2213G R 2215

G R 2241

GR 2246

GR 2249

GR 2252

G R 2267

GR 2272GR 2278

G R 2283

GR 2289

GR 3 6

G R 3 21

GR 3 32

GR 3 38

GR 3 41GR 3 42

G R 3 47

G R 3 58

G R 3 64

G R 3 65

GR 3 70

GR 3 77G R 3 78

GR 3 84G R 3 86 GR 3 87

GR 3103

GR 3139G R 3140

GR 3151

G R 3161

G R 3173

G R 3208

GR 3212

GR 3215

G R 3219

G R 3224GR 3225

G R 3235

G R 3243

GR 3245GR 3247GR 3248G R 3251GR 3255

GR 3262G R 3264

GR 3269

G R 3274G R 3275GR 3276

G R 3282

GR 3287GR 3288

G R 3293GR 3298

GR 3302

GR 3327

GR 3328

G R 3332

G R 3337

GR 3345

G R 3353

GR 3355

GR 3362

G R 3369GR 3371

G R 3376

G R 3378

GR 3463

GR 3465G R 3466

ITA 10

J U 45

J U 51

JU 57

J U 60J U 61

J U 66

JU 78

J U 91J U 93

J U 100

J U 105

JU 115

J U 125

J U 141 JU 143JU 144

J U 148J U 155J U 156

J U 158

J U 171

J U 180

J U 181J U 182

LOET391

LO ET415

LO ET426

LOE T706a

LOET714

LO ET724

LO ET732

LU 1LU 6LU 7

LU 25

LU 34LU 36

LU 52 LU 58

LU 69

LU 91

LU 105LU 106LU 108

LU 118

LU 125

LU 130LU 131

LU 145

LU 159

LU 176

LU 182

LU 200LU 204

LU 208

LU 254LU 258

LU 277LU 282

LU 320

LU 323

NE 3

NE 18NE 19

N E 27NE 28NE 33

N E 37N E 38

N E 44NE 47

NE 55N E 60

NE 65

NE 68

NE 72

NE 81

NE 83

NE 87

NE 96

NE 105N E 107

NE 112

NE 115N E 121

NE 124NE 125

N E 139

NE 143

N E 150

N E 156

NE 163

N E 165N E 167

N E 169

N E 171NE 173NE 174

NE 179NE 180

N E 185NE 188

NE 194

NE 200

NE 222NE 235NE 236

NE 248NE 249

N E 252

NE 257 NE 262NE 263

NE 276

N E 284NE 285

N E 288

NE 293NE 295

NE 297

NW 7

NW 11N W 14

OW 22

O W 40

OW 44

OW 53

OW 57

O W 63

SG 14s

SG 18a

SG 34SG 35SG 36

SG 39

SG 41SG 42

SG 47

SG 50

SG 51

SG 56

SG 64S G 69SG 71

SG 79S G 80

SG 98SG 99

S G 113

SG 114SG 116SG 117

SG 165

S G 168

SG 171

SG 201

SG 206

SG 209SG 210

S G 226SG 240

SG 243

SG 251

SG 276

SG 283

SG 287

SG 295SG 296a

SG 301S G 302

SG 311

SG 345

SG 361

SG 377SG 379

SG 384

SG 387

SG 398

SG 413SG 415

SG 480 SG 485

SG 491SG 503SG 504

SG 518

S G 533SG 534

SG 561

SG 569

SG 589a

S G 594

SG 604S G 605

SG 647

SH 3SH 6SH 9

SH 23

SH 25

SH 33

SH 39

SH 50 S

SH 58

SH 63

SIM P 18SIMP 19

SIM P 37

S IM P 53

SIM P 58

SIM P 67

S IM P032

SIM P037

SIMP 045

SIMP 051

SIMP 060

S IM P077

SO 2

SO 27

SO 49

S O 51

SO 53

SO 61

SO 74

SO 83SO 84

SO 95

SO 98SO 100

SO 104

SO 111SO 113

SO 116

SO 131

SO 132

SZ 11

SZ 24SZ 25

SZ 29

S Z 42

SZ 63

S Z 68

SZ 74

SZ 75SZ 78SZ 80

SZ 81

SZ 92

SZ 99

SZ 104

SZ 107

SZ 112SZ 113

TG 4TG 11

TG 34

TG 42

TG 44

TG 53

TG 157

TG 169

TG 177TG 179

TG 181

TG 197

TG 204TG 206

TG 209

TG 223

TG 232

TG 247

TG 259

TG 261

TG 275

TG 291

TI 1

TI 7

TI 10TI 12

TI 14TI 15TI 16TI 19TI 20

TI 22

TI 25

TI 36

TI 39

TI 40a

TI 67 TI 71TI 73

TI 93

TI 97

TI 118

TI 132

TI 139TI 141

TI 176TI 177

TI 192TI 206

TI 217a

TI 231

TI 236TI 241

TI 245

TI 251

TI 313

TI 328

TI 340

TI 344

TI 360

TI 363

TI 379

TI 384

TI 398TI 399

TI 402

TI 403

TI 406

TI 460

TI 473TI 474

TI 509

TI 541

TI 563

TI 604

U R 4UR 5UR 6

U R 10

UR 19

UR 23

U R 25

UR 41U R 42UR 44

UR 49

UR 50

U R 53

UR 65

U R 71

UR 77UR 78UR 80

U R 101U R 102bUR 105a

U R 108UR 109

UR 113

UR 117

U R 127U R 128

UR 136U R 138

UR 146U R 149

U R 152

UR 156

UR 163

U R 174

UR 178

U R 184

UR 187

UR 191

UR 195

UR 198

UR 199UR 201

U R 204

UR 206

U R 209U R 217

UR 234

UR 244 UR 249UR 256

U R 261UR 270

UR 275

VD E 1VD E 2VD E 18

V D E115VD E120

VD E248

VD E251

VD E254VD E 264VD E265

VD E272VD E277

VD E285

V D E292VD E293

VD E301

VD E318V D E319

V D E343

VD E347

VD E353

V D E358

VD E360

VD E365

VD E380

VD E386

VD E389VD E390

VD E397

VD E410

VD E426

VD E458V D E464

VD E 477 VD E479

VD E485

VD O 18

V D O 27

VD O 70

VD O 74

VD O 76VD O 79VD O 80

VD O 97VD O 98

VD O 170VD O 174

V D O189

VD O208

VD O 222

VD O230

VD O245VD O247V D O248

VD O 265

VD O284

VD O292VD O293

VD O 305

VD O308VD O 309VD O 311

VD O 317VD O 318

VD O 319VD O320

VD O322VD O 324

VD O327

V D O336

VD O341

VD O344VD O345

VD O 347VD O348

VD O351

VD O 356VD O358

VD O360VD O 361

VD O367

VD O 370VD O371

VD O 382

VD O 398

VD O 406VD O 408VD O 409VD O 410

VD O427VD O 428

VD O 431

VD O448

VS D 5VS D 8

VS D 23VS D 24VS D 26

V S D 28VS D 34VS D 35

VS D 39VS D 41

VS D 48

VS D 54

VS D 64

VS D 81

VS D 86

VS D 93

VS D119

VS D 136

VS D141

VS D151VS D 156aVS D157

VS D 158

VS D164

VS D170aVS D 175

VS D188VS D194

VS D197

VS D 200

VS D 205VS D 206

VS D216VS D217

VS D219

VS D 221

VS D 226

VS D231

V S D241

V S D 248VS D249VS D254VS D255

VS D267

V S D 270V S D 271VS D273VS D275

VS D277

V S D 286

VS D 289VS D291

VS D 294VS D296VS D301 VS D304

VS D 345

VS D367VS D368

VS D369VS D 370VS D371VS D407VS F 1

VS F 21VS F 22VS F 25

VS F 31VS F 34VS F 36

VS F 78VS F 83

VS F 85a

VS F 86

VS F 90VS F 91

VS F 93

VS F101

VS F107

VS F121

VS F127

VS F138

VS F142VS F144

VS F148VS F150

VS F154

VS F161

VS F194

VS F202

VS F233

V S F243

VS F249

VS F255

VS F257

VS F260VS F262

V S F264VS F267VS F269

VS F272

V S F281VS F284

VS F290VS F293

ZG 1

ZG 12ZG 13ZG 17

ZG 33

ZG 44ZG 86

ZH 3ZH 4

ZH 16

ZH 61

ZH 66

ZH 73ZH 79

ZH 92

ZH 96

ZH 118

ZH 137ZH 155

ZH 163

ZH 170

ZH 172

ZH 193

ZH 197

ZH 202

ZH 205

ZH 211

ZH 216ZH 220

ZH 232ZH 243

ZH 246

ZH 253a

ZH 257

ZH 266

ZH 298

ZH 302

ZH 320ZH 321

ZH 333

ZH 340

ZH 347

-0.20 m

-0.18 m

-0.16 m

-0.14 m

-0.12 m

-0.10 m

-0.08 m

-0.06 m

-0.04 m

-0.02 m

-0.00 m

0.02 m

0.04 m

0.06 m

0.08 m

0.10 m

Fig. 5-3 Differences between LN02 and normal heights

-0.20 m

-0.15 m

-0.10 m

-0.05 m

-0.00 m

0.05 m

0.10 m

0.15 m

0.20 m

0.25 m

0.30 m

0.35 m

0.40 m

0.45 m

0.50 m

0.55 m

0.60 m

0.65 m

Fig. 5-4: Differences between LHN95 and LN02

6 Maintenance of networks in Switzerland The organization and the revision cycle of the various networks are defined in the internal report 02-01 "Landesvermessung der Schweiz, Unterhaltskonzept der geodätischen Netze" [Santschi et al., 2002]. The revision work, quality standards, data management, documentation and archiving are defined for the various categories. All stations of the European networks are integrated in these categories and thus their maintenance is ensured.

6.1 EUREF stations This maintenance concept includes the following networks: - non-permanent EUREF stations - fundamental station Zimmerwald

6.2 National control points This maintenance concept includes the following networks:

Page 6: EUREF'03: National Report of Switzerland · EUREF'03: National Report of Switzerland New Developments in Swiss National Geodetic Surveying B. Vogel1, ... (AIUB) and the Swiss Federal

- the permanent stations of the Automated GPS Network of Switzerland, AGNES (including the fundamental station Zimmerwald)

- stations of the GPS network LV95 - transformation fiducial points for the conversion of the

national triangulation network LV03 national GPS control network LV95 (first order points)

- control points of the old LV03 (first order points)

- height control points (benchmarks) of the national height network LHN95 (first order points)

- test networks of the national survey

The organization and revision cycles are shown in Tab. 6-1.

Tasks number of sites

distance

km

establishment

when

maintenance

what where when

Zimmerwald 1 250 -- operation/measurement CH perm./yearly

EUREF stations

3 150 if required inspection CH every 5 years

AGNES stations

29 50 if required operation/inspection CH perm./every 5 years

LV95 stations

206 15 if required inspection CH every 5 years

First order points (LV03) 1)

3000 5 no new sites inspection Centr.Plateau every 15 years inspection Prealps/Jura every 25 years Alps if required

First order leveling points (LHN95)

9000 3 if required inspection CH every 15 years

Test nets 2 0-5 if required inspection CH every 5 years

1) Maintenance will be discontinued when LV95 is introduced as the reference frame for all surveying applications in Switzerland

Tab. 6-1 Maintenance concept of the Swiss control points

7 Current projects 7.1 Control point data service The schedule of the initial project "Datashop Geodesy" was revised and renamed "Control point data service" in June 2001. The focus of this project is no longer in just preparing the data of the control points for use on the Internet, but in establishing and updating a central database of the control points together with the surveying authorities of the cantons, whereby the data will be made available to customers via the so-called "Central Point of Delivery". In the scope of the transition from the old triangulation network LV03 to the new GPS control network LV95, it is very important to maintain and keep up the data of the control points. In order to achieve this goal, close collaboration is required between the Geodesy Division, the Federal Directorate for Cadastral Surveying and the cantons. Currently a Java user interface is being programmed and the data from swisstopo and the cantons are being imported.

7.2 GIS for the national border The responsibility of the technical administration and the maintenance of the national border network lie with the Geodesy Division. For some time already, the main focus has been on drafting a new maintenance and documentation concept on the one hand, and on coordinating this information with the official cadastral surveying data on the other hand. Therefore, in addition to the daily business, the

efforts were concentrated on this concept, which resulted in the new project "National Border".

The project consists of the following tasks: - securing and maintaining the points of the national border

together with the neighboring countries - modernizing the data management and documentation - making the coordinates available in the European

reference frame ETRF89 as well as in the reference frames of the neighboring countries

- preparing the data and their integration in the GIS of the official cadastral survey and in the topographic database

The data management is to be part of a GIS. The same instrument should also be used for the administration of the boundaries between cantons, districts and municipalities. In addition, the data model should be revised and made available in the geographic data standard INTERLIS in order to guarantee a uniform data transfer. This conversion should be realized by the end of 2007.

7.3 New national height system LHN95 The activities in 2002 were mainly focused on the following subjects: - integrating the new observations 2001/02 of the 1st order

leveling network and the connections to the AGNES and LV95 stations

- documenting the network concept LHN95; observation schedule 2004-2008

Page 7: EUREF'03: National Report of Switzerland · EUREF'03: National Report of Switzerland New Developments in Swiss National Geodetic Surveying B. Vogel1, ... (AIUB) and the Swiss Federal

- collaboration in the CHGeo2003 campaign [Brockmann et al., 2003]

- coordination with the users of the official cadastral survey and GIS

- developing the software module for the transition LHN95 LN02 (see chap. 5.3)

- finishing the scans for the site documentation - developing the new database in the scope of the project

"Control point data service" (see chap. 7.1) The introduction of LHN95 as the official vertical reference frame for cadastral surveying was rejected by the surveying authorities of the cantons. Therefore, the valid height reference frame for official cadastral surveying is still the "old" LN02. However, LHN95 will remain indispensable for applications in national surveying, scientific research, for the integration of European height systems, and for large engineering projects such as the new Alpine railway tunnels (AlpTransit). As a consequence, increased significance will be placed on the software for the transformation between LN02 and LHN95.

7.4 Swiss 4D: Establishing a kinematic model for Switzerland

Based on the data of the Swiss permanent GPS network AGNES and repeated measurements, swisstopo is developing a kinematic model in collaboration with the Geodesy and Geodynamics Lab of the Swiss Federal Institute of Technology in Zürich, which will take into account recent tectonic movements (see Fig. 7-1).

The determination of a local–regional kinematic model for Switzerland (CHKM95) is an essential component of the new definition of the Swiss geodetic reference system CHTRS95. CHKM95 describes regional movements in Switzerland relative to the European reference system ETRS89 as well as local movements in the geodetic networks LV95 and LHN95 in all three dimensions.

Last but not least, the deformation of space and time will be analysed so that tectonic interpretations are possible. Continuous spatial velocity or strain rate fields are suited for the description of the deformation processes. Also, seismic and geological information is of interest.

Fig. 7-1: Swiss permanent GPS network (blue: station has been operating more than 4 years)

AGNES Velocities

Page 8: EUREF'03: National Report of Switzerland · EUREF'03: National Report of Switzerland New Developments in Swiss National Geodetic Surveying B. Vogel1, ... (AIUB) and the Swiss Federal

References Brockmann E. (2001): Positionierungsdienste und Geodaten

des Schweizerischen Bundesamtes für Landestopographie, (2001) POSNAV 2001 Tagungsband, DGON Symposium, 6-8. März Dresden, Bonn 2001.

Brockmann E., S. Grünig, R. Hug, D. Schneider, A. Wiget and U. Wild (2001a): Introduction and first applications of a Real-Time Precise Positioning Service using the Swiss Permanent Network 'AGNES'. In: Torres J.A. and H. Hornik (Eds): Subcommission for the European Reference Frame (EUREF). National Report of Switzerland, EUREF Publication No. 10, Mitteilungen des Bundesamtes für Kartographie und Geodäsie, Vol. 23, Frankfurt am Main 2002, pp. 272-276; swisstopo Technischer Bericht 01-13, Wabern, Switzerland.

Brockmann E., G. Guerova and M. Troller (2001b): Swiss Activities in combining GPS with Meteorology. In Torres, J.A. and H. Hornik (Eds): Subcommission for the European Reference Frame (EUREF). EUREF Publication Nr. 10, München 2001.

Brockmann E. and M. Troller (2002): GPS Meteorology in the Swiss Alps: Interpolation Accuracy for different Alpine Areas and Near Real-time Results, COST-716 workshop Potsdam, Jan. 28-29 2002.

Brockmann E., R. Hug and Th. Signer (2002a): Geotectonics in the Swiss Alps using GPS. In: Torres, J.A. and H. Hornik (Eds): Subcommission for the European Reference Frame (EUREF). EUREF Publication No. 11 (in prep.).

Brockmann E., S. Grünig, D. Schneider, A. Wiget and U. Wild (2002b): Applications of the real-time Swiss GPS permanent network AGNES. In Proceedings of the EGS XXVII General Assembly Nice, 21-26 April 2002, Session 9 on Evolving Space Geodesy Techniques, Physics and Chemistry of the Earth (in prep.)

Brockmann E., D. Ineichen, M. Kistler, U. Marti, A. Schlatter and D. Schneider (2003): CH-CGN activities in Switzerland. In: Torres, J.A. and H. Hornik (Eds): Subcommission for the European Reference Frame (EUREF). (this volume).

Guerova G., J.-M. Bettems, E. Brockmann and Ch. Matzler (2002): Assimilation of the GPS-derived Integrated Water Vapour (IWV) in the MeteoSwiss Numerical Weather Prediction model - a first experiment. In Proceedings of the EGS XXVII General Assembly Nice,

21-26 April 2002, Session 9 on Evolving Space Geo-desy Techniques, Physics and Chemistry of the Earth (in prep.).

Hugentobler U., S. Schaer and P. Fridez (Eds.) (2001): Bernese GPS Software Version 4.2 documentation. Astronomical Institute of the University of Berne, 2001.

Ihde J., J. Adam, C. Bruyninx, A. Kenyeres and J. Simek (2002): Development of a European Combined Geodetic Network (ECGN). In: Torres, J.A. and H. Hornik (Eds): Subcommission for the European Reference Frame (EUREF). EUREF Publication No. 11 (in prep.).

Kenyeres A., J. Bosy, E. Brockmann, C. Bruyninx, A. Caporali, J. Hefty, L. Jivall, A. Kosters, M. Poutanen, F. Rui and G. Stangl (2001): EPN Special Project on “Time series analysis … “Preliminary Results and Future Prospects. EUREF Publication Nr. 10, München 2001.

Kenyeres A., J. Ihde, J. Simek, U. Marti, R. Molendijk (2002): EUREF Action for the Densification of the existing EUVN Network. EUREF Publication Nr. 12, München, in press.

Marti U. (2002): IGGC 2002: Modelling of Differences of Height Systems in Switzerland. (Paper presented at the 3rd Meeting of the International Gravity and Geoid Commission in Thessaloniki, Greece, August 26-30, 2002.) Technischer Bericht 02-34, Bundesamt für Landestopographie, Wabern.

Santschi W., B. Vogel, Th. Signer, B. Mattli und D. Gutknecht (2002): Landesvermessung der Schweiz, Unterhaltskonzept der geodätischen Netze. Swisstopo Report 02-01.

Schneider D., E. Brockmann, U. Marti, A. Schlatter, Th. Signer, A. Wiget and U. Wild (2002): National report of Switzerland: New developments in Swiss National Geodetic Surveying. In: Torres, J.A. and H. Hornik (Eds): Subcommission for the European Reference Frame (EUREF). EUREF Publication No. 11 (in prep.).

van der Marel H., E. Brockmann, E. Calais, J. Dousa, G. Gendt, M. Ge, S. de Haan, M. Higgins, J. Johansson, D. Offiler, R. Pacione, A. Rius and F. Vespe (2001): The COST-716 Benchmark GPS Campaign for Numerical Weather Prediction Applications. EGS General Assembly, Nice, 29 March 2001. Geodesy and Meteorology. Publication in prep.