examination of coordination requests

83
Examination of Coordination Requests International Telecommunication Union Efficient use of the spectrum / orbit resource workshop, Cyprus 2014 Hon Fai Ng Space Services Department

Upload: hfng

Post on 10-Jul-2015

84 views

Category:

Government & Nonprofit


0 download

TRANSCRIPT

Page 1: Examination of Coordination Requests

Examination of Coordination Requests

223,26,49

140,181,201

249,254.252

92,91,90

44,57,74

International Telecommunication Union Efficient use of the spectrum / orbit resource workshop, Cyprus 2014

Hon Fai Ng

Space Services Department

Page 2: Examination of Coordination Requests

A API

C Coordination

N Notification

Start of regulatory

clock

Negotiate for

interference free

operation

Record in MIFR

(International

Recognition)

& BIIU 7 years

Non-planned Procedures (Articles 9 & 11)

Page 3: Examination of Coordination Requests

Input: Requests for coordination

Appendix 4 Info (No. 9.30)

BR: Validate/Check/Process

Output: CR/C Publication in

BR IFIC DVD

Conformity

with Radio

Regulations

(No. 9.35)

Coordination

Requirements

(No. 9.36)

C Coordination

Page 4: Examination of Coordination Requests

Output: CR/C Publication in

BR IFIC DVD

Page 5: Examination of Coordination Requests

Output: CR/C Publication in

BR IFIC DVD

Page 6: Examination of Coordination Requests

0

200

400

600

800

1983 1988 1993 1998 2003 2008 2013

cost recovery

introduced

Source: SNL (1983– 1997), SNTrack (1998-2013)

Coordination Requests

311 per year

Page 7: Examination of Coordination Requests

300+ CR/C

Publications per year

Source: Coordination Requests received in between 2008 and 2013

Page 8: Examination of Coordination Requests

Unfavourable

Finding

One in three CR/Cs (No. 11.31)

No status, priority lost, cost

recovery incurred

Source: Coordination Requests received in between 2008 and 2013

Page 9: Examination of Coordination Requests

Substantial

coordination

workload

60+ affected administrations

2000+ affected networks

Source: Coordination Requests received in 2013 under No. 9.7

Page 10: Examination of Coordination Requests

Fee remains unchanged after 100

units, no incentive to keep filings

small

Cost

recovery

fee

Units 100 units

Source: Decision 482 (modified 2012) Doc C12/95(Rev.2)

2 beams

10 frequencies

5 emissions

1 class of station

Example:

Page 11: Examination of Coordination Requests

HOW TO

Avoid unfavourable findings

Manage coordination requirements

Page 12: Examination of Coordination Requests

Conformity

with Radio

Regulations

(No. 9.35)

Coordination

Requirements

(No. 9.36)

C Coordination

Page 13: Examination of Coordination Requests

Conformity

with Radio

Regulations

(No. 9.35 of RR)

Page 14: Examination of Coordination Requests

Conformity with Table of

Frequency Allocation & other

provisions (PFD/EIRP Limits

etc.) Nos. 9.35, 11.31 of RR, RoP11.31

Page 15: Examination of Coordination Requests

Conformity with RR (No. 9.35 of RR)

Network summary Frequency bands

Direction of transmission

Class of station/Services

Beams/Service area

Table of Frequency

Allocation (Article 5 of Radio Regulations)

Relevant footnotes

Page 16: Examination of Coordination Requests

Conformity with RR (No. 9.35 of RR)

Frequency bands of network

Frequency allocation

Page 17: Examination of Coordination Requests

Conformity with RR (No. 9.35 of RR)

Frequency bands of network

Frequency allocation

N- A- A- A- A-

N- A- N-

N-

N-

Unfavourable (N-)

if not within allocation

Page 18: Examination of Coordination Requests

Conformity with RR (No. 9.35 of RR)

Frequency bands of network

N- N- N- N- N-

N- N- N-

N-

N-

Unfavourable (N-)

if wrong Service or Direction of Transmission

Page 19: Examination of Coordination Requests

Conformity with RR (No. 9.35 of RR)

Service area of network

R1 R2 R3

Page 20: Examination of Coordination Requests

Conformity with RR (No. 9.35 of RR)

If allocation to Region 1 only

R1 R2 R3

Page 21: Examination of Coordination Requests

Conformity with RR (No. 9.35 of RR)

Unfavourable

(N-)

Favourable

(A-)

R1 R2 R3

Service area is split

Page 22: Examination of Coordination Requests

Conformity with RR (No. 9.35 of RR)

Power-flux density

limits (PFD) Articles 21, 22, footnotes, etc.

EIRP limits Articles 21, footnotes, etc.

PFD = Power Density + 10log(Ref. Bandwidth) +

G(theta) – 10log(4piR^2) dB(W/m2)

Where G = Gain of transmitting space station

R = Distance from satellite to point on Earth’s surface

Page 23: Examination of Coordination Requests

Conformity with RR (No. 9.35 of RR)

Power-flux density

limits (PFD)

EIRP limits GIBC Program v7 (Graphical Interface for Batch Calculations)

Page 24: Examination of Coordination Requests

Enter Network ID

Select “Hard Limits”

Click Start

Conformity with RR (No. 9.35 of RR)

PFD (Terrestrial Services)

Page 25: Examination of Coordination Requests

Conformity with RR (No. 9.35 of RR)

PFD.LST

Page 26: Examination of Coordination Requests

Conformity with RR (No. 9.35 of RR)

GIBC Output Level 2 – All locations with excess:

Beam name Maximum Gain

Frequency assignment with excess (Frequency | Bandwidth | Emission | Peak Power | Maximum

Power Density)

Group ID

Worst case coordinate & location

Gain | PFD | Max Excess | PFD Limit

PFD.LST

Reference to PFD limit

Page 27: Examination of Coordination Requests

Conformity with RR (No. 9.35 of RR)

PFD.LST

Unfavourable (N-) Split from groups with Favourable assignments

Fixed beams

Steerable beams

Gain | PFD | Max Excess | PFD Limit

Page 28: Examination of Coordination Requests

Conformity with RR (No. 9.35 of RR)

PFD.LST

Favourable (A-)*

Fixed beams

Steerable beams

Gain | PFD | Max Excess | PFD Limit

Unfavourable (N-) Split from groups with Favourable assignments

Page 29: Examination of Coordination Requests

Conformity with RR (No. 9.35 of RR)

*2 Conditions Provide method to meet PFD limit

&

One location PFD limit is met (Annex 1 of RoP No. 21.16)

Favourable (A-)* Steerable beams

Page 30: Examination of Coordination Requests

Conformity with RR (No. 9.35 of RR)

*2 Conditions Provide method to meet PFD limit

&

One location PFD limit is met (Annex 1 of RoP No. 21.16)

Max Excess ≤ 9.5 dB (C, Ku, Ka-bands FSS GSO)

(Globally steerable but actual value depends on PFD limits)

Source: Rules of Procedure on No. 21.16

Page 31: Examination of Coordination Requests

Conformity with RR (No. 9.35 of RR)

Common Unfavourable Findings

1. EIRP/PFD hard limits exceeded Check GIBC/PFD results

2. Not in accordance with ToFA Check frequency bands, direction of

transmission, class of station, service area

3. PFD limits exceeded for steerable

beams and no method provided Refer to Annex 1 of RoP on No. 21.16

Page 32: Examination of Coordination Requests

Conformity with RR (No. 9.35 of RR)

Favourable

frequency

assignments

will proceed …

Page 33: Examination of Coordination Requests

Coordination

requirements (No. 9.36 of RR)

Page 34: Examination of Coordination Requests

Identify any administration

with which coordination

may need to be effected No. 9.36 of RR

Page 35: Examination of Coordination Requests

Coordination requirements (No. 9.36 of RR)

GSO Satellites

Terrestrial

Transmitting

Earth Station

Receiving

Earth Station

Non-GSO

Satellites Interference

Page 36: Examination of Coordination Requests

Coordination requirements (No. 9.36 of RR)

GSO Satellites

Terrestrial

Transmitting

Earth Station

Receiving

Earth Station

Non-GSO

Satellites Interference

A30#7.1,

A30A#7.1

9.14,

9.11,

9.21/C

9.12,

9.21/B

9.7

9.7

9.7

9.13,

9.21/B

9.14, 9.11,

9.21/C,

RS539

9.12A,

9.21/A

9.21/A,

9.41

9.21/A

9.21/A,

9.41

A30A#7.1

Forms of

coordination

Page 37: Examination of Coordination Requests

Coordination requirements (No. 9.36 of RR)

GSO Satellites

Terrestrial

Transmitting

Earth Station

Receiving

Earth Station

Non-GSO

Satellites Interference

A30#7.1,

A30A#7.1

9.14,

9.11,

9.21/C

9.12,

9.21/B

9.7

9.7

9.7

9.13,

9.21/B

9.14, 9.11,

9.21/C,

RS539

9.12A,

9.21/A

9.21/A,

9.41

9.21/A,

9.41

9.21/A,

9.41

GSO vs GSO 9.7 GSO/NGSO vs NGSO 9.11A (9.13, 9.12, 9.12A)

GSO/NGSO vs Terrestrial 9.11A (9.14)

BSS (non-Plan) vs Terrestrial 9.11, RS539

GSO vs Plan A30#7.1, A30A#7.1

Agreement with administrations 9.21

Forms of

coordination

Page 38: Examination of Coordination Requests

Coordination requirements (No. 9.36 of RR)

Forms of

coordination

Page 39: Examination of Coordination Requests

Coordination requirements (No. 9.36 of RR)

Network Summary

Identify forms of coordination Article 9 & Appendix 5 for criteria

Article 5 footnotes (9.21, 9.11A)

Rules of Procedure (9.11A)

Articles 7 of Appendices 30, 30A

Resolutions 33, 539

Forms of

coordination

Page 40: Examination of Coordination Requests

Coordination requirements (No. 9.36 of RR)

GSO

9.7 9.21/A

RS33#3

9.11

9.14

9.21/C

RS33#2.1

GSO A30#7.1 A30A#7.1

GSO 9.13

9.21/B

9.12

9.12A

9.21/A

9.21/B

NGSO GSO 9.11

9.14

9.21/C

RS33#2.1

NGSO

Identify forms of coordination Article 9 & Appendix 5 for criteria

Article 5 footnotes (9.21, 9.11A)

Rules of Procedure (9.11A)

Articles 7 of Appendices 30, 30A

Resolutions 33, 539

Page 41: Examination of Coordination Requests

Coordination requirements (No. 9.36 of RR)

Frequency Overlap

with Space Services

Frequency Overlap

with Terrestrial

Services PFD (Trigger) AP8 PFD (Space)

GIBC

GSO

9.7 9.21/A

RS33#3

9.11

9.14

9.21/C

RS33#2.1

GSO A30#7.1 A30A#7.1

GSO 9.13

9.21/B

9.12

9.12A

9.21/A

9.21/B

NGSO GSO 9.11

9.14

9.21/C

RS33#2.1

NGSO

Page 42: Examination of Coordination Requests

Coordination requirements (No. 9.36 of RR)

Frequency Overlap

with Space Services

Frequency Overlap

with Terrestrial

Services

GSO 9.13

9.21/B

9.12

9.12A

9.21/A

9.21/B

NGSO GSO 9.11

9.14

9.21/C

RS33#2.1

NGSO

PFD (Trigger) AP8 PFD (Space) GIBC

GSO

9.7 9.21/A

RS33#3

9.11

9.14

9.21/C

RS33#2.1

GSO A30#7.1 A30A#7.1

Page 43: Examination of Coordination Requests

Coordination requirements (No. 9.36 of RR)

(WRC-03)

Enter Network ID

Controls display of

sample DT/T cases 1 - Per administration

2 - Per group

3 - Per assignment

Click Start

Appendix 8

Page 44: Examination of Coordination Requests

Coordination requirements (No. 9.36 of RR)

DT/T > 6% APP8.LST

Network under examination Satellite name | Longitude | Frequency

Beam | Maximum Gain

Frequency Assignment | Power characteristics | Date of protection

Existing network

Associated ES

Page 45: Examination of Coordination Requests

Coordination requirements (No. 9.36 of RR)

9.7 Coordination Arc WRC-12 reduced CA for C & Ku-bands to 8 & 7 degs

9.7 DT/T

9.21/A

RS33 (9.7 for API from 01.01.1999)

A30A#7.1

APP8.LST (cont.)

Page 46: Examination of Coordination Requests

Coordination requirements (No. 9.36 of RR)

A = Recorded in MIFR / Already published

T = Under examination

N = Notification / C = Coordination

C = Network causing interference

R = Network receiving interference

A = Coordination Arc

NTW.LST

Page 47: Examination of Coordination Requests

Coordination requirements (No. 9.36 of RR)

Managing coordination

requirements

Example 1: Organizing Data

Page 48: Examination of Coordination Requests

Coordination requirements (No. 9.36 of RR)

Batchresults.mdb > tr_aff_ntw Filter or Sort

Page 49: Examination of Coordination Requests

Coordination requirements (No. 9.36 of RR)

Batchresults.mdb > queries

Example: provn

Page 50: Examination of Coordination Requests

Coordination requirements (No. 9.36 of RR)

Batchresults.mdb > queries

Example: provn

Page 51: Examination of Coordination Requests

Coordination requirements (No. 9.36 of RR)

Batchresults.mdb > queries

Example: com_el + grp + srv_cls + provn

Page 52: Examination of Coordination Requests

Coordination requirements (No. 9.36 of RR)

Batchresults.mdb > queries

Example: com_el + grp + srv_cls + provn

Page 53: Examination of Coordination Requests

Coordination requirements (No. 9.36 of RR)

Managing coordination

requirements

Example 2: “What-if” studies

Page 54: Examination of Coordination Requests

Coordination requirements (No. 9.36 of RR)

Example:

Satellite X

1980 – 31000 MHz

FSS, MSS, BSS

8000+ units

Coordination under No. 9.7

published by BR:

57 affected administrations

1695 affected networks

What-if:

C, Ku-bands

FSS

Page 55: Examination of Coordination Requests

Coordination requirements (No. 9.36 of RR)

Open SRS SpaceCap

Export

Network

Click Start Page,

enter network id

Page 56: Examination of Coordination Requests

Coordination requirements (No. 9.36 of RR)

SpaceCap

Set Target Db Create a new database

Eg. Satellite Name

Set Options Keep Group Ids of the Source

Replace Notice in Target

Page 57: Examination of Coordination Requests

Coordination requirements (No. 9.36 of RR)

SpaceCap Open Exported Database

Delete

beams or

groups not to

be included

in “what-if

study”

Page 58: Examination of Coordination Requests

Coordination requirements (No. 9.36 of RR)

GIBC

Select Exported

Database

Tools/Options

Add SRS.mdb

Page 59: Examination of Coordination Requests

Coordination requirements (No. 9.36 of RR)

GIBC Enter Network ID

Appendix 8

Click Start

Page 60: Examination of Coordination Requests

Coordination requirements (No. 9.36 of RR)

What-if:

C, Ku-bands

FSS

Coordination under No. 9.7

22 affected administrations

154 affected networks

Example:

Satellite X

1980 – 31000 MHz

FSS, MSS, BSS

8000+ units

Coordination under No. 9.7

published by BR:

57 affected administrations

1695 affected networks

Page 61: Examination of Coordination Requests

Coordination requirements (No. 9.36 of RR)

PFD (Trigger) AP8 PFD (Space) GIBC

GSO

9.7 9.21/A

RS33#3

9.11

9.14

9.21/C

RS33#2.1

GSO A30#7.1 A30A#7.1

Page 62: Examination of Coordination Requests

Coordination requirements (No. 9.36 of RR)

PFD (Trigger) AP8 PFD (Space) GIBC

GSO

9.7 9.21/A

RS33#3

9.11

9.14

9.21/C

RS33#2.1

GSO A30#7.1 A30A#7.1

Page 63: Examination of Coordination Requests

Coordination requirements (No. 9.36 of RR)

PFD (Terrestrial Services) Examination: Trigger

Enter

Network ID

Click Start

Page 64: Examination of Coordination Requests

Coordination requirements (No. 9.36 of RR)

PFD (Terrestrial Services)

9.11, 9.14, 9.21/C

Page 65: Examination of Coordination Requests

Coordination requirements (No. 9.36 of RR)

PFD (Trigger) AP8 PFD (Space) GIBC

GSO

9.7 9.21/A

RS33#3

9.11

9.14

9.21/C

RS33#2.1

GSO A30#7.1 A30A#7.1

Page 66: Examination of Coordination Requests

Coordination requirements (No. 9.36 of RR)

PFD (Trigger) AP8 PFD (Space) GIBC

GSO

9.7 9.21/A

RS33#3

9.11

9.14

9.21/C

RS33#2.1

GSO A30#7.1 A30A#7.1

Page 67: Examination of Coordination Requests

Coordination requirements (No. 9.36 of RR)

PFD (Space Services)

Enter

Network ID

Click Start

Page 68: Examination of Coordination Requests

Coordination requirements (No. 9.36 of RR)

A30#7.1

PFD (Space Services)

Page 69: Examination of Coordination Requests

Conformity

with Radio

Regulations

(No. 9.35)

Coordination

Requirements

(No. 9.36)

C Coordination

Output: CR/C Publication in

BR IFIC DVD

Page 70: Examination of Coordination Requests

CR/C PUBLICATION

Page 71: Examination of Coordination Requests

Network ID

Date of Receipt

Deadline for comments

Page 72: Examination of Coordination Requests

Summary of affected administrations

for entire network (mandatory)

Page 73: Examination of Coordination Requests

Summary of affected administrations for

entire network (for info)

Comment within 4 months, else

agreement

Page 74: Examination of Coordination Requests

Conformity with RR A-: Favourable

N-: Unfavourable

Forms of coordination

Page 75: Examination of Coordination Requests

Detailed characteristics

of network

Page 76: Examination of Coordination Requests

Gain contour & service

area diagrams Align steerable beams

with service area

(provide effective gain

contours 0, -2, -4, -6, -

10, -20 dB) B.3.b1 of Appendix 4 (WRC-12)

Page 77: Examination of Coordination Requests

Gain contour & service

area diagrams Align steerable beams

with service area

(provide effective gain

contours 0, -2, -4, -6, -

10, -20 dB) B.3.b1 of Appendix 4 (WRC-12)

Page 78: Examination of Coordination Requests

Comments by BR, explanation of

findings

Page 79: Examination of Coordination Requests

Coordination requirements at group level

9.7 (DT/T) 9.7 (CA)

Page 80: Examination of Coordination Requests

Other forms of coordination at group level

Page 81: Examination of Coordination Requests

List of affected networks

Modified by WRC-12,

effective 01.01.2013

Formal

Page 82: Examination of Coordination Requests

FINAL POINTS

Use GIBC to check PFD/EIRP

hard limits

Check conformity with RR

Use SpaceCap and GIBC for

coordination requirements “what-

if” studies

Page 83: Examination of Coordination Requests

Examination of Coordination Requests

223,26,49

140,181,201

249,254.252

92,91,90

44,57,74

International Telecommunication Union Efficient use of the spectrum / orbit resource workshop, Cyprus 2014

Hon Fai Ng

Space Services Department