Design according to Pre-feasibility study of brine effluent evaporation for Abengoa solar
Annual precipitation: 83.00 mm/yearDrought precipitation: 0.00 mm/year Not GivenEvaporation rate: 2421.00 mm/year
Annual net evaporation capability: 2338.00 mm/yearNet pan evaporation: 2.34 m/year
Factor for salinity correction: 0.87
Pan factor 0.85
Design basis evaporation rate: 1.72 m/year
Effluents to Evaporation pond: 46641.89 m3/year
Equivalent hours at 100%: 24 hour/dayAnnual flow to Evaporation pond: 27040.61 m3/year
Evaporation ponds area: 15676.781 m2Depth of Pond 1.72 m
125.41425
(To determinate an equivalent evaporation rate in the ponds a factor for salinity correction is used since the evaporation ponds will be a high dissolved solids concentration which will afeect the vapor pressure of water)
Design according to Pre-feasibility study of brine effluent evaporation for Abengoa solar
he
(To determinate an equivalent evaporation rate in the ponds a factor for salinity correction is used since the evaporation ponds will be a high dissolved solids concentration which will afeect the
Urban distribution network
WTP Vendor
City water supply
Abeinsa Filter Feedpumps2 X 100%
Raw Water Tank
Drinking Water
2
1
Streams Descripction1 Drinking Water from Existing Water System2 Raw Water at Tank3 Fire Fighting4 Filter Water Inlet5 SAC Inlet6 SBA Inlet7 MB Inet8 DM Water9 Service Water for plant
10 Service water for chemicals11 Service water for other cleanings12 DM Water for make up of evaporative cooling13 Make-up water for HRSG Blowdown14 Auxiliary cooling closed circuit make-up water15 Make-up for Auxiliary Boiler 16 DM Water for GT Washing 17 Auxiliary Waste Water to N-pit18 Waste Water from Plant to collection basin19 Sanitary Waste Water20 Chemical drains to N-pit21 Steam cycle blowdown to N-pit22 Waste Water from DM Plant to N-Pit23 Waste Water from N-Pit to Collection Basin24 Waste Water from collection basin to evaporation pond25 DM Water for Thermal Cycle Make-up
Filter Feedpumps2 X 100%
Drinking water consumers
Other cleanings Oily wastewater
Oil / water separator
Drinking water tank
30 m3
46
Filter Backwash
Waste
4
Strong Acid Cation
2x100%
Sanitary waste water
Multi-Grade filter
2x100%
SAC Waste
SBA Waste
Fire Fighting System3
11
Degassed Water Tank
30m3
5
Unitm3/h 5.00m3/h 10.40m3/h 0.00m3/h 10.40m3/h 10.20m3/h 9.98m3/h 9.76m3/h 9.58m3/h 1.25m3/h 0.75
Service water for other cleanings m3/h 0.50m3/h 2.16m3/h 4.43m3/h 1.06m3/h 0.16m3/h 0.04m3/h 1.26
Waste Water from Plant to collection basin m3/h 0.50m3/h 5.00m3/h 0.75m3/h 1.48m3/h 0.82m3/h 4.90
Waste Water from collection basin to evaporation pond m3/h 5.40m3/h 1.73
Avinash Giri:It is loss due to evaporation hence it will not consider as effleunt.
Avinash Giri:• Medical waste water.• Rainwater.• Fire protection water.• Waste to evacuate building site by truck• Drains and purgings of boilers, samplings etc• Drains of the equipment.• Drains of surface.
Avinash Giri:Based on cooment although the DM Plant designed ased on the1.8 kg/s blow down. However in normal case blow down will be only 0.9 kg/s
WTP Vendor
Abeinsa
Service Water for Plant
Oil Water treatment
Oil / water separator
SBA (2X100%) MB (2X100%)DM Water
Storage Tank
19
13
22
9
Sanitary waste water
SBA Waste
MB Waste
7
8
14
15
21
16
Neutralisation Pit
12
25
22
Neutralization Pit Pumps (NPP) (2*100%)
Chemicals for Neutralisation/pH
Adjustment
Neutralisation Pit
Avinash Giri:It is loss due to evaporation hence it will not consider as effleunt.
Avinash Giri:• Medical waste water.• Rainwater.• Fire protection water.• Waste to evacuate building site by truck• Drains and purgings of boilers, samplings etc• Drains of the equipment.• Drains of surface.
Avinash Giri:Based on cooment although the DM Plant designed ased on the1.8 kg/s blow down. However in normal case blow down will be only 0.9 kg/s
Chemical Cleaning Waste to WWTP
WTP Vendor
Steam cycle make-up Condensate hot well
Auxiliary cooling water closed circuit
Service Water for Plant
Chemical Preparation10
Auxiliary Boiler Make up
20
15
GT Washing16
Make-up for evaporative colling
17
18
Thermal cycle make-up
Abeinsa
Evaporation Pond
Collection BasinNeutralization Pit Pumps
(NPP) (2*100%)
24
Efflunet Transfer Pumps ETP) (2*100%)
23
18
Chemical Cleaning Waste to WWTP
HRSG
Turbine