    TECHNICAL DOCUMENTATION

    RESULTS OF DEVIATION MEASUREMENTS

    AND

    GEOMETRY OF ROTARY KILN No 1

    AT

    EXEMPLARY CEMENT PLANT

    PERIOD OF SURVEY:

    30th

    of March - 16th

    of April, 2004

  • 7/28/2019 Exemplary Documentation

    2/59

    1

    FINAL REPORT ON KILN No 1

    AT EXEMPLARY CEMENT PLANT

    I. SCOPE OF WORK:

    1. Measurement of kiln axis deformation in horizontal and vertical plane with

    accuracy +/- 1.0 mm

    2. Measurement of rollers horizontal skewings and rollers inclinations with

    accuracy +/- 0.5 mm

    3. Measurement of undertyre clearances

    4. Measurement of rollers operating angles

    5. Measurement of shell radial and axial deformations (shell profile)

    6. Measurement of drive pinion deviations

    7. Measurement of supporting rollers mechanial wear

    8. Measurement of drive gear run out and wobbling

    9. Measurement of tire wobbling

    10. Measurement of roller shaft deflections

    11. Elaboration, presentation and submission to the Client the complete

    measurement report.

  • 7/28/2019 Exemplary Documentation

    3/59

    2

    II. SURVAY OF ROTARY KILN

    1. All measurements were taken by GEOSERVEX Hot Kiln Alignment Team

    Bydgoszcz, Poland from 30.03.2004. to 16.04.2004.

    2. After completing all measurements for the kiln, technical documentation waspresented to cement plant representatives and the adjustment program and

    schedule was discussed and agreed.

    III. RESULTS OF MEASUREMENTS

    1. Kiln axis

    kiln axis in horizontal plane is deviated by 19 mm on second pier and

    11 mm on third pier and require adjustment

    kiln axis in vertical plane is deviated by 12.0 mm on second pier andrequire adjustment

    undertire clearances are slightly too large for tires No 1,2,4 and it's

    incorrect for tire No 3 where it rise up to 14 mm. The clearance

    should be corrected by inserting shims at the nearest kiln stoppage.

    Too large clearance may cause too high shell ovality and as a result

    refractory loss.

    kiln slope is 2.50 % and it's correct.

    2. Roller's parameters and kiln thrust

    rollers skewing are correct, it's values are small and do not cause

    high axial forces

    rollers inclinations are correct for all rollers

    kiln thrust is correct, kiln is well balanced

    hydraulic system pressure is around 40-50 Bar and it's correct

    rollers operating angles are correct on piers No 2,3,4 and exceeds

    tolerance for pier No 1, however it should not cause any problems

    with kiln's operation

    roller's mechanical wear is not high comparing to other older kilns

    however it exceeds value of 1 mm for radius

    3. Drive station

    drive pinion axis is deviated by 3.5 mm in horizontal plane and by 2.0

    mm in vertical plane (reduced for regulation bolts distance), this

    deviation is higher than expected for this parameter

    gear rim eccentricity is 4 mm what causes 8 mm change of root

    clearance

    gear rim eccentricity is caused by kiln shell eccentricity at the gear

    (see cross section No 24), however the gear eccentricity is smaller

    than eccentricity of shell in this zone gear rim wobbling is not high and equal +/- 1.6 mm

  • 7/28/2019 Exemplary Documentation

    4/59

    3

    drive gear rim and pinion are mechanically worn, all root's working

    surfaces are damaged, root clearance and backlash are both incorrect

    there is very high vibration caused by improper mesh of the drive

    the pinion should be replaced as soon as possible

    the gear rim should be also replaced and it can not be installed in

    opposite position (after turning it by 180 degrees) because the rootsare worn both sides, the gear replacement should be performed with

    consideration on eccentricity reduction

    4. Kiln shell

    survey of shell deviation was taken in 35 sections shown on the draft

    maximum deviations of the shell (eccentric) rise up to 64 mm

    (section No 16) and it exceed tolerance several times, there is a huge

    "banana" formation in this zone

    deviations of the shell surface (circular deviations) exceed tolerance

    for cross sections No 5 and No 16 to No 32.

    deviations of the shell surface (circular deviations) from section No

    17 to No 22 is critically high and rise up to +/- 35 mm, replacement

    of this shell portion should be taken under consideration if any

    refractory loss had place in this zone

    tire wobbling is +/- 1.8 mm for tire No 1, +/- 0.5 mm for tire No 2,

    0.3 for tire No 3 and 0.7 mm for tire No 4, tire No 1 wobbling only

    slightly exceeds tolerance

    roller shaft deflections doesn't exceed value of 0.11 mm

    (eccentricity) while the tolerance given by kiln producer (FLS) is0.15 mm

    roller shaft deflection are caused by mechanical crank of the shell

    however the crank formation in the shell is smaller than that which is

    normally considered dangerous

    IV. ADJUSTMENT OF THE KILN

    1. Kiln axis should be adjusted to proper position in horizontal and vertical plane

    by shifting rollers on first and second piers what has been discussed and agreed

    with plant representatives.

    2. It has been agreed that vertical adjustment axis on second pier should remains

    6 mm over straight line connecting remaining axis points (Adjustment

    program, VERSION I ) , what is recommended by the kiln producer (FLS)

    3. It has been agreed that the adjustment should be done in small steps by plant

    crew according to adjustment program prepared by Geoservex

    4. First 16 steps (first day of adjustment) has been performed under supervision

    of Geoservex team, there was no problems with shifting of the rollers,

    reference system is clearly marked on foundation frames

  • 7/28/2019 Exemplary Documentation

    5/59

    4

    V. CONCLUSION

    The kiln should be adjusted to proper positions of the axis. The most critical

    point for kiln operation is drive station. The drive gear rim and pinion mesh is

    critically incorrect and may cause serious problems for the future. There is nopossibility to solve this problem by adjusting rollers. It is strongly recommended

    to replace this worn components as soon as possible.

    The kiln shell deformations is very high in several places. This deformations

    has serious influence on refractory life-time. If refractory loss had place in a zone

    where shell deformations are serious , this part of shell should be replaced.

    VI. THANKS

    1. The GEOSERVEXs Hot Kiln Alignment team would like to thank officialy

    the plant mechanical crew for help and assistance during measurements and

    adjustment of the kiln

    2. We would like to thank Cementos Goliat Plants Management for choosing our

    company as the Hot Kiln Alignment Service deliverer. We aprieciate Your

    confidence to us and we hope for long time cooperation with Your company.

    3. In case of any problems with the kiln geometry please contact our company by

    fax or mail for free consulting.

    GEOSERVEX

    Dipl. Eng. Zbigniew Krystowczyk (M. Sc.)

    Place of measurements:

    Date: 16.04.2004.

  • 7/28/2019 Exemplary Documentation

    6/59

    EXEMPLARY CEMENT PLANT

    TECHNICAL DOCUMENTATION

    RESULTS OF DEVIATION MEASUREMENAND

    GEOMETRY OF ROTARY KILN No 1

    GEOSERVEX

    ENGINEERING MEASUREMENTSENTERPRISE LTD

    POLAND

  • 7/28/2019 Exemplary Documentation

    7/59

    Index

    Table of ContentsSym

    x

    y

    a

    h

    Dy

    Dz

    ds

    s

    d

    axial

    under

    rollers

    slope

    horizo

    ovaliz

    horizo

    z vertic

    vertic

    skew

    real

    regu

    refe

    Measurement Data

    Table of contents

    Axial Deviations in Horizontal Plane

    Drive Pinion Axis Deviations

    Axial Deviations in Vertical Plane

    Rollers Skewing in Vertical Plane

    Rollers Skewing in Horizontal Plane

    Drive Gear Run Out

    Tyre Wobbling

    Roller Shaft Deflection

    Shell Deformations

    Adjustment Program and Schedule

    Control Check Measurement

  • 7/28/2019 Exemplary Documentation

    8/59

    Measurement Data

    y1 =x1 =

    h a4 =a3 =a2 =a 1 =

    ,o

    ,o

    ,o

    ,o

    ,o[ ]

    [ m ]

    x4 =

    x2 =

    x3 =

    y4 =

    y2 =

    [ mm ]

    y3 =

    s3 =

    s2 =

    [ mm ]

    s1 =

    Coordinates " x "

    Undertire clearance "s " rollers operating angle " a"

    Coordinates " y "

    s4 =

    101.98

    66.04

    31.94

    0.00

    0.0

    + 11.0

    + 19.0

    0.0

    8.0

    14.0

    8.5

    58 40

    58 29

    59 16

    62 53

    discharge

    feed

    discharge

    feed

    dis

    discharge

    feed

    discharge

    feed

    8.0

  • 7/28/2019 Exemplary Documentation

    9/59

    Axial Deviations

    In Horizontal Plane

    DEFORMATION SCALE : 1:1

    0.0 mm + 11.0 mm

    realaxis

    Precis

    + 19.0 mm

    FEED

    refere

    y

    Sou

    No

    EXEMPLARY CEMENTPLANT

    Kiln No 1

    Date of survay: 05.04.2004.

  • 7/28/2019 Exemplary Documentation

    10/59

    Axial Deviations

    In Vertical Plane

    Precisio

    DEFORMATION SCALE : 1:1

    GEOSERVEX - P

    a = 58 o 29 s = 14.0 mm

    a = 58 o 40 s = 8 mm

    F

    E

    E

    D

    refere

    z

    + 12.0 mm0.0 mm

    0.0 mm

    a = 59 o 16 s = 8.5 mm

    kiln slope = 2.50%

    EXEMPLARY CEMENTPLANT

    Kiln No 1

    Date of survay: 05.04.2004.

  • 7/28/2019 Exemplary Documentation

    11/59

    FEED

    y

    Rollers Skewing

    In Horizontal Plane

    Sou th

    North

    Rollers skewing (Sh)

    kiln axi

    1.0 mm 0.0 mm

    1.5 mm 0.0 mm

    1.0 mm

    1.0 mm

    EXEMPLARY CEMENTPLANT

    Kiln No 1

    Date of survay: 05.04.2004.

  • 7/28/2019 Exemplary Documentation

    12/59

    Rollers Skewing

    In Vertical Plane

    South side

    North side

    Rollers skewing (Sv) are reduced for screw distance

    0.0 mm

    0.5 mm

    0.0 mm

    1.0 mm

    F

    E

    E

    D

    refe

    z

    1.0 mm

    1.0 mmEXEMPLARY CEMENT

    PLANT

    Kiln No 1

    Date of survay: 05.04.2004.

  • 7/28/2019 Exemplary Documentation

    13/59

    DEFORMATION SCALE : 1:1

    Precis

    Adjustment Program

    In Horizontal Plane

    0.0 mm 0.0 mm

    r

    0.0 mm

    FEED

    refere

    y

    Sou th side

    North sideadjustme

    EXEMPLARY CEMENTPLANT

    Kiln No 1

    Date of survay: 05.04.2004.

  • 7/28/2019 Exemplary Documentation

    14/59

    Precisio

    DEFORMATION SCALE : 1:1

    GEOSERVEX - P

    F

    E

    E

    D

    z

    4.0 mm0.0 mm

    0.0 mm

    kiln slope = 2.50%

    Adjustment Program

    In Vertical Plane

    VERSION I

    reference line

    6.0 mm

    adjustmentaxis

    EXEMPLARY CEMENTPLANT

    Kiln No 1

    Date of survay: 05.04.2004.

  • 7/28/2019 Exemplary Documentation

    15/59

    Precisio

    DEFORMATION SCALE : 1:1

    GEOSERVEX - P

    F

    E

    E

    D

    z

    9.0 mm0.0 mm

    0.0 mm

    kiln slope = 2.50%

    Adjustment Program

    In Vertical Plane

    VERSION II

    reference ladjustmentaxis

    EXEMPLARY CEMENTPLANT

    Kiln No 1

    Date of survay: 05.04.2004.

  • 7/28/2019 Exemplary Documentation

    16/59

    Adjustment Schedule

    In Horizontal Plane

    VERSION I

    7.0mm

    FEED

    refere

    y

    Sou

    Nor

    7.0mm

    7.0mm

    7.0mm

    EXEMPLARY CEMENTPLANT

    Kiln No 1

    Date of survay: 05.04.2004.

  • 7/28/2019 Exemplary Documentation

    17/59

    Adjustment Schedule

    In Horizontal Plane

    VERSION II

    FEED

    refere

    y

    Sou

    Nor

    15.5mm

    15.5mm

    15.5

    mm

    15.5

    mm

    EXEMPLARY CEMENTPLANT

    Kiln No 1

    Date of survay: 05.04.2004.

  • 7/28/2019 Exemplary Documentation

    18/59

    Pinion Axis

    in Reference to Kiln Axis

    GEOSERVEX - POLAND

    IN HORIZONTAL PLANE

    IN VERTICAL PLANE

    kiln

    axis

    2.0 mm

    pinionaxis

    kiln axis

    pinion

    axis 3.5 mm

    h2.50 %

    FEE

    D

    DISCHARGE

    FEED

    DISCHARGE

    CAUTION!Values of pinion axis deviations

    are calculated for regulationbolts distance

    2010 mm

    2010 mm

    12

    South side

    North side

    EXEMPLARY CEMENT

    PLANT

    Kiln No 1

    Date of survay: 05.04.2004.

  • 7/28/2019 Exemplary Documentation

    19/59

    Rollers Mechanical Wear GEOSERVEX - POLAND13

    Pier I

    Pier II

    Pier III

    Pier IV

    - 0.5- 1.0

    0.0- 1.0- 0.5

    max. radius = 647.5 mm

    - 0.5- 0.5

    0.00.00.0

    max. radius = 750.5 mm

    0.0- 0.5- 0.5- 0.5- 1.5

    max. radius = 655 mm

    - 1.5- 1.5- 1.5

    0.00.0

    max. radius = 890 mm

    - 1.5- 2.5- 1.5- 1.5

    0.0

    max. radius = 877 mm

    - 1.00.00.0

    - 1.00.0

    max. radius = 649.5 mm

    - 1.0- 1.5- 1.0- 1.0

    0.0

    max. radius = 747 mm

    0.0- 1.0- 0.5

    0.0- 0.5

    max. radius = 647 mm

    FEED

    DISCHARGE

    [mm]deviation

    [mm]deviation

    [mm]deviation

    [mm]deviation

    [mm]deviation

    [mm]deviation

    [mm]deviation

    [mm]deviation

    EXEMPLARY CEMENTPLANT

    Kiln No 1

    Date of survay: 05.04.2004.

  • 7/28/2019 Exemplary Documentation

    20/59

    D

    I

    SC

    H

    A

    R

    G

    E

    PIER. III

    (viewing from feed end)

    PIER. IV

    manhole line

    Z

    Y

    rotation axis

    + 2 mm

    + 3 mm

    4 mm

    GEOMETRIC CENTRE

    COORDINATES

    Y

    Z

    EXCENTR

    Drive Gear Run Out and Wobbling GEOSERVEX - POLAND14

    geometriccetre

    1.6 mm 1.6 mm

    point No 9

    point No 25

    max. wobbling line

    32123

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    1516 17 18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    28

    29

    30

    31

    EXEMPLARY CEMENT

    PLANT

    Kiln No 1

    Date of survay: 05.04.2004.

  • 7/28/2019 Exemplary Documentation

    21/59

    Tire No I Wobbling GEOSERVEX - POLAND15

    D

    I

    SC

    H

    A

    R

    G

    E

    TIRE I

    (viewing from feed end)

    TIRE II

    1.8 mm 1.8 mm

    point No 30

    point No 14

    manhole line

    max.w

    obblinglin

    e

    32123

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    1516 17 18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    28

    29

    30

    31

    EXEMPLARY CEMENTPLANT

    Kiln No 1

    Date of survay: 05.04.2004.

  • 7/28/2019 Exemplary Documentation

    22/59

    Tire No II Wobbling GEOSERVEX - POLAND16

    D

    I

    S

    CH

    A

    R

    G

    E

    TIRE II

    (viewing from feed end)

    TIRE III

    0.5 mm 0.5 mm

    point No 6

    point No 22

    manhole line

    max

    .wobblin

    glin

    e

    32123

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    1516 17 18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    28

    29

    30

    31

    EXEMPLARY CEMENT

    PLANTKiln No 1

    Date of survay: 05.04.2004.

  • 7/28/2019 Exemplary Documentation

    23/59

    Tire No III Wobbling GEOSERVEX - POLAND17

    D

    I

    S

    CH

    A

    R

    G

    E

    TIRE III

    (viewing from feed end)

    TIRE IV

    0.3 mm 0.3 mm

    point No 30

    point No 14

    manhole line

    max.w

    obb

    lingline

    32123

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    1516 17 18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    28

    29

    30

    31

    EXEMPLARY CEMENT

    PLANT

    Kiln No 1

    Date of survay: 05.04.2004.

  • 7/28/2019 Exemplary Documentation

    24/59

    Tire No IV Wobbling GEOSERVEX - POLAND18

    D

    I

    SC

    H

    A

    R

    G

    E

    (viewing from feed end)

    TIRE IV

    TIRE III

    0.7 mm 0.7 mm

    point No 27

    point No 10

    manhole line

    32123

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    1516 17 18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    28

    29

    30

    31

    max.wobblingline

    EXEMPLARY CEMENT

    PLANTKiln No 1

    Date of survay: 05.04.2004.

  • 7/28/2019 Exemplary Documentation

    25/59

    Tyre and Roller

    Diameters

    f = 4659 mm

    f = 1295 mm f = 1500 mm

    f = 4672 mm

    f = 1299 mm

    f = 1310 mm

    f = 1294 mm f = 1494 mm

    f = 4764 mm

    Precisio

    FEED

    y

    Sou

    Nor

    EXEMPLARY CEMENTPLANT

    Kiln No 1

    Date of survay: 05.04.2004.

  • 7/28/2019 Exemplary Documentation

    26/59

    Adjustment Schedule

    Step by Step - Days 8 - 9

    FEED

    refere

    y

    Sou

    No

    1

    3

    9

    11

    10

    12

    2

    4

    6

    7

    5

    15

    13

    1 mm

    1 mm

    1 mm

    1 mm

    1 mm

    1 mm

    1 mm

    1 mm

    1 mm

    1 mm

    1 mm

    1 mm

    1 mm

    1 mm

    1 mm

    1 mm

    mo

    afte

    morn

    after

    Caution!

    Adjustment shoud be made in following order

    day 8 - perform steps 1 to 16

    day 9 - perform steps 1 to 8 and 9,10,13,14

    8

    14

    16

    EXEMPLARY CEMENTPLANT

    Kiln No 1

    Date of survay: 05.04.2004.

  • 7/28/2019 Exemplary Documentation

    27/59

    Adjustment Schedule

    Step by Step - Days 1 - 7

    FEED

    refere

    y

    Sou

    No

    Caution!

    Adjustment shoud be made in following ord

    days 1 to 6 - perform steps 1 to 16, each dayday 7 - perform steps 1,2,5,6

    EXEMPLARY CEMENTPLANT

    Kiln No 1

    Date of survay: 05.04.2004.

  • 7/28/2019 Exemplary Documentation

    28/59

    EXEM

    6789101112131415161718192021222324252627282930313233

    No of point on circumference

    ROLLER SHAFT DEFLECTION

    Date of survay: 09.04.2004.

    GEOSERVEX - POLAND

    Eccentricity: 0.05 mm

    Total value of deflection: 0.10 mm

    Maximum deflection angle: 205 deg

    Pier No III - NORTH roller

  • 7/28/2019 Exemplary Documentation

    29/59

    EXEM

    6789101112131415161718192021222324252627282930313233

    No of point on circumference

    ROLLER SHAFT DEFLECTION

    Date of survay: 09.04.2004.

    GEOSERVEX - POLAND

    Eccentricity: 0.09 mm

    Total value of deflection: 0.18 mm

    Maximum deflection angle: 238 deg

    Pier No III - SOUTH roller

  • 7/28/2019 Exemplary Documentation

    30/59

    Drive Mesh Visual Inspection GEOSERVEX - POLAND22

    EXEMPLARY CEMENT

    PLANTKiln No 1

    Date of survay: 05.04.2004.

  • 7/28/2019 Exemplary Documentation

    31/59

    Drive Mesh Visual Inspection GEOSERVEX - POLAND23

    EXEMPLARY CEMENT

    PLANTKiln No 1

    Date of survay: 05.04.2004.

  • 7/28/2019 Exemplary Documentation

    32/59

    GEOSERVEX - POLANDMechanical Inspection(visual)

    17

    Photo # 1

    Photo # 2 Photo # 3

    Tire No I

    Too big clearance betweentire and stopping blocks.

    Upper stopping blockLower stopping block

    Thickness of

    stopping blockis very low

    Too big clearance

    EXEMPLARY CEMENT PLANTKILN No #

    DATE

  • 7/28/2019 Exemplary Documentation

    33/59

    18

    Photo # 4

    Photo # 5

    GEOSERVEX - POLANDMechanical Inspection(visual)

    Tire No IUndertire shims are damaged

    Small thickness shim should beinstalled UNDER big shim

    Rollers are lubricated by greasewhat cause components wear-out

    EXEMPLARY CEMENT PLANTKILN No #

    DATE

  • 7/28/2019 Exemplary Documentation

    34/59

    19

    Photo # 6

    Photo # 7

    GEOSERVEX - POLANDMechanical Inspection(visual) Drive station

    Drive stationCracksWeld-joints

    EXEMPLARY CEMENT PLANTKILN No #

    DATE

  • 7/28/2019 Exemplary Documentation

    35/59

    20

    Photo # 8

    Photo # 9

    GEOSERVEX - POLANDMechanical Inspection(visual)

    Drive station

    Crack

    Drive pinions foundation frameis loosed and it move by 5 mm

    EXEMPLARY CEMENT PLANTKILN No #

    DATE

  • 7/28/2019 Exemplary Documentation

    36/59

    21

    Photo # 10

    Photo # 12

    GEOSERVEX - POLANDMechanical Inspection(visual)

    Photo # 11

    Girth Gear Fastening

    Girth gear fastening blocksare corroded, plates are loosed,weld joints are ckacked

    Some fastening boltshave felt down

    EXEMPLARY CEMENT PLANTKILN No #

    DATE

  • 7/28/2019 Exemplary Documentation

    37/59

    22

    Photo # 13

    Photo # 14

    GEOSERVEX - POLANDMechanical Inspection(visual)

    Shell section between V and VI tire

    The shell has been overheated

    EXEMPLARY CEMENT PLANTKILN No #

    DATE

  • 7/28/2019 Exemplary Documentation

    38/59

    23

    Photo # 15

    Photo # 16

    Photo # 17

    GEOSERVEX - POLANDMechanical Inspection(visual)

    Clinker stock wall is damagedand kiln piers are surroundedby clinker

    Sixth pier is permanentlycovered by clinker droppingfrom the coolers

    EXEMPLARY CEMENT PLANTKILN No #

    DATE

  • 7/28/2019 Exemplary Documentation

    39/59

    TECHNICAL DOCUMENTATION

    SHELL PROFILE MEASUREMEN

    KILN No 1

    GEOSERVEX

    ENGINEERING MEASUREMENTSENTERPRISE LTD

    POLAND

    Date

    EXEMPLARY CEMENT PLANT

  • 7/28/2019 Exemplary Documentation

    40/59

    FEED

    ( VIEW FROM THE AIR )

    Kiln No 1

    P -IIP - IIIP - IV

    20.1

    4m

    25.6

    2m

    28.6

    8m

    29.5

    7m

    31.0

    4m

    31.9

    4

    m

    Date of survey : 7.04.2004

    32.8

    6m

    34.7

    8m

    36.0

    8m

    39.0

    6m

    42.0

    0m

    53.7

    8m

    44.9

    3m

    62.6

    0m

    65.0

    6m

    66.04

    66.8

    0m

    70.7

    4

    71.6

    1m

    80.1

    1m

    88.9

    6m

    97.8

    0m

    101.1

    0m

    101.9

    8

    m

    102.5

    3m

    104.9

    3m

    107.7

    1m

    108.9

    6m

    SHELL SECTIONS LENGHTS ( HOT CONDITION )

    manh

    EXEMPLARY CEMENT PLANT

  • 7/28/2019 Exemplary Documentation

    41/59

    FEED

    SECTIONS POSITION DRAFT FOR KILN SHELL DEVIATION SUR

    ( VIEW FROM THE AIR )

    EXEMPLARY CEMENT PLANT

    Kiln No 1

    P -IIP - IIIP - IV

    19.9

    0m

    25.9

    0m

    28.5

    0m

    31.9

    4m

    Date of survey : 7.04.2004

    34.6

    0m

    36.3

    0m

    39.3

    0m

    42.2

    0m

    54.0

    0m

    45.1

    0m

    62.8

    0m

    66.0

    4

    70.7

    4

    71.4

    0m

    80.3

    0m

    89.2

    0m

    98.0

    0m

    101.9

    8m

    104.5

    0m

    108.8

    5m

    67

    15.6

    0m

    8910

    11

    29.8

    0m

    22.9

    0m

    12

    13

    1415161922 1718

    48.1

    0m

    51.0

    0m

    56.7

    0m

    59.6

    0m

    20212324

    67.8

    5m

    2730 26 25

    74.4

    0m

    77.2

    0m

    2829

    83.0

    5m

    86.0

    0m

    33 3132

    91.9

    0m

    94.8

    0m

    3435

    manho

  • 7/28/2019 Exemplary Documentation

    42/59

    FEED

    rotaryaxi

    s

    Z

    Y

    PIERNo

    IV

    DRIVE

    AXONOMETRIC VIEWING

    KILN No 1

    Date of survey: 07.04.2004

    SUMARY DIAGRAM OF SHELL DEFORMATION

    PIERNo

    III

    PIERNo

    II

    56

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16171819

    20

    21

    22

    23

    34

    35

    2425

    2627

    28

    29

    30

    31

    32

    33

    No of section

    Y geom.centre

    Z geom.centre

    Excentr

    P- IV

    -

    -

    -

    P- III

    -

    -

    -

    34

    + 3

    - 3

    4

    12

    + 10

    - 6

    12

    13

    + 16

    - 11

    19

    14

    + 26

    - 19

    32

    15

    + 33

    - 33

    47

    16

    + 42

    - 48

    64

    17

    + 37

    - 47

    60

    18

    + 37

    - 45

    58

    19

    + 34

    - 41

    53

    20

    + 26

    - 34

    43

    21

    + 13

    - 24

    27

    22

    + 9

    - 13

    16

    23

    - 2

    + 7

    7

    24

    - 1

    + 7

    7

    25

    - 1

    + 8

    8

    26

    - 1

    + 9

    9

    27

    - 1

    + 9

    9

    28

    - 3

    + 10

    10

    29

    - 4

    + 9

    10

    30

    - 2

    + 8

    8

    31

    - 1

    + 5

    5

    32

    0

    + 3

    3

    33

    0

    + 2

    2

    35

    + 8

    - 5

    9

    EXEMPLARY CEMENT PLANT

  • 7/28/2019 Exemplary Documentation

    43/59

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +100

    -10

    -20

    +20+

    10

    0-10-

    20

    +20

    +10

    0

    -10

    -20

    +2

    0+10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +

    20

    +10

    0

    -10

    -20

    +2

    0

    +1

    0

    0

    -10

    -20+

    20

    +1

    0

    0

    -10

    -20

    +2

    0

    +1

    0

    0

    -10

    -20

    +

    20

    +

    10 0

    -10

    -20

    +2

    0 +1

    00

    -10 -

    20

    +2

    0+1

    0

    0

    -10

    -20

    +20

    +1

    0

    0

    -10

    -20

    +2

    0

    +1

    0

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    3212

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16 17 18

    19

    20

    21

    22

    23

    27

    28

    29

    30

    31

    GEOSERVEX - POLAND

    Caution: Ma- in t

    geometric

    centre

    Z

    Y

    rotation axis

    RADIAL DIA

    ( CIR

    VIEW

    manhole

  • 7/28/2019 Exemplary Documentation

    44/59

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +100

    -10

    -20

    +20+

    10

    0-10-

    20

    +20

    +10

    0

    -10

    -20

    +2

    0+10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +

    20

    +10

    0

    -10

    -20

    +2

    0

    +1

    0

    0

    -10

    -20+

    20

    +1

    0

    0

    -10

    -20

    +2

    0

    +1

    0

    0

    -10

    -20

    +

    20

    +

    10 0

    -10

    -20

    +2

    0 +1

    00

    -10 -

    20

    +2

    0+1

    0

    0

    -10

    -20

    +20

    +1

    0

    0

    -10

    -20

    +2

    0

    +1

    0

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    3212

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16 17 18

    19

    20

    21

    22

    23

    27

    28

    29

    30

    31

    GEOSERVEX - POLAND

    Caution: Ma- in t

    geometric

    centre

    Z

    Y

    rotation axis

    RADIAL DIA

    ( CIR

    VIEW

    manhole

  • 7/28/2019 Exemplary Documentation

    45/59

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +100

    -10

    -20

    +20+

    10

    0-10-

    20

    +20

    +10

    0

    -10

    -20

    +2

    0+10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +

    20

    +10

    0

    -10

    -20

    +2

    0

    +1

    0

    0

    -10

    -20+

    20

    +1

    0

    0

    -10

    -20

    +2

    0

    +1

    0

    0

    -10

    -20

    +

    20

    +

    10 0

    -10

    -20

    +2

    0 +1

    00

    -10 -

    20

    +2

    0+1

    0

    0

    -10

    -20

    +20

    +1

    0

    0

    -10

    -20

    +2

    0

    +1

    0

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    3212

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16 17 18

    19

    20

    21

    22

    23

    27

    28

    29

    30

    31

    GEOSERVEX - POLAND

    Caution: Ma- in t

    geometric

    centre

    Z

    Y

    rotation axis

    RADIAL DIA

    ( CIR

    VIEW

    manhole

  • 7/28/2019 Exemplary Documentation

    46/59

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +100

    -10

    -20

    +20+

    10

    0-10-

    20

    +20

    +10

    0

    -10

    -20

    +2

    0+10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +

    20

    +10

    0

    -10

    -20

    +2

    0

    +1

    0

    0

    -10

    -20+

    20

    +1

    0

    0

    -10

    -20

    +2

    0

    +1

    0

    0

    -10

    -20

    +

    20

    +

    10 0

    -10

    -20

    +2

    0 +1

    00

    -10 -

    20

    +2

    0+1

    0

    0

    -10

    -20

    +20

    +1

    0

    0

    -10

    -20

    +2

    0

    +1

    0

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    3212

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16 17 18

    19

    20

    21

    22

    23

    27

    28

    29

    30

    31

    GEOSERVEX - POLAND

    Caution: Ma- in t

    geometric

    centre

    Z

    Y

    rotation axis

    RADIAL DIA

    ( CIR

    VIEW

    manhole

    32mm

  • 7/28/2019 Exemplary Documentation

    47/59

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +100

    -10

    -20

    +20+

    10

    0-10-

    20

    +20

    +10

    0

    -10

    -20

    +2

    0+10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +

    20

    +10

    0

    -10

    -20

    +2

    0

    +1

    0

    0

    -10

    -20+

    20

    +1

    0

    0

    -10

    -20

    +2

    0

    +1

    0

    0

    -10

    -20

    +

    20

    +

    10 0

    -10

    -20

    +2

    0 +1

    00

    -10 -

    20

    +2

    0+1

    0

    0

    -10

    -20

    +20

    +1

    0

    0

    -10

    -20

    +2

    0

    +1

    0

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    3212

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16 17 18

    19

    20

    21

    22

    23

    27

    28

    29

    30

    31

    GEOSERVEX - POLAND

    Caution: Ma- in t

    geometric

    centre

    Z

    Y

    rotation axis

    RADIAL DIA

    ( CIR

    VIEW

    manhole

    47mm

  • 7/28/2019 Exemplary Documentation

    48/59

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +100

    -10

    -20

    +20+

    10

    0-10-

    20

    +20

    +10

    0

    -10

    -20

    +2

    0+10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +

    20

    +10

    0

    -10

    -20

    +2

    0

    +1

    0

    0

    -10

    -20+

    20

    +1

    0

    0

    -10

    -20

    +2

    0

    +1

    0

    0

    -10

    -20

    +

    20

    +

    10 0

    -10

    -20

    +2

    0 +1

    00

    -10 -

    20

    +2

    0+1

    0

    0

    -10

    -20

    +20

    +1

    0

    0

    -10

    -20

    +2

    0

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    3212

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16 17 18

    19

    20

    21

    22

    23

    27

    28

    29

    30

    31

    GEOSERVEX - POLAND

    Caution: Ma- in t

    geometric

    centre

    Z

    Y

    RADIAL DIA

    ( CIR

    VIEW

    manhole

    rotation axis

    64mm

  • 7/28/2019 Exemplary Documentation

    49/59

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +100

    -10

    -20

    +20+

    10

    0-10-

    20

    +20

    +10

    0

    -10

    -20

    +2

    0+10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +

    20

    +10

    0

    -10

    -20

    +2

    0

    +1

    0

    0

    -10

    -20+

    20

    +1

    0

    0

    -10

    -20

    +2

    0

    +1

    0

    0

    -10

    -20

    +

    20

    +

    10 0

    -10

    -20

    +2

    0 +1

    00

    -10 -

    20

    +2

    0+1

    0

    0

    -10

    -20

    +20

    +1

    0

    0

    -10

    -20

    +2

    0

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    3212

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16 17 18

    19

    20

    21

    22

    23

    27

    28

    29

    30

    31

    GEOSERVEX - POLAND

    Caution: Ma- in t

    geometric

    centre

    Z

    Y

    rotation axis

    RADIAL DIA

    ( CIR

    VIEW

    manhole

    60mm

  • 7/28/2019 Exemplary Documentation

    50/59

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +100

    -10

    -20

    +20+

    10

    0-10-

    20

    +20

    +10

    0

    -10

    -20

    +2

    0+10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +

    20

    +10

    0

    -10

    -20

    +2

    0

    +1

    0

    0

    -10

    -20+

    20

    +1

    0

    0

    -10

    -20

    +2

    0

    +1

    0

    0

    -10

    -20

    +

    20

    +

    10 0

    -10

    -20

    +2

    0 +1

    00

    -10 -

    20

    +2

    0+1

    0

    0

    -10

    -20

    +20

    +1

    0

    0

    -10

    -20

    +2

    0

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    3212

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16 17 18

    19

    20

    21

    22

    23

    27

    28

    29

    30

    31

    GEOSERVEX - POLAND

    Caution: Ma- in t

    geometric

    centre

    Z

    Y

    rotation axis

    RADIAL DIA

    ( CIR

    VIEW

    manhole

    58mm

  • 7/28/2019 Exemplary Documentation

    51/59

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +100

    -10

    -20

    +20+

    10

    0-10-

    20

    +20

    +10

    0

    -10

    -20

    +2

    0+10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +

    20

    +10

    0

    -10

    -20

    +2

    0

    +1

    0

    0

    -10

    -20+

    20

    +1

    0

    0

    -10

    -20

    +2

    0

    +1

    0

    0

    -10

    -20

    +

    20

    +

    10 0

    -10

    -20

    +2

    0 +1

    00

    -10 -

    20

    +2

    0+1

    0

    0

    -10

    -20

    +20

    +1

    0

    0

    -10

    -20

    +2

    0

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    3212

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16 17 18

    19

    20

    21

    22

    23

    27

    28

    29

    30

    31

    GEOSERVEX - POLAND

    Caution: Ma- in t

    geometric

    centre

    Z

    Y

    RADIAL DIA

    ( CIR

    VIEW

    manhole

    rotation axis

    53mm

  • 7/28/2019 Exemplary Documentation

    52/59

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +100

    -10

    -20

    +20+

    10

    0-10-

    20

    +20

    +10

    0

    -10

    -20

    +2

    0+10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +

    20

    +10

    0

    -10

    -20

    +2

    0

    +1

    0

    0

    -10

    -20+

    20

    +1

    0

    0

    -10

    -20

    +2

    0

    +1

    0

    0

    -10

    -20

    +

    20

    +

    10 0

    -10

    -20

    +2

    0 +1

    00

    -10 -

    20

    +2

    0+1

    0

    0

    -10

    -20

    +20

    +1

    0

    0

    -10

    -20

    +2

    0

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    +20

    +10

    0

    -10

    -20

    3212

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16 17 18

    19

    20

    21

    22

    23

    2

    28

    29

    30

    31

    GEOSERVEX - POLAND

    Caution: Ma- in t

    geometric

    centre

    Z

    Y

    rotation axis

    RADIAL DIA

    ( CIR

    VIEW

    manhole

    43mm

  • 7/28/2019 Exemplary Documentation

    53/59

  • 7/28/2019 Exemplary Documentation

    54/59

  • 7/28/2019 Exemplary Documentation

    55/59

  • 7/28/2019 Exemplary Documentation

    56/59

  • 7/28/2019 Exemplary Documentation

    57/59

    REFERENCE LIST

    Year/m Kind of works Plant name Company name Country

    2005/04 Rotary Dryers Alignment Clinton ADM Clinton USA*2005/04 Hot Kiln Alignment San Juan Essroc Puerto Rico*2005/04 Hot Kiln Alignment Kryvyi Rih Cement Heidelbergcement Ukraine2005/04 Cement Mill Alignment Kryvyi Rih Cement Heidelbergcement Ukraine2005/04 Hot Kiln #4 Alignment Rudniki CEMEX Poland2005/03 Hot Kiln Alignment Nasice NEXE Grupa Croatia2005/03 Hot Kiln #1 Alignment Runiki CEMEX Poland2005/03 Hot Kiln #1 Alignment Dniprocement Heidelbergcement Ukraine

    2005/03 Hot Kiln #2 Alignment Dniprocement Heidelbergcement Ukraine2005/03 Hot Kiln #5 Alignment VAC Heidelbergcement Hungary2005/03 Kiln #2 Renovation

    SupervisionGorazdze Heidelbergcement Poland

    2005/03 Hot Kiln Alignment Odra Cement Odra Poland2005/03 Hot Kiln #1 Alignment Gorazdze Heidelbergcement Poland2005/02 Coal Mill Alignment Gorazdze Heidelbergcement Poland2005/01 Hot Kiln #1 Alignment Adana Cimento OYAK Turkey2005/01 Hot Kiln #3 Alignment Adana Cimento OYAK Turkey2005/01 Hot Kiln #4 Alignment Adana Cimento OYAK Turkey

    2005/01 Hot Kiln #1 Alignment Mardin Cimeto OYAK Turkey2004/12 Cement Mill #3 Alignment Gorazdze Heidelbergcement Poland2004/12 Hot Kiln Alignment Kryvyi Rih Cement Heidelbergcement Ukraine2004/11 Hot Kiln #1 Alignment Dniprocement Heidelbergcement Ukraine2004/11 Hot Kiln #2 Alignment Dniprocement Heidelbergcement Ukraine2004/11 Hot Kiln #1 Alignment Hanil Hanil Cement Korea2004/11 Hot Kiln #2 Alignment Hanil Hanil Cement Korea2004/10 Hot Kiln Alignment Odra Cement Odra Poland2004/10 Rotary Cooler Alignment Anwil-Wloclawek ORLEN Poland2004/10 Centering of Drive Gear IP Kwidzyn International Paper Poland

    2004/09 Hot Kiln Alignment Afyon Cimento SET-Italcementi Turkey2004/08 Hot Kiln #1 Alignment Kutayha Magnesit Kumas Turkey2004/08 Hot Kiln #2 Alignment Kutayha Magnesit Kumas Turkey2004/07 Hot Kiln #3 Alignment JECHEON-SI Asia Cement Korea2004/07 Hot Kiln #4 Alignment JECHEON-SI Asia Cement Korea2004/06 Alignment of Power Turbine Borowo BE&K Europe Poland2004/06 Alignment of Power Turbine Bydgoszcz Power Plant Poland2004/05 Hot Kiln Alignment Jaroszw Jaroszw Cement Poland2004/05 Hot Kiln #2 Alignment Hejocsaba Holcim Hungary2004/05 Measurements of Furnance#4 Glogow Coper Plant KGHM Poland

    2004/04 Hot Kiln Alignment Mason City Holcim USA*2004/04 Kiln Renovation Supervision IOWA Holcim USA*

  • 7/28/2019 Exemplary Documentation

    58/59

    2004/04 Hot Kiln Alignment Jaroszw Jaroszw Cement Poland2004/04 Kiln Renovation Supervision Jaroszw Jaroszw Cement Poland2004/04 Rotary Cooler Alignment Anwil-Wloclawek ORLEN Poland2004/04 Hot Kiln #1 Alignment Rudniki CEMEX Poland2004/04 Hot Kiln #3 Alignment Rudniki CEMEX Poland2004/04 Hot Kiln #4 Alignment Rudniki CEMEX Poland2004/03 Hot Kiln #1 Alignment Goliat Malaga Cem.RezolaItalcementi Spain2004/03 Hot Kiln #2 Alignment Goliat Malaga Cem.RezolaItalcementi Spain2004/03 Cement Mill #2 Alignment Goliat Malaga Cem.RezolaItalcementi Spain2004/03 Hot Kiln Alignment Picton Essroc USA*2004/03 Cement Mill #4 Alignment Goliat Malaga Cem.RezolaItalcementi Spain2004/03 Kiln #2 Renovation

    SupervisionGorazdze Heidelbergcement Poland

    2004/03 Hot Kiln #4 Alignment Odra Cement Odra Poland2004/03 Hot Kiln Alignment Arrigorriaga Cem.RezolaItalcementi Spain

    2004/02 Kiln #1 RenovationSupervision

    Gorazdze Heidelbergcement Poland

    2004/02 Hot Kiln #1 Alignment Gorazdze Heidelbergcement Poland2004/02 Kiln Renovation Supervision Kryvyi Rih Cement Heidelbergcement Ukraine2004/02 Hot Kiln Alignment Kryvyi Rih Cement Heidelbergcement Ukraine2004/02 Kiln #1 Renovation

    SupervisionDniprocement Heidelbergcement Ukraine

    2004/02 Kiln #2 RenovationSupervision

    Dniprocement Heidelbergcement Ukraine

    2004/01 Hot Kiln #1 Alignment Dniprocement Heidelbergcement Ukraine2004/01 Hot Kiln #2 Alignment Dniprocement Heidelbergcement Ukraine

    2004/01 Hot Kiln Alignment Arrigorriaga Cem.RezolaItalcementi Spain2004/01 Hot Kiln Alignment Hanil HANIL CEMENT KoreaBefore 2004 Hot Kiln #1 and 2 Alignment Denizli Denizli Cimento TurkeyBefore 2004 Hot Kiln Alignment Beli Izvor Holcim BulgariaBefore 2004 Kiln Erection Supervision Kujawy Lafarge PolandBefore 2004 Hot Kiln Alignment IOWA Heidelbergcement USA*Before 2004 Hot Kiln Alignment Mason City Holcim USA*Before 2004 Hot Kiln Alignment NUH Cimento NUH TurkeyBefore 2004 Hot Kiln Alignment Sung Shin Sung Shin Cement KoreaBefore 2004 Hot Kiln Alignment Dong Hae Ssang Yung KoreaBefore 2004 Hot Kiln Alignment Sam Chok Tong Yang Major KoreaBefore 2004 Hot Kiln Alignment Monselice Italcementi ItalyBefore 2004 Hot Kiln Alignment Broceni Readymix LatviaBefore 2004 Hot Kiln Alignment Trbovlie Lafarge SloveniaBefore 2004 Hot Kiln Alignment Nowiny Dyckerhoff PolandBefore 2004 Hot Kiln Alignment Sankarnagar The India Cement IndiaBefore 2004 Hot Kiln Alignment Jaypee Bela Jaypee Bela Cem. IndiaBefore 2004 Hot Kiln Alignment Jaypee Rewa Jaypee Rewa Cem. IndiaBefore 2004 Hot Kiln Alignment Chilamkur The India Cement IndiaBefore 2004 Hot Kiln Alignment Limassol The Cyprus Cem. CyprusBefore 2004 Hot Kiln Alignment Vassiliko Vassiliko Cement CyprusBefore 2004 Hot Kiln Alignment Nazareth Essroc USA*

  • 7/28/2019 Exemplary Documentation

    59/59

    Before 2004 Hot Kiln Alignment Speed Essroc USA*Before 2004 Hot Kiln Alignment Bessemer Essroc USA*Before 2004 Kiln Renovation Supervision Bessemer Essroc USA*Before 2004 Hot Kiln Alignment Frederick Essroc USA*Before 2004 Hot Kiln Alignment Mason City Holnam USA*Before 2004 Hot Kiln Alignment Mason City Lehigh USA*Before 2004 Hot Kiln Alignment Logansport Essroc USA*Before 2004 Hot Kiln Alignment St. Lawrence Holcim Canada*Before 2004 Hot Kiln Alignment Ponce CEMEX Puerto Rico*Before 2004 Hot Kiln Alignment Picton Essroc Canada*