LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2 EXHIBIT E – ACCEPTABLE EQUIPMENT AND MATERIALS SUPPLIERS Table of Contents 1 MECHANICAL EQUIPMENT ................................................................................................ 4 1.1 AIR COMPRESSORS ................................................................................................................. 4 1.2 AIR DRYERS ........................................................................................................................... 4 1.3 AIR FILTERS............................................................................................................................ 4 1.4 BOILERS PACKAGED ............................................................................................................ 4 1.5 CHEMICAL FEED EQUIPMENT.................................................................................................. 5 1.6 COMBUSTION TURBINES ......................................................................................................... 5 1.7 CONDENSATE POLISHER ......................................................................................................... 5 1.8 CONDENSER ............................................................................................................................ 5 1.9 COOLING TOWERS .................................................................................................................. 5 1.10 CATALYST (OXIDATION) ................................................................................................... 6 1.11 CATALYST (SCR) ................................................................................................................. 6 1.12 DAMPERS - HRSG STACK .................................................................................................. 6 1.13 DEMINERALIZER SYSTEM ..................................................................................................... 6 1.14 DESUPERHEATERS ................................................................................................................ 6 1.15 ELEVATORS .......................................................................................................................... 6 1.16 EXPANSION JOINTS ............................................................................................................... 7 1.17 CENTRIFUGAL FANS.............................................................................................................. 7 1.18 FIRE PROTECTION SYSTEMS.................................................................................................. 7 1.19 FUEL GAS ............................................................................................................................. 8 1.20 HEAT EXCHANGERS .............................................................................................................. 8 1.21 HEAT RECOVERY STEAM GENERATORS ................................................................... 9 1.22 HOISTING EQUIPMENT .......................................................................................................... 9 1.23 HVAC .................................................................................................................................. 9 1.24 HYDRAULIC FLUID COUPLINGS .......................................................................................... 10 1.25 INSULATION (BUILDING) ..................................................................................................... 10 1.26 LUBE OIL CONDITIONERS ........................................................................................... 10 1.27 LUBRICANTS ....................................................................................................................... 11 1.28 MECHANICAL SEALS........................................................................................................... 11 1.29 MIXERS, STATIC ................................................................................................................. 11 1.30 OIL-WATER SEPARATORS (PACKAGED).............................................................................. 11 1.31 PIPE HANGERS AND SUPPORT ............................................................................................. 11 1.32 PUMPS................................................................................................................................. 11 1.33 STEAM TRAPS ..................................................................................................................... 13 1.34 STEAM TURBINES ............................................................................................................... 13 1.35 TANKS ................................................................................................................................ 14 1.36 VALVES .............................................................................................................................. 14 Exhibit E – Acceptable Equipment and Materials Suppliers Page 1 of 41

Upload: lamthien

Post on 27-May-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

EXHIBIT E – ACCEPTABLE EQUIPMENT AND MATERIALS

SUPPLIERS Table of Contents

1 MECHANICAL EQUIPMENT ................................................................................................ 4 1.1 AIR COMPRESSORS ................................................................................................................. 4 1.2 AIR DRYERS ........................................................................................................................... 4 1.3 AIR FILTERS ............................................................................................................................ 4 1.4 BOILERS – PACKAGED ............................................................................................................ 4 1.5 CHEMICAL FEED EQUIPMENT .................................................................................................. 5 1.6 COMBUSTION TURBINES ......................................................................................................... 5 1.7 CONDENSATE POLISHER ......................................................................................................... 5 1.8 CONDENSER ............................................................................................................................ 5 1.9 COOLING TOWERS .................................................................................................................. 5 1.10 CATALYST (OXIDATION) ................................................................................................... 6 1.11 CATALYST (SCR) ................................................................................................................. 6 1.12 DAMPERS - HRSG STACK .................................................................................................. 6 1.13 DEMINERALIZER SYSTEM ..................................................................................................... 6 1.14 DESUPERHEATERS ................................................................................................................ 6 1.15 ELEVATORS .......................................................................................................................... 6 1.16 EXPANSION JOINTS ............................................................................................................... 7 1.17 CENTRIFUGAL FANS.............................................................................................................. 7 1.18 FIRE PROTECTION SYSTEMS .................................................................................................. 7 1.19 FUEL GAS ............................................................................................................................. 8 1.20 HEAT EXCHANGERS .............................................................................................................. 8 1.21 HEAT RECOVERY STEAM GENERATORS ................................................................... 9 1.22 HOISTING EQUIPMENT .......................................................................................................... 9 1.23 HVAC .................................................................................................................................. 9 1.24 HYDRAULIC FLUID COUPLINGS .......................................................................................... 10 1.25 INSULATION (BUILDING) ..................................................................................................... 10 1.26 LUBE OIL CONDITIONERS ........................................................................................... 10 1.27 LUBRICANTS ....................................................................................................................... 11 1.28 MECHANICAL SEALS ........................................................................................................... 11 1.29 MIXERS, STATIC ................................................................................................................. 11 1.30 OIL-WATER SEPARATORS (PACKAGED).............................................................................. 11 1.31 PIPE HANGERS AND SUPPORT ............................................................................................. 11 1.32 PUMPS ................................................................................................................................. 11 1.33 STEAM TRAPS ..................................................................................................................... 13 1.34 STEAM TURBINES ............................................................................................................... 13 1.35 TANKS ................................................................................................................................ 14 1.36 VALVES .............................................................................................................................. 14

Exhibit E – Acceptable Equipment and Materials Suppliers Page 1 of 41

Page 2: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

1.37 WATER/STEAM SAMPLE PANELS ........................................................................................ 17 1.38 WATER AND WASTE WATER TREATMENT ......................................................................... 17

2 ELECTRICAL EQUIPMENT ............................................................................................... 19 2.1 CABLE .................................................................................................................................. 19 2.2 CABLE TRAY SYSTEM ........................................................................................................... 19 2.3 DISTRIBUTION PANELBOARDS-120V AC/125V DC ............................................................. 19 2.4 DRIVES – VARIABLE SPEED, 600V AND BELOW .................................................................... 20 2.5 DISTRIBUTION, TRANSFORMERS AND POWER PANELS .......................................................... 20 2.6 UNINTERRUPTIBLE POWER SUPPLY ...................................................................................... 20 2.7 STATION BATTERY ............................................................................................................... 20 2.8 STATION BATTERY CHARGER ............................................................................................... 20 2.9 FREEZE PROTECTION EQUIPMENT ......................................................................................... 20 2.10 HIGH VOLTAGE ................................................................................................................... 21 2.11 ISO PHASE OR NONSEGRATED BUS .................................................................................... 21 2.12 LIGHTING ............................................................................................................................ 21 2.13 MOTORS ............................................................................................................................. 22 2.14 MOTOR CONTROL CENTERS (MCC’S) ................................................................................ 22 2.15 RELAYS............................................................................................................................... 22 2.16 SWITCHBOARDS – AC AND DC ........................................................................................... 23 2.17 MEDIUM AND LOW VOLTAGE SWITCHGEAR................................................................ 23 2.18 GENERATOR BREAKERS ...................................................................................................... 23 2.19 TRANSDUCERS (ELECTRICAL) ............................................................................................. 23 2.20 TRANSFORMERS .................................................................................................................. 23 2.21 TERMINAL BLOCKS (LOW VOLTAGE INSTRUMENTATION) .................................................. 24

3 CIVIL EQUIPMENT .............................................................................................................. 24 3.1 STEEL, FABRICATED ............................................................................................................. 24 3.2 PRE-ENGINEERED BUILDINGS / ENCLOSURES ....................................................................... 24

4 INSTRUMENTATION AND CONTROLS EQUIPMENT ................................................ 26 4.1 ACTUATORS .......................................................................................................................... 26 4.2 ANALYZERS .......................................................................................................................... 26 4.3 COMPUTER PERIPHERALS - MODEMS .................................................................................... 28 4.4 COMPUTING MODULES - ELECTRONIC .................................................................................. 28 4.5 CONTINUOUS EMISSION MONITORING SYSTEM EQUIPMENT ................................................. 28 4.6 CONTROL PANELS ................................................................................................................. 28 4.7 CONTROL STATIONS (LOCAL) ............................................................................................... 29 4.8 DIGITAL CONTROL SYSTEMS - DCS ..................................................................................... 29 4.9 CONTROL VALVES ................................................................................................................ 29 4.10 DETECTORS (LIQUID LEVEL) .............................................................................................. 30 4.11 DENSITY DEVICES .............................................................................................................. 30 4.12 FIRE DETECTION ................................................................................................................. 30 4.13 FITTINGS, TUBE .................................................................................................................. 30 4.14 FLAME SCANNERS .............................................................................................................. 30 4.15 FLOW DEVICES ................................................................................................................... 30 4.16 FREQUENCY TRANSDUCERS ................................................................................................ 33

Exhibit E – Acceptable Equipment and Materials Suppliers Page 2 of 41

Page 3: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

4.17 I/P CONVERTERS ................................................................................................................. 33 4.18 INSTRUMENTS (GENERAL CONTROL AND INDICATION) ...................................................... 33 4.19 INSTRUMENTS (LABORATORY) ........................................................................................... 33 4.20 INSTRUMENTS – (PH PROBES) ............................................................................................ 34 4.21 INSTRUMENTS – MEDIUM AND LOW VOLTAGE SWITCHGEAR .......................................... 34 4.22 ISOLATORS, ELECTRICAL .................................................................................................... 34 4.23 LEVEL DEVICES .................................................................................................................. 34 4.24 LIMIT SWITCHES ................................................................................................................. 36 4.25 LOCAL PNEUMATIC INSTRUMENTATION ............................................................................. 36 4.26 MANIFOLDS ........................................................................................................................ 37 4.27 MULTIPLEXERS ................................................................................................................... 37 4.28 PANEL DEVICES .................................................................................................................. 37 4.29 POWER SUPPLIES ................................................................................................................ 38 4.30 PRESSURE DEVICES............................................................................................................. 38 4.31 PROGRAMMABLE LOGIC CONTROLLERS ............................................................................. 38 4.32 RECORDERS - ELECTRONIC ................................................................................................. 38 4.33 SOLENOID VALVES ............................................................................................................. 39 4.34 STACK TESTING .................................................................................................................. 39 4.35 TAGS (IDENTIFICATION) ...................................................................................................... 39 4.36 TEMPERATURE DEVICES ..................................................................................................... 39 4.37 VAR TRANSDUCERS ........................................................................................................... 40 4.38 VIBRATION ......................................................................................................................... 40 4.39 VOLTAGE DEVICES ............................................................................................................. 40 4.40 WATTAGE DEVICES ............................................................................................................ 41

Exhibit E – Acceptable Equipment and Materials Suppliers Page 3 of 41

Page 4: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

APPROVED VENDORS The following is a list of equipment suppliers that is acceptable to the Owner. Where the Owner has a preference for a particular supplier, the name of the supplier is underlined. During Contractor’s procurement of equipment, preference shall be given to the Owner’s preferred suppliers. When the Owner’s preferred supplier’s offering is technically acceptable but not the lowest price, Contractor shall disclose to the Owner the difference in cost between the low bidder and the preferred supplier. To the extent possible, all supplier subsystems shall use the same manufactures and devices such that there is commonality of spare equipment and operator/technician training is minimized. Bidders for equipment not listed in this document shall be from Contractor's acceptable bidder list and will not require Owner approval. Additional bidders for equipment listed below may be added by Contractor subject to Owner approval.

ARTICLE 1MECHANICAL EQUIPMENT

1.1 Air Compressors

• Atlas Copco • Kobelco • Gardner Denver • Ingersoll-Rand • Sullair

1.2 Air Dryers

• Air Compressor suppliers listed above. • Sahara • Hankinson International • Henderson • Pneumatic Products

1.3 Air Filters

• Marsh Bellofram • Hankinson International • Norgren • Pneumatic Products

1.4 Boilers – Packaged

• B&W • Cleaver Brooks – Nebraska • Indeck • Rentech

Exhibit E – Acceptable Equipment and Materials Suppliers Page 4 of 41

Page 5: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

1.5 Chemical Feed Equipment

• Dewco Pumps & Equipment, Inc. • Johnson March Systems, Inc. • Lutz-JESCO America Corp. • Milton Roy • Siemens • GE Water and Process Technology • Global Chem Feed Solutions • AmeriChem • JCI Industries • Monk Engineering • Delphi

1.6 Combustion Turbines

• Alstom • General Electric • Siemens

1.7 Condensate Polisher

• Anderson Waters (Subsidiary of Infilco Degremont) • Siemens • Aquatech • Ecodyne • Pall • Hungerford & Terry

1.8 Condenser

• SPX Heat Transfer: Ecolaire • Foster Wheeler • Graham Corp. • Holtec • Babcock Power: Thermal Engineering International (TEI) • Laurson & Toubro • Maarky

1.9 Cooling Towers

• GEA Power Cooling • Research Cottrell CoolingInternational Cooling Tower • Midwest Cooling Tower • SPX Cooling Technologies: Balcke, Marley, Recold, Ceramic • SPIG

Exhibit E – Acceptable Equipment and Materials Suppliers Page 5 of 41

Page 6: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

1.10 Catalyst (oXIDATION)

• Engelhard Camet/BASF • Haldor Topsoe • Johnson Matthey • Emerachem

1.11 Catalyst (SCR)

• Ceram • Cormetech • Haldor Topsoe • Hitachi • Johnson Matthey

1.12 Dampers - HRSG STACK

• Effox-Flextor • Fox Equipment • Process Barron • WahlcoMetroflex

1.13 Demineralizer System

• Aquatech • Ecodyne/Graver • GE Power & Water • Hungerford & Terry • Water & Power Technology • Infilco Degremont • Siemens Water Technology • AvanTech • Eco-Tec • American Water Systems • H2O Innovations • Veolia

1.14 Desuperheaters

• Fisher • Masoneilan • Yarway • CCI

1.15 Elevators

• Otis Elevators

Exhibit E – Acceptable Equipment and Materials Suppliers Page 6 of 41

Page 7: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

• KONE • Schindler Elevator Corporation • ThyssenKrupp Elevator • Almak HEK • Tower Elevator • Hoist Co Inc.

1.16 Expansion Joints

1.16.1 Flue Gas Ductwork

• Advanced Flexible Systems • EFFOX Flextor • Fox Equipment • PAPCO Industries, Inc. • Parker Hannifin (RM Dynex) • Senior Flexonics Pathway • WahlcoMetroflex

1.16.2 Piping

• ADSCO • Senior Flexonics Pathway • Piping Technology & Products/U.S. Bellows, Inc. • WahlcoMetroflex • Expansion Joint Systems (EJS)

1.17 Centrifugal Fans

• Chicago Blower • Greenheck • Howden • New York Blower • Robinson

1.18 Fire Protection Systems

• F.E. Moran, Inc. (Provided Control System logic is provided to Owner) • SimplexGrinnell - Grinnell Fire Protection Systems (Subject to Owner final approval

prior to award) • McDaniel Fire Systems • Shambaugh & Sons • Webb Murray • Automatic sprinkler system • American Fire Technology • VFP Fire Systems

Exhibit E – Acceptable Equipment and Materials Suppliers Page 7 of 41

Page 8: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

1.19 Fuel Gas

1.19.1 Heaters

• Aether DBS • Chromalox • ETI • GasTech Engineering • Integrated Flow Solutions

1.19.2 Compressors

• Atlas Copco • Dresser-Rand • GE Oil & Gas • KOBELCO EDTI Compressors • UE Compression • MAN Turbomachinery • Siemens

1.19.3 Filters and Scrubbers

• Filtration Technologies • GasTech Engineering • John Crane • Peerless • Perry Equipment Company

1.20 Heat Exchangers

1.20.1 Plate and Frame

• Alfa Laval • Graham Manufacturing • Mueller • Tranter • Spirax Sarco • Babcock Power (TEI, Struthers) • ITT Standard

1.20.2 Shell and Tube

• API Heat Transfer (Basco) • Babcock Power (TEI, Struthers) • Hoffman Process • Perfex • SPX Heat Transfer (Yuba)

Exhibit E – Acceptable Equipment and Materials Suppliers Page 8 of 41

Page 9: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

• Ohmstede • ITT Standard

1.21 HEAT RECOVERY STEAM GENERATORS

• Alstom • CMI • NEM • Nooter/Eriksen • Vogt

1.22 Hoisting Equipment

1.22.1 Bridge Crane

• Konecranes Incorporated • Virginia Crane • Whiting Corporation • Dearborn Crane • G&H Cranes • Ace World Companies

1.22.2 Hoists

• ACCO • Columbus McKinnon (Budgit, Chester, Shaw-Box, Yale) • Robbins & Myers • Harrington • Konecranes Incorporated • Whiting • Accent Sales and Service

1.22.3 Monorails

• ACCO • American Monorail • Konecranes Incorporated • Gorbel • Trambeam Corp.

1.23 HVAC

1.23.1 Air Conditioning Equipment

• Carrier • Liebert • Trane

Exhibit E – Acceptable Equipment and Materials Suppliers Page 9 of 41

Page 10: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

• York International 1.23.2 Dampers (HVAC)

• Air Heater Seal Co. • American Warming and Ventilating • Carnes Co. • Control Equipment Co., Inc. • Process Barron

1.23.3 Fire Dampers

• American Warming and Ventilation • Greenheck • Lloyd Industries • Prefco • Ruskin

1.23.4 Package Units

• Carrier • McQuay • Trane • York

1.23.5 Power Roof Ventilation / Wall Fans

• Aerovent • Cincinnati Fan and Ventilator Company • Greenheck • Hartzell Fan, Inc. • Moffitt

1.24 Hydraulic Fluid Couplings

• Howden Gyrol Fluid Drives • Rexnord (Falk) • The Rowland Company • Voith

1.25 Insulation (Building)

• Johns Manville • Owens Corning

1.26 LUBE OIL CONDITIONERS

• HY-PRO Filtration, model COT • Kaydon, model TURBO-TOC

Exhibit E – Acceptable Equipment and Materials Suppliers Page 10 of 41

Page 11: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

1.27 Lubricants

• Chevron • Conoco • Exxon/Mobile

1.28 Mechanical Seals

• Chesterton • EagleBurgmann (Burgmann) • FlowServe (BW Seals, Durametallic, Five Star, Pac-Seal, Pacific-Wietz) • John Crane (General Service) • U.S. Seal (General Service)

1.29 Mixers, Static

• Chemineer • Koch-Glitsch • Koflo Corporation • Sulzer Chemtech

1.30 Oil-Water Separators (Packaged)

• Highland Tank • McTighe • Pan America Environmental, Inc. • PS International

1.31 Pipe Hangers and Support

• Anvil International • Basic-PSA • Bergen-Power Pipe Supports • Lisega • PHS Industries • Piping Technology & Products

1.32 Pumps

1.32.1 Boiler Feedwater

• KSB • Sulzer • Toroshima • Clyde Union Pumps (recently purchased by SPX) • Flowserve • Hyosung Goodspring

Exhibit E – Acceptable Equipment and Materials Suppliers Page 11 of 41

Page 12: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

1.32.2 Vertical Turbine

• Flowserve • KSB • Sulzer • Toroshima

1.32.3 Vertical Cantilever

• Hazelton • Weir (Warman) • Lawrence • Nagle

1.32.4 Circulating Water

• Flowserve • Kirloskar • Ruhrpumpen • Sulzer • Toroshima • Clyde Union Pumps (recently purchased by SPX) • Hyosung Goodspring

1.32.5 Condensate

• Flowserve • Ruhrpumpen • Sulzer • Toroshima • now Clyde Union Pumps (recently purchased by SPX)

1.32.6 Firewater

• Fairbanks Morse • Kirloskar • Patterson • Peerless • Sterling Fluid System

1.32.7 Lube Oil

• Buffalo Pumps • IMO Delaval • Parker Hannifin (Denison) • Tuthill

Exhibit E – Acceptable Equipment and Materials Suppliers Page 12 of 41

Page 13: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

• Viking 1.32.8 Metering

• LMI • Madden • Milton Roy • Neptune • Pulsafeeder

1.32.9 Miscellaneous

• Carver Pump • Flowserve Corporation • Lawrence • KSB • Sterling Fluid System • Toyo • Sulzer Pumps

1.32.10 Sump Pumps and Lift Stations

• Cortech • Flowserve Corporation • Metropolitan Industries • Yeomans Chicago Corporation

1.32.11 Vacuum

• Garnder Denver (Nash) • KSB • Sterling Fluid System • Siemens

1.32.12 Water, except filtrate pumps

• Flowserve

1.33 Steam Traps

• Armstrong • Spirax Sarco • Velan • Flowserve/Gestra

1.34 Steam Turbines

• Alstom • General Electric

Exhibit E – Acceptable Equipment and Materials Suppliers Page 13 of 41

Page 14: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

• Hitachi • Mitsubishi Heavy Industries • Siemens • Toshiba International Corporation

1.35 Tanks

1.35.1 Field Fabricated Tanks - Metal

• Chicago Bridge & Iron • Columbian TecTank • Pittsburgh Tank and Tower • RECO • Superior Tank Co. • Enerfab • Advance Tank & Construction • Chattanooga Boiler & Tank • Erected Steel Products of Alabama • Fisher Tank • Matrix

1.35.2 Shop Fabricated Tanks

• Chicago Bridge & Iron • Columbian TecTank • Chattanooga Boiler & Tank • Modern welding • Southern Tank • Arrow Tank & Engineering • Dixie Southern / Triple S&P • Dixie Tank • Palmer Manufacturing

1.35.3 FRP Tanks

• Augusta Fiberglass • Belding Tank Technologies, Inc. • Ershings • Palmer Manufacturing and Tank Inc. • Plas-Tanks Industries, Inc.

1.35.4 Tank Lining

• Columbian TecTank • Enerfab

1.36 Valves

Exhibit E – Acceptable Equipment and Materials Suppliers Page 14 of 41

Page 15: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

1.36.1 Ball

• Conbraco Industries: Apollo • Crane (Xomox) • Metso (Jamesbury) • Nibco • Velan • Valve Technologies • Severe Service Technologies (SST)

1.36.2 Ball – Instrumentation Service

• Aptek Instrumentation Pvt. Ltd. • Parker • Pioneer Enterprise • S.D. Industries

1.36.3 Boiler Drain Isolation

• Flowserve (Rockwell-Edwards) • Sigma or Mogas Ball Valves (Blockers) • Tyco (Yarway) • Valve technologies • Velan

1.36.4 Boiler Safety

• CCI • Dresser-Consolidated • Tyco (Anderson-Greenwood, Crosby, Kunkle)

1.36.5 Bronze

• Conbraco Industries: Apollo • Crane (Jenkins) • Lunkenheimer • Powell

1.36.6 Butterfly

• BAF Industries • Bray Controls • Fisher Controls International • Flowserve • Pratt • Tyco • Crane

Exhibit E – Acceptable Equipment and Materials Suppliers Page 15 of 41

Page 16: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

• Weir 1.36.7 Butterfly - High Performance

• Bray Controls • Fisher Controls International • Metso (Jamesbury) • Mueller Steam Specialty • Flowserve • Pratt • Tyco • Crane • Weir

1.36.8 Butterfly - Circulating Water

• Bray Controls • KSB (Amri) • Pratt • Townley • Weir (Atwood & Morrill) • Crane • Tyco

1.36.9 Cast Steel

• Newmans: Newco • Crane: Pacific • Flowserve: Edwards • Powell • Tyco • Velan • Weir (Atwood & Morrill) • Bonney Forge

1.36.10 Control Valves (see Control Vales in I&C section)

1.36.11 Forged Steel

• Bonney Forge • Conval • Powell • Flowserve • Newmans: Newco • Tyco (Yarway) • Velan

Exhibit E – Acceptable Equipment and Materials Suppliers Page 16 of 41

Page 17: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

1.36.12 Check – Insert Type

• Tyco (Keystone, Anderson& Greenwood) • Power & Process (Technocheck) • Townley

1.36.13 Check – Tilting Disc

• Crane (Pacific) • Flowserve (Anchor/Darling) • Townley • Weir (Atwood & Morrill) • Velan

1.36.14 Plug

• Crane (Nordstrom/Tufline) • DeZurik • Flowserve (Durco) • Newmans: Newco • Velan

1.36.15 Safety / Relief Valves

• Curtiss Wright (Farris) • Dresser-Consolidated • Tyco (Anderson-Greenwood, Crosby, Kunkle)

1.36.16 Solenoid

• ASCO • Mac

1.36.17 Manual – S.S. and C.S. (2 ½ in. and larger)

• Anchor/Darling • Crane • Edwards • Pacific Valves • Velan • William Powell

1.37 Water/Steam Sample Panels

• Johnson March Systems, Inc • Sentry Equipment • Waters Equipment

1.38 Water And Waste Water Treatment

Exhibit E – Acceptable Equipment and Materials Suppliers Page 17 of 41

Page 18: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

1.38.1 System Suppliers

• Aquatech • Degremont Inc. (Infilco, Anderson Water Systems, Water and Power Technologies) • Graver Technologies (Ecodyne) • GE (Glegg, Osmonics, Ionics) • Hungerford & Terry • Siemens (U.S. Filter)

1.38.2 Clarification, Filtration Equipment, and Thickeners

• Degremont (Infilco) • Graver Technologies • Siemens (Envirex) • Smith & Loveless • Westech Engineering • Veolia

Exhibit E – Acceptable Equipment and Materials Suppliers Page 18 of 41

Page 19: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

ARTICLE 2ELECTRICAL EQUIPMENT

2.1 Cable

2.1.1 Medium and Low Voltage Power Cable

• Cablec • General Cable • Kerite • Okonite • Pirelli • Southwire • Anixter • Rexel International

2.1.2 Medium Voltage Cable Terminations and Accessories

• 3M • Raychem

2.1.3 Instrument and Control Cable

• Cable USA • Imperial Wire and Cable • TE wire and Cable • Omni Wire • Aerospace Wire and Cable • Okonite • Basic Wire and Cable • Anixter • Rexel International

2.2 Cable Tray System

• GS Metals Corp. • B-Line Systems • Chalfant Products • Husky Products (Burndy) • P-W Industries • T.J. Cope • US Gypsum Globe Div.

2.3 Distribution Panelboards-120V AC/125V DC

• General Electric • Siemens • Square D

Exhibit E – Acceptable Equipment and Materials Suppliers Page 19 of 41

Page 20: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

• Eaton/ Cutler-Hammer 2.4 Drives – Variable Speed, 600V and below

• Allen Bradley • ABB • Emerson • Square D

2.5 Distribution, Transformers and Power Panels

• Eaton/Cutler-Hammer • General Electric • Siemens • Square D

2.6 Uninterruptible Power Supply

• Ametek/SCI • Gutor • Cyberex Inc • Liebert • Custom Controls (packager)

2.7 Station Battery

• Exide Technologies • GNB • EnerSys • SAFT • Custom Controls (packager)

2.8 Station Battery Charger

• Ametek/Solid State Controls, Inc. • Gutor • Exide • Custom Controls (packager)

2.9 Freeze Protection Equipment

2.9.1 Heaters / Electrical Heat Tracing

• Chromalox • Nelson • Thermon • Raychem • Tyco

Exhibit E – Acceptable Equipment and Materials Suppliers Page 20 of 41

Page 21: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

2.9.2 Enclosures

• Bylin • Chemelex • Nelson • Thermon • O’Brien

2.10 High Voltage

2.10.1 Tubular Steel Dead End Structures

• Dis-Tran • Valmont Industries • Thomas and Betts • Sabre

2.11 ISO Phase or NonSegrated Bus

• ABB • Alstom • AZZ Calvert • Delta-Unibus • GE • Alfa Standard • Simelectro • PowerGear

2.12 Lighting

2.12.1 General

• Crouse Hinds • General Electric • Holophane • Lithonia

2.12.2 Panelboard

• Eaton/Cutler-Hammer • General Electric • Siemens • Square D

2.12.3 Photo electric light

• Sigma Instruments Co.

Exhibit E – Acceptable Equipment and Materials Suppliers Page 21 of 41

Page 22: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

2.12.4 Receptacles

• Crouse Hinds Co. • Hubbell, Inc.

2.13 Motors

2.13.1 Low Voltage

• General Electric • Siemens • TECO/Westinghouse • US Motors • Toshiba • Baldor/Reliance • Marathon

2.13.2 Medium Voltage

• General Electric • Siemens • TECO/Westinghouse • ABB • Reliance • US Motors • Toshiba • Electric Machinery

2.14 Motor Control Centers (MCC’S)

• Allen-Bradley (Rockwell Automation) • Eaton/Cutler Hammer • GE • Siemens • Square D

2.15 Relays

2.15.1 Auxiliary Control

• Allen Bradley • Diversified Electronics • General Electric • Square D • Potter Brumfield

2.15.2 Timing

Exhibit E – Acceptable Equipment and Materials Suppliers Page 22 of 41

Page 23: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

• Eagle • Adalake • Potter Brumfield • Diversified Electronics • Allen Bradley

2.16 Switchboards – AC and DC

• ABB • General Electric • Eaton/Cutler-Hammer • Square D

2.17 MEDIUM and LOW VOLTAGE Switchgear

• ABB, Inc. • Eaton / Cutler Hammer • Powell • Square D

2.18 Generator Breakers

• ABB • Areva/Alstom Grid

2.19 Transducers (Electrical)

• Moore Industries • Rochester Instruments • Scientific Columbus • Transdata • Action Pak

2.20 Transformers

2.20.1 Low Voltage Dry Type

• General Electric • Eaton/Cutler-Hammer • ABB • Square D

2.20.2 Aux Power and Load Center Transformers

• ABB • Hyundai • Hico • Square D

Exhibit E – Acceptable Equipment and Materials Suppliers Page 23 of 41

Page 24: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

• General Electric • Pennsylvania • Siemens

2.20.3 Generator Step-Up Transformers

• General Electric • Siemens • ABB • Hico • Hyundai • Pennsylvania

2.21 Terminal Blocks (Low Voltage Instrumentation)

• Allen Bradley • General Electric • Square D • Phoenix Contact • Weidmueller

ARTICLE 3CIVIL EQUIPMENT

3.1 Steel, Fabricated

• AFCO Steel – A W & W Steel Company • Central Texas Iron Works • Cives Steel Company • Hirschfield Steel Company, Inc. • Paxton Vierling • PSP • Severfield Reeve • Structural Fabricators of Monroe, Inc. • Structural Steel Services, Inc. • Qualico Steel Co., Inc. • Merrill • SuperMetal • Lenex

3.2 Pre-Engineered Buildings / Enclosures

• Butler • Parkline • Superior • Darland • Patterson Horth

Exhibit E – Acceptable Equipment and Materials Suppliers Page 24 of 41

Page 25: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

• Siscorp • Varco Pruden

Exhibit E – Acceptable Equipment and Materials Suppliers Page 25 of 41

Page 26: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

ARTICLE 4INSTRUMENTATION AND CONTROLS EQUIPMENT

4.1 Actuators

4.1.1 Dampers

• Auma – On/Off service • Rotork – On/Off service • Limitorque – On/Off or modulating service • Beck – Modulating service

4.1.2 Hydraulic

• Clarkson • Parker • Rexa

4.1.3 Motor Operated Valves

• Rotork – On/Off Service • Beck – Modulating Service • Limitorque – On/Off Service • EIM Controls – On/Off Service

4.1.4 Pneumatic Operated Valves

• Flowserve: Automax • Emerson: Fisher • Tyco: Keystone

4.2 Analyzers

4.2.1 Gas – Ammonia (for slip)

• Rosemount • Draeger

4.2.2 Gas – Chromatography/BTU

• Daniel Industries • Yokogawa • Rosemount • Land Combustion & Environmental Monitoring

4.2.3 Gas – CO, In-Situ

• Thermo Scientific 4.2.4 Gas – NOx

Exhibit E – Acceptable Equipment and Materials Suppliers Page 26 of 41

Page 27: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

• Thermo Scientific 4.2.5 Gas – CO2

• California Analytical • Land Combustion & Environmental Monitoring

4.2.6 Gas – CO

• TECO • Land Combustion & Environmental Monitoring • Thermo Scientific

4.2.7 Gas - Stack Flow (Ultrasonic)

• Sick Maihak 4.2.8 Gas - Dewpoint

• Endress-Hauser • Kahn • Panametrics • Shaw

4.2.9 Gas – Humidity

• Vaisala • Land Industries

4.2.10 Gas – Oxygen, In-Situ

• Rosemount • Yokogawa • Land Combustion & Environmental Monitoring

4.2.11 Water - Conductivity

• Foxboro • Rosemount • Yokogawa • L&N

4.2.12 Water – Dissolved Oxygen

• Foxboro • Rosemount • Yokogawa

4.2.13 Water - Density

Exhibit E – Acceptable Equipment and Materials Suppliers Page 27 of 41

Page 28: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

• Thermo Measure Tech • Orion Research

4.2.14 Water - pH

• Foxboro • ITT Barton • KayRay/Sensall Inc Model #3680CA • Ohmart • Rosemount

4.2.15 Water - Silica

• Hach • Analyzers, Water - Sodium • Orion Research

4.2.16 Water - Sodium

• Orion Research • Hach

4.3 Computer Peripherals - Modems

• Black Box • Hayes • Cisco

4.4 Computing Modules - Electronic

• Moore Industries • Trans Data • RIS

4.5 Continuous Emission Monitoring System Equipment

4.5.1 Data Acquisition System

• Environmental Systems Corporation (ESC) 4.5.2 Systems Integration

• Shaw Environmental, Inc. • Thermo Scientific • CEMTEK

4.6 Control Panels

• Comsip Customline • Hatch Inc.

Exhibit E – Acceptable Equipment and Materials Suppliers Page 28 of 41

Page 29: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

• Johnson Controls • KEMCO • Powell • Sewell

4.7 Control Stations (Local)

• Allen Bradley • Crouse Hinds • Cutler Hammer • Square D

4.8 Digital Control Systems - DCS

• Emerson Process Management (Ovation) • Honeywell • Mark 6 (for BOP if GE combustion turbines selected)

4.9 Control Valves

4.9.1 General Valves and Regulators

• Fisher 4.9.2 Control Valves and Regulators - Steam service

• CCI • Fisher • Flowserve/Valek • SPX Dezurik Copes Vulcan

4.9.3 Control Valves – General Service

• Fisher Controls • Masoneilan • Rockwell Edwards • Samson • Tyco • Flowserve/Valek • SPX Dezurik Copes Vulcan

4.9.4 Control Valves – Severe Service

• CCI • Fisher • Flowserve/Valek • SPX Dezurik Copes Vulcan

4.9.5 Turbine Bypass Control Valves

Exhibit E – Acceptable Equipment and Materials Suppliers Page 29 of 41

Page 30: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

• CCI (sole source), 4.9.6 Control Valves – Rotary

• Fisher Controls 4.10 Detectors (Liquid Level)

• Drexelbrook Engineering • Endress Hauser • Milltronics • K-Tek

4.11 Density Devices

4.11.1 Indicators/Transmitters

• Thermo Scientific 4.12 Fire Detection

• Chemetron • Grinnell/Automatic Sprinkler • Notifier (Honeywell) • Vulcan

4.13 Fittings, Tube

• Parker Hannifin • Swagelok

4.14 Flame Scanners

Combustion turbines may use their standard suppliers. The HRSG duct burner shall use companies below:

• Forney Engineering • Iris • MPS Talentum • ABB

4.15 Flow Devices

4.15.1 Averaging Pitot Tubes

• Rosemount (Dieterich Standard) • Kurz • FCI

4.15.2 Flow Computers

Exhibit E – Acceptable Equipment and Materials Suppliers Page 30 of 41

Page 31: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

• Daniel Industries 4.15.3 Flow Nozzles

• Badger Meter • Flow Tech • Fluidic Techniques • Vickery-Simms

4.15.4 Orifices

• Badger Meter • Daniel Industries • Flow Tech • Fluidic Techniques • Mack Iron Works

4.15.5 Restriction Orifices

• Badger Meter • Daniel Industries • Flow Tech • Vickery-Simms • Fluidic Techniques

4.15.6 Venturi

• Daniel Industries • Flow Tech • Fluidic Techniques • Vickery-Simms

4.15.7 Sight

• Brooks Instruments DI • Ernst Gauge • Penberthy • Universal Flow Monitor

4.15.8 Precision Metering Run

• Daniel Industries • Fluidic Techniques

4.15.9 Flow Indicators

• Universal • Rosemont • Honeywell

Exhibit E – Acceptable Equipment and Materials Suppliers Page 31 of 41

Page 32: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

4.15.10 Magnetic Flow meter

• ABB • Fisher & Porter • Rosemount • Foxboro • Brooks

4.15.11 Mass Flow Meter

• ABB • Rosemount • Sierra • Honeywell

4.15.12 Paddle Flow Meter

• Brooks Instrument • Ernst Gauge • Penberthy • Signet

4.15.13 Positive Displacement Flow Meter

• Badger Meter • Neptune

4.15.14 Positive Displacement – Fuel Oil

• Brooks Instrument • Badger Meter • Brodie Meter

4.15.15 Rotameters

• Brooks Instruments • ABB • Penberthy • Wallace & Tiernan

4.15.16 Flow Transmitter

• Rosemount • ABB • Foxboro • Yokogawa • Honeywell

4.15.17 Turbine Flow Meter

Exhibit E – Acceptable Equipment and Materials Suppliers Page 32 of 41

Page 33: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

• Badger Meter • ITT Barton

4.15.18 Ultrasonic Flow Meter

• ABB • Polysonics

4.15.19 Vortex Shedding Flow Meter

• ABB • Rosemount • Yokogawa

4.15.20 Slurry Flow Meter

• Krohne • Honeywell • Brooks

4.15.21 Slurry Flow—Magnetic

• Endress & Hauser • Honeywell • Yokagawa • Rosemount • Brooks

4.16 Frequency Transducers

• Scientific Columbus

4.17 I/P Converters

• ABB • Emerson • Foxboro • Masoneilian International • Action Pak • Moore • Fisher

4.18 Instruments (General Control And Indication)

• General Electric ( • Allen Bradley • Square D

4.19 Instruments (Laboratory)

Exhibit E – Acceptable Equipment and Materials Suppliers Page 33 of 41

Page 34: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

• Fisher Scientific • Mettler Instrument Corp. • Perkin Elmer

4.20 Instruments – (PH Probes)

• ABB • Yokagawa • Honeywell • Hach • Rosemount • Great Lakes

4.21 Instruments – Medium AND LOW Voltage Switchgear

(Control switches, indicating lamps, protective relays, etc.) • General Electric (Type SB-1 control switches, ET-16 lamp holder) • ABB • Yokagawa • Multilin • Schweitzer

4.22 Isolators, Electrical

• Black Box • Rochester Instrument • Rosemount

4.23 Level Devices

4.23.1 Controllers – Pneumatic, Displacer

• Emerson Fisher • K-Tek • Magnetrol • Masoneilan

4.23.2 Level Gauges – Bubbler

• Meriam Instrument • Uehling

4.23.3 Level Gauges – Float

• Daniel Industries • Groth Equipment • K-Tek

4.23.4 Level Gauges – Sight Glass

Exhibit E – Acceptable Equipment and Materials Suppliers Page 34 of 41

Page 35: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

• Ernst & Whitney Press • Ernst Gage • Yarway • Penberthy • Quest-Tec Solutions • Clark-Reliance

4.23.5 Level Gauges – Tank Monitoring

• Groth Equipment • Rosemount - Varec

4.23.6 Level Indication System - Drum

• ABB • Emerson Fisher • Rosemount • Solartron • Yarway • K-Tek • Quest-Tec Solutions • Clark-Reliance

4.23.7 Level Switches - Capacitance

• Drexelbrook • K-Tek

4.23.8 Level Switches - Conductivity

• Solartron • K-Tek • Quest-Tec Solutions • Clark-Reliance

4.23.9 Level Switches - Displacer

• Magnetrol • SOR • K-Tek

4.23.10 Level Switches - Float

• Groth Equipment • Magnetrol • SOR • K-Tek

Exhibit E – Acceptable Equipment and Materials Suppliers Page 35 of 41

Page 36: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

4.23.11 Level Switches - Ultrasonic

• Milltronics • Sensall • Magnetrol

4.23.12 Level Transmitters - Capacitance

• Drexelbrook

4.23.13 Level Transmitters - Displacer

• ABB • K-Tek • Magnetrol • Rosemount • Emerson Fisher

4.23.14 Level Transmitters – Ultra Sonic

• ProsonicEndress Hauser

4.23.15 RF Admittance

• Drexelbrook Engineering • Endress & Hauser • MilltronicsB

4.24 Limit Switches

4.24.1 General

• Crouse Hinds • Namco (Snap Lock) • Topworx (formerly GO Swtich)

4.24.2 Proximity

• Allen Bradley • Balluff • GE • Topworx (formerly GO Swtich) • Square D

4.24.3 Rotary Position

• ABB • Emerson Fisher

4.25 Local Pneumatic Instrumentation

Exhibit E – Acceptable Equipment and Materials Suppliers Page 36 of 41

Page 37: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

• Fisher Controls • Foxboro • Mosonelian International • Moore Products

4.26 Manifolds

• Anderson-Greenwood • PGI • Swagelock – Whitney

4.27 Multiplexers

• Bailey Controls • Modicon • Yokogawa • Moore Products

4.28 Panel Devices

4.28.1 Panel Lights

• Allen Bradley • General Electric • Square D

4.28.2 Analog Panel Meters

• Yokogawa • Newport

4.28.3 Digital Panel Meters

• Digitec • Newport • Precision • Red Lion • Weschler

4.28.4 Digital - Counters

• Eagle Signal Controls • Veeder-Root • Newport

4.28.5 Digital – Tachometers

• Bentley Nevada • IRD Mechanalysis

Exhibit E – Acceptable Equipment and Materials Suppliers Page 37 of 41

Page 38: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

• Newport • Weschler

4.28.6 Panel Switches – Thumbwheels

• General Electric • Allen Bradley

4.29 Power Supplies

• Lambda • Sola

4.30 Pressure Devices

4.30.1 Manometers

• Meriam Instrument 4.30.2 Pressure gages

• Ashcroft • Rosemont • Perma-Cal Industries • McDaniels

4.30.3 Pressure Transmitters

• Rosemount • ABB • Foxboro • Yokogawa • Honeywell

4.30.4 Pressure switches

• SOR • Barksdale • Dwyer • United Electric • ASCO

4.31 Programmable Logic Controllers

Use DCS in all control applications, if this absolutely cannot be done then Allen Bradley PLC only with the exception for CEMDAS and Air Compressors application.

• Allen Bradley

4.32 Recorders - Electronic

Exhibit E – Acceptable Equipment and Materials Suppliers Page 38 of 41

Page 39: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

• Honeywell • Leeds & Northrup • Yokogawa

4.33 Solenoid Valves

• ASCO • Rexroth • Mac

4.34 Stack Testing

• GE Energy Management Services • Clean Air Engineering • Platt • Metro Environmental • Air Quality Services (AQS) • Catalyst Air Management

4.35 Tags (Identification)

• AMP • W.H. Brady • Electromark Company • Raychem Corporation • Stanco Products Inc. • The Thomas and Betts Co.

4.36 Temperature Devices

4.36.1 Temperature Indicators

• Ashcroft • Palmer

4.36.2 RTD

• Omega • Thermo Electric • UEC • Daily Thermetics

4.36.3 Thermocouples

• Omega • Thermo Electric • UEC • PYCO

Exhibit E – Acceptable Equipment and Materials Suppliers Page 39 of 41

Page 40: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

• Conax 4.36.4 Thermometers

• Ashcroft • Palmer Instruments

4.36.5 Thermometers - Dial

• Ashcroft • Palmer Instruments • Temp-Line • Dresser

4.36.6 Thermowells

• Omega • Thermo Electric • UEC • Daily Thermetic • PYCO • Conax

4.36.7 Temperature switches

• ASCO • Ashcroft • United Electric Controls • Barksdale

4.37 VAR Transducers

• Scientific Columbus 4.38 Vibration

4.38.1 Vibration Monitoring Systems

• Bently-Nevada • IRD • ABB ETSI • Emerson CSI

4.39 Voltage Devices

4.39.1 Transducers

• Scientific Columbus • Transdata

Exhibit E – Acceptable Equipment and Materials Suppliers Page 40 of 41

Page 41: EXHIBIT E – ACCEPTABLE EQUIPMENT AND …... ·  · 2014-03-201.21 HEAT RECOVERY STEAM GENERATORS ... Contractor shall disclose to the Owner the difference in cost between the low

LG&E/KU Engineering, Procurement and Construction Cane Run Generating Station Issue: For Contract Natural Gas Combined Cycle Project Section Revision: 2

4.40 Wattage Devices

4.40.1 Watthour Meters

• GE KV2

Exhibit E – Acceptable Equipment and Materials Suppliers Page 41 of 41