December 10, 2013 PRESENTED BY Everglades Restoration: Update on Progress and Activities Shannon Estenoz Director, Office of Everglades Restoration Initiatives U.S. Department of the Interior Florida Keys National Marine Sanctuary Advisory Council

Upload: others

Post on 20-Jul-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Everglades Florida Keys Restoration: National Marine Sanctuary … · 2017-07-27 · Everglades Restoration . EVERGLADES NATIONAL . PARK . Florida Bay . Biscayne Bay . Foundation

December 10, 2013

PRESENTED BY

Everglades Restoration: Update on Progress and Activities

Shannon Estenoz

Director, Office of Everglades Restoration Initiatives

U.S. Department of the Interior

Florida Keys National Marine Sanctuary Advisory Council

Page 2: Everglades Florida Keys Restoration: National Marine Sanctuary … · 2017-07-27 · Everglades Restoration . EVERGLADES NATIONAL . PARK . Florida Bay . Biscayne Bay . Foundation

Everglades Restoration

EVERGLADES NATIONAL

PARK

Florida Bay

Biscayne Bay

Foundation Projects ► Kissimmee River ► C-111 South Dade ► C-51/STA-1E ► Modified Water Deliveries

1st Generation CERP ► Site 1 Impoundment ► IRL-South ► Picayune Strand

2nd Generation CERP ► C-43 Reservoir ► Broward County WPA ► C-111 Spreader Canal ► Biscayne Bay Coastal Wetlands

Page 3: Everglades Florida Keys Restoration: National Marine Sanctuary … · 2017-07-27 · Everglades Restoration . EVERGLADES NATIONAL . PARK . Florida Bay . Biscayne Bay . Foundation

Kissimmee Restoration: Looking east at Phase II/III railroad bridge construction progress.

October 3, 2012

Page 4: Everglades Florida Keys Restoration: National Marine Sanctuary … · 2017-07-27 · Everglades Restoration . EVERGLADES NATIONAL . PARK . Florida Bay . Biscayne Bay . Foundation

Kissimmee Restoration: Montsdeoca Run - Phase I restoration area

October 3, 2012

Page 5: Everglades Florida Keys Restoration: National Marine Sanctuary … · 2017-07-27 · Everglades Restoration . EVERGLADES NATIONAL . PARK . Florida Bay . Biscayne Bay . Foundation

Steps to Complete Modified Waters and C-111 South Dade Projects

G-3273 and S-356 operational testing Northern Detention

Area and C-111 South Dade constructed (Contract 8) Combined

operational plan for Modified Waters and C-111

Page 6: Everglades Florida Keys Restoration: National Marine Sanctuary … · 2017-07-27 · Everglades Restoration . EVERGLADES NATIONAL . PARK . Florida Bay . Biscayne Bay . Foundation
Page 7: Everglades Florida Keys Restoration: National Marine Sanctuary … · 2017-07-27 · Everglades Restoration . EVERGLADES NATIONAL . PARK . Florida Bay . Biscayne Bay . Foundation

BIG CYPRESS NATIONAL PRESERVE

WCA 1

LAKE OKEECHOBEE

EVERGLADES NATIONAL

PARK

WCA 2

WCA 3A

3B

COMPREHENSIVE EVERGLADES RESTORATION PLAN 68 Components

30+ year implementation

► Storage

► STAs for water quality

► Seepage management

► Removing barriers to flow

► Revised operations

Surface ASR

Page 8: Everglades Florida Keys Restoration: National Marine Sanctuary … · 2017-07-27 · Everglades Restoration . EVERGLADES NATIONAL . PARK . Florida Bay . Biscayne Bay . Foundation

EVERGLADES NATIONAL

PARK

Florida Bay

Biscayne Bay

CENTRAL EVERGLADES

Reduce undesirable discharges to east and west coast estuaries

Deliver “new” sources of clean water to the Central Everglades and ENP

Restore habitat in the central Everglades

Page 9: Everglades Florida Keys Restoration: National Marine Sanctuary … · 2017-07-27 · Everglades Restoration . EVERGLADES NATIONAL . PARK . Florida Bay . Biscayne Bay . Foundation

Too Dry

Healthy

Too Dry; No Flow

Too Dry

Page 10: Everglades Florida Keys Restoration: National Marine Sanctuary … · 2017-07-27 · Everglades Restoration . EVERGLADES NATIONAL . PARK . Florida Bay . Biscayne Bay . Foundation

10

NORTHERN WCA 3A PROBLEMS TOO DRY, TOO OFTEN

MIAMI CANAL IS AN UNNATURAL HABITAT

A RIVER THAT DOES NOT FLOW

With Flow Without Flow

Page 11: Everglades Florida Keys Restoration: National Marine Sanctuary … · 2017-07-27 · Everglades Restoration . EVERGLADES NATIONAL . PARK . Florida Bay . Biscayne Bay . Foundation

LAKE OKEECHOBEE

St. Lucie Estuary

Caloosahatchee Estuary

Gulf of Mexico

Florida Bay

Biscayne Bay

EVERGLADES AGRICULTURAL

AREA

EVERGLADES NATIONAL

PARK

WCA 3

WCA 1

WCA 2

CENTRAL EVERGLADES PLANNING PROJECT (CEPP)

PROPOSES TO:

Move water south from Lake Okeechobee through Everglades Agricultural Area (EAA)

Improve benefits to the Caloosahatchee and St Lucie estuaries

Store and treat flows with proposed flowage equalization basin (FEB) in the EAA

Send treated water south through Water Conservation Area 3A (WCA 3) and a flowway portion of 3B, and into Everglades National Park and Florida Bay

Page 12: Everglades Florida Keys Restoration: National Marine Sanctuary … · 2017-07-27 · Everglades Restoration . EVERGLADES NATIONAL . PARK . Florida Bay . Biscayne Bay . Foundation

WCA 3A

WCA 2

WCA 1

I-75

WCA 3B

SPATIAL PERSPECTIVE North of the Redline

Combination of features to increase water deliveries downstream and improve estuarine benefits

South of the Redline Features and their locations to best restore

sheetflow in northern Water Conservation Area 3A

Greenline/Blueline Features to best restore sheetflow through southern

WCA-3A and 3B

Configuration of conveyance features to best restore flows to Everglades National Park

Yellowline Features to best compliment rest of project and

manage seepage to the eastern urban area without impacting the water supply

S-333

L-30

L-33

L-28

L-5

Tamiami Trail

L-67 Ext

EVERGLADES AGRICULTURAL

AREA

WATER CONSERVATION

AREAS

EVERGLADES NATIONAL

PARK

L-29

With CEPP planning terminology

Page 13: Everglades Florida Keys Restoration: National Marine Sanctuary … · 2017-07-27 · Everglades Restoration . EVERGLADES NATIONAL . PARK . Florida Bay . Biscayne Bay . Foundation

TENTATIVELY SELECTED PLAN (Alt 4R)

Construct A-2 FEB and integrate with A-1 FEB operations Lake Okeechobee operation refinements within LORS

DISTRIBUTION/CONVEYANCE

SEEPAGE MANAGEMENT

STORAGE AND TREATMENT

DISTRIBUTION/CONVEYANCE

Increase S-333 capacity to 2,500 cfs Two 500 cfs gated structures in L-67A, 0.5 mile spoil removal west of

L-67A canal north and south of structures Construct ~8.5 mile levee in WCA 3B, connecting L-67A to L-29 Remove ~8 miles of L-67C levee in Blue Shanty flowway (no canal back fill) One 500 cfs gated structure north of Blue Shanty levee and 6,000-ft gap

in L-67C levee Remove ~4.3 miles of L-29 levee in Blue Shanty flowway, divide structure

east of Blue Shanty levee at terminus of western bridge Tamiami Trail western 2.6 mile bridge and L-29 canal max stage at

9.7 ft (FUTURE WORK BY OTHERS) Remove entire 5.5 miles L-67 Extension levee, backfill L-67 Extension canal Remove ~6 mile Old Tamiami Trail road (from L-67 Ext to Tram Rd)

Increase S-356 pump station to ~1,000 cfs Partial depth seepage barrier south of Tamiami Trail (along L-31N) G-211 operational refinements; use coastal canals to convey seepage

FEB Pump

Note: System wide operational changes and adaptive management considerations will be included in project

Gated Structure Levee Removal

STA Backfill

Seepage Barrier Levee Divide

Diversion of L-6 flows, Infrastructure and L-5 canal improvements Remove western ~2.9 miles of L-4 levee (west of S-8 3,000 cfs capacity) 360 cfs pump station at western terminus of L-4 levee removal Backfill Miami Canal and Spoil Mound Removal ~1.5 miles south of S-8 to I-75

WCA 3A

WCA 1

I-75

S-333

L-30

L-33

C-2

L-28

S-356

S-335

EVERGLADES AGRICULTURAL

AREA

WCA 3A

S-8 L-5

NOT TO SCALE

L-4

Old Tamiami Trail Removal

WCA 2

EVERGLADES NATIONAL

PARK

Tamiami Trail S-334

L-29

WCA 3B

WATER CONSERVATION

AREAS

Canal Improvement

L.O. WATER FLOW

G-211 L-67 Ext 8.5

SMA

C-11

1 SD

A-1 A-2

`

Page 14: Everglades Florida Keys Restoration: National Marine Sanctuary … · 2017-07-27 · Everglades Restoration . EVERGLADES NATIONAL . PARK . Florida Bay . Biscayne Bay . Foundation

Questions?