euso balloon instrument assembly, integration and tests plan
DESCRIPTION
EUSO BALLOON INSTRUMENT Assembly, Integration and Tests Plan. Sylvie Dagoret-Campagne LAL. TABLE OF CONTENT. 1 Scope of the document 5 2 Documentation 5 2.1 Applicable documents 5 2.2 Reference documents 5 2.3 glossary 5 3 Instrument overview 6 3.1 Sybsystems configurations 8 - PowerPoint PPT PresentationTRANSCRIPT
9th EUSO-B Progress Meeting, Naples, November 9th 2012
1
EUSO BALLOON INSTRUMENTAssembly, Integration and Tests
Plan
Sylvie Dagoret-CampagneLAL
9th EUSO-B Progress Meeting, Naples, November 9th 2012
2
TABLE OF CONTENT1 Scope of the document 52 Documentation 52.1 Applicable documents 52.2 Reference documents 52.3 glossary53 Instrument overview 63.1 Sybsystems configurations 83.1.1 EUSO Balloon instrument in C1 configuration 83.1.2 EUSO Balloon instrument in C2 configuration 93.1.3 EUSO Balloon instrument in FLIGHT configuration 94 AIT organisation94.1 General overview of the AIT 94.2 Constitution of the AIT teams 104.3 Management 104.3.1 Schedule and activities Management 104.3.2 TraçabilitY 114.3.3 Risk 115 GROUND FACILITIES 115.1 Electrical Segment Equipement 115.2 Photometric Segment Equipement 115.3 Mechanical Segment Equipement 115.4 Optical Segment Equipement 12
9th EUSO-B Progress Meeting, Naples, November 9th 2012
3
6. subsystem AIT activity 126.1 PDM 126.1.1 AIT activities overview 126.1.2 PDM AIT detailed activities 166.1.3 PDM delivery to the instrument 316.2 DP AIT activities316.2.1 AIT activities overview 316.2.2 DP AIT detailed activities 316.2.3 DP delivery to the instrument 356.3 Lenses AIT activities 356.3.1 AIT activities overview 356.3.2 Lenses AIT detailed activities 356.3.3 Lenses delivery to the instrument 356.4 PWP AIT Activity 35
9th EUSO-B Progress Meeting, Naples, November 9th 2012
4
7 EUSO Balloon Instrument AIT activities 367.1 Activities overview 367.2 AIT of the Instrument phase 1 377.2.1 Preparation of the mechanical integration 377.2.2 Assembly of the electrical section 377.2.3 Good health tests 387.2.4 Assembly of the Optical Section 387.2.5 Optical alignment397.3 AIT of the Instrument phase 2 397.3.1 Functional tests of the TM with NOSYCA 397.3.2 Autonomous gondola tests 407.3.3 Campaign simulation tests 407.4 AIT of the Instrument phase 3 407.4.1 disassembly of the instrument 407.4.2 Instrument packaging for transportation 417.5 AIT of the Instrument phase 4 417.5.1 Reception control and preparation 417.5.2 Assembly of the whole instrument 417.5.3 Optical alignment of the instrument 417.5.4 Instrument good health tests 417.5.5 Gondola finalization 427.5.6 Instrument recovery 427.5.7 Instrument integrity control 427.5.8 Instrument packaging for transportation 42
9th EUSO-B Progress Meeting, Naples, November 9th 2012
5
INSTRUMENT OVERVIEW
9th EUSO-B Progress Meeting, Naples, November 9th 2012
6
EC-HV
EC-DYNODE
HVPS2
HVPS1
MAP
MT
EC-ANODE
EC-ASIC
PDM-B
IR-CAM
Batteries
PWP
LVPS
-DP1
LVPS
-DP2
LVPS-PDM
LVPS
-HK
HK
CCB
CLKB
GPSR
CPU
DST
SIREN
CNES Telemetry
EXT
Bat Controller
TLS
Sensors
Motors
SPACEWIRE/PCI
EC-Front
EC-Back
DP PDM
9th EUSO-B Progress Meeting, Naples, November 9th 2012
7
PDM AIT
9th EUSO-B Progress Meeting, Naples, November 9th 2012
8
ComponentPre-assembly
Component test
EC-Unit
HVPS
EC-ASIC
PDM-B
ComponentManufacturing
Pre-Integration Assembly
IntegrationTests &Validation
PAECM2
PAECM1
THV1
THV2
TECA2
TECA1
TPD1..N
IEC1
IEC2
IEC3
IEL1
IEL2
AP1
AP2
AP3 CAPHEC1
TrigPDM
9th EUSO-B Progress Meeting, Naples, November 9th 2012
9
9th EUSO-B Progress Meeting, Naples, November 9th 2012
10
NIM/CAMAC
Pre-Integration IEC3(@APC)
Light Source
&Opt. Bench
Power 28 V
Special EC Frame (1)
HV Box(1)
EC-Unit1
EC-ASICs1
Test-EC-Unit(2- ?)
FAST-DAQOr
LAbView
• Slow control parameters can be downloaded and read back,
• Trigger curves obtained by DAC threshold slopes (S-Curves) measured on each of the 64 channel of the photon counting,
• No particular check will be done on KI channels at this stage.
Power 3.3 V & 1.5 V
9th EUSO-B Progress Meeting, Naples, November 9th 2012
11
PDM Frame (1)
EC-Unit(9)
EC-ASICs(6)
Assembly
AP1 AP2
PDM Frame (1)
HV Box(1)
EC-Unit(9)
EC-ASICs(6)36 EC-Anode Flex
256 HV cables
9th EUSO-B Progress Meeting, Naples, November 9th 2012
12
NIM/CAMAC
Integration AP1,AP2,AP3, CAPHEC1(APC)
Light Source
&Opt. Bench
Power 28 V
PDM Frame (1)
HV Box(1)
EC-Unit(9)
EC-ASICs(6)
Test-EC-Unit(2- ?)
FAST-DAQOr
LAbView
Assembly (AP1,AP2,AP3) : mount all Electronics at the rear of the PDM• EC-ASIC• HV
Integration put the cables in the connectors:• Connect the EC-Units to the EC-ASIC through the FS frame though the EC-Anode flex cables,
Test and validation , CAPHEC1 at APC• Photon detection efficiency for each channel,• Gain of each MAPMT,• Electronic gain matching• S-Curves for each pixel,• KI-S-curve,• Voltage for each EC,
Power 3.3 V & 1.5 V
9th EUSO-B Progress Meeting, Naples, November 9th 2012
13
Data analysis for each of the 64 channels- Quantum efficiency- Gain
EC-Units EC-ASIC
Pulser
LED
PhotocathodeUniform illuminationIn single photoelectronmode
HV 900 V HVPS
K and dynodes
Test and Validation CAPHEC1 (Calibration@APC)
Integrand sphere
collimators
TEST-ECASIC
9th EUSO-B Progress Meeting, Naples, November 9th 2012
14
FSEC-Units EC-ASIC
HV 900 V HVPS
K and dynodes
Trigger Validation TrigPDM
PDMB
AbsorberTo work inUV and low light mode
9th EUSO-B Progress Meeting, Naples, November 9th 2012
15
Electronic Integration IEL1 (Resp LAL)
(1) (6)
PDM-B EC-ASIC
5 V PDM-B5 V EC-ASICs
PDM-B Analysis tools
Pulse Generator
40 MHz clock
9th EUSO-B Progress Meeting, Naples, November 9th 2012
16
Electronic Integration IEL2 (Resp LAL)
LAL (1) (1) (6)PDM-B EC-ASICDP Pulse
Generator
clock4 x 28 V
CPU software
9th EUSO-B Progress Meeting, Naples, November 9th 2012
17
NIM/CAMAC
Final PDM Integration AP4 (APC)
Light Source
&Opt. Bench
Power 28 V
PDM Frame (1)
HV Box(1)
EC-Unit(9)
EC-ASICs(6)
• Assembly (AP4) : put all calbles at PDM-B• EC-ASIC• HV
• Integration put the cables in the connectors:• Connect the EC-Units to the EC-ASIC through the FS frame though the
EC-Anode flex cables,• Test and validation
• Test EC-ASICs R&W by PDM-B to retrieve LAL integration tests
PDM-B(1)
Power 5 V
9th EUSO-B Progress Meeting, Naples, November 9th 2012
18
INTEGRATION OF DP
CPUHK
CLKB
GPSR
CCB
LVPSHK
LVPSDP1LVPS
DP2
LVPSPDM
9th EUSO-B Progress Meeting, Naples, November 9th 2012
19
Summary of DP Integration (@Naples)
• 3 monthes (TBC)• Mechanical and electrical compatibility• Hardware tests• Software tests
ID1:LVPS+
HK+CPU
ID2:+GPS+CLK+SPI
ID3:+CCB
ID4:+CCB+SPI
UNAM+INFN(Na-Ba-Roma2)
UNAM+INFN(Na-Ba-Roma2)
IAAT+Naples+Bari
IAAT+(Na-Ba-Roma2)
ID5:SpaceWire
IAAT+(Na-Ba-Roma2)
9th EUSO-B Progress Meeting, Naples, November 9th 2012
20
DP Integration Phase 1 (ID1)
• Integration ID1 : participants UNAM, Naples/INFN, Bari/INFN and Roma2/INFN The first step of the integration will regard the LVPS modules, the HK and the CPU. During this phase, after the verification of all the mechanical and electrical compatibilities, the communication between CPU and HK system on the RS422 port will be faced and tuned. (HK configuration, switch-on/off sequence etc etc)
LVPS HK CPU
DP-Box
DP-Box
RS422
9th EUSO-B Progress Meeting, Naples, November 9th 2012
21
DP Integration Phase 2 (ID2)
• Integration ID2 : participants UNAM and INFN (NA-BA-Roma2)
the introduction in the system of the CLK board and GPS board in order to test the relative LVPS and to verify the SPI interfaces HK-CLKb and HK-GPSb. The interface CLKb-GPSb with the two boards powered by the LVPS will be tested too.
LVPS HK CPU
DP-Box
DP-Box
CLKGPS
SPI
9th EUSO-B Progress Meeting, Naples, November 9th 2012
22
DP Integration Phase 3 (ID3)
Integration ID3 : participants IAAT and INFN (Na-Ba-Roma2)the introduction in the system of the CCB. Also in this case we have to test mechanical and electrical compatibilities, the interface with CLKb in order to provide a clock to the board and all the ancillary functionality.
LVPS HK CPU
DP-Box
DP-Box
CLK CCB PDM-B EmulatorGPS
SPI
9th EUSO-B Progress Meeting, Naples, November 9th 2012
23
DP Integration Phase 4 (ID4)
Integration ID4 : participants IAAT, UNAM and INFN(NA-BA-Roma2)
we have to test the SPI interface HK-CCB
LVPS HK CPU
DP-Box
DP-Box
CLK CCB PDM-B EmulatorGPS
SPI
9th EUSO-B Progress Meeting, Naples, November 9th 2012
24
DP Integration Phase 5 (ID5)
Integration ID5 : participants IAAT and INFN (NA-BA-Roma2)The fiveth step will be the test of the the SpaceWire interface and the full simulation of the different operational mode of the system.
LVPS HK CPU
DP-Box
DP-Box
CLK CCB PDM-B EmulatorGPS
SpaceWireSPI
9th EUSO-B Progress Meeting, Naples, November 9th 2012
25
INTEGRATION OF PWP
9th EUSO-B Progress Meeting, Naples, November 9th 2012
26
Integration of PWP1
Power Pack box: Riken
PWP
Batteries cells : CNES
AP1:PWP
Assembly
TP1:Test of PWP
IP1:Integration
of PWP
Assembly of the cellsInside the PWP box
IRAP
Test of the PWP(external power as well as batteries )
IRAP
Integration with the electronics
IRAP
9th EUSO-B Progress Meeting, Naples, November 9th 2012
27
FINAL INTEGRATION
9th EUSO-B Progress Meeting, Naples, November 9th 2012
28
NIM/CAMAC
FINAL PDM+DP Integration before IRAP Light
Source &
Opt. Bench
Power 28 V/PWP
PDM Frame (1)
HV Box(1)
EC-Unit(9)
EC-ASICs(6)
• Assembly connect PDM-B to DP• CCB, HK
• Integration put the cables in the connectors:• Connect the EC-Units to the EC-ASIC through the FS frame though the
EC-Anode flex cables,• Test and validationData from CPU to computer / from storage, Monitoring,
PDM-B(1)
DPLVPS2DP
LVPS3DP
LVPS1PDMLVPS
CCBGPSRCLKB
HK CPU
9th EUSO-B Progress Meeting, Naples, November 9th 2012
29
OPTICS
9th EUSO-B Progress Meeting, Naples, November 9th 2012
30
Lenses
9th EUSO-B Progress Meeting, Naples, November 9th 2012
31
Validation and Acceptance tests for the lenses
RIKEN : estimation of theFocal length of each lens in visible and UV.s
UAH : precision measurementOf the focal length of each lensIn UV
9th EUSO-B Progress Meeting, Naples, November 9th 2012
32
BACKUP
9th EUSO-B Progress Meeting, Naples, November 9th 2012
33
EC-HV
EC-DYNODE
HVPS2
HVPS1
MAP
MT
EC-ANODE
EC-ASIC
PDM-B
IR-CAM
Batteries
PWP
LVPS
-DP1
LVPS
-DP2
LVPS-PDM
LVPS
-HK
HK
CCB
CLKB
GPSR
CPU
DST
SIREN
CNES Telemetry
EXT
Bat Controller
TLS
Sensors
Motors
SPACEWIRE/PCI
EC-Front
EC-Back
DP PDM
9th EUSO-B Progress Meeting, Naples, November 9th 2012
34
EC-HV
EC-DYNODE
HVPS2
HVPS1
MAP
MT
EC-ANODE
EC-ASIC
PDM-B
IR-CAM
Batteries
PWP
LVPS
-DP1
LVPS
-DP2
LVPS-PDM
LVPS
-HK
HK
CCB
CLKB
GPSR
CPU
DST
SIREN
CNES Telemetry
EXT
Bat Controller
TLS
Sensors
Motors
SPACEWIRE/PCI
EC-Front
EC-Back
DP PDM
9th EUSO-B Progress Meeting, Naples, November 9th 2012
35
EC-HV
EC-DYNODE
HVPS2
HVPS1
MAP
MT
EC-ANODE
EC-ASIC
PDM-B
IR-CAM
Batteries
PWP
LVPS
-DP1
LVPS
-DP2
LVPS-PDM
LVPS
-HK
HK
CCB
CLKB
GPSR
CPU
DST
SIREN
CNES Telemetry
EXT
Bat Controller
TLS
Sensors
Motors
SPACEWIRE/PCI
EC-Front
EC-Back
9th EUSO-B Progress Meeting, Naples, November 9th 2012
36
Pre-Assembly of EC-Front Units
Integrand sphere
Data analysis for each of the 64 channels- Quantum efficiency- Gain
MAPMT QADC
Pulser
LED PhotocathodeUniform illuminationIn single photoelectronmode
HV 900 V
Voltage divider
64anodes
K and dynodes
Gate