even cheap wine needs a good plan: project management planning and dita

31
1 @kimadam2007#DITA North America Even Cheap Wine Needs A Good Plan Kimberlee Adam, PMP [email protected] @kimadam2007 © 2016 Kaplan Professional Education

Upload: oasis-dita-adoption-tc

Post on 13-Apr-2017

38 views

Category:

Technology


0 download

TRANSCRIPT

Page 1: Even Cheap Wine Needs A Good Plan: Project Management Planning and DITA

1@kimadam2007#DITA North America

Even Cheap Wine Needs A Good Plan

Kimberlee Adam, [email protected]

@kimadam2007

© 2016 Kaplan Professional Education

Page 2: Even Cheap Wine Needs A Good Plan: Project Management Planning and DITA

2@kimadam2007#DITA North America

Topics

• Project Management Process• Project challenge• Processes that were more successful than

planned• Processes that were not as successful as

planned

© 2016 Kaplan Professional Education

Page 3: Even Cheap Wine Needs A Good Plan: Project Management Planning and DITA

3@kimadam2007#DITA North America

Creating a Plan

© 2016 Kaplan Professional Education

Page 4: Even Cheap Wine Needs A Good Plan: Project Management Planning and DITA

4@kimadam2007#DITA North America

Creating a Plan

Project Management Process Groups

© 2016 Kaplan Professional Education

Page 5: Even Cheap Wine Needs A Good Plan: Project Management Planning and DITA

5@kimadam2007#DITA North America

Kaplan Professional Education

• Who we are?• Areas of study:

– Schweser– Kaplan Financial Education– Real Estate– Architecture & Engineering– IT Training

© 2016 Kaplan Professional Education

Page 6: Even Cheap Wine Needs A Good Plan: Project Management Planning and DITA

6@kimadam2007#DITA North America

Conversion Project

• Convert content to an one-source• Now, in the fourth years into a five year

project– Pilot – Yr 1, Test ROI theory– Initial deployment – Yr 2, validate ROI– Integrating Tools – Yr 3, rollout new systems– Implementation – Yr 4 – 5, all KPE

© 2016 Kaplan Professional Education

Page 7: Even Cheap Wine Needs A Good Plan: Project Management Planning and DITA

7@kimadam2007#DITA North America

CMS / Authoring Tool

© 2016 Kaplan Professional Education

Page 8: Even Cheap Wine Needs A Good Plan: Project Management Planning and DITA

8@kimadam2007#DITA North America

Project Challenge

• 34 KPE Product Lines• Various requirements• Different stakeholders• Shared services

© 2016 Kaplan Professional Education

Page 9: Even Cheap Wine Needs A Good Plan: Project Management Planning and DITA

9@kimadam2007#DITA North America

Project Management

• How has project management helped us?

© 2016 Kaplan Professional Education

Page 10: Even Cheap Wine Needs A Good Plan: Project Management Planning and DITA

10@kimadam2007#DITA North America

Project Charter

© 2016 Kaplan Professional Education

Image from: http://lisamdrake.com/2011/04/30/what-is-a-project-charter/

Page 11: Even Cheap Wine Needs A Good Plan: Project Management Planning and DITA

11@kimadam2007#DITA North America

Project Management Plan

© 2016 Kaplan Professional Education

Project Management 

Plan

Executive Summary

Scope MgmtPlan

Time MgmtPlan

Cost MgmtPlan

Quality MgmtPlan

Commun‐icationMgmtPlan

Stake‐holder MgmtPlan

Close Project Plan

Page 12: Even Cheap Wine Needs A Good Plan: Project Management Planning and DITA

12@kimadam2007#DITA North America

Project Management Plan

© 2016 Kaplan Professional Education

Project Management 

Plan

Executive Summary• Project Purpose

• Project Objectives• Benefits statement

Page 13: Even Cheap Wine Needs A Good Plan: Project Management Planning and DITA

13@kimadam2007#DITA North America

Project Management Plan

© 2016 Kaplan Professional Education

Project Management 

Plan

Scope MgmtPlan

• Tools• In Scope/Out of Scope• Conversion Recommendations

and Requirements• Product Reuse• Deliverable Types• Conversion Strategy• Product Scope

Page 14: Even Cheap Wine Needs A Good Plan: Project Management Planning and DITA

14@kimadam2007#DITA North America

Project Management Plan

© 2016 Kaplan Professional Education

Project Management 

Plan

Time MgmtPlan

• Milestones• Change in Stage

Page 15: Even Cheap Wine Needs A Good Plan: Project Management Planning and DITA

15@kimadam2007#DITA North America

Project Management Plan

© 2016 Kaplan Professional Education

Project Management 

Plan

Cost MgmtPlan

• Budget breakdown• External costs

Page 16: Even Cheap Wine Needs A Good Plan: Project Management Planning and DITA

16@kimadam2007#DITA North America

Project Management Plan

© 2016 Kaplan Professional Education

Project Management 

Plan

Quality MgmtPlan

• Accurate / Valid Content• Low Variation• Kaplay Way for Learning• Customer Satisfaction

Page 17: Even Cheap Wine Needs A Good Plan: Project Management Planning and DITA

17@kimadam2007#DITA North America

Project Management Plan

© 2016 Kaplan Professional Education

Project Management 

Plan

Commun‐icationMgmtPlan

• Project Charter• Approval• Email

• PPM• Approval• Highlights• Half-hour

meeting

Page 18: Even Cheap Wine Needs A Good Plan: Project Management Planning and DITA

18@kimadam2007#DITA North America

Project Management Plan

© 2016 Kaplan Professional Education

Project Management 

Plan

Stake‐holder MgmtPlan

• Project Executive Team

• Project Team• Functional Team• Steering Committee

Page 19: Even Cheap Wine Needs A Good Plan: Project Management Planning and DITA

19@kimadam2007#DITA North America

Project Management Plan

© 2016 Kaplan Professional Education

Project Management 

Plan

Close Project Plan • Activities to close

project

Page 20: Even Cheap Wine Needs A Good Plan: Project Management Planning and DITA

20@kimadam2007#DITA North America

DITA Conversion

• Putting the plan into action– Convert content to DITA– Ensure quality standards– Produce deliverables

© 2016 Kaplan Professional Education

Page 21: Even Cheap Wine Needs A Good Plan: Project Management Planning and DITA

21@kimadam2007#DITA North America

Production

• Metrics, metrics and more metrics– Measure performance– Compare to baselines– Validate assumptions

© 2016 Kaplan Professional Education

Page 22: Even Cheap Wine Needs A Good Plan: Project Management Planning and DITA

22@kimadam2007#DITA North America

DITA Deployment

• Deliverables• Report on metrics• Lessons learned activity

–I Liked / I Wish

© 2016 Kaplan Professional Education

Page 23: Even Cheap Wine Needs A Good Plan: Project Management Planning and DITA

23@kimadam2007#DITA North America

Successes

• Earned trust• Documented project requirements• Defining quality

© 2016 Kaplan Professional Education

Page 24: Even Cheap Wine Needs A Good Plan: Project Management Planning and DITA

24@kimadam2007#DITA North America

Lessons Learned

• Communication Plan• Too much detail in the plan

© 2016 Kaplan Professional Education

Page 25: Even Cheap Wine Needs A Good Plan: Project Management Planning and DITA

25@kimadam2007#DITA North America

Key Takeaways

• What do YOU need to know?• What do YOUR stakeholders need to know?

© 2016 Kaplan Professional Education

Page 26: Even Cheap Wine Needs A Good Plan: Project Management Planning and DITA

26@kimadam2007#DITA North America

Questions?

© 2016 Kaplan Professional Education

Project Management 

Plan

Executive Summary

Scope Mng Plan

Time MngPlan

Cost MngPlan

Quality Mng Plan

Commun‐ication

Mng Plan

Stake‐holder 

Mng Plan

Close Project Plan

Kim Adam –[email protected]

Page 27: Even Cheap Wine Needs A Good Plan: Project Management Planning and DITA

27@kimadam2007#DITA North America

KPE Content Model

• Project Challenge• Producing KPE Products• Format to Fit Output• DITA XML• Producing KPE Products using DITA XML

© 2016 Kaplan Professional Education

Page 28: Even Cheap Wine Needs A Good Plan: Project Management Planning and DITA

28@kimadam2007#DITA North America

Producing KPE Products

© 2016 Kaplan Professional Education

Page 29: Even Cheap Wine Needs A Good Plan: Project Management Planning and DITA

29@kimadam2007#DITA North America

Format to Fit Output• Format for display and how it looks for each output

© 2016 Kaplan Professional Education

Smith vs. Johnson

Smith vs. Johnson

Smith vs. Johnson

Page 30: Even Cheap Wine Needs A Good Plan: Project Management Planning and DITA

30@kimadam2007#DITA North America

DITA XML• DITA is an XML-based open standard• XML is designed to be independent of the tool and

focus on what the data is

© 2016 Kaplan Professional Education

<legalCite>Smith vs. Johnson</legalCite>

Smith vs. Johnson

Smith vs. Johnson

Smith vs. Johnson

Page 31: Even Cheap Wine Needs A Good Plan: Project Management Planning and DITA

31@kimadam2007#DITA North America

Producing KPE Products using DITA XML

© 2016 Kaplan Professional Education

Conversion is a one-time process

DITAmaps