eurocode ~ complete object denotation environment eurocode ~ complete object denotation environment...
TRANSCRIPT
EuroCODE ~ CompleteObjectDenotation
Environment
EuroCODE ~ CompleteObjectDenotation
Environment
A Component-based Semantic Knowledge Platform
Erfahrungen mit einem EU-Proposalaus dem MultiMedia Lab
A Component-based Semantic Knowledge Platform
Erfahrungen mit einem EU-Proposalaus dem MultiMedia Lab
Guerino MazzolaGuerino Mazzola
Autumn 2002
The Topos of MusicThe Topos of Music Geometric Logic of Concepts, Geometric Logic of Concepts, Theory, and PerformanceTheory, and Performance
In collaboration with
Stefan GöllerStefan Göller and and
Stefan MüllerStefan Müller
Contributions by
Carlos Agon, Moreno Andreatta, Carlos Agon, Moreno Andreatta,
Gérard Assayag, Jan Beran, Gérard Assayag, Jan Beran, Chantal Chantal
ButeauButeau, , Roberto FerrettiRoberto Ferretti, Anja , Anja
Fleischer, Harald Fripertinger, Jörg Fleischer, Harald Fripertinger, Jörg
Garbers,Werner Hemmert, Michael Garbers,Werner Hemmert, Michael
Leyton, Emilio Lluis Puebla,Leyton, Emilio Lluis Puebla,
Mariana Montiel Hernandez, Mariana Montiel Hernandez,
Thomas Noll, Joachim Stange-Elbe, Thomas Noll, Joachim Stange-Elbe,
Hans StraubHans Straub, , Oliver ZahorkaOliver Zahorka
1368pp/CD-ROM1368pp/CD-ROM
ISBN 3-7643-5731-2ISBN 3-7643-5731-2
ToM
... to survive!... to survive!Apply!Apply!
in o
rder
to s
urvi
ve
Project CategoryProject Category
-> Priority 2 = IST = Information Society Technologies-> Priority 2 = IST = Information Society Technologies 11stst Call (Dec.2002) Call (Dec.2002) Activity code = IST-2002-2.3.1.7 ~ Activity code = IST-2002-2.3.1.7 ~ Semantic-based knowledge systemsSemantic-based knowledge systems
multimedia content mining, multimedia content mining, distributed computing platforms,distributed computing platforms,mastery of complex information spaces,mastery of complex information spaces,visualisation of high-dimensional objects, visualisation of high-dimensional objects, new formal models, covering foundational new formal models, covering foundational component-level as well as system-level researchcomponent-level as well as system-level research
-> Instrument = STREP =-> Instrument = STREP = SSpecial pecial TTargeted argeted REREsearch and innovation search and innovation PProjectroject (new results/knowledge -> develop products) (new results/knowledge -> develop products)
-> STREP Activity = RTD + innovation-related-> STREP Activity = RTD + innovation-related + project management activities + project management activities
+ demonstration activities + demonstration activities
6th Framework Program6th Framework ProgramE
U 6
th F
P
Instrument = STRIP = Instrument = STRIP = SSpecial pecial TTargeted argeted RResearch and esearch and IInnovation nnovation PProjectroject
1.1. Knowledge is Knowledge is ordered access to ordered access to information information
3 pr
inci
ples
2.2. Knowledge is controlled by Knowledge is controlled by multimedia objectsmultimedia objects3
prin
cipl
es
3. 3. The body of knowledgeThe body of knowledgeevolves in a cyclic processevolves in a cyclic process3
prin
cipl
es ProductionProduction
DisseminationDissemination
DocumentationDocumentation
ReflectionReflection
prestopresto®
1:26
pres
to
Os XOs X
RUBATORUBATO®®
RU
BA
TO
GeneralNoteGeneralNoteGeneralNoteGeneralNote
–– ––
OnsetOnsetOnsetOnset LoudnessLoudnessLoudnessLoudness DurationDurationDurationDurationPitchPitchPitchPitch
NoteNoteNoteNote
STRGSTRGŸŸ–– ––
DurationDurationDurationDurationOnsetOnsetOnsetOnset
PausePausePausePause
conc
ept m
odel
ing
MakroNoteMakroNoteMakroNoteMakroNote
MakroNoteMakroNoteMakroNoteMakroNote
SatellitesSatellitesSatellitesSatellites
• OrnamentsOrnaments• Schenker AnalysisSchenker Analysis
GeneralNoteGeneralNoteGeneralNoteGeneralNote
–– ––
OnsetOnsetOnsetOnset LoudnessLoudnessLoudnessLoudness DurationDurationDurationDurationPitchPitchPitchPitch
NoteNoteNoteNote
STRGSTRGŸŸ–– ––
DurationDurationDurationDurationOnsetOnsetOnsetOnset
PausePausePausePause
conc
ept m
odel
ing
EE
form
sem
iotic
s
Mono(E E )
RR
DenDen FormsForms
Diagrams (DenDen /E E )Diagrams (DenDen /E E )
Coordinate Identifier
D-Name
F-Name
Form
Type
DiagramTypesTypes
◊
FrameSpace for type:
Simple √ = ◊ RRsimple(simple(√) =) = RR
representationrepresentationrepresentationrepresentation
Limit √ = form-name diagram EElimit(limit(√) = ) = lim(f. diagram lim(f. diagram E E )) conjunctionconjunctionconjunctionconjunction
Colimit √ = form-name diagram EEcolimit(colimit(√) = ) = colim(f. diagram colim(f. diagram EE )) disjunctiondisjunctiondisjunctiondisjunction
Power √ = fn EE power(power(√) =) = Space(fn)Space(fn) collectioncollectioncollectioncollection
fram
e sp
aces
Bab
ousk
a
Expression Signification Content
Meta system
ExpressionExpression SignificationSignification ContentContent
Expression Signification Content
Motivation
Expression Signification Content
Connotation
Hjelmslev‘s Babouska PrincipleHjelmslev‘s Babouska Principle
Name Type/Diagram Identifier
Name Form Coordinate
DenotatorDenotator
Topos
form
sem
iotic
sThe semiotic structure (Hjelmslev stratification) of denotators:The semiotic structure (Hjelmslev stratification) of denotators:The triadic sign structure (signifier/signification/signified) The triadic sign structure (signifier/signification/signified) reads from left to rightreads from left to right
pate
nt
MakroNoteMakroNoteMakroNoteMakroNote
MakroNoteMakroNoteMakroNoteMakroNote
SatellitesSatellitesSatellitesSatellitesGeneralNoteGeneralNoteGeneralNoteGeneralNote
–– ––OnsetOnsetOnsetOnset LoudnessLoudnessLoudnessLoudnessDurationDurationDurationDurationPitchPitchPitchPitch
NoteNoteNoteNote
STRGSTRGŸŸ–– ––DurationDurationDurationDurationOnsetOnsetOnsetOnset
PausePausePausePause
RenderRenderDenoteDenote
mul
timed
ia s
cien
ce
VECTORSVECTORS
CONCEPTSCONCEPTS
foldfoldconceiveconceive
parametrizeparametrize
denotedenote
objectivizeobjectivize
renderrender
manipulatemanipulate operateoperate
transformtransform
mul
timed
ia s
cien
ce
VECTORSVECTORS
CONCEPTSCONCEPTS
foldfoldobjectivizeobjectivize
renderrender
mul
timed
ia s
cien
ce
VECTORSVECTORS
CONCEPTSCONCEPTS
foldfold
fold
ing
lexicographic orderinglexicographic ordering
xxx = (xx = (x11,x,x22,x,x33,...,x,...,xnn))
n-cuben-cube
quantize:quantize:xxii = 0,1,2,3,...,d = 0,1,2,3,...,d
real axisx*x*
common orderingcommon ordering
x* = 0.xx* = 0.x11xx22xx33...x...xnn
fold
ing
mul
timed
ia s
cien
ce
VECTORSVECTORS
objectivizeobjectivize
pino
cchi
o
book
s
mov
ie Movie of Stefan Göller‘s Movie of Stefan Göller‘s PrimavistaBrowserPrimavistaBrowser
500 Pinocchios500 Pinocchios AnimatesAnimatesWorkflowWorkflow
11
11 1
1111 1
1
sate
llite
sSatSatSatSat
SatlistSatlistSatlistSatlistGeoGeoGeoGeo
TimeTimeTimeTime
——22
——*4*4
SoundSoundSoundSound
TimeTimeTimeTime
——22
——*3*3
ScaleScaleScaleScale
TimeTimeTimeTime
——22
——*3*3
TransTransTransTrans
TimeTimeTimeTime
——22
——*3*3
RotRotRotRot
TimeTimeTimeTime
——22
——**
TexTexTexTex
TimeTimeTimeTime
——22
——*3*3
ColorColorColorColor
ETCETCETCETCTerminatorTerminator
RTCRTCRTCRTC
URLURL
SatlistSatlistSatlistSatlist SatSatSatSat
manipulatemanipulatem
anip
ulat
e ob
ject
s
cock
pit -
esp
ress
o
cock
pit -
esp
ress
o
cock
pit -
esp
ress
o
The EuroCODE ArchitectureThe EuroCODE Architecture
Framework: Framework: Denotator, Form,Denotator, Form,Topoi (Ring, Module, etc.)Topoi (Ring, Module, etc.)Diagram, ...Diagram, ...
LoGeo class library: LoGeo class library: Logical and geometric Logical and geometric operations for predicate operations for predicate construction and construction and
manipulationmanipulation search algorithmssearch algorithms
Prima-Prima-Vista-Vista-BrowserBrowser
Info-Info-CodetteCodette
MandatoryMandatory
Codette-Codette-FactoryFactory
ChallengingChallenging
Cockpit-Cockpit-FactoryFactory
ToolsTools
XMLXML22CODECODE
Mus-e-Mus-e-Lear-Lear-ningning
AMO-AMO-CodetteCodette
Data-Data-ScapeScape
Etc.Etc.
Cockpit 1Cockpit 1
Cockpit 2Cockpit 2
Challenging ComponentsChallenging ComponentsGeneric toolsGeneric tools
The EuroCODE R&D Strategy = The EuroCODE R&D Strategy = RED&TRED&T
LoGeoLoGeo
Codette-Codette-FactoryFactory
Cockpit-Cockpit-FactoryFactory
= PredicateBuilder (Processes)
= StructureBuilder (Architecture)
= InterfaceBuilder (Interaction)
Data-Data-ScapeScape
XMLXML22CODECODE
AMOAMOCodetteCodette
Mus-e-Mus-e-Lear-Lear-ningning
Etc.Etc.
ExtendExtend
TestTest
DeliverDeliver
RequestRequest
red&
t
wor
kpac
kage
s11 partners:11 partners:55 Universities andUniversities and
research centersresearch centers1 1 foundationfoundation1 1 big companybig company4 4 SMEsSMEs
15 WP, 122 DEL15 WP, 122 DEL3 years, 3 years,
5.8 M€ ~ 926 MM5.8 M€ ~ 926 MM0.3 M€ management0.3 M€ management
management-oriented packagesmanagement-oriented packages
• WORK 1 (project management)WORK 1 (project management)• WORK 2 (communication WORK 2 (communication
management)management)• WORK 3 (scientific coordination)WORK 3 (scientific coordination)• WORK 15 (transfer management)WORK 15 (transfer management)
generic workpackagesgeneric workpackages
• WORK 4 (Framework) WORK 4 (Framework) • WORK 5 (PredicateBuilder) WORK 5 (PredicateBuilder) • WORK 6 (PrimavistaBrowser) WORK 6 (PrimavistaBrowser) • WORK 7 (CodetteFactory) WORK 7 (CodetteFactory) • WORK 8 (CockpitFactory) WORK 8 (CockpitFactory)
challenging component targeted challenging component targeted packagespackages
• WORK 9 (XML2CODE)WORK 9 (XML2CODE)• WORK 10 (AMOCodette)WORK 10 (AMOCodette)• WORK 11 (DataScape) WORK 11 (DataScape) • WORK 12 (TerrainDataView)WORK 12 (TerrainDataView)• WORK 13 (KnowledgeGate)WORK 13 (KnowledgeGate)• WORK 14 (Mus-e-Learning) WORK 14 (Mus-e-Learning)
Project ManagerProject Manager
General PublicGeneral Public EU CommissionEU Commission
Steering BoardSteering Board(with representa-(with representa-tives from eachtives from eachpartner)partner)
AdministrationAdministration ComunicationComunication Scientific Scientific CoordinationCoordination
Transfer Transfer ManagementManagement
man
agem
ent
WORK 1WORK 1 WORK 2WORK 2 WORK 3WORK 3 WORK 15WORK 15
Statistik zur 1. IST-Ausschreibung Die erste IST-Ausschreibung im 6. Forschungsrahmenprogramm endete am 24. April 2003. Insgesamt sind 1473 Projektanträge eingereicht wordenInsgesamt sind 1473 Projektanträge eingereicht worden, und zwar 77,6% als Papierversion und 22,4% per elektronischer Einreichung.
Ein erster statistischer Überblick über die Anzahl der eingereichten Projektanträge - aufgeschlüsselt nach den einzelnen strategischen Zielen aus dem IST-Arbeitsprogramm und mit Verteilung auf die einzelnen Instrumente (IP, NoE, STREP und andere: CA, SSA): 2.3.1.1 CMOS und Post-CMOS: 53 gesamt (11 IPs, 8 NoEs, 29 STREPs, 5 andere)2.3.1.2 Mikro-, Nanosysteme: 82 gesamt (25 IPs, 14 NoEs, 36 STREPs, 7 andere) 2.3.1.3 Breitband für alle: 80 gesamt (12 IPs, 8 NoEs, 45 STREPs, 15 andere) 2.3.1.4 Mobile drahtlose Systeme: 92 gesamt (15 IPs, 15 NoEs, 50 STREPs, 12 andere) 2.3.1.5 Zuverlässigkeit, Sicherheit: 93 gesamt (23 IPs, 8 NoEs, 55 STREPs, 7 andere) 2.3.1.6 Multimodale Schnittstellen: 74 gesamt (23 IPs, 10 NoEs, 36 STREPs, 5 andere) 2.3.1.7 Wissenssysteme: 129 gesamt (2.3.1.7 Wissenssysteme: 129 gesamt (18 IPs, 21 NoEs,, 80 STREPs, 80 STREPs, 10 andere)) 2.3.1.8 audiov. Syst., Heimplattformen: 78 gesamt (18 IPs, 7 NoEs, 48 STREPs, 5 andere) 2.3.1.9 eBusiness, eGovernment: 248 gesamt (59 IPs, 19 NoEs, 116 STREPs, 54 andere) 2.3.1.10 eSafety: 53 gesamt (11 IPs, 3 NoEs, 35 STREPs, 4 andere) 2.3.1.11 eHealth: 170 gesamt (47 IPs, 20 NoEs, 89 STREPs, 14 andere) 2.3.1.12 eLearning, Kultur: 217 gesamt (54 IPs, 27 NoEs, 115 STREPs, 21 andere) 2.3.4.2 FET vorausschauend: 30 gesamt (25 IPs, 4 NoEs, 1 STREP)
2.3.6 Begleitmaßnahmen: 35 gesamt (4 CAs, 31 SSAs)
Summe: 1473 gesamt (348 IPs, 169 NoEs, 755 STREPs, 58 CAs, 138 SSAs, 5?) Die budgetmäßige budgetmäßige ÜberzeichnungÜberzeichnung (Verhältnis von beantragtem Budget zu verfügbarem Budget) variiert in den einzelnen strategischen Zielen und liegt zwischen 5:1 und 20:1liegt zwischen 5:1 und 20:1.
Gemeinsame Ausschreibung mit Priorität 3 2.3.3.1 Produkte und Dienste 2010: 92 gesamt (52 IPs, 18 NoEs, 9 CAs, 13 SSAs)
Weiterer Zeitplan für die 1. IST-Ausschreibung: Die Europäische Kommission hat folgenden Zeitplan für die erste IST-Ausschreibung vorgelegt: 12. bis 23. Mai 2003: Begutachtung der Projektanträge 2. bis 13. Juni 2003: Anhörungen (hearings) zu den erfolgreichen (über Schwellwerten liegend) IPs und NoEs 26. Kalenderwoche (=nächste Woche): Projektkoordinator erhält Bewertungsbericht26. Kalenderwoche (=nächste Woche): Projektkoordinator erhält Bewertungsbericht (Evaluation Summary Report) und Begutachtungsbericht geht an das IST Committee. Ab diesem Zeitpunkt können wir Ihnen nähere Auskünfte zu Ihren Projektanträgen geben (Anfragen bitte per eMail an [email protected] mit Angaben zu Antrags-Nr., Akronym, angesprochener IST Bereich 'strategic objective', Name des Antragstellers) 9.-10. Juli 2003: Bilaterale Gespräche zwischen Vertretern der Mitgliedstaaten (IST Committee) und Europäischer Kommission 25. Juli 2003: Endgültige Liste der geförderten Projekte (implementation plan)
stat
istic
s