executive summary - patan (revised on 10.05.2010)

Upload: nazakat-hussain

Post on 06-Apr-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/3/2019 Executive Summary - Patan (Revised on 10.05.2010)

    1/5

    PAKISTANWATER AND POWER DEVELOPMENT AUTHORITY

    PATAN HYDROPOWER PROJECT

    2800 MW

    FEBRURY, 2011

    HYDRO PLANNING ORGANIZATION

    WAPDA, SUNNY VIEW, LAHORE

    P-1

    A L L A I K H W A R1 2 1 M W

    T H A K O TR E S E R V O I R

    T H A K O TB R ID G E

    KHANKHWAR

    72MW

    T H A K O T D A M A X I S

    Karakuram

    600

    H i g h W

    a y

    THAKOT

    2800 MW

    760

    800

    600800

    610

    Khan

    Khwar

    800

    P O W E R H O U S E

    INDUSRIV

    ER

    N

    LEGEND

    R I V E R

    N U L L A

    R E S E R V O I R

    T O W N

    D A M A X I S

    P O W E R H O U S EP A T A N H P P

    T H A K O T H P P

    W . L. 760 m . a. s. l

    W . L . 610 m . a. s. l

    RESERVOIR

    W. L. 1450 m.a.s.l

    TAIL RACE

    W . L . 6 9 3 m .a .s . l

    RESERVOIR

    W . L . 7 6 0 m .a .s . l

    TAIL RACE

    W . L . 6 1 0 m .a .s . l

    RESERVOIR

    W . L . 6 1 0 m .a .s . l

    TAIL RACE

    W . L . 4 7 2 m .a .s . l

    TAIL RACE

    W . L . 5 7 0 m .a .s . l

    RESERVOIR

    W . L . 8 2 5 m .a .s . l

    RESERVOIR

    W . L . 1 2 1 8 m .a .s . l

    TAIL RACE

    W . L . 6 7 7 m .a .s . l

    RESERVOIR

    W. L. 1422.5 m.a.s.l

    TAIL RACE

    W. L. 686 m.a.s.l

    TAIL RACE

    W. L. 552 m.a.s.l

    1000

    1000

    1200

    1200

    1000

    1200

    1000

    1200

    1000

    1200

    1000

    12001000

    Highway

    Karak

    uram

    DuberKhw

    ar

    KeyalK

    hwar

    Ranolia

    Khwa

    r

    Darton

    Khwar

    1200

    KEYAL

    122MW

    P A T A N T O W N

    KarakuramHighway

    PALASV

    ALLEY

    800

    Bankhar

    Khw

    ar

    D U B E R B A Z A R

    1000

    1200

    P A T A N D A M A X I S

    DUBER

    130MW

    800

    800

    PALASVALLEY

    621 MW

    INDUSRIVER

    800

    800

    800

    800

    PATAN2800MW

    INDUSRIVER

    P A T A N A N D T H A K O T H Y D R O P O W E R P R O

    C O N C E P T U A L L A Y O U T

    P A T A N H P PR E S E R V O I R

    1000

    1000

    1000

    1000

    1 2 0 0

    KhanKhw

    ar

    Ming

    oraRo

    ad

    R o a d To B a t g r a mA n d M a n s e h r a

    1000

    600

    800

    1000

    1000

    1000

    1000

    600

    600

    600

    800

    600

    800

    1200

    12

    00

    12001000

    1200

    1000

    1200

    1200

    800

    600

    1200

    600

    600

    800

    600

    800

    800

    1000

    800

    1000

    1000

    1200

    800

    1000

    12

    00

    100080

    0

    1200

    INDUSRIVER

    AnalK

    hwar

    B E S H A M

  • 8/3/2019 Executive Summary - Patan (Revised on 10.05.2010)

    2/5

    PATAN HYDROPOWER PROJECT

    1.0 General

    The Pakistan Water and Power Development Authority (WAPDA) launched a 25

    years comprehensive integrated programme in 2001 Water Resources and

    Hydropower Development Vision 2025. Programme which aims at the

    development of water storage projects as well as harnessing the hydropower

    potential in the country. Thakot Hydropower Project, being a run off river

    hydropower project, is also included in that programme.

    2.0 Location

    Patan Hydropower Project is located on Indus River in District Kohistan of NWFP.

    The dam site is located on Indus River about 4 Km upstream of village Patan onKarakorum Highway (KKH). The proposed underground powerhouse site is

    located on the left bank about 8 km upstream of Besham Town and is accessible

    via KKH. Powerhouse and dam sites are 349 km and 383 km respectively from

    Islamabad.

    3.0 Background

    WAPDA in 1975 requested the assistance of Canadian Government through

    CIDA in making ranking study of hydroelectric power sites with a view to meet the

    long-term power demand of Pakistan. Accordingly CIDA provided a grant to

    assist WAPDA in cost effective hydropower sites and to focus on the best-ranked

    project for development / implementation.

    CIDA appointed Montreal Engineering Company Limited (MONENCO) to

    undertake hydroelectric inventory ranking and feasibility studies in Pakistan. The

    contract between CIDA and Consultant (MECO) was signed on August 5, 1981.

    Patan Hydropower Project was identified as part of Inventory and Ranking Study

    of Hydropower potential on main rivers of Pakistan, carried out in

    1981-84. For main-stem Indus River Projects, Patan Project was ranked fifth after

    Basha, Dasu, Bunji and Thakot hydropower projects.

    Monenco studies revealed at identification level that Patan Hydropower Project

    would utilize the steep river gradient available on Indus river. The concept of

    development was to construct a 104 m high dam on Indus river. The project

    P-2

  • 8/3/2019 Executive Summary - Patan (Revised on 10.05.2010)

    3/5

    would provide some 1172 MW (Index Capacity) in an underground powerhouse

    with gross head of 150 m and design discharge of 1070 m3/s.

    The Index capacity at Identification study by Monenco was reviewed and revised

    as 2800 MW with design discharge of 2600 m3/s and mean annual energy of

    15,230 GWh by Hydro Planning Organization with updated flow data and design

    discharge.

    4.0 Salient Features (Review of MONENCO Study by HPO, WAPDA)

    - Design Capacity : 2800 MW

    - Design Discharge : 2600 m3/s.

    - Plant Factor : 62.2 %

    - Full supply level : 760 m.a.s.l

    - Normal Tailwater Level at damsite : 680 m.a.s.l

    - Normal Powerhouse Tailrace Level : 610 m.a.s.l

    - Gross Head : 150 m

    - Net Head : 129 m

    - Mean Annual Energy : 15230 GWh

    - Mean Annual Flow : 2180 m3/s.

    - Dam height : 104 m

    - Length of Power Tunnel : 18 Km

    - Tentative Project Cost ; 6.0 Billion US $

    Scope fpr Feasibility Study

    The study will cover data collection, field investigations, technical analysis to select

    the appropriate project lay out to develop the hydro power potential required to fully

    establish the feasibility of the selected project layout, design of structure and

    equipments, cost estimates, economic and financial analysis for the Patan

    Hydropower project.

    The works for a feasibility study are indicated below :

    Field surveys and investigations

    Collecting of all relevant data

    Finalization of project layout after considering different alternatives.

    Design of Structures and equipments,

    P-3

  • 8/3/2019 Executive Summary - Patan (Revised on 10.05.2010)

    4/5

  • 8/3/2019 Executive Summary - Patan (Revised on 10.05.2010)

    5/5

    7.0 Present Status

    CDWP has approved PC-II for an amount of Rs.731.233 Million in a

    meeting held on 17.09.2009.

    MoW&P has accorded administrative approval to undertake the work vide

    No. P.II.15(17)/2009 dated 27.10.2009.

    Feasibility study will be completed in twenty four months after engagement

    of Consultants.

    P-5