examining common contractor mistakes exploring innovative pre-review solutions

55
Examining Common Contractor Mistakes Exploring Innovative Pre-Review Solutions CPSR: Review Topics Inside and Outside The Procurement File

Upload: clive

Post on 25-Feb-2016

44 views

Category:

Documents


1 download

DESCRIPTION

CPSR: Review Topics Inside and Outside The Procurement File. Examining Common Contractor Mistakes Exploring Innovative Pre-Review Solutions. Introductions. Your Instructor. Founder of and Lead Consultant for ProcureLinx LLC Creator of ProcureLinx Pro™ Web-Enabled CPRS Solution - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

Examining Common Contractor Mistakes Exploring Innovative Pre-Review Solutions

CPSR: Review Topics Inside and Outside The Procurement File

Page 2: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

IntroductionsYour Instructor• Founder of and Lead Consultant for ProcureLinx LLC• Creator of ProcureLinx Pro™ Web-Enabled CPRS Solution• Former …• Subject Matter Expert, Federal Procurement Compliance• General and Corporate Counsel• Director of Compliance• Director of Purchasing• Sub/Contracts Administrator

Page 3: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

IntroductionsOverview – What Will We Cover?

• What is a CPSR?

• Recent Changes in the CPSR Process and Environment

• Four Common “File” Findings and Remedies

• Three Common “Enterprise” Findings and Remedies

Page 4: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

IntroductionsWhat is a CPSR?

A Contractor Purchasing System Review (CPSR) is a comprehensive review of a contractor’s enterprise system for purchasing goods and services on the open market for performance under certain types of contracts issued under the authority of FAR Part 15 by agencies of the federal government.

Page 5: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

5

CPSR Background• FAR 44.3 and DFARS 252.244-7001 outline and enable the Contractor Purchasing System Review Process ($25M+ in annual revenue)

• Early on, DCMA reviewed “Major Contractor Systems” with DCAA reviewing smaller contractor systems.

• DCMA was given sole authority to perform CPSRs in Feb 2012

Page 6: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

IntroductionsWhat Happens During a CPSR? (FAR 44.303)

DCMA reviews three (3) main aspects of Contractor Purchasing Systems:• Purchasing/Procurement Manual (How You Say You Manage the Supply Chain)• Procurement Files (How You Actually Manage the Supply Chain)• Enterprise-Wide Supply Chain Management Initiatives (How Your System is Administered and Maintained)

These are Government Deliverables Subject to Inspection and Acceptance

Page 7: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

7

The ProcessImpact of a CPSR [FAR 52.244-2]

DCMA Acceptance of System Deliverables Means:

• No “Significant Deficiencies”

• Elimination/Significantly Reduction of AN&C

• Higher Win Rate on Contracts

• Lower Cost / Higher Effective Fee

• Ability to bid on Contracts requiring an approved system

Page 8: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

8

The ProcessImpact of a CPSR [DFARS 252.242-7005(d)]

DCMA Rejection of System Deliverables Means:

• One or More “Significant Deficiencies”• Significant Oversight and Monitoring (AN&C; Repeat CPSRs; Quarterly Reports)• Preliminary Disqualification from Bidding on Prime Contracts• 5-10% Withhold on Payments Due under DoD Prime Contracts• ACO advance consent or approval could cause significant delays in meeting customer requirements

Page 9: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

9

Previous CPSR Environment (Prior to 2009)• CPSRs were a collaborative process between CPSR Team Leads and Contractors.

• The Selection of CPSR Team Leads based on geographic placement led to long-standing relationships between DCMA and Contractors.

• Generally 1-2 person CPSR Teams performed onsite reviews for 1-2 weeks (depending on contractor size) with final reports within 30 days after conclusion of review.

• 75-92% of Contractors failed their CPSR if reviews were not completed within 5 years from last review.

Page 10: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

10

Current CPSR Environment (Post 2009)• CPSR Teams are rotated amongst all DCMA Branch Offices.

• Generally 2-4 person CPSR Teams performing onsite reviews for at least two weeks with occasional participation of DCAA (cost/price analysis)

• CPSR Team findings are evaluated by a Review Board.

• Contractors currently wait as long as 13 months for final reports.

• >98% of Contractors failed their CPSR if reviews were not completed within 5 years of their last review.

Page 11: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

Current EnvironmentWhat Has Changed In The Last Three Years?• JAN 2009: Senate Committee on Wartime Contracting Created

• 2009: Senate Committee on Wartime Contracting Interim Commission Report

• 2010: Jean Labadini Named New CPSR Director

• 2010-2011: Public Laws Revised and Tightened; CPSR Environment Changes …

• FEB 2012: DFARS 252.242.7005 Enacted

• FEB-JUNE 2012: Lockheed Martin Hit With 2-5% Withhold on the F-35 Program

• AUG 2012: Jean Labadini Retires; New Acting CPSR Director …

Page 12: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

IntroductionsIncredibly Common File Findings

What Is DCMA “Finding” During CPSRs?

• Lack of Competition

• Inadequate/Insufficient Price Analysis

• “Missing” File Documentation (That Cause Public Law Trouble)

(Inadequate Process for Awarding Other Than FFP Subcontracts)

Page 13: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

First File Finding: Competition• DCMA expects 60-70% competitive procurements.• Manufacturing Contractors average 40-70%• Service Contractors average 3-25%

• Lack of Competition Can Lead to Several Additional Findings• Price Analysis – Why?• Insufficient Noncompetitive Justifications• Lead Time• Usurpation of Procurement Authority

Page 14: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

First File Finding: CompetitionHow does DCMA define Competition During a CPSR?• ADEQUATE PRICE COMPETITION

WHY?• FAR 6.3 vs. 52.244-5• FAR Part 6 and CICA• FAR 52.244-5 Limitations on Competition

Page 15: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

First File Finding: CompetitionResult of Application of 52.244-5 as Competition Metric:• Technical “Competition” Without Price

Competition PROCUREMENT IS CONSIDERED NONCOMPETITIVE • No Technical “Competition” With Price

CompetitionPROCUREMENT IS CONSIDERED

COMPETITIVE

Page 16: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

First File Finding: CompetitionHow Does This Concept Impact Your Procurements?1. ID/IQ Teams Negotiated Against Target Rates• Subcontractor Rates are Compared to Contractor “Target

Rate” Developed as an Estimated “Price to Win”• Price Analysis – 15.404-1(b)(2)(v) (Noncompetitive)

• All Team Member Subcontract Rates analyzed using this

technique will likely be determined Noncompetitive Awards by CPSR Team

Page 17: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

First File Finding: CompetitionWhat’s the Remedy?Incorporate Target Rates Into A Competitive Rate

Analysis

• If Target Rate Lower Than Range – “Competitive Plus” Analysis

• If Target Rate Within Range – Pre-Negotiation Position

• Target Rate Higher Than Range?

Page 18: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

First File Finding: Competition2. Noncompetitive SME Procurements• Subcontractor Selected on Noncompetitive Basis Per COTR

“Direction”• Check the Source Justification

• “Customer Direction,” “Only Contractor Qualified,” “Expert Services”

• No/Weak Market Research

Page 19: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

First File Finding: CompetitionHow Do You Fix it?Best Value / Technical Trade-Off Procurement

• Develop the SOW based on Customer Requirements• Source Amongst Technically Qualified Offerors• Valid “No Bid”• Evaluating Technical Qualifications vs. Price – What

Constitutes a “Substantial Factor?”• Best Value or LPTA w PQ?

Page 20: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

First File Finding: Competition3. “Noncompetitive” Part Procurements• Parts Sourced Without “Functional Equivalent” Option

Provided to Offerors• FAR 6.302-1(c) says this is Noncompetitive Procurement• So What?• Compete in accordance with 52.244-5 and Get Credit for a

Competitive Procurement During Your CPSR

Page 21: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

Second File Finding: Price Analysis• Often Accompanies “Lack of Competition” Finding• Where Does the “Price Analysis Requirement” Come From?• Why is it SO IMPORTANT?• What is DCMA Looking For?• Correct Use of Price Analysis Technique• Detailed Narrative• Analysis NOT Justification• Effective Negotiations

Page 22: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

The Mathematics of Price AnalysisThe Price Analysis Algorithm

X / Y = ZIF Z ≤ 1.0, THEN X IS FAIR AND REASONABLE

Page 23: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

Just A Little Bit of Algebra …Okay … So What Do Those Letters Mean?

YInput (Subcontractor Proposal)XConstant (Evaluation Criteria)

Z Dependent Variable (Delta)

Page 24: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

Learning to Love AlgorithmsHold On … How the @$#*& Does This Work?

Low Price Evaluation ExampleThree Qualified Bids Received:1) $10,000.00 (X1)(Lowest Bid Also = Y)2) $12,000.00 (X2)3) $14,000.00 (X3)

Page 25: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

Learning to Love Algorithms …You Didn’t Even Know You Were Doing Algebra, Did You?

The Algebraic Evaluation Process1) 12,000(X2) / 10,000(Y) = 1.2 (Z)2) 14,000(X3) / 10,000(Y) = 1.4 (Z)3) 10,000(X1) / 10,000(Y) = 1.0 (Z)✔

Page 26: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

Price Analysis Requirements“Tell the Story” by Including the Following:

• Summary Background of the Procurement• Summary of Analysis Technique and Selection Process• Narrative Description of Basis of Comparison• Bid / Comparison Matrix (SHOW YOUR WORK)• Conclusion (F&R / Subject to Further Negotiation)

Page 27: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

Climbing the Decision Tree

• The FAR Provides Criteria: 15.404-1(b)(2)• Criteria is Prioritized [15.404-1(b)(3)]• Decision Tree vs. Checklist• Why It Matters

Page 28: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

Price Analysis vs. Price Justification

• Price Justifications are not permitted by the FAR, DCMA or DCAA. What is a Justification?

• During a Justification, the Price Proposed is Accepted Before the Evaluation is Performed. As a result, Fair and Reasonable Pricing Has Not Been Established.

Page 29: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

A Little More Algebra …The Price Justification Algorithm

X / Z ≤ 1.0

X IS ALWAYS JUSTIFIED

Page 30: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

A Little Bit More Algebra …Okay … So What Do THOSE Letters Mean?

ZInput (Subcontractor Proposal)XDependent Variable (Evaluation Criteria)

Y A Constant Is Not Included In Equation

Page 31: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

NegotiationsWhat Happens when Z > 1.0A Negotiation Accomplishes One of Two Primary Goals:• Downward Adjustment of Subcontractor Proposal (XN)to

Conform with Original Evaluation Criteria (Y) and/or

• Establishment and Documentary Support for Adjustment(s) to Original Evaluation Criteria (YN)

Page 32: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

The Mathematics of NegotiationsThe Negotiation Algorithms

XN / Y ≤ 1.0ORX / YN ≤ 1.0

Page 33: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

Just A Little Bit (More) Algebra …

YNegotiated Subcontractor RateXN

Constant (Evaluation Criteria / Pre-Negotiation Position)

X Subcontractor Rate

YN Negotiated Criteria

Page 34: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

Third File Finding: “Missing” Compliance Documentation• Centralized Representations and Certifications

• Contractor Reasoning: Streamlined Files• CPSR Risk: CPSR Team does not look “outside of the file”• Effect: 4+ Public Law Violations

• Debarment Cert• Anti-Lobbying Act• Anti-Kickback Act• CAS Certification

Page 35: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

Third File Finding: “Missing” Compliance Documentation• “Common Sense” Determinations of Commerciality

• Contractor Reasoning: Reduction of Duplicative Documentation – Do obviously COTS items REALLY need it?

• CPSR Risk: ANY Procurement Decision requires documentation. Obvious Equals Easy, Not Nothing.

• Effect: Public Law and Regulatory Violations• CAS• TINA• Small Business Subcontracting Plan• Foreign Subcontractor Notice

Page 36: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

Bonus Finding: Awarding Other-Than-FFP Subcontracts

• Where Did The Increased Emphasis on Award of Other-Than-FFP Subcontracts Come From?• Fraud, Waste and Abuse Investigations• Public Law (52.244-2)• DCAA

• What Do You Need to Know?

Page 37: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

Questions?

Conclusion of Part One 

Page 38: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

IntroductionSurprisingly Sneaky Enterprise Findings

What Does DCMA Expect From Your Enterprise System?

• Appropriate Organizational Structure and Authority Matrix

• Adequate Lead Time

• Accurate Data Call Responses

Page 39: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

First Enterprise Finding: Organizational Structure / Signature AuthorityWhat Does DCMA Expect From Your Org Structure?• The Procurement Structure Must Retain Structural Integrity

and Autonomy• Organizational Structure Protects Autonomy• Question – Can An Operational Employee Fire a

Procurement Professional Without Oversight?

Page 40: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

First Enterprise Finding: Organizational Structure / Signature Authority

CCO / CFO

Subcontracts Pricing Purchasing

Shared Service ModelPreferred

Page 41: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

First Enterprise Finding: Organizational Structure / Signature Authority

CCO / CFO

Subcontracts Pricing Purchasing

Operational Division

Dotted Line ModelAcceptable

Page 42: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

First Enterprise Finding: Organizational Structure / Signature Authority

Operational Division

Subcontracts Purchasing

Operational SubsetDiscouraged

Page 43: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

First Enterprise Finding: Organizational Structure / Signature AuthorityHow Does DCMA Review Signature Authority?• Approval Chain During Requisition Process• Authority Thresholds for Procurement

Administration• Documented Increases In Warrant

Page 44: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

Second Enterprise Finding: Lead Time

What Does DCMA Expect?

• Enterprise Average of 30 Days Per Procurement

• Higher the Dollar Value, the Longer the Lead Time

• Industry Average is 3-10 days. WHY?

Page 45: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

Second Enterprise Finding: Lead Time

Common Issue – “The Patchwork Approach”• Contractors Use Accounting System Requisitions

(ASRs) for Procurement File Requisition Requirement• ASR Commits Funding; Does Not Initiate a

Procurement Action• 48-72 Hour Processing Goals

Page 46: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

Second Enterprise Finding: Lead Time

RFQ Request (Email)

Bid Request/Receipt Evaluation

Award Decision Requisition Award

ASR Model

Page 47: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

Second Enterprise Finding: Lead Time

Fixing “The Patchwork Approach”• Replace Informal RFQ Requests With Purchasing

System Requisition (PSR)• Document and Capture Lead Time• Add Efficiency to Requisition Process

Page 48: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

Second Enterprise Finding: Lead Time

PSR Bid Request/Receipt Evaluation

Award Decision ASR Award

PSR Model

Page 49: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

Third Enterprise Finding: Data Call Accuracy

What Does DCMA Expect?

• Accurate, Timely, Reliable Responses to DCMA Requests for Information

• Effectively Include AND Exclude – Too Much Information Is a BAD THING

Page 50: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

Third Enterprise Finding: Data Call AccuracyWhat Can Happen?

• Mistaken / Repeatedly Revised Data Call Responses Can Lead to a Significant System Deficiency.

• One Significant Deficiency Fails a Purchasing System

Page 51: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

Third Enterprise Finding: Data Call AccuracySignificant Finding? How?Defense FAR Supplement (DFARS) 252.242-7005(b), “Contractor Business Systems,” provides the following definition:

“‘Significant deficiency,’ in the case of a contractor business system, means a shortcoming in the system that materially affects the ability of officials of the Department of Defense to rely upon information produced by the system that is needed for management purposes.”

Page 52: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

Third Enterprise Finding: Data Call Accuracy

What Happens? “The Patchwork Approach”• Accounting System Reports Used for Data Call• Accounting System Is Not Required to Track Purchasing System Data Points• Manual Edits + 1000’s Lines of Data + Tight

Deadline/Panic = Mistakes

Page 53: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

Third Enterprise Finding: Data Call Accuracy

How to Fix “The Patchwork Approach”• Track Purchasing System Data Points In Accounting System• Revise PO/Subcontract Numbering Process• Track PSRs

Page 54: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

Questions?

Conclusion of Part Two 

Page 55: Examining Common Contractor Mistakes           Exploring Innovative Pre-Review Solutions

www.ProcureLinx.com

On LinkedIn and Facebook: “CPSR Help and Hints”

Thank You!