The P.W.D. Nalbari Building with its Office at Nalbari was established in the year-1979 and from the very beginning, the Division has been
performing Construction, Repairing & Maintenance works of different buildings of different department of Greater Nalbari District in addition to
the works of Rangia Civil Sub-Division and some major works of Baska District. In the year-2005 Barpeta Building Division was merged with
Nalbari Building Division with all work load of Barpeta District.
ii) Location of Office:-----
The Nalbari Building Division discharging departmental functions with its three Sub-Divisions namely -
1. Nalbari Building Sub-Division with H.Q at Nalbari discharging departmental functions for Nalbari
District & Baska District.
2. Mukalmua Building Sub-Division with H.Q at Mukalmua discharging departmental functions for
Nalbari District.
3. Barpeta Building Sub-Division with H.Q at Barpeta discharging departmental functions for Barpeta
District
Schematic Chart of Office Organisation Structures under Civil Administrative District :----
The P.W.D. Building Wing of Assam Public Works Department in generally deals with the Construction of Civil works including Sanitary & Water
supply and Electrical works of almost all Govt. Buildings in the State of Assam.
The main objective of the department are: ----- As the State of Assam is in seismic Zone-V, Seismic Hazard is the main vulnerability & risk to the building structures in the district. More over the
district is flooded by river Brahmaputra and its tributaries at different places causing major threat to the buildings in the district.
PWDNalbari Building Division.
Nalbari.
PWD Nalbari Building
Sub-Division.Nalbari.
PWD Mukalmua Building
Sub-Division.Mukalmua
PWD Barpeta Building
Sub-Division. Barpeta
Civ
il A
dmin
istr
ativ
eD
istr
ict-
Bas
ka.
Civ
il A
dmin
istr
ativ
eD
istr
ict-
Nal
bari
Civ
il A
dmin
istr
ativ
eD
istr
ict-
Bar
peta
The main objective of the department is to construct earthquake resistant building as mandated by the National Building Code-2005, EarthquakeResistant Building Code and other relevant safety code so that the building in the district may get severely damaged but would not collapse duringstrong earthquake and assures safety to the people and contents in it and disaster is avoided.
Secondly necessary adequate measures is to be taken so that the buildings are not overtopped during flood and erosion & damages to the buildingstructures is avoided..
To have response system in place to face any eventuality related damages to buildings.
To ensure active participation by the Government administration , communities , NGOs, CBOs and volunteers at all levels making optional utilization ofavailable human resources for prevention, mitigation, response for a probable disaster.
Staff Details:-----
List of Employees of the Nalbari P.W.D. Building Division, Nalbari
Sl. No. Name of Employees Designation Date of joiningin the Division
Mobile No.
1 Sri Dipak Kumar
Barman
Executive
Engineer
26-04-2013 9435114856
2 Sri Ajoy Kr. Das A.E.E. (T/C) 24-02-2014 9435082586
3 Dhajendra Nath A.E. 10-03-2014 9435145479
4 Narendra Nr. Dutta J.E. 14-05-2014 (Attached to theDivision)
9435311375
5 Khalilur Rahman J.E. 31-10-2000 9435310108
6 Gautam Kr. Sarma Dy. A.O. 11-07-2012 9435510807
7 Pralay Kr. Deka Dy. A.O. 07-11-2013 9435325258
8 Nirupam Talukdar A.A.O. 25-02-2014 9864146804
9 Abanish Bhattacharjjya A.A.O. 12-02-2015 9864190573
List of Employees of the Nalbari P.W.D. Building Sub-Division, Nalbari
Sl.No.
Name of Employees Designation Date of joiningin the Division
Mobile No.
1 Sri Madhusudhan Das AssistantExecutiveEngineer
07-03-2014 9435043632
2 Kashab NarayanBaruah
S.O. 27-05-1994 9435323044
3 Pramod Kalita S.O 01-12-1979 9435202351
4 Dipak Ch. Baishay S.O 22-08-2002 9707627391
5 Dipak Bharaly S.O 05-03-2014 9571197831
6 Gokul Ch. Patowary Head Asstt. 13-03-1980 9859034332
7 Nabajyoti Patowary Jr. Asstt. 31-12-2008 9508071571
8 Jonali Barman Jr. Asstt 01-02-1995 9864113703
9 Shohida Begum Jr. Asstt 07-03-1995 9957500676
10 Nilima Dutta Section Asstt. 09-04-1982 9706406622
11 Dipali Devi Section Asstt 22-10-1982 94O1334143
12 Jutika Dutta Baruah Section Asstt 22-10-1982 8751963430
13 Anowar Hussain Section Asstt. 08-03-1995 8876295724
14 Chitra Lekha Das Tracer 14-08-1992 9859210736
15 Sri JoychandraRajbongshi
Section Asstt 06-05-1986 9864334203
16 Faznor Ali Sub-Eng. Gr.II 24-07-1980 9707092056
17 Matir Ali Sub-Eng. Gr.II 11-04-1980 9707092016
18 Mukul Ali Sub-Eng. Gr.II 29-11-1979 9954321583
19 Arjun Sarma Sub-Eng. Gr.II 01-06-1987 9954973554
20 Birendra KumarTalukder
Sub-Eng. Gr.II 24-07-1980 9707973255
21 Monoranjan Sarma Section Asstt 10-06-1987 9864382644
22 Sukadev Talukder Section Asstt 02-05-1988 9613505949
23 Jagat Talukder Section Asstt 02-05-1988 9864148126
24 Pratul Sarma Section Asstt 10-06-1987 9954676460
25 Kameswar Talukder Section Asstt 10-06-1987 9435323017
26 Nilamoni Deka Section Asstt 01-02-1993 9859109483
27 Girish Barman Section Asstt 06-04-1988 9864750686
28 Tafiqur Rahman Section Asstt 02-07-1995 8486844765
29 Abdul Majid Section Asstt 16-06-1987 7896471832
30 Harkanta Deka Section Asstt 01-01-1987 9864843569
31 Guneswar Baruah Section Asstt 20-02-1993 9859482528
32 Ratul Talukder Section Asstt 04-11-1986 9864560059
33 Jyoti Prasad Sarma Section Asstt 15-06-1994 9854410576
34 Pradip Basumatary Section Asstt 20-03-1995 9435293733
35 Akshay Kr. Sarma Section Asstt 05-11-1993 9854014284
36 Bhabesh Mahata Section Asstt 01-08-1994 9864933507
List of Employees of the Mukalmua P.W.D. Building Sub-Division, Mukalmua.
Sl.No.
Name of Employees Designation Date of joiningin the Division
Mobile No.
1 Sri Dilip Kr Das. AssistantExecutiveEngineer
15-09-2008 9864016944
2 Sri Pramod Sarma. H/A 12-11-1979 9613025970
3 Sri Pradip Kr Sarma Jr. Asstt. 24-12-2010 9678875875
4 Sri Keshab Mudiar. Office Peon. 07-05-2005 9864781385
5 Sri Amar BahadurChetri.
I.B.Chowkider.
30-11-1982 9859034597
6 Sri Huamesh Seal. OfficeChowkider.
18-12-2013 9854611310
7 Sri Hanif Ali. M/R Lab. 30-03-1995 9864633326
8 Sri Basudev Das. J.E. 08-08-2003 9864947702
9 Sri Alxul Jalil Sub-Engr. Gr-II.
05-08-1987 9706064235
10 Sri Janiur Rahman J.E. 07-03-2011 9085720510
11 Sri Maser Ali. Sub-Engr. Gr-II.
25-07-1980 8822252557
12 Sri Satish Ch. Barman. S/A. 31-12-1992 9707116189
13 Sri Niyamat Ali. S/A. 06-09-1985 9707916933
14 Sri Umesh Mudiar. S/A. 26-06-1980 9864402109
15 Sri Sorat Ch. Sarma. S/A. 12-06-1987 9854705145
16 Sri Bipin ChSwargiyari.
C/C Staff. 04-05-1993 9678702103
Functional Organization structures at state , District & Local Levels underAssam Public (Bldg. & N.H.) Department
Sl.
No.
Name of Officers Name of Department Phone No.
1 Sri Ajoy Bardoloi Commissioner & Spl. Secretary
to Govt. of Assam PW(Bldg. & NH) Deptt.. Dispur ,Guwahati-6
9435012873
2.
Sri P.K. Chaudhury Chief Engineer , PW(Bldg.)D, Assam , Chandmari , Guwahati -3
9435041799
3.
Sri Pulin Knowar Superintending Engineer , PWD, Guwahati Building Circle-I,
Fancy Bazar, Ghy-1
9435303515
4.
Sri Dipak Kr. Barman Executive Engineer , PWD ,
Nalbari Building Division, Nalbari9435114856
5.
Sri Madhu SudhanDas
Asstt. Executive Engineer PWD
Nalbari Building Sub-Division, Nalbari9435043632
6.
Sri Ajoy Kr Das Asstt. Executive Engineer PWD Mukalmua Building Sub-Division., Mukalmua
9435082586
7.
Sri Barindra Kr.Talukdar
Asstt. Executive Engineer PWD
Barpeta Building Sub-Division., Barpeta9954533398
B) SCHEMATIC DETAILS OF SCHEMES IMPLEMENTED BY P.W.D. NALBARI BUILDING DIVISION FOR THE YEAR 2014-15.
1) UP to date Status (Physical & Financial) of the Scheme under Education Department for the year 2011-12under PWD Nalbari Building Division .
Progress Up to31st Jan . 2015S
L
No.
Name of program andScheme
Sanctioned
Amount (Rs.
inCrore .
)
TenderAmoun
t(Rs.in
Lakh.)
Nameof
Contractor
Dateof
Allotment
Dateof
completionas perTende
r
Financial(Rs.in
Lakh)
Physica
l
Remarks
1 2 3 4 5 6 7 9 11 13
1 "Establishment of 21Nos. New Polytechnicsin different District of
Assam under Planduring 2011-12 at
Chandkuchi Bahjani inNalbari District
(Pakage No. Poly-11)
12.3Cr.
780.90
PulenHaloi,GopalBazar,Nalbari
12-1-2013
12-7-2014
236.37L
62%
Work is inprogress..Contractorassured to
complete theAdm.
Bldg, Hosteland
Workshopbefore
31st
March,2015.
2
"Establishment of 21Nos. New Polytechnicsin different District of
Assam under Planduring 2011-12 at
12.3Cr.
780.92
M/SAnupa
mNirman
Pvt.
11-3-13
11-11-14
205.0
41%
Work is inprogress.
Belguri Pathar inBaska District
(Package Poly-19.)
Ltd.
3 Const. Of 2(Two)storyed Hostel
Building of NalbariSanskrit College atNalbari under plan
2009-10.
0.50Cr.
48.92
AfzalAli,
Batsar,Nalbari
04-11-
2013
04-05--2015
22.75 L
95%
Work is inprogress..
Painting andWater
Supply is to bedone.
4
Const. Of RCCSanskrit College
Building at Nalbariunder plan 2010-11.
1.00Cr.
98.60
AfzalAli,
Batsar,Nalbari
15-12-
2013
15-06--2015
39.58 L
50%
Work is inprogress. .
2) Up to date Status (Physical & Financial) of the Schemes under GAD Department in Nalbari District.
Progress Up to31st Jan . 2015
Sl
No.
Name ofprogram and
Scheme
Sanctioned
Amount (Rs. inLakh.)
Tender
Amount (Rs.
inLakh.)
Name ofContract
or
Dateof
Allotment
Dateof
completionas perTende
r
Extention
oftimegranted up
to
Financial(Rs.in
Lakh)
Physica
lRemar
ks
1 2 3 4 5 6 7 8 9 11 13
1
Const. of watchSecurity Tower,
PermanentSheds for VIP,
VVIP and Drainaround SP
office ParadeGround atNalbari.
33.95 34.63Md.
TazerAli
15-8-14
15-2-15
28-2-15
---90%
Workin
Progress.
Const.Of
Pavilion&
Barrack in
progress.All
workswillbe
completed
before28th
Feb,15.
2
Renovation ofD.C. CourtBuilding at
Nalbari.
25.309
Md.TazerAli
5-11-14
12-2-15
28-2-15
---30%
Workis in
progress.
3) Up to date Status (Physical & Financial) of the Schemes of Girls Hostel under P.W.D. Nalbari Building Division under RMSA Assam .
Progress Up to31st Jan . 2015
NameofDistrict/Division
Name ofScheme/Name
of Scheme
TenderAmoun
t (InRs.)
Name ofContract
or
F.W.O.No. &Date
Dateof
Compln.
as perTende
r.
Financial
(Rs. inLakh)
Physical
Targetdate ofComple
tion.
Remarks
2 3 5 6 7 8 10 11 12 13
Nalbari
Constructionof Girls Hostel
at ChandiMedhi Balika
H.S. underBarkhetriBlock in
Nalbari Dist(Gr. No,-43)
1,42,34,200/
M/sMayur
Associates
FWO no -.BN/46/2013/9 dt.8-
8-13.
6/15/2014
--- 85%31-12-
14.
Paintingand
Finishing
worksare
to bedone.
4) Up to date Status (Physical & Financial) of the works under Judicial Department in Nalbari District .
Progress Up to31st Jan . 2015S
L
No.
Name of program andScheme
Sanction
Amoun
t(Rsin
Lakh.)
Tender
Amount(Rs.in
Lakh.)
Nameof
Contractor
Dateof
Allotment
Dateof
compln. asper
Tender
Extension
ofTimegranted up
to
Financial(Rs
in L)
Physica
l
Remarks
1 2 3 4 5 6 7 8 9 11 131 Repair/Renovation of
Chief JudicialMagistrate Court Bldg.(Ground floor D.C.'s
Office Bldg. in NalbariDistrict at Nalbari.
54.79
53.72
BrajenDas
19-3-12
19-12-12
31-9-14
31.97
85%
Progress of
work isslow,
becauseworksite is
notclearlyreceive
d..
2Construction of ADR
Centre under 13thFinance CommissionPakage No. ADR-3 at
Nalbari District.
100.00
95.88
Harunar
Rashid
12-5-13
19-12-13
31-11-14
34.62
96%
Workin prog.
3Const. of Garrage for P-
1 the Qtr of Dist.Sessions Judge Qtr andCJM Qtr and const. of
servant room withattach bathroom & WC
for the qtr of Dist.Sessions Judge, Nalbari& others 6 nos . JudicialQtr (One No Garrage)
25.703
26.3542
SriRajibu
lHaque
.
21-10-13
28-2-14.
30-6-14
100%
4 Imp. Of CJM’s Qtr atNalbari by providingVitrified Tiles, CC
Floring, , Gr-IV Qtr andgrill.
12.36
12.63
SriRajibu
lHaque
21-10-13
28-2-2014
.
30-6-14
Nil 100%
WorkComple
ted
5) Up to date Status (Physical & Financial) of the Model Schools under RMSA Assam in Nalbari District .
Progress Up to31st Jan . 2015
SL
No
Name ofprogram and
Scheme
Sanctioned
Amount (Rs.
inLakh.)
Tender
Amount (Rs.
inLakh.)
Name ofContract
or
Dateof
Allotment
Targetdateof
completionas perTende
r
Extension
ofTimegranted up
to
Financial(Rsin
Lakh)
Physica
l
Remarks
1 2 3 4 5 6 7 8 9 11 131 Construction
of ModelSchool atDifferent
District underRMSA, Assam
362.00
362.00
SriBalaji
Construction
25-04-12
25-2-13.
25-12-14
83.60
42%
Progress slowdue to
sitedisturba
nce
at villageBahbari under
TamulpurBlock in Baska
District .(Group-15)
2 Constructionof ModelSchool atDifferent
District underRMSA, Assamat village Kaldi
underBarkhetriBlock inNalbariDistrict
Assam, (GroupNo.II)
362.00
361.99
M/SAnupamNirmanPvt. Ltd.
29-07-12
29-05-13
31-03-14
360.0
100%
Workcomplet
ed.Rectific
ationwork ofFloorsare inprog
and islikelyto be
completed by20th
Jan,2015.
6) Up to date Status (Physical & Financial) of the Schemes under MPLAD fund under PWD Nalbari Building Division.
Progress Up to31st Jan . 2015
SL
No
Name of programand Scheme
Sanctioned
Amount (Rs.
inLakh.)
TenderAmoun
t(Rs.in
Lakh.)
Name of
contractor
Dateof
allotment
Targetdateof
completionas perTende
r
Extension
oftimegranted up
to.
Financial(Rs
in L)
Physica
l
Remarks
1 2 3 4 5 6 78
9 11 12
1
Construction ofBuilding/Classroom(
RCC Gr.Fl) withprovision of 3
Storied Building atPiplibari HighSchool, under
MPLAD Fund inNalbari Dist. for
2010-11.
20.0020.00
SriChandraKr.
Barman.
19-9-13
5-12-13.
31-7-2014
8.50L
100%
WorkComple
ted.
2
Construction of RCCBuilding ( Gr.Fl)
with provision of 2Storied Building atKakaya HS School,under MPLAD Fund
in Nalbari Dist.2013-14.
20.0020.00
SriChandraKr.
Barman
4-3-14.
12-03-15
-------
-------
25%
Work isin
progress.
PlinthComp,
7) Up to date Status (Physical & Financial) of the Schemes under NRHM for the year 2010-11under PWD Nalbari Building Division .
Progress Up to31st Jan . 2015S
L
No.
Name ofprogram and
Scheme
Sanctioned
Amount (Rs.
inLakh.)
TenderAmoun
t(Rs.in
Lakh.)
Name ofcontracto
r
Dateof
Allotment
Targetdateof
Completionas perTende
r
Extension
oftimegranted up
to
Financial(Rs
in L)
Physica
l
Remarks
1 2 3 4 5 6 7 8 9 11 13
1
Construction of 10bedded
Maternityward underNRHM in
NalbariDistrict for
15.0011.91
RanjitSarma,
Adarshapur Lane
No.-2,Dispur,Ghy-6.Work
17-8-11
17-10-11
31st
Aug,14.
----60%
Work hasbeen rescind
from thecont. B/swork isbeing
executedthrough
other
3
Construction of RCCBuilding ( Gr.Fl)Administrative
Building for NatunDehar Mauza MilanHigher Secondary
School, Banekushi,Nalbari, under
MPLAD Fund inNalbari Dist.
2013-14.
20.0020.00
SriDilipMed
hi
4-3-14.
12-03-15
-------
-------
25%
Work isin
progress.
.PlinthComple
ted
the year2010-11.AtGhograpar
BPHC
re-alloted
toJ. PasaP.O.
Nalbari.
contractor.Up to Truss
Comp.
8) Up to date Status (Physical & Financial) of the Schemes for the work of Planetarium under P.W.D. Nalbari Building Division .
Progress Up to31st Jan . 2015S
L
No.
Name ofprogram and
Scheme
Sanctioned
Amount (Rs.
inLakh.)
TenderAmoun
t(Rs.in
Lakh.)
Name ofContracto
r
Dateof
Allotment
Target
dateof
completion asper
Tender
Extension
ofTimeGranted
up to
Financial(Rs
in L)
Physical Remarks
1 2 3 4 5 6 7 8 9 11 13
1 Constructionof proposed
Sub-RegionalScience
Centre CumPlanetariumfor ASTEC
underDepartment
of Science &Technology,
Govt. ofAssam atNalbari.
150.00
150.00
SriGautamKalita
5-11-12
05-05-14
5-11-14.
36.08
87%
Work inProgressFinishingof Civil
works aregoingon...
9) Up to date Status (Physical & Financial) of the works under Revenue Department for 2014-15. in Nalbari District up to 28th Feb./2015.
SL
Name of program and Scheme Sanctioned
Tender
Nameof
Dateof
Targetdate
Progress Up to31st Jan . 2015
Remarks
No
Amount (Rs.
inLakh.)
Amount (Rs.
inLakh.)
Contractor
Allotment
ofcompletionas perTende
r
Financial(Rs
in L)
Physica
l
1 2 3 4 5 6 7 9 11 131 Renovation of Circle Office
Building in respect of CircleOfficer Tihu.
Head “2029-LR-00-103-LR-0146-DC-00-13-MW-00(N/P)”
1.50 1.50
2 Renovation of Residence andConstruction of one Garrage in
respect of Circle OfficerBarkhetri Revenue Circle..
Head “2029-LR-00-103-LR-0146-DC-00-13-MW-00(N/P)”
5.00 5.00
3 Construction of Circle OfficeBuilding, Brick Boundary wall
and site development, RCCStaging and Electrification 100
KVA Sub Station with HT & LTline in respect of Circle Officer,
Banekushi Revenue Circle.
101.22172
Md.JiyaurPasa.
27-1-15.
12month
s
4 Construction of Residenceincluding Boundary Wall,
Heavy Duty Iron Gate, RaisingLow site in respect of CircleOfficer, Tihu Revenue Circle
under Nalbari Dist.
27.15609
Mrinmoy
Kumar Das.
14-2-15.
5 Renovation of Circle OfficeBuilding in respect of CircleOfficer, Barkhetri RevenueCircle under Nalbari Dist
7.95369
Khairul
HoqueChoudhury
. 23-2-15.
4Month
s
6 Ghograpar 9.90 LoyRamDas
7 Construction of Residenceincluding raising low
compound, compound wall withiron gate in respect of Circle
Officer, Nalbari Revenue Circleunder Nalbari Dist.
26.09199
Rafikul IslamSarthebari.
18-2-15
4Month
s
10) Up to date Status (Physical & Financial) of the Schemes under PWD Nalbari Building Division under Rashtriya Madhamik SikshaAbhijan for the year 2010-11 .
Progress Up to31st Jan . 2015
SL
No.
Name of programand Scheme
Sanctioned
Amount(In
Rs..)
Tender
Amount (InRs..)
Name ofContracto
r
Dateof
Allotment
Dateof
completionas perTende
r
Financial(Rs
in L)
Physica
l
Remarks
1 2 3 4 5 6 7 9 11 13
A.
Construction of High School and Higher Secondary School under Rashtriya MadhmikSiksha Abhijan for the year 2010-11 under Nalbari District) Addl. Class Room, Science
Lab., Computer Lab. & Library etc. in the Secondary School.1.
Amoni JanakalyanHigh School
(Gr.-I)
24,35,170/
20,51,358/
Dilippatowary,Ghy-21.
25-06-13
3month
s
11.21
85%
Painting andFurniture areto be done..
2Asomi High School
Balizar(Gr-2)
19,44,335/
19,44,333/
JogeshDas
24-6-13
3month
s
------50%
WorkWithdrawnfrom Cont..
3B.R. Medhi H.S.
School(Gr.3)
17,45,505/
17,61,276/
KamalTalukdar
26-6-13
3month
s8.07
100%
Completedin all
respect.HandedOver.
4Banbhag
Batahghilla highSchool(Gr.-4)
19,44,335/
19,28,033/
JiyaurPasa,
Nalbari
17-5-13
3month
s8.66
100%
Completedin all
respect.Handed
Over5
Banbhag KhataDigijari High
School(Gr.-5)
24,35,170/
24,35,170/
LakshmiDaimari
10-6-13
3month
s10.4
992%
Civil workscompleted.
OnlyFurniture are
to besupplied.
6Barbori High School
(Gr.-6)23,35,170/
23,10,000/
NabaKanta
Talukadr,Kalag
21-5-13
3month
s
12.01
92%
Work inprog.
7 Barnibari MilanHigh School
(Gr.-7)
24,35,170/
20,27,833/
PradipBarmanBelsor
18-4-13
3month
s9.51
89%
Painting anFurniture
Left.
8Bartala High School
(Gr. No.8)24,35,170/
21,91,653/
Altafuddin Ahmed,Mukalmu
a
10-6-13
3month
s9.65
100%
Completedin all
respect.Handed
Over
9Chanda Kushi
Public High School(Gr. 9)
19,44,335/
19,44,147/
ParameshM.B.
Baruah,Nalbari
30-05-13
3month
s------
90%
Civil workscompleted.
OnlyFurniture are
to besupplied.
10
Dahudi High School(Gr.10)
29,89,005/
29,89,005/
GolapHussainKhan,
Chenga
13-06-13
3month
s
14.90
100%
Workcompleted .
Dakhin Pokowa 29,89, 29,89, Khanindra 05- 3 11.9 90 Civil works
11
Bahjani HighSchool (Gr. 11)
005/ 005/ Choudhury, Nalbari
06-13
months
8 % completed.Only
Furniture areto be
supplied.
12
Debiram PathsalaH.S. School
(Gr.-12)
18,08,505/
17,18,080/
M/s DDEnterprise, Nalbari
5-7-13
3month
s------
89%
Civil workscompleted.
OnlyFurniture are
to besupplied.
13
Dhamdhama GirlsHigh School
(Gr.13)
15,98,505/
15,82,520/
Anil Kr.Chakrabor
ty,Nalbari
21-06-13
3month
s8.34
90%
Civil workscompleted.
OnlyFurniture are
to besupplied.
14
Dhamdhama HighSchool
(Gr. -14)
19,44,335/
18,48,347/
ArikulHussain,Nalbari
10-7-13
3month
s------
90%
Civil workscompleted.
OnlyFurniture are
to besupplied.
15
Ganga PukhuriBarkuriha HighSchool (Gr. -15)
23,35,170/
23,35,162/
JogeshDas
24-06-13
3month
s
12.03
85%
Paint,furniture etc.
Notcompleted
16
Gograpar Girls HighSchool
(Gr. -16)
24,35,170/
24,59,241/
SatyaRanjanHaloi,Dispur
31-05-13
3month
s------ 90
%
Civil workscompleted.
OnlyFurniture tobe supplied.
Gograpar HighSchool (Gr.-17)
24,35,170/
24,59,241/
Do31-05-
3month
------90%
Civil workscompleted.
17
13 s OnlyFurniture are
to besupplied.
18
GopalthanPolytechnical
Institution(GR.-18)
19,44,335/
19,36,919/
M/SM.M.
International, Ghy.
10-06-13
3month
s
10.66
85%
Paint,furniture etc.
Notcompleted
19
Jagra high School(Gr. 19)
29,80,005/
29,89,005/-
Abjal Ali,Nalbari
04-06-13
3month
s
19.77
100%
Completedin all
respect.Handed
Over
20
JalkhanaBhatuakhana High
School(Gr.-20)
28,89,005/
28,80,629/
BijayTalukdar,
Tihu
26-06-13
3month
s
12.70 L
75%
Completedup to rooftruss, L.D.(Penalty)
imposed oncont.
21
Janakalyan HighSchool (Gr.-21)
24,35,170/
24,35,170/
Alimuddin
Ahmed,Nalbari
30-5-13
3month
s
18.09
100%
Completedin all
respect.Handed
Over
22
Janata H.S. Rampur(Gr.-22)
11,54,670/
11,50,700/
MahseenAli,
Rampur,Nalbari
27-06-13
3month
s5.68
100%
Completed,some minorrectificationis in prog.
23
Janapit High Schhol(Gr. -23)
23,35,170/
22,41,849/
PinkuBaishya,
Ghy.
04-06-13
3month
s
16.78
100%
Completedin all
respect.Handed
Over
24
Kakaya higherSecondary School
(Gr.-24)
17,45,505/
14,53,833/
M/S H.B.Engineers, BinothM BezBaruah
09-05-13
3month
s
11.02
95%
Civil workscompleted.Furniturenot yet
supplied25
Kamarkuchi HighSchhol
(Gr.-25)
24,35,170/
24,35,170/
ArupKalita,
Santipur,hillside
17-06-13
3month
s------
85%
painting,furniture etc.
not done
26
Kampur BidhapiyaHigh SchoolMug kushi(Gr.-26)
19,44,335/
19,05,448/
PankajBezbaruay, Nalbari
17-06-13
3month
s
10.49
100%
Workcompleted .
27 Kaldi Gopalthan
High School(Gr.-27)
24,35,170/
24,72,969/
JiyaurPasa,
Nalbari
17-05-13
3month
s
12.41
100%
Completedin all
respect.Handed
Over
28
Karia HigherSecondary School
(Gr.-28)
17,45,505/
17,01,867/
Ganashyam
Talukdar,Ghy.
14-06-13
3month
s8.42
85%
Workcompleted
except .Furniture,Laboratory
slab.29
Lawpara HighSchool (Gr.-29)
24,35,170/
24,70,000/
DhaniramDas,
Kulhati
29-05-13
3month
s
12.60
100%
Workcompleted ..
30
Mahendra NarayanChoudhury Balika
Bidyapith(Gr.-30)
23,35,170/
22,58,822/
ArikulHussain. .. Nalbari
10-7-13
3month
s------
70%
Work inprogress
One roomwill be in 1st
floor.
31
Makhibaha GirlasHigh School
(Gr.-31)24,35,170/
24,35,170/
BijayTalukdar,
Tihu
26-6-13
3month
s------ --
Workwithdrawn
fromcont.and willbe executed
throughSMDC.
32
Milan High SchoolPanigaon(Gr.-32)
35,42,840/
32,13,520/
HarunurRashid,
24-05-13
3month
s
18.14
100%
workscompleted.
33
Milan High SchoolBanekushi(Gr.-33)
28,89,005/
28,89,005/
DipankarKalita,LachitNagar
24-05-13
3month
s
14.75
90%
Civil workscompleted.Furniturenot yet
supplied
34
Morowa AnandaRam Baruah H.S.
School(Gr.-34)
17,45,505/
17,72,968/
UdayBaishyaMorowa
10-6-13
3month
s------
85%
Toilet Blocknot started,finishing
works to bedone.
35
Mugdi MilanH.S.School
(Gr.-35)
23,35,170/
23,35,170/
M/S.Mayur
Associatres ,
Hatogaon
05-06-13
3month
s------
93%
Civil workscompleted.Furniturenot yet
supplied
36
Namati VidyapitHigh School.
(Gr.-36)
23,35,170/
23,35,170/
PranabKr.
Goswami,Patachark
ushi
13-06-13
3month
s
12.63
100%
workscompleted..
37
P.B. Allia HighSchool (Gr.-37)
24,35,170/
23,01,236/
NarayanKalita,
Gograpar
26-04-13
3month
s
13.70
100%
Completedin all
respect.Handed
Over
38
Pachim BanbhagH.S. School
(Gr.-38)
24,35,170/
24,35,170/
LakshmiDaimari,Gograpar
06-06-13
3month
s
12.37
60%
WorkWithdrawnfrom Cont.
39
Pub Barkhetri HighSchool
(Gr.-39)
24,35,170/
22,61,542/
MreeganSaharia,
Ghy.
13-06-13
3month
s
11.15
93%
Civil workscompleted.
Furniture areordered
40
Pub Kalakushi HighSchool
(Gr.-40)
24,85,170/
24,40,156/
WahedurRahman,Japorigog
06-06-13
3month
s
10.77
90%
Civil workscompleted.
Furniture areordered
41
Raj Kadamtal HighSchool
(Gr.-41)
24,35,170/
23,86,467/
BrajenDas,
Nalbari
19-04-13
3month
s
11.97
100%
Completedin all
respect.Handed
Over
42
RaghunathChoudhury H.S.
School(Gr.-42)
27,06,175/
27,00,000/
KhairulHaque
Choudhury,
Mukalmua
09-05-13
3month
s
15.87
100%
Completedin all
respect.Handed
Over
43
Chamata Girls HighSchool
(Gr.-43)
19,44,335/
16,91,267/
DilipPatowary,
Ghy.
17-06-13
3month
s------
85%
Painting andfurniture areto be done.
44
Solmara HigherSecondary School
(Gr.-44).
23,35,170/
22,40,412/
M/S.Sunrise
Enterprise,.
17-06-13
3month
s
14.03
100%
Completedin all
respect.Handed
Over
45
Suradi HighMadrassa(Gr.-45)
29,89,005/
28,39,553/
PankajBezbaruah, Nalbari
17-06-13
3month
s------
55%
Work inprog. Up toroof truss.
46
Swahid MukundaKakati Vidyapith,
Barbhag(Gr.-46)
24,35,170/
21,06,422/
DineshGoswami,Christaian
-basti,Ghy.
26-04-13
3month
s6.50
85%
Civil workscompleted.
Furniture areordered
11) Up to date Status (Physical & Financial) of the works under SCA Plan in Nalbari Distinct .
Progress Up to31st Jan . 2015S
L
No.
Name ofprogram and
Scheme
Sanctioned
Amount (Rs.
inLakh.)
TenderAmoun
t(Rs.in
Lakh.)
Nameof
Contractor
Dateof
Allotment
Targetdate ofCompletion as
perTender
Extension oftime
granted upto
Financial(Rs
in L)
Physica
l
Remarks
1 2 3 4 5 6 7 8 9 11 13
1 Constructionof KumarBhaskarBarmanSanskrit
University atNalbari
(Administrative Building and
Barrack)Pakage-I
250.00
182.24
TapanDeka
11-03-12
30-06-14
---92.8
785%
Work is inprogressfinishingworks areleft.. Will
becompleted
inFeb,2015
2 Constructionof KumarBhaskarBarmanSanskrit
University atNalbari (EntireBoundary wall,main entrance
and siteDevelopment
200.00
176.47
TapanDeka
02-1-13
2-04-1431-05-
14170.31
98%
Work is inprogressLetter
Likely tobe
completedin
Feb,2015..
by earth fillingunder SCAPlan during2011-12)
12) Up to date Status (Physical & Financial) of the Schemes under Medical 2011-12 & 2012-13 in Nalbari District .
Progress Up to31st Jan . 2015
Sl
No
Name of programand Scheme
Sanctioned
Amount (Rs.
inLakh.)
TenderAmoun
t(Rs.in
Lakh.)
Nameof
Contractor
Dateof
Allotment
Dateof
completionas perTende
r
TimeExtensiongranted up
to
Financial(Rs
in L)
Physica
l
Remarks
1 2 3 4 5 6 7 8 9 11 13
1
Construction/Re-construction of
boundary wallaround the Hospitalstaff Qtr campus of
SMK CivilHospital, Nalbari
under Annual plan2011-12
35.7535.76
AbjalAli
17-1-12
17-3-12
…. ---95%
Aportion
of5%wallcouldnot be
executed due to
nonpossession ofsite.
2Construction of
/Reconstruction of46.14
L45.24
AbjalAli
25-4-13
1-8-131-12-
1326.6
0100%
boundary wallaround the SMKCivil Hospital
(Balance portion ofcampus coveringJoint Director,
Girls Hostel & frontsite and new
morque side) under2012-13.
WorkComple
ted
3
Construction ofPHC Building andand RCC Bldg. Gr.Fl. (Phase-1) withprovision of (G+2)
with top floorAssam type atGhograpar in
Nalbari Districtunder Non plan.
2012-13.
48.907
47.948
SriJogeshDas.
3-9-13
1-8-141-12-14.
27.44 L
60%
Work isin
progress,
Likelyto be
completed in
March,2015.
13) Up to date Status (Physical & Financial) of the Schemes under Untied fund for the year 2012-13 under PWD Nalbari BuildingDivision .
Progress Up to31st Jan . 2015S
L
No.
Name ofprogram
and Scheme
Sanctioned
Amount (Rs.
inLakh.)
TenderAmoun
t(Rs.in
Lakh.)
Name ofcontracto
r
Dateof
allotment
Dateof
completionas perTende
r
Extension
oftimegranted up
to.
Financial(Rs
in L)
Physica
l
Remarks
1 2 3 4 5 6 78
9 11 13
Development of
NalbariGordon
Field UnderUntied fund
2012-13.
Gr.A=499,490/-
16-9-13
16-11-13
Gr.C=4 99,490/-
16-9-13
16-11-13
Gr.G=4 98,816/-
21-9-13
21-11-13
Gr.H=4 99,046/-
21-9-13
21-11-13
Gr.J=4 75,268/-
Sri BirajDas
Maligaon
21-9-13.
21-11-13
31-3-14
--90%
Work inProgress.Work is
likely to becompleted
by Feb2015.
Gr.B=499,490/-
16-9-13
16-11-13
Gr.D=4,99,490/-
16-9-13
16-11-13
1
Gr.F=4,
50.00.
96,913/-
Sri.PrasantaBarman
23-9-13
23-11-13
31-3-14
--90%
Work inProgress.Work is
likely to becompleted
by Feb2015
Gr.E=4,75,455/-
M/sJonali
enterprise
16-9-13
16-11-13.
31-3-14
--90%
Work islikely to becompleted
by Feb2015,Work in
Progress..
RKVEY1i) Marowa
49.95Uday
Baishya26-3-
1325-9-
13
31-03-14
49.93
100%
WorksCompleted.
ESVHD
i) Debochara 28-8-13
7-3-14 ---- ---- 100%
WorksCompleted.
ii)Dhamdhama
28-8-13
7-3-14 ---- ---100%
WorksCompleted.
2
iii)Makhibaha
40.80NarayanKalita
28-8-13
7-3-14 ---- --40%
Work inprogress.
RIDF -XVIII
i) BarnadiPk-72
60.933
Sri RajibDas ZooRoad ,Ghy-5
25-12-13
25-6-13
70%
Work inprog
ii)Ghograpar
Pk-74
58.899
Nayanjyoti
Talukdar,
Sorbhog,Barpeta.
70%
Work inprog.
3
iii) Jagra 60.69 Sri 6-3- 17-11- 50Work in
Pk-76 952 AtikurRahman,Majdia,Sartheba
ri.
14 14 % progress.
iv) SatemariPk- 77
63.495
Md.KhairulHaque
Choudhury,
Mukalmua.
17-5-14
65%
Work inProg.
v) NalbariPk-75
59.11
M/sMayur
Associates
5%
Work inProg
vi)Chandakushi
Pk-60.93
Md.JiyaurPasa.
3-3-14
6-9-1470%
Work inProg.
vii)Ranakushi
Sri UdayBaishya
30
%-
Work inProg
14) Up to date Status (Physical & Financial) of the Schemes of IMPLEMENTATION OF SCHEMES UNDER THE AWARD OFFOURTH ASSAM STATE FINANCE COMMISSION DURING THE YEAR 2011-12. .
Progress Up to31st Jan . 2015
Sl.
No
Name of Scheme
A.A.Amount (InRs..)
Tender
Value(In
Rs..)
Nameof
Contractor
F.W.O.No. &Date of
Commencemt.
Date ofCompletion (as
pertender)
Financial(Rs
in L)
Physica
l
Remarks
1 3 5 6 7 8 9 10 111 Construction of Gr.
IV Qtr. Under theAward of FourthAssam Finance
commission duringthe year 2011-12 at16 No. Khatikuchi
G.P.
2,10,000/
210,000/
SriAnjanDeka,
Nalbari.
NZP/9/FASC/2012/637A
dt.14/8/13.
2.10 100%
WorkCompleted
2 -Do-at 13 No. Gograpar
G.P.
2,10,000/
210,000/
SriAnjanDeka,
Nalbari.
45Days
80%
Up to roof
3 -Do-at 09 No. Madhya
Bahjani G.P.
2,10,000/-
199,500/
SriDhirenBezbar
uah,Bahjani
.
NZP/9/FASC/2012/640A
dt.14/8/13.
45Days
1.186L
100%
WorkCompleted
4 -Do-at KuriahamariBarsulia G.P. 2,10,0
00/-210,000/
Sri.BirajDas,
Nalbari
Works NotStarted yet,
the workmay be
withdrawnfrom the
cont. Letterto CEO
submitted.
5 -Do-at Upper Barbhag
G.P.
2,10,000/-
210,000/
Sri.BirajDas,
Nalbari
100%
WorkCompleted
6 Construction of Gr.IV Qtr. Under theAward of FourthAssam Finance
commission duringthe year 2011-12 at04 No. Khata G.P.
2,10,000/-
210,000/
Sri.BirajDas,
Nalbari
100%
WorkCompleted
7 -Do-at 38 No. paschimNatun dehar G.P.
2,10,000/-
210,000/
SriBijay
Talukdar
Tihu
45%
Workstarted.
8 -Do-at 24 No. Dakhin
Madhya DharmapurG.P.
199,500/
Md.SarifulhaqueBelsor.
100%
WorkCompleted.
9 -Do-at Jalkhana
Bhatwakhana G.P.2,10,000/-
210,000/
SriBijay
Talukdar
Tihu
35%
Work inprogress
10
-Do-at 31 (3) Dakhin
Pakowa G.P.2,10,000/-
199,500/
Md.Abdul
AliAhmedNalbari
.
NZP/9/FASC/2012/633A
dt.14/8/13.
45Days
100%
completed
11
-Do-at Mugdi Rampur
G.P.2,10,000/-
210,000/
RafiqueZamanTalukd
ar,Mugdi.
NZP/9/FASC/2012/636A
dt.14/8/13.
45Days
100%
completed
12
-Do-at 25 No.
Rupiyabathan G.P.2,10,000/-
199,500/
Md.SarifulhaqueBelsor.
NZP/9FASC/2012. dt.14-
8-13
10%
Modification required.
13
Construction ofG.P. Secy. Qtr.
Under the Award ofFourth assam State
FinanceCommission duringthe year 2011-12 at16 No. Khatikushi
G.P.
340,000/
340,000/
Md.RajibulHaque,Nalbari
.
50%
In progress
14
Construction ofG.P. Office Bldg.
Under the Award ofFourth assam State
FinanceCommission duringthe year 2011-12 at
05 No. PubBatahghilla G.P.
10,72,700/
1,019,065/
AnisurRahma
n,Nalbari
2.515
50%
In progress
15
Construction ofG.P. Office Bldg.
Under the Award ofFourth assam State
FinanceCommission duringthe year 2011-12 at
Kalar Char G.P.
10,72,700/
10,72,700/
AnisurRahma
n,Nalbari
----
As there isno land
available inKalar Char,
Hencework may
beWithdrwan
from theCont.Letter
issued to
CEO.
16
Construction ofG.P. Office Bldg.
Under the Award ofFourth assam State
FinanceCommission duringthe year 2011-12 at
23 No. DakhinKhetri Dharmapur
G.P.
10,72,700/
1,019,065/
AtiqurRahma
nBarpeta
.
NZP/9/FASC/2012/628A
dt.14/8/13.
90Days
4.06 100%
Workcompleted
17
Construction ofG.P. Office Bldg.
Under the Award ofFourth assam State
FinanceCommission duringthe year 2011-12 at
Pani gaon. G.P.
10,72,700/
10,72,700/
PrabirbarmanNalbari
NZP/9/FASC/2012/629A
dt.14/8/13.
90Days
----Land
possessionnot yetgiven.
18
Extension of G.P.Office Bldg. Underthe Award of Fourthassam State FinanceCommission duringthe year 2011-12 at
MukalmuaNarayanpur . G.P.
8,50,000/
8,50,000/-
Md.NazrulIslamBuri
Nagar,Nalbari
.
NZP/9/FASC/201
2/ 231Dt.22-4-
13
45Days
3.69 100%
Workcomp.
19
Extension of G.P.Office Bldg. Underthe Award of Fourthassam State FinanceCommission during
8,50,000/
8,07,500/-
DipakDeka,
Bidyapur
NZP/9/FASC/201
2/ 230Dt.22-4-
45Days
7.187
100%
Comp.
the year 2011-12 atMugdi Rampur .
G.P.
13
20
Extension of G.P.Office Bldg. Underthe Award of Fourthassam State FinanceCommission duringthe year 2011-12 at13 No. Gograpar .
G.P.
8,50,000/-
8,07,500/-
SriSaratKalita
Gograpar
--Site handed
over butwork notstarted.
21
Extension of G.P.Office Bldg. Underthe Award of Fourthassam State FinanceCommission duringthe year 2011-12 at
48(2) UpperBarbhag . G.P.
8,50,000/-
8,07,500/-
SriNabaKantaTalukd
ar,Kalag
NZP/9/FASC/2012/ 648ADt.14-8-
13
60Days
100%
Workcompleted
22
Extension of G.P.Office Bldg. Underthe Award of Fourthassam State FinanceCommission duringthe year 2011-12 at
Nathkushi . G.P.
8,50,000/-
8,07,500/-
Sri AtulBasuma
tary,Baska
NZP/9/FASC/2012/ 649ADt.14-8-
13
60Days
5.40 90%
Work inProgress.
23
Extension of G.P.Office Bldg. Underthe Award of Fourthassam State FinanceCommission duringthe year 2011-12 at7 No. Pub Bahjani .
G.P.
8,50,000/-
8,07,500/-
M/sMM
Internatio-nal,Chandmari,Ghy-3
NZP/9/FASC/2012/ 645ADt.14-8-
13
100%
Workcompleted
24
Extension of G.P.Office Bldg. Underthe Award of Fourthassam State FinanceCommission duringthe year 2011-12 at19 No. Chataibari .
G.P.
8,50,000/-
8,07,500/-
Md.ZohirulIslam
Hatigaon,
Sijubari
NZP/9/FASC/2012/ 644ADt.14-8-
13
60Days
4.05 100%
Workcompleted
25
Extension of G.P.Office Bldg. Underthe Award of Fourthassam State FinanceCommission duringthe year 2011-12 at33 No. Belsor . G.P.
8,50,000/-
8,07,500/-
SriMridulBarmanVill:-
Belsor,Nalbari
.
NZP/9/FASC/2012/647A.dt 14-8-
13
60Days Only
painting isto be done
26
Extension of G.P.Office Bldg. Underthe Award of Fourthassam State FinanceCommission duringthe year 2011-12 at
38 No. PaschimNatun Dehar G.P.
8,50,000/-
8,07,500/-
SriKamalaKanta
Basumatary,
Kathalbari,
Nalbari.
NZP/9/FASC/2012/ 646ADt.14-8-
13
60Days
3.76 100%
Workcompleted
27
Construction ofBDO/ EO Qtr forA.P. Under the
Award of Fourthassam State FinanceCommission duringthe year 2011-12 atBorigog Banbhag
6,30,000/-
5,98,500/-
SriSatya
RanjanHaloi,Dispur
2.16 100%
Workcompleted
A.P.
28
Extension of 3Storyed RCC Office
Building (Groundfloor) only forBarkhetri A. P.
Under the Award ofFourth assam State
FinanceCommission during
the year 2011-12
2,100,000/
2,100,000/
Md.JiyaurPasa,
Nalbari.
NZP/9/FASC/2012./229.
Dt. 22-4-13
45Day
s
12.997
100%
Workcompleted
29
Construction ofMultipurpose Hallfor A.P. at Paschim
Nalbari A.P.Solmara Under theAward of Fourth
assam State FinanceCommission during
the year 2011-12
1,22,56,900/
11,644,055/
M/sSunrise
Enterprise, Prop.Mainul
Ali,Khanapa
ra.
NZP/9/FASC/2012/232..
Dt. 22-4-13
45Day
s6
months
47.868
91%
Work inProgress
30
Construction ofG.P. Secy. Qtr.
Under the Award ofFourth assam State
FinanceCommission duringthe year 2011-12 at
31 (3) DakshinPokowa G.P.
3,40,000/-
3,40,000/-
Sarif AliBatsor
NZP/9/FASC/2012/655A
dt.14/8/13.
60Day
s
1.855
100%
Completed& handed
over
31
Construction ofG.P. Secy. Qtr.
Under the Award ofFourth assam State
FinanceCommission duringthe year 2011-12 at
JalkhanaBhatuakhana G.P.
3,40,000/-
3,23,000/-
Bijoytalukdar
Tihu 35%
Work inProgress
32
Construction ofG.P. Secy. Qtr.
Under the Award of4th.Assam State
Finance Commi-ssion during theyear 2011-12 at
50(4) UpparBarbhag G.P.
3,40,000/-
3,23,000/-
Sri UdayBaishyaMorowa
Tender notreceived.
33
Construction ofG.P. Secy. Qtr.
Under the Award of4th.Assam State
Finance Commi-ssion during the
year 2011-12 at 6No. Batahgilla G.P.
3,40,000/-
3,38,635/-
SriGurucha
ranDeka,
Kazipara.
NZP/9/FASC/201
2/656ADt.14-8-13
60Day
s
1.874
100%
Workcompleted
34
Construction ofG.P. Secy. Qtr.
Under the Award4th.Assam State
Finance Commi-ssion during the
year 2011-12 at 9No. Madhya
3,40,000/-
3,23,000/-
M/s MMInternati
onal,Chandmari, Ghy-
3
100%
Onlypainting isto be done
Bahjani G.P.
35
Construction ofG.P. Secy. Qtr.
Under the Award4th.Assam State
Finance Commi-ssion during the
year 2011-12 at 38No. Paschim Natun
Dehar G.P.
3,40,000/-
3,23,000/-
KamalaKanta
Basumatary,
Kathalbari,
Nalbari
NZP/9/FASC/2012/ 660ADt.14-8-
13
60Day
s1.69
100%
Workcompletedup to Post
plate.
36
Construction ofG.P. Secy. Qtr.
Under the Award4th.Assam State
Finance Commi-ssion during the
year 2011-12 at 26No. Bangaon G.P.
3,40,000/-
3,23,000/-
Md.Mahrum
Ali,Barnaddi
,Nalbari.
NZP/9/FASC/2012/ 661ADt.14-8-
13
60Day
s
100%
Workcompleted
37
Construction ofG.P. Secy. Qtr.
Under the Award of4th.Assam State
Finance Commi-ssion during theyear 2011-12 at
Mugdi Rampur G.P.
3,40,000/-
3,23,000/-
RafiqueZaman
Talukdar, Mugdi.
NZP/9/FASC/2012/652A
dt.14/8/13.
60Day
s3.23
100%
Workcompleted
38
Construction ofG.P. Secy. Qtr.
Under the Award of4th.Assam State
Finance Commi-3,40,00
0/-3,40,00
0/-DipakDeka,
60Day
s
85%
GlassFitting inWindows
and
ssion during theyear 2011-12 at
Loharkatha AdabariG.P.
Bidyapur Electricalfittings areto be done.
39
Construction ofG.P. Secy. Qtr.
Under the Award of4th.Assam State
Finance Commi-ssion during theyear 2011-12 at
Kurihamari BarsuliaG.P.
3,40,000/-
3,40,000/-
Md.Sarif Ali,Batsor,Nalbari.
NZP/9/FASC/2012/653A
dt.14/8/13.
60Day
s
100%
Workcompleted
40
Construction of Gr.III Qtr for AP.
Under the Award4th.Assam State
Finance Commi-ssion during theyear 2011-12 at
Pub Nalbari A.P.
3,40,000/-
3,23,000/-
Md.SafikulIslam,
Mularkushi,
Nalbari.
60Day
s
100%
Workcompleted
Executive Engineer, P.W.D.Nalbari Building Division.
Nalbari.
Model School at Kaladi
Additional Classrooms & Computer Lab.
Girls Hostel at Mukalmua
\
Polytechnic College at Chandkuchi
Veterinary Hospital
ADR (Judicial)BUILDING AT NALBARI
Major Projects in last 3 years
Name of Project Amount (Rs.)
New Polytechnic Building at Chandakushi 780.00 L
Brick Boundary wall and Gate of Sanskrit University 200.00 L
Administrative Building of Sanskrit University at Namati 200.00 L
Model School at Kaldi under RMSA 362.00 L
Planetarium at Sariahtuli village 200.00 L
Boundary Wall around SMK Civil Hospital 146.00 L
ADR centre at Nalbari under Judicial Department 100.00 L
Development of Nalbari Gordon Field (Untied Fund) 50.00 L
Ambedkar Bhawan 50.00 L
Name of Project Amount (Rs.)
9 Nos. of Office Building and Residential Quarter of Vety. Deptt. 60.00 L (each)
Auditorium of District Library 100.00 L
40 nos. of office and Residential Buildings of CEO, Zilla Parishad 349.80 L
100 Bedded Girls Hostel at Mukalmua under RMSA 142.34 L
3 nos. of School Building under MPLAD fund 60.00 L
Additional Class Rooms, Science Lab., Computer Lab. etc.(46Schools)
1066.65 L
Sanskrit College and Hostel Building, Nalbari 150.00 L
Construction of Class Room and Science Laboratory forintroduction of Science Stream in High Schools.(8 nos.)
133.00 L