“EURORAIL” ProjectOrganizational model

Page 2: Euro rail eng_full

EURORAIL Project

Initiator: Ministry of transport and communications of Ukraine Lviv Oblast State Administration Lviv City Council

Cost: 500 mln. EUR

Terms: 2010-2015

Prerequisites: • Discrepancy of Ukrainian and CIS countries’ railways

(1520) with the EU railway standard UIC (1435) • Increased demand for fast and qualified

communication between Ukraine (CIS) and Europe

Page 3: Euro rail eng_full

EURORAIL Project

Page 4: Euro rail eng_full

Project main statements

Project subject: The construction of 84 km long EU standard rail track and all required infrastructure between Lviv and Polish-Ukrainian border (Prezemysl/Mostyska and Krakivets).

Goal: to provide high speed railway connection between Lviv and Polish-Ukrainian border within III Euro transport corridor.

Mechanism: Concession for construction and further operation of the rail track and its infrastructure.

Participants: Cabinet of Ministers of Ukraine, Ministry of transport and communication of Ukraine, Lviv Oblast State Administration, Lviv City Council, private companiesЛьвівська обласна Рада, Львівська міська Рада, приватні компанії. Participation of Ministry of infrastructure of Poland is also needed.

Page 5: Euro rail eng_full

Implementation algorithm

1. JSC “Evrokoliya” set up by experienced in this field companies. 2. The Cabinet of Ministers of Ukraine is to issue the Resolution

regarding “Eurorail” Project implementation and assign core Ministry (Ministry of transport and communication of Ukraine) to be responsible for its realization.

3. The Concession Agreement is to be signed with the Company-contractor identified through the Tender.

4. The Concession Agreement is to be prepared and signed by Ministry of transport and communication of Ukraine, Lviv Oblast State Administration, Lviv City Council and JSC “Evrokoliya” and is to contain Project implementation mechanisms.

5. JSC “Evrokoliya” attracts all required financial funds and contractors for the Project implementation.

6. After the project is implemented it is to be managed and used by Ministry of transport and communication of Ukraine. The last is to make payments for the benefit of JSC “Evrokoliya”.

Page 6: Euro rail eng_full

Project schemeJSC

“Eurokoliya

Ministry of transport

Rail track and infrastructure

oper

atio

n

Ow

ner

ship

for

the

rail

trac

k an

d t

he

par

t of

infr

astr

uct

ure

JSC “Eurokoliya”

Plots

Spec

ific

atio

ns

ІInfo

rmat

ion

Ministry of transport

Lviv Oblast Administration

Investm

ents

Lviv City Council

Founders

Const

ruct

ion p

roce

ss

Euro

rai

l tr

ack

usa

ge

pay

men

ts a

ccord

ing t

o t

he

Conce

ssio

n A

gre

emen

t as

the

inve

stm

ents

re

turn

sourc

eOw

ner

ship

for

the

par

t of

infr

astr

uct

ure

Page 7: Euro rail eng_full

JSC “Evrokoliya” set up “Evrokoliya” is to be joint-stock company

JSC “Evrokoliya” founders (companies) are to be able to provide qualified Project implementation.

Company’s dominant task – is to develop contract and legal platform for its further activity (including possible relations coordination between core Ministers of Ukraine and Poland and between Lviv Oblast Administration and Lviv City Council).

JSC “Evrokoliya” is to hold a research on a Project, provide its feasibility study and approve the Project with all Participants.

The last stage – Project Business Plan, investments attraction and Project implementation.

Page 8: Euro rail eng_full

Concession Agreement

Main regulations: Project participant’s collaboration mechanism.

Participant’s obligations (land plots, information, specifications provision for the Project by its Participants).

Constructed object’s ownership (tracks, terminals, technical buildings, warehouses etc.).

Relations among Project Participants on the after construction stage when the rail track and its infrastructure will be operated.

Rail track and its infrastructure usage payments as the investments return source

Page 9: Euro rail eng_full

Implementation phases Phase I: 2008 - 2009•Pre-feasibility study• Memorandum of Understanding with Dutch MOVARES and NEA for pre-feasibility study, 133,000 EUR attracted from the Dutch government. •Additional investment required for Phase 1 – 250,000 eur

Phase II: 2009 – 2010•Pre-feasibility study presentation to all the stakeholders for final decision-making•The establishment of the International Project Implementation Consortium•Finalizing Project Finance Structure and Legal Model (PPP)

Phase III: 2010 – 2013Project Implementation: •Construction the rail track from Polish/Ukrainian border to Lviv (86 km)•New rail infrastructure development, including modern passenger and goods terminal near and in Lviv

Page 10: Euro rail eng_full

Project impact assessment

Increase of passenger and cargo flowsMaximum shortening of the travel time

Social and economic development of the regionUkraine’s integration with main European cities

Page 11: Euro rail eng_full

Leonid Bogdanov, CEO [email protected] Stetskiv, CFO [email protected]

Kyiv, Ukraine 011339 Lesi Ukrainki Blvd, Tel.: +38 044 585 10 80Fax: +38 044 585 10 79www.unidevelop.com