LG&E/KU Engineering, Procurement and Construction

Cane Run Generating Station Issue: For Contract

Natural Gas Combined Cycle Project Section Revision: 1

Exhibit R – Rates

EXHIBIT R – RATES

EXHIBIT R

THE MAN‐HOUR AND EQUIPMENT RENTAL RATES PROVIDED IN THIS EXHIBIT DO NOT INCLUDE ANY OVERHEAD OR PROFIT

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    1 

 

 

Staff and Craft Labor Rates 

 2013  Base Rate  PT&I 

Workers Comp.  (see notes) 

Fringes (vacation, insurance) 

Small Tools 

Consumables 

Safety Supplies 

NCCER Assessment 

Per Diem 

Total Straight Time  

Total Over Time 

Classification     21.20%     31.80%  $0.00  3.00%  2.00%  $0.50          

      2.00%                         

Project Director  $72.00  $15.26 $1.44 $22.90 $0.00 $0.00  $1.44 $0.50 $0.00 $113.54 $113.54 

Construction Manager  $66.00  $13.99 $1.32 $20.99 $0.00 $0.00  $1.32 $0.50 $0.00 $104.12 $104.12 

Site Project Manager   $64.00  $13.57 $1.28 $20.35 $0.00 $0.00  $1.28 $0.50 $7.00 $107.98 $107.98 

Project Superintendent   $56.00  $11.87 $1.12 $17.81 $0.00 $0.00  $1.12 $0.50 $7.00 $95.42 $95.42 

Area Superintendent  $50.00  $10.60 $1.00 $15.90 $0.00 $0.00  $1.00 $0.50 $6.00 $85.00 $85.00 

Craft Superintendent  $45.00  $9.54 $0.90 $14.31 $0.00 $0.00  $0.90 $0.50 $6.00 $77.15 $77.15 

Project Controls Supervisor  $50.00  $10.60 $1.00 $15.90 $0.00 $0.00  $1.00 $0.50 $6.00 $85.00 $85.00 

Project Planner  $43.00  $9.12 $0.86 $13.67 $0.00 $0.00  $0.86 $0.50 $6.00 $74.01 $74.01 

Project Scheduler  $36.00  $7.63 $0.72 $11.45 $0.00 $0.00  $0.72 $0.50 $6.00 $63.02 $63.02 

Project Engineer  $48.00  $10.18 $0.96 $15.26 $0.00 $0.00  $0.96 $0.50 $6.00 $81.86 $81.86 

Field Engineer I  $43.00  $9.12 $0.86 $13.67 $0.00 $0.00  $0.86 $0.50 $6.00 $74.01 $74.01 

Field Engineer II  $34.00  $7.21 $0.68 $10.81 $0.00 $0.00  $0.68 $0.50 $6.00 $59.88 $59.88 

Office Manager  $41.00  $8.69 $0.82 $13.04 $0.00 $0.00  $0.82 $0.50 $6.00 $70.87 $70.87 

Quality Control Manager  $51.00  $10.81 $1.02 $16.22 $0.00 $0.00  $1.02 $0.50 $6.00 $86.57 $86.57 

QC Inspector (Hourly)  $41.00  $8.69 $0.82 $13.04 $0.00 $1.23  $0.82 $0.50 $6.00 $72.10 $103.47 

Safety Manager  $45.00  $9.54 $0.90 $14.31 $0.00 $0.00  $0.90 $0.50 $6.00 $77.15 $77.15 

Safety Man (Hourly)  $28.00  $5.94 $0.56 $8.90 $1.65 $0.84  $0.56 $0.50 $6.00 $52.95 $74.37 

Procurement/ Material Manager  

$41.00  $8.69 $0.82 $13.04 $0.00 $0.00  $0.82 $0.50 $6.00 $70.87 $70.87 

Material Buyer   $30.00  $6.36 $0.60 $9.54 $0.00 $0.00  $0.60 $0.50 $6.00 $53.60 $53.60 

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    2 

 

 

 2013  Base Rate  PT&I 

Workers Comp.  (see notes) 

Fringes (vacation, insurance) 

Small Tools 

Consumables 

Safety Supplies 

NCCER Assessment 

Per Diem 

Total Straight Time  

Total Over Time 

Classification     21.20%     31.80%  $0.00  3.00%  2.00%  $0.50          

      2.00%                         

Document Control Coordinator  $20.00  $4.24 $0.40 $6.36 $0.00 $0.60  $0.40 $0.50 $6.00 $38.50 $53.80 

Timekeeper  $18.00  $3.82 $0.36 $5.72 $0.00 $0.54  $0.36 $0.50 $0.00 $29.30 $43.07 

Clerk  $16.00  $3.39 $0.32 $5.09 $0.00 $0.48  $0.32 $0.50 $0.00 $26.10 $38.34 

Secretary  $14.00  $2.97 $0.28 $4.45 $0.00 $0.42  $0.28 $0.50 $0.00 $22.90 $33.61 

Classification     21.20%     3.75%  $1.65  4.00%  2.50%  $0.50          

Boiler Makers        6.07%                         

General Foreman  $32.00  $6.78 $1.94 $1.20 $1.65 $1.28  $0.80 $0.50 $9.00 $55.16 $75.15 

Foreman  $29.00  $6.15 $1.76 $1.09 $1.65 $1.16  $0.73 $0.50 $7.50 $49.53 $67.65 

Journeyman ‐ Certified Plus (J‐C+) 

$26.00  $5.51 $1.58 $0.98 $1.65 $1.04  $0.65 $0.50 $7.50 $45.41 $61.65 

Journeyman ‐ Certified (J‐C)  $25.00  $5.30 $1.52 $0.94 $1.65 $1.00  $0.63 $0.50 $7.50 $44.03 $59.65 

Journeyman ‐ Uncertified (J‐UNC) 

$24.00  $5.09 $1.46 $0.90 $1.65 $0.96  $0.60 $0.50 $7.50 $42.65 $57.65 

Top Helper 1 (TP1)  $21.60  $4.58 $1.31 $0.81 $1.65 $0.86  $0.54 $0.50 $5.00 $36.85 $50.35 

Top Helper 2 (TP2)  $19.20  $4.07 $1.17 $0.72 $1.65 $0.77  $0.48 $0.50 $5.00 $33.55 $45.55 

Helper 1 (H1)  $18.00  $3.82 $1.09 $0.68 $1.65 $0.72  $0.45 $0.50 $5.00 $31.90 $43.15 

Helper 2 (H2)  $16.80  $3.56 $1.02 $0.63 $1.65 $0.67  $0.42 $0.50 $5.00 $30.25 $40.75 

Helper 3 (H3)  $15.60  $3.31 $0.95 $0.59 $1.65 $0.62  $0.39 $0.50 $0.00 $23.60 $33.35 

Helper 4 (H4)  $14.40  $3.05 $0.87 $0.54 $1.65 $0.58  $0.36 $0.50 $0.00 $21.95 $30.95 

Helper 5 (H5)  $13.20  $2.80 $0.80 $0.50 $1.65 $0.53  $0.33 $0.50 $0.00 $20.30 $28.55 

Helper 6 (H6)  $12.00  $2.54 $0.73 $0.45 $1.65 $0.48  $0.30 $0.50 $0.00 $18.65 $26.15 

Pipe Fitters        5.58%                         

General Foreman  $32.00  $6.78 $1.79 $1.20 $1.65 $1.28  $0.80 $0.50 $9.00 $55.00 $74.99 

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    3 

 

 

 2013  Base Rate  PT&I 

Workers Comp.  (see notes) 

Fringes (vacation, insurance) 

Small Tools 

Consumables 

Safety Supplies 

NCCER Assessment 

Per Diem 

Total Straight Time  

Total Over Time 

Classification     21.20%     31.80%  $0.00  3.00%  2.00%  $0.50          

      2.00%                         

Foreman  $29.00  $6.15 $1.62 $1.09 $1.65 $1.16  $0.73 $0.50 $7.50 $49.39 $67.51 

Journeyman ‐ Heavy Wall Welder 

$30.00  $6.36 $1.67 $1.13 $1.65 $1.20  $0.75 $0.50 $7.50 $50.76 $69.50 

Journeyman ‐ Comb. Welder  $27.00  $5.72 $1.51 $1.01 $1.65 $1.08  $0.68 $0.50 $7.50 $46.65 $63.52 

Journeyman ‐ Certified Plus (J‐C+) 

$26.00  $5.51 $1.45 $0.98 $1.65 $1.04  $0.65 $0.50 $7.50 $45.28 $61.52 

Journeyman ‐ Certified (J‐C)  $25.00  $5.30 $1.40 $0.94 $1.65 $1.00  $0.63 $0.50 $7.50 $43.91 $59.53 

Journeyman ‐ Uncertified (J‐UNC) 

$24.00  $5.09 $1.34 $0.90 $1.65 $0.96  $0.60 $0.50 $7.50 $42.54 $57.53 

Top Helper 1 (TP1)  $21.60  $4.58 $1.21 $0.81 $1.65 $0.86  $0.54 $0.50 $5.00 $36.75 $50.24 

Top Helper 2 (TP2)  $19.20  $4.07 $1.07 $0.72 $1.65 $0.77  $0.48 $0.50 $5.00 $33.46 $45.45 

Helper 1 (H1)  $18.00  $3.82 $1.00 $0.68 $1.65 $0.72  $0.45 $0.50 $5.00 $31.82 $43.06 

Helper 2 (H2)  $16.80  $3.56 $0.94 $0.63 $1.65 $0.67  $0.42 $0.50 $5.00 $30.17 $40.67 

Helper 3 (H3)  $15.60  $3.31 $0.87 $0.59 $1.65 $0.62  $0.39 $0.50 $0.00 $23.53 $33.27 

Helper 4 (H4)  $14.40  $3.05 $0.80 $0.54 $1.65 $0.58  $0.36 $0.50 $0.00 $21.88 $30.88 

Helper 5 (H5)  $13.20  $2.80 $0.74 $0.50 $1.65 $0.53  $0.33 $0.50 $0.00 $20.24 $28.48 

Helper 6 (H6)  $12.00  $2.54 $0.67 $0.45 $1.65 $0.48  $0.30 $0.50 $0.00 $18.59 $26.09 

Electricians        4.95%                         

General Foreman  $32.00  $6.78 $1.58 $1.20 $1.65 $1.28  $0.80 $0.50 $9.00 $54.80 $74.79 

Foreman  $29.00  $6.15 $1.44 $1.09 $1.65 $1.16  $0.73 $0.50 $7.50 $49.21 $67.32 

Instrument Technician  $35.00  $7.42 $1.73 $1.31 $1.65 $1.40  $0.88 $0.50 $7.50 $57.39 $79.26 

Journeyman ‐ Certified Plus (J‐C+) 

$26.00  $5.51 $1.29 $0.98 $1.65 $1.04  $0.65 $0.50 $7.50 $45.11 $61.36 

e027164
Highlight
e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    4 

 

 

 2013  Base Rate  PT&I 

Workers Comp.  (see notes) 

Fringes (vacation, insurance) 

Small Tools 

Consumables 

Safety Supplies 

NCCER Assessment 

Per Diem 

Total Straight Time  

Total Over Time 

Classification     21.20%     31.80%  $0.00  3.00%  2.00%  $0.50          

      2.00%                         

Journeyman ‐ Certified (J‐C)  $25.00  $5.30 $1.24 $0.94 $1.65 $1.00  $0.63 $0.50 $7.50 $43.75 $59.37 

Journeyman ‐ Uncertified (J‐UNC) 

$24.00  $5.09 $1.19 $0.90 $1.65 $0.96  $0.60 $0.50 $7.50 $42.39 $57.38 

Top Helper 1 (TP1)  $21.60  $4.58 $1.07 $0.81 $1.65 $0.86  $0.54 $0.50 $5.00 $36.61 $50.11 

Top Helper 2 (TP2)  $19.20  $4.07 $0.95 $0.72 $1.65 $0.77  $0.48 $0.50 $5.00 $33.34 $45.33 

Helper 1 (H1)  $18.00  $3.82 $0.89 $0.68 $1.65 $0.72  $0.45 $0.50 $5.00 $31.70 $42.95 

Helper 2 (H2)  $16.80  $3.56 $0.83 $0.63 $1.65 $0.67  $0.42 $0.50 $5.00 $30.07 $40.56 

Helper 3 (H3)  $15.60  $3.31 $0.77 $0.59 $1.65 $0.62  $0.39 $0.50 $0.00 $23.43 $33.17 

Helper 4 (H4)  $14.40  $3.05 $0.71 $0.54 $1.65 $0.58  $0.36 $0.50 $0.00 $21.79 $30.79 

Helper 5 (H5)  $13.20  $2.80 $0.65 $0.50 $1.65 $0.53  $0.33 $0.50 $0.00 $20.15 $28.40 

Helper 6 (H6)  $12.00  $2.54 $0.59 $0.45 $1.65 $0.48  $0.30 $0.50 $0.00 $18.52 $26.02 

Millwrights        7.78%                         

General Foreman  $32.00  $6.78 $2.49 $1.20 $1.65 $1.28  $0.80 $0.50 $9.00 $55.70 $75.70 

Foreman  $29.00  $6.15 $2.26 $1.09 $1.65 $1.16  $0.73 $0.50 $7.50 $50.03 $68.14 

Journeyman ‐ Certified Plus (J‐C+) 

$26.00  $5.51 $2.02 $0.98 $1.65 $1.04  $0.65 $0.50 $7.50 $45.85 $62.09 

Journeyman ‐ Certified (J‐C)  $25.00  $5.30 $1.95 $0.94 $1.65 $1.00  $0.63 $0.50 $7.50 $44.46 $60.08 

Journeyman ‐ Uncertified (J‐UNC) 

$24.00  $5.09 $1.87 $0.90 $1.65 $0.96  $0.60 $0.50 $7.50 $43.07 $58.06 

Top Helper 1 (TP1)  $21.60  $4.58 $1.68 $0.81 $1.65 $0.86  $0.54 $0.50 $5.00 $37.22 $50.72 

Top Helper 2 (TP2)  $19.20  $4.07 $1.49 $0.72 $1.65 $0.77  $0.48 $0.50 $5.00 $33.88 $45.88 

Helper 1 (H1)  $18.00  $3.82 $1.40 $0.68 $1.65 $0.72  $0.45 $0.50 $5.00 $32.21 $43.46 

Helper 2 (H2)  $16.80  $3.56 $1.31 $0.63 $1.65 $0.67  $0.42 $0.50 $5.00 $30.54 $41.04 

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    5 

 

 

 2013  Base Rate  PT&I 

Workers Comp.  (see notes) 

Fringes (vacation, insurance) 

Small Tools 

Consumables 

Safety Supplies 

NCCER Assessment 

Per Diem 

Total Straight Time  

Total Over Time 

Classification     21.20%     31.80%  $0.00  3.00%  2.00%  $0.50          

      2.00%                         

Helper 3 (H3)  $15.60  $3.31 $1.21 $0.59 $1.65 $0.62  $0.39 $0.50 $0.00 $23.87 $33.62 

Helper 4 (H4)  $14.40  $3.05 $1.12 $0.54 $1.65 $0.58  $0.36 $0.50 $0.00 $22.20 $31.20 

Helper 5 (H5)  $13.20  $2.80 $1.03 $0.50 $1.65 $0.53  $0.33 $0.50 $0.00 $20.53 $28.78 

Helper 6 (H6)  $12.00  $2.54 $0.93 $0.45 $1.65 $0.48  $0.30 $0.50 $0.00 $18.86 $26.35 

Iron Workers        14.02%                         

General Foreman  $32.00  $6.78 $4.49 $1.20 $1.65 $1.28  $0.80 $0.50 $9.00 $57.70 $77.69 

Foreman  $29.00  $6.15 $4.07 $1.09 $1.65 $1.16  $0.73 $0.50 $7.50 $51.84 $69.95 

Journeyman ‐ Certified Plus (J‐C+) 

$26.00  $5.51 $3.65 $0.98 $1.65 $1.04  $0.65 $0.50 $7.50 $47.47 $63.72 

Journeyman ‐ Certified (J‐C)  $25.00  $5.30 $3.51 $0.94 $1.65 $1.00  $0.63 $0.50 $7.50 $46.02 $61.64 

Journeyman ‐ Uncertified (J‐UNC) 

$24.00  $5.09 $3.36 $0.90 $1.65 $0.96  $0.60 $0.50 $7.50 $44.56 $59.56 

Top Helper 1 (TP1)  $21.60  $4.58 $3.03 $0.81 $1.65 $0.86  $0.54 $0.50 $5.00 $38.57 $52.07 

Top Helper 2 (TP2)  $19.20  $4.07 $2.69 $0.72 $1.65 $0.77  $0.48 $0.50 $5.00 $35.08 $47.08 

Helper 1 (H1)  $18.00  $3.82 $2.52 $0.68 $1.65 $0.72  $0.45 $0.50 $5.00 $33.33 $44.58 

Helper 2 (H2)  $16.80  $3.56 $2.36 $0.63 $1.65 $0.67  $0.42 $0.50 $5.00 $31.59 $42.08 

Helper 3 (H3)  $15.60  $3.31 $2.19 $0.59 $1.65 $0.62  $0.39 $0.50 $0.00 $24.84 $34.59 

Helper 4 (H4)  $14.40  $3.05 $2.02 $0.54 $1.65 $0.58  $0.36 $0.50 $0.00 $23.10 $32.09 

Helper 5 (H5)  $13.20  $2.80 $1.85 $0.50 $1.65 $0.53  $0.33 $0.50 $0.00 $21.35 $29.60 

Helper 6 (H6)  $12.00  $2.54 $1.68 $0.45 $1.65 $0.48  $0.30 $0.50 $0.00 $19.61 $27.10 

Operators        7.78%                         

General Foreman  $32.00  $6.78 $2.49 $1.20 $1.65 $1.28  $0.80 $0.50 $9.00 $55.70 $75.70 

Foreman  $29.00  $6.15 $2.26 $1.09 $1.65 $1.16  $0.73 $0.50 $7.50 $50.03 $68.14 

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    6 

 

 

 2013  Base Rate  PT&I 

Workers Comp.  (see notes) 

Fringes (vacation, insurance) 

Small Tools 

Consumables 

Safety Supplies 

NCCER Assessment 

Per Diem 

Total Straight Time  

Total Over Time 

Classification     21.20%     31.80%  $0.00  3.00%  2.00%  $0.50          

      2.00%                         

Tower Crane Operator  $28.00  $5.94 $2.18 $1.05 $1.65 $1.12  $0.70 $0.50 $7.50 $48.63 $66.13 

Operator 3 (Lattice Boom)  $27.00  $5.72 $2.10 $1.01 $1.65 $1.08  $0.68 $0.50 $7.50 $47.24 $64.11 

Operator 2 (RT, excavator, CDL driver) 

$26.00  $5.51 $2.02 $0.98 $1.65 $1.04  $0.65 $0.50 $7.50 $45.85 $62.09 

Operator 1 (forklift, backhoe, bobcat) 

$25.00  $5.30 $1.95 $0.94 $1.65 $1.00  $0.63 $0.50 $7.50 $44.46 $60.08 

Mechanic  $26.00  $5.51 $2.02 $0.98 $1.65 $1.04  $0.65 $0.50 $7.50 $45.85 $62.09 

Carpenters        8.09%                         

General Foreman  $29.00  $6.15 $2.35 $1.09 $1.65 $1.16  $0.73 $0.50 $9.00 $51.62 $69.73 

Foreman  $26.00  $5.51 $2.10 $0.98 $1.65 $1.04  $0.65 $0.50 $7.50 $45.93 $62.17 

Journeyman ‐ Certified Plus (J‐C+) 

$23.00  $4.88 $1.86 $0.86 $1.65 $0.92  $0.58 $0.50 $7.50 $41.74 $56.11 

Journeyman ‐ Certified (J‐C)  $22.00  $4.66 $1.78 $0.83 $1.65 $0.88  $0.55 $0.50 $7.50 $40.35 $54.09 

Journeyman ‐ Uncertified (J‐UNC) 

$21.00  $4.45 $1.70 $0.79 $1.65 $0.84  $0.53 $0.50 $7.50 $38.95 $52.07 

Top Helper 1 (TP1)  $18.90  $4.01 $1.53 $0.71 $1.65 $0.76  $0.47 $0.50 $5.00 $33.52 $45.33 

Top Helper 2 (TP2)  $16.80  $3.56 $1.36 $0.63 $1.65 $0.67  $0.42 $0.50 $5.00 $30.59 $41.09 

Helper 1 (H1)  $15.75  $3.34 $1.27 $0.59 $1.65 $0.63  $0.39 $0.50 $5.00 $29.13 $38.97 

Helper 2 (H2)  $14.70  $3.12 $1.19 $0.55 $1.65 $0.59  $0.37 $0.50 $5.00 $27.66 $36.85 

Helper 3 (H3)  $13.65  $2.89 $1.10 $0.51 $1.65 $0.55  $0.34 $0.50 $0.00 $21.20 $29.73 

Helper 4 (H4)  $12.60  $2.67 $1.02 $0.47 $1.65 $0.50  $0.32 $0.50 $0.00 $19.73 $27.60 

Helper 5 (H5)  $11.55  $2.45 $0.93 $0.43 $1.65 $0.46  $0.29 $0.50 $0.00 $18.27 $25.48 

Helper 6 (H6)  $10.50  $2.23 $0.85 $0.39 $1.65 $0.42  $0.26 $0.50 $0.00 $16.80 $23.36 

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    7 

 

 

 2013  Base Rate  PT&I 

Workers Comp.  (see notes) 

Fringes (vacation, insurance) 

Small Tools 

Consumables 

Safety Supplies 

NCCER Assessment 

Per Diem 

Total Straight Time  

Total Over Time 

Classification     21.20%     31.80%  $0.00  3.00%  2.00%  $0.50          

      2.00%                         

Concrete Finishers        8.09%                         

General Foreman  $29.00  $6.15 $2.35 $1.09 $1.65 $1.16  $0.73 $0.50 $9.00 $51.62 $69.73 

Foreman  $26.00  $5.51 $2.10 $0.98 $1.65 $1.04  $0.65 $0.50 $7.50 $45.93 $62.17 

Journeyman ‐ Certified Plus (J‐C+) 

$23.00  $4.88 $1.86 $0.86 $1.65 $0.92  $0.58 $0.50 $7.50 $41.74 $56.11 

Journeyman ‐ Certified (J‐C)  $22.00  $4.66 $1.78 $0.83 $1.65 $0.88  $0.55 $0.50 $7.50 $40.35 $54.09 

Journeyman ‐ Uncertified (J‐UNC) 

$21.00  $4.45 $1.70 $0.79 $1.65 $0.84  $0.53 $0.50 $7.50 $38.95 $52.07 

Top Helper 1 (TP1)  $18.90  $4.01 $1.53 $0.71 $1.65 $0.76  $0.47 $0.50 $5.00 $33.52 $45.33 

Top Helper 2 (TP2)  $16.80  $3.56 $1.36 $0.63 $1.65 $0.67  $0.42 $0.50 $5.00 $30.59 $41.09 

Helper 1 (H1)  $15.75  $3.34 $1.27 $0.59 $1.65 $0.63  $0.39 $0.50 $5.00 $29.13 $38.97 

Helper 2 (H2)  $14.70  $3.12 $1.19 $0.55 $1.65 $0.59  $0.37 $0.50 $5.00 $27.66 $36.85 

Helper 3 (H3)  $13.65  $2.89 $1.10 $0.51 $1.65 $0.55  $0.34 $0.50 $0.00 $21.20 $29.73 

Helper 4 (H4)  $12.60  $2.67 $1.02 $0.47 $1.65 $0.50  $0.32 $0.50 $0.00 $19.73 $27.60 

Helper 5 (H5)  $11.55  $2.45 $0.93 $0.43 $1.65 $0.46  $0.29 $0.50 $0.00 $18.27 $25.48 

Helper 6 (H6)  $10.50  $2.23 $0.85 $0.39 $1.65 $0.42  $0.26 $0.50 $0.00 $16.80 $23.36 

Rod Busters        14.02%                         

General Foreman  $29.00  $6.15 $4.07 $1.09 $1.65 $1.16  $0.73 $0.50 $9.00 $53.34 $71.45 

Foreman  $26.00  $5.51 $3.65 $0.98 $1.65 $1.04  $0.65 $0.50 $7.50 $47.47 $63.72 

Journeyman ‐ Certified Plus (J‐C+) 

$23.00  $4.88 $3.22 $0.86 $1.65 $0.92  $0.58 $0.50 $7.50 $43.11 $57.48 

Journeyman ‐ Certified (J‐C)  $22.00  $4.66 $3.08 $0.83 $1.65 $0.88  $0.55 $0.50 $7.50 $41.65 $55.40 

Journeyman ‐ Uncertified (J‐ $21.00  $4.45 $2.94 $0.79 $1.65 $0.84  $0.53 $0.50 $7.50 $40.20 $53.32 

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    8 

 

 

 2013  Base Rate  PT&I 

Workers Comp.  (see notes) 

Fringes (vacation, insurance) 

Small Tools 

Consumables 

Safety Supplies 

NCCER Assessment 

Per Diem 

Total Straight Time  

Total Over Time 

Classification     21.20%     31.80%  $0.00  3.00%  2.00%  $0.50          

      2.00%                         

UNC) 

Top Helper 1 (TP1)  $18.90  $4.01 $2.65 $0.71 $1.65 $0.76  $0.47 $0.50 $5.00 $34.64 $46.45 

Top Helper 2 (TP2)  $16.80  $3.56 $2.36 $0.63 $1.65 $0.67  $0.42 $0.50 $5.00 $31.59 $42.08 

Helper 1 (H1)  $15.75  $3.34 $2.21 $0.59 $1.65 $0.63  $0.39 $0.50 $5.00 $30.06 $39.90 

Helper 2 (H2)  $14.70  $3.12 $2.06 $0.55 $1.65 $0.59  $0.37 $0.50 $5.00 $28.53 $37.72 

Helper 3 (H3)  $13.65  $2.89 $1.91 $0.51 $1.65 $0.55  $0.34 $0.50 $0.00 $22.01 $30.53 

Helper 4 (H4)  $12.60  $2.67 $1.77 $0.47 $1.65 $0.50  $0.32 $0.50 $0.00 $20.48 $28.35 

Helper 5 (H5)  $11.55  $2.45 $1.62 $0.43 $1.65 $0.46  $0.29 $0.50 $0.00 $18.95 $26.17 

Helper 6 (H6)  $10.50  $2.23 $1.47 $0.39 $1.65 $0.42  $0.26 $0.50 $0.00 $17.42 $23.98 

Scaffold Builders        8.09%                         

General Foreman  $28.00  $5.94 $2.27 $1.05 $1.65 $1.12  $0.70 $0.50 $9.00 $50.22 $67.71 

Foreman  $25.00  $5.30 $2.02 $0.94 $1.65 $1.00  $0.63 $0.50 $7.50 $44.54 $60.15 

Journeyman ‐ Certified Plus (J‐C+) 

$22.00  $4.66 $1.78 $0.83 $1.65 $0.88  $0.55 $0.50 $7.50 $40.35 $54.09 

Journeyman ‐ Certified (J‐C)  $21.00  $4.45 $1.70 $0.79 $1.65 $0.84  $0.53 $0.50 $7.50 $38.95 $52.07 

Journeyman ‐ Uncertified (J‐UNC) 

$20.00  $4.24 $1.62 $0.75 $1.65 $0.80  $0.50 $0.50 $7.50 $37.56 $50.05 

Top Helper 1 (TP1)  $18.00  $3.82 $1.46 $0.68 $1.65 $0.72  $0.45 $0.50 $5.00 $32.27 $43.51 

Top Helper 2 (TP2)  $16.00  $3.39 $1.29 $0.60 $1.65 $0.64  $0.40 $0.50 $5.00 $29.48 $39.47 

Helper 1 (H1)  $15.00  $3.18 $1.21 $0.56 $1.65 $0.60  $0.38 $0.50 $5.00 $28.08 $37.45 

Helper 2 (H2)  $14.00  $2.97 $1.13 $0.53 $1.65 $0.56  $0.35 $0.50 $5.00 $26.69 $35.43 

Helper 3 (H3)  $13.00  $2.76 $1.05 $0.49 $1.65 $0.52  $0.33 $0.50 $0.00 $20.29 $28.41 

Helper 4 (H4)  $12.00  $2.54 $0.97 $0.45 $1.65 $0.48  $0.30 $0.50 $0.00 $18.89 $26.39 

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    9 

 

 

 2013  Base Rate  PT&I 

Workers Comp.  (see notes) 

Fringes (vacation, insurance) 

Small Tools 

Consumables 

Safety Supplies 

NCCER Assessment 

Per Diem 

Total Straight Time  

Total Over Time 

Classification     21.20%     31.80%  $0.00  3.00%  2.00%  $0.50          

      2.00%                         

Helper 5 (H5)  $11.00  $2.33 $0.89 $0.41 $1.65 $0.44  $0.28 $0.50 $0.00 $17.50 $24.37 

Helper 6 (H6)  $10.00  $2.12 $0.81 $0.38 $1.65 $0.40  $0.25 $0.50 $0.00 $16.10 $22.35 

Material Handling / Receiving        14.02%                         

General Foreman  $32.00  $6.78 $4.49 $1.20 $1.65 $1.28  $0.80 $0.50 $9.00 $57.70 $77.69 

Foreman  $29.00  $6.15 $4.07 $1.09 $1.65 $1.16  $0.73 $0.50 $7.50 $51.84 $69.95 

Journeyman ‐ Certified Plus (J‐C+) 

$26.00  $5.51 $3.65 $0.98 $1.65 $1.04  $0.65 $0.50 $7.50 $47.47 $63.72 

Journeyman ‐ Certified (J‐C)  $25.00  $5.30 $3.51 $0.94 $1.65 $1.00  $0.63 $0.50 $7.50 $46.02 $61.64 

Journeyman ‐ Uncertified (J‐UNC) 

$24.00  $5.09 $3.36 $0.90 $1.65 $0.96  $0.60 $0.50 $7.50 $44.56 $59.56 

Top Helper 1 (TP1)  $21.60  $4.58 $3.03 $0.81 $1.65 $0.86  $0.54 $0.50 $5.00 $38.57 $52.07 

Top Helper 2 (TP2)  $19.20  $4.07 $2.69 $0.72 $1.65 $0.77  $0.48 $0.50 $5.00 $35.08 $47.08 

Helper 1 (H1)  $18.00  $3.82 $2.52 $0.68 $1.65 $0.72  $0.45 $0.50 $5.00 $33.33 $44.58 

Helper 2 (H2)  $16.80  $3.56 $2.36 $0.63 $1.65 $0.67  $0.42 $0.50 $5.00 $31.59 $42.08 

Helper 3 (H3)  $15.60  $3.31 $2.19 $0.59 $1.65 $0.62  $0.39 $0.50 $0.00 $24.84 $34.59 

Helper 4 (H4)  $14.40  $3.05 $2.02 $0.54 $1.65 $0.58  $0.36 $0.50 $0.00 $23.10 $32.09 

Helper 5 (H5)  $13.20  $2.80 $1.85 $0.50 $1.65 $0.53  $0.33 $0.50 $0.00 $21.35 $29.60 

Helper 6 (H6)  $12.00  $2.54 $1.68 $0.45 $1.65 $0.48  $0.30 $0.50 $0.00 $19.61 $27.10 

Surveyors        7.78%                         

Party Chief  $32.00  $6.78 $2.49 $1.20 $1.65 $1.28  $0.80 $0.50 $9.00 $55.70 $75.70 

Instrument Man  $29.00  $6.15 $2.26 $1.09 $1.65 $1.16  $0.73 $0.50 $7.50 $50.03 $68.14 

Chainman  $20.70  $4.39 $1.61 $0.78 $1.65 $0.83  $0.52 $0.50 $5.00 $35.97 $48.90 

Rodman  $14.95  $3.17 $1.16 $0.56 $1.65 $0.60  $0.37 $0.50 $5.00 $27.96 $37.30 

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    10 

 

 

 2013  Base Rate  PT&I 

Workers Comp.  (see notes) 

Fringes (vacation, insurance) 

Small Tools 

Consumables 

Safety Supplies 

NCCER Assessment 

Per Diem 

Total Straight Time  

Total Over Time 

Classification     21.20%     31.80%  $0.00  3.00%  2.00%  $0.50          

      2.00%                         

Laborers        8.09%                         

General Foreman  $26.00  $5.51 $2.10 $0.98 $1.65 $1.04  $0.65 $0.50 $9.00 $47.43 $63.67 

Foreman  $23.00  $4.88 $1.86 $0.86 $1.65 $0.92  $0.58 $0.50 $7.50 $41.74 $56.11 

Laborer 1  $15.00  $3.18 $1.21 $0.56 $1.65 $0.60  $0.38 $0.50 $0.00 $23.08 $32.45 

Laborer 2  $12.00  $2.54 $0.97 $0.45 $1.65 $0.48  $0.30 $0.50 $0.00 $18.89 $26.39 

Other        5.58%                         

Firewatch / Holewatch  $12.00  $2.54 $0.67 $0.45 $1.65 $0.48  $0.30 $0.50 $0.00 $18.59 $26.09 

PWHT Foreman  $29.00  $6.15 $1.62 $1.09 $1.65 $1.16  $0.73 $0.50 $7.50 $49.39 $67.51 

PWHT technician  $26.00  $5.51 $1.45 $0.98 $1.65 $1.04  $0.65 $0.50 $7.50 $45.28 $61.52 

PWHT helper  $18.00  $3.82 $1.00 $0.68 $1.65 $0.72  $0.45 $0.50 $5.00 $31.82 $43.06 

* Note: Rates valid until 6/2013 

Notes: 

 ‐ Labor rates are based on current representative rates being paid in the area.  ‐ Small tools and consumables are included per the attached lists.  ‐ Welding materials such as filler metal and gases are not included as consumables and will be billed as material.  ‐ Small tools and consumables are included per the attached lists.  ‐ Workers Compensation rates are valid until and subject to adjustment after 6/30/13  ‐ Labor rate mark‐up percentages are fixed and not subject to auditing. ‐ The overtime rate will be paid for all hours over 40 per week. 

 

 

   

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    11 

 

 

 2014  Base Rate  PT&I 

Workers Compensation (see notes) 

Fringes (vacation, insurance) 

Small Tools 

Consumables 

Safety Supplies 

NCCER Assessment 

Per Diem 

Total Straight Time  

Total Over Time 

Classification     21.20%     31.80%  $0.00  3.00%  2.00%  $0.50          

         2.00%                         

Project Director  $74.16  $15.72 $1.48 $23.58 $0.00 $0.00  $1.48 $0.50 $0.00 $116.93 $116.93 

Construction Manager  $67.98  $14.41 $1.36 $21.62 $0.00 $0.00  $1.36 $0.50 $0.00 $107.23 $107.23 

Site Project Manager   $65.92  $13.98 $1.32 $20.96 $0.00 $0.00  $1.32 $0.50 $7.00 $110.99 $110.99 

Project Superintendent   $57.68  $12.23 $1.15 $18.34 $0.00 $0.00  $1.15 $0.50 $7.00 $98.06 $98.06 

Area Superintendent  $51.50  $10.92 $1.03 $16.38 $0.00 $0.00  $1.03 $0.50 $6.00 $87.36 $87.36 

Craft Superintendent  $46.35  $9.83 $0.93 $14.74 $0.00 $0.00  $0.93 $0.50 $6.00 $79.27 $79.27 

Project Controls Supervisor  $51.50  $10.92 $1.03 $16.38 $0.00 $0.00  $1.03 $0.50 $6.00 $87.36 $87.36 

Project Planner  $44.29  $9.39 $0.89 $14.08 $0.00 $0.00  $0.89 $0.50 $6.00 $76.04 $76.04 

Project Scheduler  $37.08  $7.86 $0.74 $11.79 $0.00 $0.00  $0.74 $0.50 $6.00 $64.72 $64.72 

Project Engineer  $49.44  $10.48 $0.99 $15.72 $0.00 $0.00  $0.99 $0.50 $6.00 $84.12 $84.12 

Field Engineer I  $44.29  $9.39 $0.89 $14.08 $0.00 $0.00  $0.89 $0.50 $6.00 $76.04 $76.04 

Field Engineer II  $35.02  $7.42 $0.70 $11.14 $0.00 $0.00  $0.70 $0.50 $6.00 $61.48 $61.48 

Office Manager  $42.23  $8.95 $0.84 $13.43 $0.00 $0.00  $0.84 $0.50 $6.00 $72.80 $72.80 

Quality Control Manager  $52.53  $11.14 $1.05 $16.70 $0.00 $0.00  $1.05 $0.50 $6.00 $88.97 $88.97 

QC Inspector (Hourly)  $42.23  $8.95 $0.84 $13.43 $0.00 $1.27  $0.84 $0.50 $6.00 $74.07 $106.37 

Safety Manager  $46.35  $9.83 $0.93 $14.74 $0.00 $0.00  $0.93 $0.50 $6.00 $79.27 $79.27 

Safety Man (Hourly)  $28.84  $6.11 $0.58 $9.17 $1.65 $0.87  $0.58 $0.50 $6.00 $54.29 $76.36 

Procurement/ Material Manager  

$42.23  $8.95 $0.84 $13.43 $0.00 $0.00  $0.84 $0.50 $6.00 $72.80 $72.80 

Material Buyer   $30.90  $6.55 $0.62 $9.83 $0.00 $0.00  $0.62 $0.50 $6.00 $55.01 $55.01 

Document Control Coordinator  $20.60  $4.37 $0.41 $6.55 $0.00 $0.62  $0.41 $0.50 $6.00 $39.46 $55.22 

Timekeeper  $18.54  $3.93 $0.37 $5.90 $0.00 $0.56  $0.37 $0.50 $0.00 $30.16 $44.35 

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    12 

 

 

 2014  Base Rate  PT&I 

Workers Compensation (see notes) 

Fringes (vacation, insurance) 

Small Tools 

Consumables 

Safety Supplies 

NCCER Assessment 

Per Diem 

Total Straight Time  

Total Over Time 

Clerk  $16.48  $3.49 $0.33 $5.24 $0.00 $0.49  $0.33 $0.50 $0.00 $26.87 $39.48 

Secretary  $14.42  $3.06 $0.29 $4.59 $0.00 $0.43  $0.29 $0.50 $0.00 $23.57 $34.60 

Classification     21.20%     3.75%  $1.65  4.00%  2.50%  $0.50          

Boiler Makers        6.07%                         

General Foreman  $32.96  $6.99 $2.00 $1.24 $1.65 $1.32  $0.82 $0.50 $9.00 $56.48 $77.07 

Foreman  $29.87  $6.33 $1.81 $1.12 $1.65 $1.19  $0.75 $0.50 $7.50 $50.73 $69.39 

Journeyman ‐ Certified Plus (J‐C+) 

$26.78  $5.68 $1.63 $1.00 $1.65 $1.07  $0.67 $0.50 $7.50 $46.48 $63.21 

Journeyman ‐ Certified (J‐C)  $25.75  $5.46 $1.56 $0.97 $1.65 $1.03  $0.64 $0.50 $7.50 $45.06 $61.15 

Journeyman ‐ Uncertified (J‐UNC) 

$24.72  $5.24 $1.50 $0.93 $1.65 $0.99  $0.62 $0.50 $7.50 $43.64 $59.09 

Top Helper 1 (TP1)  $22.25  $4.72 $1.35 $0.83 $1.65 $0.89  $0.56 $0.50 $5.00 $37.75 $51.64 

Top Helper 2 (TP2)  $19.78  $4.19 $1.20 $0.74 $1.65 $0.79  $0.49 $0.50 $5.00 $34.35 $46.70 

Helper 1 (H1)  $18.54  $3.93 $1.13 $0.70 $1.65 $0.74  $0.46 $0.50 $5.00 $32.65 $44.23 

Helper 2 (H2)  $17.30  $3.67 $1.05 $0.65 $1.65 $0.69  $0.43 $0.50 $5.00 $30.95 $41.76 

Helper 3 (H3)  $16.07  $3.41 $0.98 $0.60 $1.65 $0.64  $0.40 $0.50 $0.00 $24.25 $34.29 

Helper 4 (H4)  $14.83  $3.14 $0.90 $0.56 $1.65 $0.59  $0.37 $0.50 $0.00 $22.55 $31.81 

Helper 5 (H5)  $13.60  $2.88 $0.83 $0.51 $1.65 $0.54  $0.34 $0.50 $0.00 $20.85 $29.34 

Helper 6 (H6)  $12.36  $2.62 $0.75 $0.46 $1.65 $0.49  $0.31 $0.50 $0.00 $19.15 $26.87 

Pipe Fitters        5.58%                         

General Foreman  $32.96  $6.99 $1.84 $1.24 $1.65 $1.32  $0.82 $0.50 $9.00 $56.32 $76.91 

Foreman  $29.87  $6.33 $1.67 $1.12 $1.65 $1.19  $0.75 $0.50 $7.50 $50.58 $69.24 

Journeyman ‐ Heavy Wall Welder 

$30.90  $6.55 $1.72 $1.16 $1.65 $1.24  $0.77 $0.50 $7.50 $51.99 $71.30 

Journeyman ‐ Comb. Welder  $27.81  $5.90 $1.55 $1.04 $1.65 $1.11  $0.70 $0.50 $7.50 $47.76 $65.13 

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    13 

 

 

 2014  Base Rate  PT&I 

Workers Compensation (see notes) 

Fringes (vacation, insurance) 

Small Tools 

Consumables 

Safety Supplies 

NCCER Assessment 

Per Diem 

Total Straight Time  

Total Over Time 

Journeyman ‐ Certified Plus (J‐C+) 

$26.78  $5.68 $1.49 $1.00 $1.65 $1.07  $0.67 $0.50 $7.50 $46.35 $63.08 

Journeyman ‐ Certified (J‐C)  $25.75  $5.46 $1.44 $0.97 $1.65 $1.03  $0.64 $0.50 $7.50 $44.94 $61.02 

Journeyman ‐ Uncertified (J‐UNC) 

$24.72  $5.24 $1.38 $0.93 $1.65 $0.99  $0.62 $0.50 $7.50 $43.52 $58.97 

Top Helper 1 (TP1)  $22.25  $4.72 $1.24 $0.83 $1.65 $0.89  $0.56 $0.50 $5.00 $37.64 $51.54 

Top Helper 2 (TP2)  $19.78  $4.19 $1.10 $0.74 $1.65 $0.79  $0.49 $0.50 $5.00 $34.25 $46.60 

Helper 1 (H1)  $18.54  $3.93 $1.03 $0.70 $1.65 $0.74  $0.46 $0.50 $5.00 $32.56 $44.14 

Helper 2 (H2)  $17.30  $3.67 $0.97 $0.65 $1.65 $0.69  $0.43 $0.50 $5.00 $30.86 $41.67 

Helper 3 (H3)  $16.07  $3.41 $0.90 $0.60 $1.65 $0.64  $0.40 $0.50 $0.00 $24.17 $34.21 

Helper 4 (H4)  $14.83  $3.14 $0.83 $0.56 $1.65 $0.59  $0.37 $0.50 $0.00 $22.47 $31.74 

Helper 5 (H5)  $13.60  $2.88 $0.76 $0.51 $1.65 $0.54  $0.34 $0.50 $0.00 $20.78 $29.27 

Helper 6 (H6)  $12.36  $2.62 $0.69 $0.46 $1.65 $0.49  $0.31 $0.50 $0.00 $19.09 $26.81 

Electricians        4.95%                         

General Foreman  $32.96  $6.99 $1.63 $1.24 $1.65 $1.32  $0.82 $0.50 $9.00 $56.11 $76.70 

Foreman  $29.87  $6.33 $1.48 $1.12 $1.65 $1.19  $0.75 $0.50 $7.50 $50.39 $69.05 

Instrument Technician  $36.05  $7.64 $1.78 $1.35 $1.65 $1.44  $0.90 $0.50 $7.50 $58.82 $81.34 

Journeyman ‐ Certified Plus (J‐C+) 

$26.78  $5.68 $1.33 $1.00 $1.65 $1.07  $0.67 $0.50 $7.50 $46.18 $62.91 

Journeyman ‐ Certified (J‐C)  $25.75  $5.46 $1.27 $0.97 $1.65 $1.03  $0.64 $0.50 $7.50 $44.77 $60.86 

Journeyman ‐ Uncertified (J‐UNC) 

$24.72  $5.24 $1.22 $0.93 $1.65 $0.99  $0.62 $0.50 $7.50 $43.37 $58.81 

Top Helper 1 (TP1)  $22.25  $4.72 $1.10 $0.83 $1.65 $0.89  $0.56 $0.50 $5.00 $37.50 $51.40 

Top Helper 2 (TP2)  $19.78  $4.19 $0.98 $0.74 $1.65 $0.79  $0.49 $0.50 $5.00 $34.12 $46.48 

Helper 1 (H1)  $18.54  $3.93 $0.92 $0.70 $1.65 $0.74  $0.46 $0.50 $5.00 $32.44 $44.02 

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    14 

 

 

 2014  Base Rate  PT&I 

Workers Compensation (see notes) 

Fringes (vacation, insurance) 

Small Tools 

Consumables 

Safety Supplies 

NCCER Assessment 

Per Diem 

Total Straight Time  

Total Over Time 

Helper 2 (H2)  $17.30  $3.67 $0.86 $0.65 $1.65 $0.69  $0.43 $0.50 $5.00 $30.75 $41.56 

Helper 3 (H3)  $16.07  $3.41 $0.80 $0.60 $1.65 $0.64  $0.40 $0.50 $0.00 $24.07 $34.11 

Helper 4 (H4)  $14.83  $3.14 $0.73 $0.56 $1.65 $0.59  $0.37 $0.50 $0.00 $22.38 $31.65 

Helper 5 (H5)  $13.60  $2.88 $0.67 $0.51 $1.65 $0.54  $0.34 $0.50 $0.00 $20.69 $29.19 

Helper 6 (H6)  $12.36  $2.62 $0.61 $0.46 $1.65 $0.49  $0.31 $0.50 $0.00 $19.01 $26.73 

Millwrights        7.78%                         

General Foreman  $32.96  $6.99 $2.56 $1.24 $1.65 $1.32  $0.82 $0.50 $9.00 $57.04 $77.63 

Foreman  $29.87  $6.33 $2.32 $1.12 $1.65 $1.19  $0.75 $0.50 $7.50 $51.24 $69.90 

Journeyman ‐ Certified Plus (J‐C+) 

$26.78  $5.68 $2.08 $1.00 $1.65 $1.07  $0.67 $0.50 $7.50 $46.94 $63.67 

Journeyman ‐ Certified (J‐C)  $25.75  $5.46 $2.00 $0.97 $1.65 $1.03  $0.64 $0.50 $7.50 $45.50 $61.59 

Journeyman ‐ Uncertified (J‐UNC) 

$24.72  $5.24 $1.92 $0.93 $1.65 $0.99  $0.62 $0.50 $7.50 $44.07 $59.51 

Top Helper 1 (TP1)  $22.25  $4.72 $1.73 $0.83 $1.65 $0.89  $0.56 $0.50 $5.00 $38.13 $52.03 

Top Helper 2 (TP2)  $19.78  $4.19 $1.54 $0.74 $1.65 $0.79  $0.49 $0.50 $5.00 $34.68 $47.04 

Helper 1 (H1)  $18.54  $3.93 $1.44 $0.70 $1.65 $0.74  $0.46 $0.50 $5.00 $32.96 $44.55 

Helper 2 (H2)  $17.30  $3.67 $1.35 $0.65 $1.65 $0.69  $0.43 $0.50 $5.00 $31.24 $42.05 

Helper 3 (H3)  $16.07  $3.41 $1.25 $0.60 $1.65 $0.64  $0.40 $0.50 $0.00 $24.52 $34.56 

Helper 4 (H4)  $14.83  $3.14 $1.15 $0.56 $1.65 $0.59  $0.37 $0.50 $0.00 $22.80 $32.07 

Helper 5 (H5)  $13.60  $2.88 $1.06 $0.51 $1.65 $0.54  $0.34 $0.50 $0.00 $21.08 $29.57 

Helper 6 (H6)  $12.36  $2.62 $0.96 $0.46 $1.65 $0.49  $0.31 $0.50 $0.00 $19.36 $27.08 

Iron Workers        14.02%                         

General Foreman  $32.96  $6.99 $4.62 $1.24 $1.65 $1.32  $0.82 $0.50 $9.00 $59.10 $79.69 

Foreman  $29.87  $6.33 $4.19 $1.12 $1.65 $1.19  $0.75 $0.50 $7.50 $53.10 $71.76 

Journeyman ‐ Certified Plus  $26.78  $5.68 $3.75 $1.00 $1.65 $1.07  $0.67 $0.50 $7.50 $48.61 $65.34 

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    15 

 

 

 2014  Base Rate  PT&I 

Workers Compensation (see notes) 

Fringes (vacation, insurance) 

Small Tools 

Consumables 

Safety Supplies 

NCCER Assessment 

Per Diem 

Total Straight Time  

Total Over Time 

(J‐C+) 

Journeyman ‐ Certified (J‐C)  $25.75  $5.46 $3.61 $0.97 $1.65 $1.03  $0.64 $0.50 $7.50 $47.11 $63.20 

Journeyman ‐ Uncertified (J‐UNC) 

$24.72  $5.24 $3.47 $0.93 $1.65 $0.99  $0.62 $0.50 $7.50 $45.61 $61.05 

Top Helper 1 (TP1)  $22.25  $4.72 $3.12 $0.83 $1.65 $0.89  $0.56 $0.50 $5.00 $39.51 $53.41 

Top Helper 2 (TP2)  $19.78  $4.19 $2.77 $0.74 $1.65 $0.79  $0.49 $0.50 $5.00 $35.92 $48.27 

Helper 1 (H1)  $18.54  $3.93 $2.60 $0.70 $1.65 $0.74  $0.46 $0.50 $5.00 $34.12 $45.70 

Helper 2 (H2)  $17.30  $3.67 $2.43 $0.65 $1.65 $0.69  $0.43 $0.50 $5.00 $32.32 $43.13 

Helper 3 (H3)  $16.07  $3.41 $2.25 $0.60 $1.65 $0.64  $0.40 $0.50 $0.00 $25.52 $35.56 

Helper 4 (H4)  $14.83  $3.14 $2.08 $0.56 $1.65 $0.59  $0.37 $0.50 $0.00 $23.73 $32.99 

Helper 5 (H5)  $13.60  $2.88 $1.91 $0.51 $1.65 $0.54  $0.34 $0.50 $0.00 $21.93 $30.42 

Helper 6 (H6)  $12.36  $2.62 $1.73 $0.46 $1.65 $0.49  $0.31 $0.50 $0.00 $20.13 $27.85 

Operators        7.78%                         

General Foreman  $32.96  $6.99 $2.56 $1.24 $1.65 $1.32  $0.82 $0.50 $9.00 $57.04 $77.63 

Foreman  $29.87  $6.33 $2.32 $1.12 $1.65 $1.19  $0.75 $0.50 $7.50 $51.24 $69.90 

Tower Crane Operator  $28.84  $6.11 $2.24 $1.08 $1.65 $1.15  $0.72 $0.50 $7.50 $49.80 $67.82 

Operator 3 (Lattice Boom)  $27.81  $5.90 $2.16 $1.04 $1.65 $1.11  $0.70 $0.50 $7.50 $48.37 $65.74 

Operator 2 (RT, excavator, CDL driver) 

$26.78  $5.68 $2.08 $1.00 $1.65 $1.07  $0.67 $0.50 $7.50 $46.94 $63.67 

Operator 1 (forklift, backhoe, bobcat) 

$25.75  $5.46 $2.00 $0.97 $1.65 $1.03  $0.64 $0.50 $7.50 $45.50 $61.59 

Mechanic  $26.78  $5.68 $2.08 $1.00 $1.65 $1.07  $0.67 $0.50 $7.50 $46.94 $63.67 

Carpenters        8.09%                         

General Foreman  $29.87  $6.33 $2.42 $1.12 $1.65 $1.19  $0.75 $0.50 $9.00 $52.83 $71.49 

Foreman  $26.78  $5.68 $2.17 $1.00 $1.65 $1.07  $0.67 $0.50 $7.50 $47.02 $63.75 

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    16 

 

 

 2014  Base Rate  PT&I 

Workers Compensation (see notes) 

Fringes (vacation, insurance) 

Small Tools 

Consumables 

Safety Supplies 

NCCER Assessment 

Per Diem 

Total Straight Time  

Total Over Time 

Journeyman ‐ Certified Plus (J‐C+) 

$23.69  $5.02 $1.92 $0.89 $1.65 $0.95  $0.59 $0.50 $7.50 $42.71 $57.51 

Journeyman ‐ Certified (J‐C)  $22.66  $4.80 $1.83 $0.85 $1.65 $0.91  $0.57 $0.50 $7.50 $41.27 $55.43 

Journeyman ‐ Uncertified (J‐UNC) 

$21.63  $4.59 $1.75 $0.81 $1.65 $0.87  $0.54 $0.50 $7.50 $39.83 $53.35 

Top Helper 1 (TP1)  $19.47  $4.13 $1.57 $0.73 $1.65 $0.78  $0.49 $0.50 $5.00 $34.31 $46.48 

Top Helper 2 (TP2)  $17.30  $3.67 $1.40 $0.65 $1.65 $0.69  $0.43 $0.50 $5.00 $31.30 $42.11 

Helper 1 (H1)  $16.22  $3.44 $1.31 $0.61 $1.65 $0.65  $0.41 $0.50 $5.00 $29.79 $39.92 

Helper 2 (H2)  $15.14  $3.21 $1.22 $0.57 $1.65 $0.61  $0.38 $0.50 $5.00 $28.28 $37.74 

Helper 3 (H3)  $14.06  $2.98 $1.14 $0.53 $1.65 $0.56  $0.35 $0.50 $0.00 $21.77 $30.55 

Helper 4 (H4)  $12.98  $2.75 $1.05 $0.49 $1.65 $0.52  $0.32 $0.50 $0.00 $20.26 $28.37 

Helper 5 (H5)  $11.90  $2.52 $0.96 $0.45 $1.65 $0.48  $0.30 $0.50 $0.00 $18.75 $26.18 

Helper 6 (H6)  $10.82  $2.29 $0.87 $0.41 $1.65 $0.43  $0.27 $0.50 $0.00 $17.24 $24.00 

Concrete Finishers        8.09%                         

General Foreman  $29.87  $6.33 $2.42 $1.12 $1.65 $1.19  $0.75 $0.50 $9.00 $52.83 $71.49 

Foreman  $26.78  $5.68 $2.17 $1.00 $1.65 $1.07  $0.67 $0.50 $7.50 $47.02 $63.75 

Journeyman ‐ Certified Plus (J‐C+) 

$23.69  $5.02 $1.92 $0.89 $1.65 $0.95  $0.59 $0.50 $7.50 $42.71 $57.51 

Journeyman ‐ Certified (J‐C)  $22.66  $4.80 $1.83 $0.85 $1.65 $0.91  $0.57 $0.50 $7.50 $41.27 $55.43 

Journeyman ‐ Uncertified (J‐UNC) 

$21.63  $4.59 $1.75 $0.81 $1.65 $0.87  $0.54 $0.50 $7.50 $39.83 $53.35 

Top Helper 1 (TP1)  $19.47  $4.13 $1.57 $0.73 $1.65 $0.78  $0.49 $0.50 $5.00 $34.31 $46.48 

Top Helper 2 (TP2)  $17.30  $3.67 $1.40 $0.65 $1.65 $0.69  $0.43 $0.50 $5.00 $31.30 $42.11 

Helper 1 (H1)  $16.22  $3.44 $1.31 $0.61 $1.65 $0.65  $0.41 $0.50 $5.00 $29.79 $39.92 

Helper 2 (H2)  $15.14  $3.21 $1.22 $0.57 $1.65 $0.61  $0.38 $0.50 $5.00 $28.28 $37.74 

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    17 

 

 

 2014  Base Rate  PT&I 

Workers Compensation (see notes) 

Fringes (vacation, insurance) 

Small Tools 

Consumables 

Safety Supplies 

NCCER Assessment 

Per Diem 

Total Straight Time  

Total Over Time 

Helper 3 (H3)  $14.06  $2.98 $1.14 $0.53 $1.65 $0.56  $0.35 $0.50 $0.00 $21.77 $30.55 

Helper 4 (H4)  $12.98  $2.75 $1.05 $0.49 $1.65 $0.52  $0.32 $0.50 $0.00 $20.26 $28.37 

Helper 5 (H5)  $11.90  $2.52 $0.96 $0.45 $1.65 $0.48  $0.30 $0.50 $0.00 $18.75 $26.18 

Helper 6 (H6)  $10.82  $2.29 $0.87 $0.41 $1.65 $0.43  $0.27 $0.50 $0.00 $17.24 $24.00 

Rod Busters        14.02%                         

General Foreman  $29.87  $6.33 $4.19 $1.12 $1.65 $1.19  $0.75 $0.50 $9.00 $54.60 $73.26 

Foreman  $26.78  $5.68 $3.75 $1.00 $1.65 $1.07  $0.67 $0.50 $7.50 $48.61 $65.34 

Journeyman ‐ Certified Plus (J‐C+) 

$23.69  $5.02 $3.32 $0.89 $1.65 $0.95  $0.59 $0.50 $7.50 $44.11 $58.91 

Journeyman ‐ Certified (J‐C)  $22.66  $4.80 $3.18 $0.85 $1.65 $0.91  $0.57 $0.50 $7.50 $42.61 $56.77 

Journeyman ‐ Uncertified (J‐UNC) 

$21.63  $4.59 $3.03 $0.81 $1.65 $0.87  $0.54 $0.50 $7.50 $41.12 $54.63 

Top Helper 1 (TP1)  $19.47  $4.13 $2.73 $0.73 $1.65 $0.78  $0.49 $0.50 $5.00 $35.47 $47.63 

Top Helper 2 (TP2)  $17.30  $3.67 $2.43 $0.65 $1.65 $0.69  $0.43 $0.50 $5.00 $32.32 $43.13 

Helper 1 (H1)  $16.22  $3.44 $2.27 $0.61 $1.65 $0.65  $0.41 $0.50 $5.00 $30.75 $40.88 

Helper 2 (H2)  $15.14  $3.21 $2.12 $0.57 $1.65 $0.61  $0.38 $0.50 $5.00 $29.18 $38.63 

Helper 3 (H3)  $14.06  $2.98 $1.97 $0.53 $1.65 $0.56  $0.35 $0.50 $0.00 $22.60 $31.39 

Helper 4 (H4)  $12.98  $2.75 $1.82 $0.49 $1.65 $0.52  $0.32 $0.50 $0.00 $21.03 $29.14 

Helper 5 (H5)  $11.90  $2.52 $1.67 $0.45 $1.65 $0.48  $0.30 $0.50 $0.00 $19.46 $26.89 

Helper 6 (H6)  $10.82  $2.29 $1.52 $0.41 $1.65 $0.43  $0.27 $0.50 $0.00 $17.88 $24.64 

Scaffold Builders        8.09%                         

General Foreman  $28.84  $6.11 $2.33 $1.08 $1.65 $1.15  $0.72 $0.50 $9.00 $51.39 $69.41 

Foreman  $25.75  $5.46 $2.08 $0.97 $1.65 $1.03  $0.64 $0.50 $7.50 $45.58 $61.67 

Journeyman ‐ Certified Plus (J‐C+) 

$22.66  $4.80 $1.83 $0.85 $1.65 $0.91  $0.57 $0.50 $7.50 $41.27 $55.43 

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    18 

 

 

 2014  Base Rate  PT&I 

Workers Compensation (see notes) 

Fringes (vacation, insurance) 

Small Tools 

Consumables 

Safety Supplies 

NCCER Assessment 

Per Diem 

Total Straight Time  

Total Over Time 

Journeyman ‐ Certified (J‐C)  $21.63  $4.59 $1.75 $0.81 $1.65 $0.87  $0.54 $0.50 $7.50 $39.83 $53.35 

Journeyman ‐ Uncertified (J‐UNC) 

$20.60  $4.37 $1.67 $0.77 $1.65 $0.82  $0.52 $0.50 $7.50 $38.40 $51.27 

Top Helper 1 (TP1)  $18.54  $3.93 $1.50 $0.70 $1.65 $0.74  $0.46 $0.50 $5.00 $33.02 $44.60 

Top Helper 2 (TP2)  $16.48  $3.49 $1.33 $0.62 $1.65 $0.66  $0.41 $0.50 $5.00 $30.15 $40.44 

Helper 1 (H1)  $15.45  $3.28 $1.25 $0.58 $1.65 $0.62  $0.39 $0.50 $5.00 $28.71 $38.36 

Helper 2 (H2)  $14.42  $3.06 $1.17 $0.54 $1.65 $0.58  $0.36 $0.50 $5.00 $27.27 $36.28 

Helper 3 (H3)  $13.39  $2.84 $1.08 $0.50 $1.65 $0.54  $0.33 $0.50 $0.00 $20.83 $29.20 

Helper 4 (H4)  $12.36  $2.62 $1.00 $0.46 $1.65 $0.49  $0.31 $0.50 $0.00 $19.40 $27.12 

Helper 5 (H5)  $11.33  $2.40 $0.92 $0.42 $1.65 $0.45  $0.28 $0.50 $0.00 $17.96 $25.04 

Helper 6 (H6)  $10.30  $2.18 $0.83 $0.39 $1.65 $0.41  $0.26 $0.50 $0.00 $16.52 $22.96 

Material Handling / Receiving        14.02%                         

General Foreman  $32.96  $6.99 $4.62 $1.24 $1.65 $1.32  $0.82 $0.50 $9.00 $59.10 $79.69 

Foreman  $29.87  $6.33 $4.19 $1.12 $1.65 $1.19  $0.75 $0.50 $7.50 $53.10 $71.76 

Journeyman ‐ Certified Plus (J‐C+) 

$26.78  $5.68 $3.75 $1.00 $1.65 $1.07  $0.67 $0.50 $7.50 $48.61 $65.34 

Journeyman ‐ Certified (J‐C)  $25.75  $5.46 $3.61 $0.97 $1.65 $1.03  $0.64 $0.50 $7.50 $47.11 $63.20 

Journeyman ‐ Uncertified (J‐UNC) 

$24.72  $5.24 $3.47 $0.93 $1.65 $0.99  $0.62 $0.50 $7.50 $45.61 $61.05 

Top Helper 1 (TP1)  $22.25  $4.72 $3.12 $0.83 $1.65 $0.89  $0.56 $0.50 $5.00 $39.51 $53.41 

Top Helper 2 (TP2)  $19.78  $4.19 $2.77 $0.74 $1.65 $0.79  $0.49 $0.50 $5.00 $35.92 $48.27 

Helper 1 (H1)  $18.54  $3.93 $2.60 $0.70 $1.65 $0.74  $0.46 $0.50 $5.00 $34.12 $45.70 

Helper 2 (H2)  $17.30  $3.67 $2.43 $0.65 $1.65 $0.69  $0.43 $0.50 $5.00 $32.32 $43.13 

Helper 3 (H3)  $16.07  $3.41 $2.25 $0.60 $1.65 $0.64  $0.40 $0.50 $0.00 $25.52 $35.56 

Helper 4 (H4)  $14.83  $3.14 $2.08 $0.56 $1.65 $0.59  $0.37 $0.50 $0.00 $23.73 $32.99 

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    19 

 

 

 2014  Base Rate  PT&I 

Workers Compensation (see notes) 

Fringes (vacation, insurance) 

Small Tools 

Consumables 

Safety Supplies 

NCCER Assessment 

Per Diem 

Total Straight Time  

Total Over Time 

Helper 5 (H5)  $13.60  $2.88 $1.91 $0.51 $1.65 $0.54  $0.34 $0.50 $0.00 $21.93 $30.42 

Helper 6 (H6)  $12.36  $2.62 $1.73 $0.46 $1.65 $0.49  $0.31 $0.50 $0.00 $20.13 $27.85 

Surveyors        7.78%                         

Party Chief  $32.96  $6.99 $2.56 $1.24 $1.65 $1.32  $0.82 $0.50 $9.00 $57.04 $77.63 

Instrument Man  $29.87  $6.33 $2.32 $1.12 $1.65 $1.19  $0.75 $0.50 $7.50 $51.24 $69.90 

Chainman  $21.32  $4.52 $1.66 $0.80 $1.65 $0.85  $0.53 $0.50 $5.00 $36.84 $50.16 

Rodman  $15.40  $3.26 $1.20 $0.58 $1.65 $0.62  $0.38 $0.50 $5.00 $28.59 $38.21 

Laborers        8.09%                         

General Foreman  $26.78  $5.68 $2.17 $1.00 $1.65 $1.07  $0.67 $0.50 $9.00 $48.52 $65.25 

Foreman  $23.69  $5.02 $1.92 $0.89 $1.65 $0.95  $0.59 $0.50 $7.50 $42.71 $57.51 

Laborer 1  $15.45  $3.28 $1.25 $0.58 $1.65 $0.62  $0.39 $0.50 $0.00 $23.71 $33.36 

Laborer 2  $12.36  $2.62 $1.00 $0.46 $1.65 $0.49  $0.31 $0.50 $0.00 $19.40 $27.12 

Other        5.58%                         

Firewatch / Holewatch  $12.36  $2.62 $0.69 $0.46 $1.65 $0.49  $0.31 $0.50 $0.00 $19.09 $26.81 

PWHT Foreman  $29.87  $6.33 $1.67 $1.12 $1.65 $1.19  $0.75 $0.50 $7.50 $50.58 $69.24 

PWHT technician  $26.78  $5.68 $1.49 $1.00 $1.65 $1.07  $0.67 $0.50 $7.50 $46.35 $63.08 

PWHT helper  $18.54  $3.93 $1.03 $0.70 $1.65 $0.74  $0.46 $0.50 $5.00 $32.56 $44.14 

* Note: Rates valid until 6/2014 

Notes:   ‐ Labor rates are based on current representative rates being paid in the area. ‐ Small tools and consumables are included per the attached lists.  ‐ Welding materials such as filler metal and gases are not included as consumables and will be billed as material.  ‐ Small tools and consumables are included per the attached lists.  ‐ Workers Compensation rates are valid until and subject to adjustment after 6/30/13  ‐ Labor rate mark‐up percentages are fixed and not subject to auditing.  ‐ The overtime rate will be paid for all hours over 40 per week.    

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    20 

 

 

 2015  Base Rate  PT&I 

Workers Compensation (see notes) 

Fringes (vacation, insurance) 

Small Tools 

Consumables 

Safety Supplies 

NCCER Assessment 

Per Diem 

Total Straight Time  

Total Over Time 

Classification     21.20%     31.80%  $0.00  3.00%  2.00%  $0.50          

      2.00%                         

Project Director  $76.38  $16.19 $1.53 $24.29 $0.00 $0.00  $1.53 $0.50 $0.00 $120.42 $120.42 

Construction Manager  $70.02  $14.84 $1.40 $22.27 $0.00 $0.00  $1.40 $0.50 $0.00 $110.43 $110.43 

Site Project Manager   $67.90  $14.39 $1.36 $21.59 $0.00 $0.00  $1.36 $0.50 $7.00 $114.10 $114.10 

Project Superintendent   $59.41  $12.60 $1.19 $18.89 $0.00 $0.00  $1.19 $0.50 $7.00 $100.77 $100.77 

Area Superintendent  $53.05  $11.25 $1.06 $16.87 $0.00 $0.00  $1.06 $0.50 $6.00 $89.78 $89.78 

Craft Superintendent  $47.74  $10.12 $0.95 $15.18 $0.00 $0.00  $0.95 $0.50 $6.00 $81.45 $81.45 

Project Controls Supervisor  $53.05  $11.25 $1.06 $16.87 $0.00 $0.00  $1.06 $0.50 $6.00 $89.78 $89.78 

Project Planner  $45.62  $9.67 $0.91 $14.51 $0.00 $0.00  $0.91 $0.50 $6.00 $78.12 $78.12 

Project Scheduler  $38.19  $8.10 $0.76 $12.15 $0.00 $0.00  $0.76 $0.50 $6.00 $66.46 $66.46 

Project Engineer  $50.92  $10.80 $1.02 $16.19 $0.00 $0.00  $1.02 $0.50 $6.00 $86.45 $86.45 

Field Engineer I  $45.62  $9.67 $0.91 $14.51 $0.00 $0.00  $0.91 $0.50 $6.00 $78.12 $78.12 

Field Engineer II  $36.07  $7.65 $0.72 $11.47 $0.00 $0.00  $0.72 $0.50 $6.00 $63.13 $63.13 

Office Manager  $43.50  $9.22 $0.87 $13.83 $0.00 $0.00  $0.87 $0.50 $6.00 $74.79 $74.79 

Quality Control Manager  $54.11  $11.47 $1.08 $17.21 $0.00 $0.00  $1.08 $0.50 $6.00 $91.45 $91.45 

QC Inspector (Hourly)  $43.50  $9.22 $0.87 $13.83 $0.00 $1.30  $0.87 $0.50 $6.00 $76.10 $109.37 

Safety Manager  $47.74  $10.12 $0.95 $15.18 $0.00 $0.00  $0.95 $0.50 $6.00 $81.45 $81.45 

Safety Man (Hourly)  $29.71  $6.30 $0.59 $9.45 $1.65 $0.89  $0.59 $0.50 $6.00 $55.68 $78.40 

Procurement/ Material Manager  

$43.50  $9.22 $0.87 $13.83 $0.00 $0.00  $0.87 $0.50 $6.00 $74.79 $74.79 

Material Buyer   $31.83  $6.75 $0.64 $10.12 $0.00 $0.00  $0.64 $0.50 $6.00 $56.47 $56.47 

Document Control Coordinator  $21.22  $4.50 $0.42 $6.75 $0.00 $0.64  $0.42 $0.50 $6.00 $40.45 $56.68 

Timekeeper  $19.10  $4.05 $0.38 $6.07 $0.00 $0.57  $0.38 $0.50 $0.00 $31.05 $45.66 

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    21 

 

 

 2015  Base Rate  PT&I 

Workers Compensation (see notes) 

Fringes (vacation, insurance) 

Small Tools 

Consumables 

Safety Supplies 

NCCER Assessment 

Per Diem 

Total Straight Time  

Total Over Time 

Classification     21.20%     31.80%  $0.00  3.00%  2.00%  $0.50          

Clerk  $16.97  $3.60 $0.34 $5.40 $0.00 $0.51  $0.34 $0.50 $0.00 $27.66 $40.64 

Secretary  $14.85  $3.15 $0.30 $4.72 $0.00 $0.45  $0.30 $0.50 $0.00 $24.26 $35.63 

Classification     21.20%     3.75%  $1.65  4.00%  2.50%  $0.50          

Boiler Makers        6.07%                         

General Foreman  $33.95  $7.20 $2.06 $1.27 $1.65 $1.36  $0.85 $0.50 $9.00 $57.84 $79.05 

Foreman  $30.77  $6.52 $1.87 $1.15 $1.65 $1.23  $0.77 $0.50 $7.50 $51.96 $71.18 

Journeyman ‐ Certified Plus (J‐C+) 

$27.58  $5.85 $1.67 $1.03 $1.65 $1.10  $0.69 $0.50 $7.50 $47.58 $64.82 

Journeyman ‐ Certified (J‐C)  $26.52  $5.62 $1.61 $0.99 $1.65 $1.06  $0.66 $0.50 $7.50 $46.12 $62.69 

Journeyman ‐ Uncertified (J‐UNC) 

$25.46  $5.40 $1.55 $0.95 $1.65 $1.02  $0.64 $0.50 $7.50 $44.66 $60.57 

Top Helper 1 (TP1)  $22.92  $4.86 $1.39 $0.86 $1.65 $0.92  $0.57 $0.50 $5.00 $38.66 $52.98 

Top Helper 2 (TP2)  $20.37  $4.32 $1.24 $0.76 $1.65 $0.81  $0.51 $0.50 $5.00 $35.16 $47.89 

Helper 1 (H1)  $19.10  $4.05 $1.16 $0.72 $1.65 $0.76  $0.48 $0.50 $5.00 $33.41 $45.34 

Helper 2 (H2)  $17.82  $3.78 $1.08 $0.67 $1.65 $0.71  $0.45 $0.50 $5.00 $31.66 $42.80 

Helper 3 (H3)  $16.55  $3.51 $1.00 $0.62 $1.65 $0.66  $0.41 $0.50 $0.00 $24.91 $35.25 

Helper 4 (H4)  $15.28  $3.24 $0.93 $0.57 $1.65 $0.61  $0.38 $0.50 $0.00 $23.16 $32.70 

Helper 5 (H5)  $14.00  $2.97 $0.85 $0.53 $1.65 $0.56  $0.35 $0.50 $0.00 $21.41 $30.16 

Helper 6 (H6)  $12.73  $2.70 $0.77 $0.48 $1.65 $0.51  $0.32 $0.50 $0.00 $19.66 $27.61 

Pipe Fitters        5.58%                         

General Foreman  $33.95  $7.20 $1.89 $1.27 $1.65 $1.36  $0.85 $0.50 $9.00 $57.67 $78.88 

Foreman  $30.77  $6.52 $1.72 $1.15 $1.65 $1.23  $0.77 $0.50 $7.50 $51.81 $71.03 

Journeyman ‐ Heavy Wall Welder 

$31.83  $6.75 $1.78 $1.19 $1.65 $1.27  $0.80 $0.50 $7.50 $53.26 $73.15 

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    22 

 

 

 2015  Base Rate  PT&I 

Workers Compensation (see notes) 

Fringes (vacation, insurance) 

Small Tools 

Consumables 

Safety Supplies 

NCCER Assessment 

Per Diem 

Total Straight Time  

Total Over Time 

Classification     21.20%     31.80%  $0.00  3.00%  2.00%  $0.50          

Journeyman ‐ Comb. Welder  $28.64  $6.07 $1.60 $1.07 $1.65 $1.15  $0.72 $0.50 $7.50 $48.90 $66.80 

Journeyman ‐ Certified Plus (J‐C+) 

$27.58  $5.85 $1.54 $1.03 $1.65 $1.10  $0.69 $0.50 $7.50 $47.45 $64.68 

Journeyman ‐ Certified (J‐C)  $26.52  $5.62 $1.48 $0.99 $1.65 $1.06  $0.66 $0.50 $7.50 $45.99 $62.56 

Journeyman ‐ Uncertified (J‐UNC) 

$25.46  $5.40 $1.42 $0.95 $1.65 $1.02  $0.64 $0.50 $7.50 $44.54 $60.45 

Top Helper 1 (TP1)  $22.92  $4.86 $1.28 $0.86 $1.65 $0.92  $0.57 $0.50 $5.00 $38.55 $52.87 

Top Helper 2 (TP2)  $20.37  $4.32 $1.14 $0.76 $1.65 $0.81  $0.51 $0.50 $5.00 $35.06 $47.79 

Helper 1 (H1)  $19.10  $4.05 $1.07 $0.72 $1.65 $0.76  $0.48 $0.50 $5.00 $33.32 $45.25 

Helper 2 (H2)  $17.82  $3.78 $0.99 $0.67 $1.65 $0.71  $0.45 $0.50 $5.00 $31.57 $42.71 

Helper 3 (H3)  $16.55  $3.51 $0.92 $0.62 $1.65 $0.66  $0.41 $0.50 $0.00 $24.83 $35.17 

Helper 4 (H4)  $15.28  $3.24 $0.85 $0.57 $1.65 $0.61  $0.38 $0.50 $0.00 $23.08 $32.63 

Helper 5 (H5)  $14.00  $2.97 $0.78 $0.53 $1.65 $0.56  $0.35 $0.50 $0.00 $21.34 $30.09 

Helper 6 (H6)  $12.73  $2.70 $0.71 $0.48 $1.65 $0.51  $0.32 $0.50 $0.00 $19.60 $27.55 

Electricians        4.95%                         

General Foreman  $33.95  $7.20 $1.68 $1.27 $1.65 $1.36  $0.85 $0.50 $9.00 $57.46 $78.67 

Foreman  $30.77  $6.52 $1.52 $1.15 $1.65 $1.23  $0.77 $0.50 $7.50 $51.61 $70.84 

Instrument Technician  $37.13  $7.87 $1.84 $1.39 $1.65 $1.49  $0.93 $0.50 $7.50 $60.30 $83.50 

Journeyman ‐ Certified Plus (J‐C+) 

$27.58  $5.85 $1.37 $1.03 $1.65 $1.10  $0.69 $0.50 $7.50 $47.27 $64.51 

Journeyman ‐ Certified (J‐C)  $26.52  $5.62 $1.31 $0.99 $1.65 $1.06  $0.66 $0.50 $7.50 $45.83 $62.40 

Journeyman ‐ Uncertified (J‐UNC) 

$25.46  $5.40 $1.26 $0.95 $1.65 $1.02  $0.64 $0.50 $7.50 $44.38 $60.29 

Top Helper 1 (TP1)  $22.92  $4.86 $1.13 $0.86 $1.65 $0.92  $0.57 $0.50 $5.00 $38.41 $52.72 

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    23 

 

 

 2015  Base Rate  PT&I 

Workers Compensation (see notes) 

Fringes (vacation, insurance) 

Small Tools 

Consumables 

Safety Supplies 

NCCER Assessment 

Per Diem 

Total Straight Time  

Total Over Time 

Classification     21.20%     31.80%  $0.00  3.00%  2.00%  $0.50          

Top Helper 2 (TP2)  $20.37  $4.32 $1.01 $0.76 $1.65 $0.81  $0.51 $0.50 $5.00 $34.93 $47.66 

Helper 1 (H1)  $19.10  $4.05 $0.95 $0.72 $1.65 $0.76  $0.48 $0.50 $5.00 $33.20 $45.13 

Helper 2 (H2)  $17.82  $3.78 $0.88 $0.67 $1.65 $0.71  $0.45 $0.50 $5.00 $31.46 $42.60 

Helper 3 (H3)  $16.55  $3.51 $0.82 $0.62 $1.65 $0.66  $0.41 $0.50 $0.00 $24.72 $35.06 

Helper 4 (H4)  $15.28  $3.24 $0.76 $0.57 $1.65 $0.61  $0.38 $0.50 $0.00 $22.99 $32.53 

Helper 5 (H5)  $14.00  $2.97 $0.69 $0.53 $1.65 $0.56  $0.35 $0.50 $0.00 $21.25 $30.00 

Helper 6 (H6)  $12.73  $2.70 $0.63 $0.48 $1.65 $0.51  $0.32 $0.50 $0.00 $19.51 $27.47 

Millwrights        7.78%                         

General Foreman  $33.95  $7.20 $2.64 $1.27 $1.65 $1.36  $0.85 $0.50 $9.00 $58.42 $79.63 

Foreman  $30.77  $6.52 $2.39 $1.15 $1.65 $1.23  $0.77 $0.50 $7.50 $52.49 $71.71 

Journeyman ‐ Certified Plus (J‐C+) 

$27.58  $5.85 $2.15 $1.03 $1.65 $1.10  $0.69 $0.50 $7.50 $48.05 $65.29 

Journeyman ‐ Certified (J‐C)  $26.52  $5.62 $2.06 $0.99 $1.65 $1.06  $0.66 $0.50 $7.50 $46.58 $63.15 

Journeyman ‐ Uncertified (J‐UNC) 

$25.46  $5.40 $1.98 $0.95 $1.65 $1.02  $0.64 $0.50 $7.50 $45.10 $61.01 

Top Helper 1 (TP1)  $22.92  $4.86 $1.78 $0.86 $1.65 $0.92  $0.57 $0.50 $5.00 $39.06 $53.37 

Top Helper 2 (TP2)  $20.37  $4.32 $1.58 $0.76 $1.65 $0.81  $0.51 $0.50 $5.00 $35.51 $48.24 

Helper 1 (H1)  $19.10  $4.05 $1.49 $0.72 $1.65 $0.76  $0.48 $0.50 $5.00 $33.74 $45.67 

Helper 2 (H2)  $17.82  $3.78 $1.39 $0.67 $1.65 $0.71  $0.45 $0.50 $5.00 $31.97 $43.10 

Helper 3 (H3)  $16.55  $3.51 $1.29 $0.62 $1.65 $0.66  $0.41 $0.50 $0.00 $25.19 $35.53 

Helper 4 (H4)  $15.28  $3.24 $1.19 $0.57 $1.65 $0.61  $0.38 $0.50 $0.00 $23.42 $32.96 

Helper 5 (H5)  $14.00  $2.97 $1.09 $0.53 $1.65 $0.56  $0.35 $0.50 $0.00 $21.65 $30.40 

Helper 6 (H6)  $12.73  $2.70 $0.99 $0.48 $1.65 $0.51  $0.32 $0.50 $0.00 $19.88 $27.83 

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    24 

 

 

 2015  Base Rate  PT&I 

Workers Compensation (see notes) 

Fringes (vacation, insurance) 

Small Tools 

Consumables 

Safety Supplies 

NCCER Assessment 

Per Diem 

Total Straight Time  

Total Over Time 

Classification     21.20%     31.80%  $0.00  3.00%  2.00%  $0.50          

Iron Workers        14.02%                         

General Foreman  $33.95  $7.20 $4.76 $1.27 $1.65 $1.36  $0.85 $0.50 $9.00 $60.54 $81.74 

Foreman  $30.77  $6.52 $4.31 $1.15 $1.65 $1.23  $0.77 $0.50 $7.50 $54.41 $73.63 

Journeyman ‐ Certified Plus (J‐C+) 

$27.58  $5.85 $3.87 $1.03 $1.65 $1.10  $0.69 $0.50 $7.50 $49.78 $67.01 

Journeyman ‐ Certified (J‐C)  $26.52  $5.62 $3.72 $0.99 $1.65 $1.06  $0.66 $0.50 $7.50 $48.23 $64.80 

Journeyman ‐ Uncertified (J‐UNC) 

$25.46  $5.40 $3.57 $0.95 $1.65 $1.02  $0.64 $0.50 $7.50 $46.69 $62.60 

Top Helper 1 (TP1)  $22.92  $4.86 $3.21 $0.86 $1.65 $0.92  $0.57 $0.50 $5.00 $40.49 $54.80 

Top Helper 2 (TP2)  $20.37  $4.32 $2.86 $0.76 $1.65 $0.81  $0.51 $0.50 $5.00 $36.78 $49.51 

Helper 1 (H1)  $19.10  $4.05 $2.68 $0.72 $1.65 $0.76  $0.48 $0.50 $5.00 $34.93 $46.86 

Helper 2 (H2)  $17.82  $3.78 $2.50 $0.67 $1.65 $0.71  $0.45 $0.50 $5.00 $33.08 $44.21 

Helper 3 (H3)  $16.55  $3.51 $2.32 $0.62 $1.65 $0.66  $0.41 $0.50 $0.00 $26.23 $36.56 

Helper 4 (H4)  $15.28  $3.24 $2.14 $0.57 $1.65 $0.61  $0.38 $0.50 $0.00 $24.37 $33.92 

Helper 5 (H5)  $14.00  $2.97 $1.96 $0.53 $1.65 $0.56  $0.35 $0.50 $0.00 $22.52 $31.27 

Helper 6 (H6)  $12.73  $2.70 $1.78 $0.48 $1.65 $0.51  $0.32 $0.50 $0.00 $20.67 $28.62 

Operators        7.78%                         

General Foreman  $33.95  $7.20 $2.64 $1.27 $1.65 $1.36  $0.85 $0.50 $9.00 $58.42 $79.63 

Foreman  $30.77  $6.52 $2.39 $1.15 $1.65 $1.23  $0.77 $0.50 $7.50 $52.49 $71.71 

Tower Crane Operator  $29.71  $6.30 $2.31 $1.11 $1.65 $1.19  $0.74 $0.50 $7.50 $51.01 $69.57 

Operator 3 (Lattice Boom)  $28.64  $6.07 $2.23 $1.07 $1.65 $1.15  $0.72 $0.50 $7.50 $49.53 $67.43 

Operator 2 (RT, excavator, CDL driver) 

$27.58  $5.85 $2.15 $1.03 $1.65 $1.10  $0.69 $0.50 $7.50 $48.05 $65.29 

Operator 1 (forklift,  $26.52  $5.62 $2.06 $0.99 $1.65 $1.06  $0.66 $0.50 $7.50 $46.58 $63.15 

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    25 

 

 

 2015  Base Rate  PT&I 

Workers Compensation (see notes) 

Fringes (vacation, insurance) 

Small Tools 

Consumables 

Safety Supplies 

NCCER Assessment 

Per Diem 

Total Straight Time  

Total Over Time 

Classification     21.20%     31.80%  $0.00  3.00%  2.00%  $0.50          

backhoe, bobcat) 

Mechanic  $27.58  $5.85 $2.15 $1.03 $1.65 $1.10  $0.69 $0.50 $7.50 $48.05 $65.29 

Carpenters        8.09%                         

General Foreman  $30.77  $6.52 $2.49 $1.15 $1.65 $1.23  $0.77 $0.50 $9.00 $54.08 $73.30 

Foreman  $27.58  $5.85 $2.23 $1.03 $1.65 $1.10  $0.69 $0.50 $7.50 $48.14 $65.37 

Journeyman ‐ Certified Plus (J‐C+) 

$24.40  $5.17 $1.97 $0.92 $1.65 $0.98  $0.61 $0.50 $7.50 $43.70 $58.94 

Journeyman ‐ Certified (J‐C)  $23.34  $4.95 $1.89 $0.88 $1.65 $0.93  $0.58 $0.50 $7.50 $42.22 $56.80 

Journeyman ‐ Uncertified (J‐UNC) 

$22.28  $4.72 $1.80 $0.84 $1.65 $0.89  $0.56 $0.50 $7.50 $40.74 $54.66 

Top Helper 1 (TP1)  $20.05  $4.25 $1.62 $0.75 $1.65 $0.80  $0.50 $0.50 $5.00 $35.13 $47.66 

Top Helper 2 (TP2)  $17.82  $3.78 $1.44 $0.67 $1.65 $0.71  $0.45 $0.50 $5.00 $32.02 $43.16 

Helper 1 (H1)  $16.71  $3.54 $1.35 $0.63 $1.65 $0.67  $0.42 $0.50 $5.00 $30.47 $40.91 

Helper 2 (H2)  $15.60  $3.31 $1.26 $0.58 $1.65 $0.62  $0.39 $0.50 $5.00 $28.91 $38.65 

Helper 3 (H3)  $14.48  $3.07 $1.17 $0.54 $1.65 $0.58  $0.36 $0.50 $0.00 $22.36 $31.40 

Helper 4 (H4)  $13.37  $2.83 $1.08 $0.50 $1.65 $0.53  $0.33 $0.50 $0.00 $20.80 $29.15 

Helper 5 (H5)  $12.25  $2.60 $0.99 $0.46 $1.65 $0.49  $0.31 $0.50 $0.00 $19.25 $26.90 

Helper 6 (H6)  $11.14  $2.36 $0.90 $0.42 $1.65 $0.45  $0.28 $0.50 $0.00 $17.69 $24.65 

Concrete Finishers        8.09%                         

General Foreman  $30.77  $6.52 $2.49 $1.15 $1.65 $1.23  $0.77 $0.50 $9.00 $54.08 $73.30 

Foreman  $27.58  $5.85 $2.23 $1.03 $1.65 $1.10  $0.69 $0.50 $7.50 $48.14 $65.37 

Journeyman ‐ Certified Plus (J‐C+) 

$24.40  $5.17 $1.97 $0.92 $1.65 $0.98  $0.61 $0.50 $7.50 $43.70 $58.94 

Journeyman ‐ Certified (J‐C)  $23.34  $4.95 $1.89 $0.88 $1.65 $0.93  $0.58 $0.50 $7.50 $42.22 $56.80 

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    26 

 

 

 2015  Base Rate  PT&I 

Workers Compensation (see notes) 

Fringes (vacation, insurance) 

Small Tools 

Consumables 

Safety Supplies 

NCCER Assessment 

Per Diem 

Total Straight Time  

Total Over Time 

Classification     21.20%     31.80%  $0.00  3.00%  2.00%  $0.50          

Journeyman ‐ Uncertified (J‐UNC) 

$22.28  $4.72 $1.80 $0.84 $1.65 $0.89  $0.56 $0.50 $7.50 $40.74 $54.66 

Top Helper 1 (TP1)  $20.05  $4.25 $1.62 $0.75 $1.65 $0.80  $0.50 $0.50 $5.00 $35.13 $47.66 

Top Helper 2 (TP2)  $17.82  $3.78 $1.44 $0.67 $1.65 $0.71  $0.45 $0.50 $5.00 $32.02 $43.16 

Helper 1 (H1)  $16.71  $3.54 $1.35 $0.63 $1.65 $0.67  $0.42 $0.50 $5.00 $30.47 $40.91 

Helper 2 (H2)  $15.60  $3.31 $1.26 $0.58 $1.65 $0.62  $0.39 $0.50 $5.00 $28.91 $38.65 

Helper 3 (H3)  $14.48  $3.07 $1.17 $0.54 $1.65 $0.58  $0.36 $0.50 $0.00 $22.36 $31.40 

Helper 4 (H4)  $13.37  $2.83 $1.08 $0.50 $1.65 $0.53  $0.33 $0.50 $0.00 $20.80 $29.15 

Helper 5 (H5)  $12.25  $2.60 $0.99 $0.46 $1.65 $0.49  $0.31 $0.50 $0.00 $19.25 $26.90 

Helper 6 (H6)  $11.14  $2.36 $0.90 $0.42 $1.65 $0.45  $0.28 $0.50 $0.00 $17.69 $24.65 

Rod Busters        14.02%                         

General Foreman  $30.77  $6.52 $4.31 $1.15 $1.65 $1.23  $0.77 $0.50 $9.00 $55.91 $75.13 

Foreman  $27.58  $5.85 $3.87 $1.03 $1.65 $1.10  $0.69 $0.50 $7.50 $49.78 $67.01 

Journeyman ‐ Certified Plus (J‐C+) 

$24.40  $5.17 $3.42 $0.92 $1.65 $0.98  $0.61 $0.50 $7.50 $45.15 $60.39 

Journeyman ‐ Certified (J‐C)  $23.34  $4.95 $3.27 $0.88 $1.65 $0.93  $0.58 $0.50 $7.50 $43.60 $58.18 

Journeyman ‐ Uncertified (J‐UNC) 

$22.28  $4.72 $3.12 $0.84 $1.65 $0.89  $0.56 $0.50 $7.50 $42.06 $55.98 

Top Helper 1 (TP1)  $20.05  $4.25 $2.81 $0.75 $1.65 $0.80  $0.50 $0.50 $5.00 $36.32 $48.85 

Top Helper 2 (TP2)  $17.82  $3.78 $2.50 $0.67 $1.65 $0.71  $0.45 $0.50 $5.00 $33.08 $44.21 

Helper 1 (H1)  $16.71  $3.54 $2.34 $0.63 $1.65 $0.67  $0.42 $0.50 $5.00 $31.46 $41.90 

Helper 2 (H2)  $15.60  $3.31 $2.19 $0.58 $1.65 $0.62  $0.39 $0.50 $5.00 $29.84 $39.58 

Helper 3 (H3)  $14.48  $3.07 $2.03 $0.54 $1.65 $0.58  $0.36 $0.50 $0.00 $23.22 $32.26 

Helper 4 (H4)  $13.37  $2.83 $1.87 $0.50 $1.65 $0.53  $0.33 $0.50 $0.00 $21.60 $29.95 

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    27 

 

 

 2015  Base Rate  PT&I 

Workers Compensation (see notes) 

Fringes (vacation, insurance) 

Small Tools 

Consumables 

Safety Supplies 

NCCER Assessment 

Per Diem 

Total Straight Time  

Total Over Time 

Classification     21.20%     31.80%  $0.00  3.00%  2.00%  $0.50          

Helper 5 (H5)  $12.25  $2.60 $1.72 $0.46 $1.65 $0.49  $0.31 $0.50 $0.00 $19.98 $27.63 

Helper 6 (H6)  $11.14  $2.36 $1.56 $0.42 $1.65 $0.45  $0.28 $0.50 $0.00 $18.35 $25.31 

Scaffold Builders        8.09%                         

General Foreman  $29.71  $6.30 $2.40 $1.11 $1.65 $1.19  $0.74 $0.50 $9.00 $52.60 $71.16 

Foreman  $26.52  $5.62 $2.15 $0.99 $1.65 $1.06  $0.66 $0.50 $7.50 $46.66 $63.23 

Journeyman ‐ Certified Plus (J‐C+) 

$23.34  $4.95 $1.89 $0.88 $1.65 $0.93  $0.58 $0.50 $7.50 $42.22 $56.80 

Journeyman ‐ Certified (J‐C)  $22.28  $4.72 $1.80 $0.84 $1.65 $0.89  $0.56 $0.50 $7.50 $40.74 $54.66 

Journeyman ‐ Uncertified (J‐UNC) 

$21.22  $4.50 $1.72 $0.80 $1.65 $0.85  $0.53 $0.50 $7.50 $39.26 $52.51 

Top Helper 1 (TP1)  $19.10  $4.05 $1.54 $0.72 $1.65 $0.76  $0.48 $0.50 $5.00 $33.80 $45.73 

Top Helper 2 (TP2)  $16.97  $3.60 $1.37 $0.64 $1.65 $0.68  $0.42 $0.50 $5.00 $30.84 $41.44 

Helper 1 (H1)  $15.91  $3.37 $1.29 $0.60 $1.65 $0.64  $0.40 $0.50 $5.00 $29.36 $39.30 

Helper 2 (H2)  $14.85  $3.15 $1.20 $0.56 $1.65 $0.59  $0.37 $0.50 $5.00 $27.88 $37.15 

Helper 3 (H3)  $13.79  $2.92 $1.12 $0.52 $1.65 $0.55  $0.34 $0.50 $0.00 $21.39 $30.01 

Helper 4 (H4)  $12.73  $2.70 $1.03 $0.48 $1.65 $0.51  $0.32 $0.50 $0.00 $19.91 $27.87 

Helper 5 (H5)  $11.67  $2.47 $0.94 $0.44 $1.65 $0.47  $0.29 $0.50 $0.00 $18.43 $25.72 

Helper 6 (H6)  $10.61  $2.25 $0.86 $0.40 $1.65 $0.42  $0.27 $0.50 $0.00 $16.95 $23.58 

Material Handling / Receiving        14.02%                         

General Foreman  $33.95  $7.20 $4.76 $1.27 $1.65 $1.36  $0.85 $0.50 $9.00 $60.54 $81.74 

Foreman  $30.77  $6.52 $4.31 $1.15 $1.65 $1.23  $0.77 $0.50 $7.50 $54.41 $73.63 

Journeyman ‐ Certified Plus (J‐C+) 

$27.58  $5.85 $3.87 $1.03 $1.65 $1.10  $0.69 $0.50 $7.50 $49.78 $67.01 

Journeyman ‐ Certified (J‐C)  $26.52  $5.62 $3.72 $0.99 $1.65 $1.06  $0.66 $0.50 $7.50 $48.23 $64.80 

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    28 

 

 

 2015  Base Rate  PT&I 

Workers Compensation (see notes) 

Fringes (vacation, insurance) 

Small Tools 

Consumables 

Safety Supplies 

NCCER Assessment 

Per Diem 

Total Straight Time  

Total Over Time 

Classification     21.20%     31.80%  $0.00  3.00%  2.00%  $0.50          

Journeyman ‐ Uncertified (J‐UNC) 

$25.46  $5.40 $3.57 $0.95 $1.65 $1.02  $0.64 $0.50 $7.50 $46.69 $62.60 

Top Helper 1 (TP1)  $22.92  $4.86 $3.21 $0.86 $1.65 $0.92  $0.57 $0.50 $5.00 $40.49 $54.80 

Top Helper 2 (TP2)  $20.37  $4.32 $2.86 $0.76 $1.65 $0.81  $0.51 $0.50 $5.00 $36.78 $49.51 

Helper 1 (H1)  $19.10  $4.05 $2.68 $0.72 $1.65 $0.76  $0.48 $0.50 $5.00 $34.93 $46.86 

Helper 2 (H2)  $17.82  $3.78 $2.50 $0.67 $1.65 $0.71  $0.45 $0.50 $5.00 $33.08 $44.21 

Helper 3 (H3)  $16.55  $3.51 $2.32 $0.62 $1.65 $0.66  $0.41 $0.50 $0.00 $26.23 $36.56 

Helper 4 (H4)  $15.28  $3.24 $2.14 $0.57 $1.65 $0.61  $0.38 $0.50 $0.00 $24.37 $33.92 

Helper 5 (H5)  $14.00  $2.97 $1.96 $0.53 $1.65 $0.56  $0.35 $0.50 $0.00 $22.52 $31.27 

Helper 6 (H6)  $12.73  $2.70 $1.78 $0.48 $1.65 $0.51  $0.32 $0.50 $0.00 $20.67 $28.62 

Surveyors        7.78%                         

Party Chief  $33.95  $7.20 $2.64 $1.27 $1.65 $1.36  $0.85 $0.50 $9.00 $58.42 $79.63 

Instrument Man  $30.77  $6.52 $2.39 $1.15 $1.65 $1.23  $0.77 $0.50 $7.50 $52.49 $71.71 

Chainman  $21.96  $4.66 $1.71 $0.82 $1.65 $0.88  $0.55 $0.50 $5.00 $37.73 $51.45 

Rodman  $15.86  $3.36 $1.23 $0.59 $1.65 $0.63  $0.40 $0.50 $5.00 $29.23 $39.14 

Laborers        8.09%                         

General Foreman  $27.58  $5.85 $2.23 $1.03 $1.65 $1.10  $0.69 $0.50 $9.00 $49.64 $66.87 

Foreman  $24.40  $5.17 $1.97 $0.92 $1.65 $0.98  $0.61 $0.50 $7.50 $43.70 $58.94 

Laborer 1  $15.91  $3.37 $1.29 $0.60 $1.65 $0.64  $0.40 $0.50 $0.00 $24.36 $34.30 

Laborer 2  $12.73  $2.70 $1.03 $0.48 $1.65 $0.51  $0.32 $0.50 $0.00 $19.91 $27.87 

Other        5.58%                         

Firewatch / Holewatch  $12.73  $2.70 $0.71 $0.48 $1.65 $0.51  $0.32 $0.50 $0.00 $19.60 $27.55 

PWHT Foreman  $30.77  $6.52 $1.72 $1.15 $1.65 $1.23  $0.77 $0.50 $7.50 $51.81 $71.03 

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    29 

 

 

 2015  Base Rate  PT&I 

Workers Compensation (see notes) 

Fringes (vacation, insurance) 

Small Tools 

Consumables 

Safety Supplies 

NCCER Assessment 

Per Diem 

Total Straight Time  

Total Over Time 

Classification     21.20%     31.80%  $0.00  3.00%  2.00%  $0.50          

PWHT technician  $27.58  $5.85 $1.54 $1.03 $1.65 $1.10  $0.69 $0.50 $7.50 $47.45 $64.68 

PWHT helper  $19.10  $4.05 $1.07 $0.72 $1.65 $0.76  $0.48 $0.50 $5.00 $33.32 $45.25 

* Note: Rates valid until 6/2015 

Notes: 

 ‐ Labor rates are based on current representative rates being paid in the area.  ‐ Small tools and consumables are included per the attached lists.  ‐ Welding materials such as filler metal and gases are not included as consumables and will be billed as material.  ‐ Small tools and consumables are included per the attached lists.  ‐ Workers Compensation rates are valid until and subject to adjustment after 6/30/13  ‐ Labor rate mark‐up percentages are fixed and not subject to auditing.  ‐ The overtime rate will be paid for all hours over 40 per week. 

   

   

 

            

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    30 

 

 

EQUIPMENT RENTAL RATES 

Description Hourly ($/Hour)

Daily (10 HRS) ($/Day)

Weekly (50 HRS) ($/Week)

Monthly (217 HRS) ($/Month)

AIR EQUIPMENT

AIR COMPRESSOR 185 CFM DIESEL $ 16.71 $ 100.26 $ 300.78 $902.35

AIR COMPRESSOR 375 CFM DIESEL $ 42.43 $ 254.55 $ 763.66 $2,290.98

AIR COMPRESSOR 800CFM ELECTRIC $ 145.40 $ 872.40 $ 2,617.20 $7,851.59

AIR COMPRESSOR 900 CFM DIESEL $ 152.78 $ 916.71 $ 2,750.13 $8,250.39

AIR DRYER 930 CFM DESICCANT $ 45.83 $ 274.98 $ 824.95 $2,474.85

AIR RECEIVER 1000 GAL $ 14.95 $ 89.72 $ 269.16 $807.48

AIR COMPRESSOR 150-225 CFM ELEC $ 9.67 $ 58.02 $ 174.05 $522.15

CONCRETE BUGGY 10 CF

CONCRETE BUGGY 16 CF $ 13.48 $ 80.85 $ 242.55 $727.65

CONCRETE, TRASH BUCKETS

CONCRETE BUCKET 1 - 1 1/2 CY $ 4.06 $ 24.37 $ 73.11 $219.34

CONCRETE BUCKET 1 3/4 - 3 CY $ 4.83 $ 29.01 $ 87.02 $261.07

TRASH HANDLER BUCKET 4 CY $ 3.36 $ 20.17 $ 60.50 $181.49

TRASH HOPPER BUCKET 2 YD $ 2.10 $ 12.62 $ 37.85 $113.55

BOATS, BARGES

QUADRAFLOATS 40' $ 22.65 $ 135.87 $ 407.62 $1,222.87

DUOFOLATS 20' $ 17.29 $ 103.74 $ 311.22 $933.65

BOAT PUSH $ 144.93 $ 869.59 $ 2,608.78 $7,826.35

BOAT WORK 18' $ 25.52 $ 153.13 $ 459.38 $1,378.15

BARGE CARPENTER $ 8.56 $ 51.33 $ 153.99 $461.97

SPUD WELLS 24" $ 6.24 $ 37.42 $ 112.26 $336.77

BARGE 36' $ 52.86 $ 317.15 $ 951.44 $2,854.33

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    31 

 

 

Description Hourly ($/Hour)

Daily (10 HRS) ($/Day)

Weekly (50 HRS) ($/Week)

Monthly (217 HRS) ($/Month)

BARGE WORK $ 37.02 $ 222.14 $ 666.43 $1,999.29

BARGE SECTIONAL $ 19.81 $ 118.84 $ 356.51 $1,069.52

COMPACTORS

COMPACTOR PLATE $ 12.76 $ 76.57 $ 229.70 $689.11

COMPACTOR DOUBLE DRUM 25" $ 21.66 $ 129.98 $ 389.95 $1,169.86

COMPACTOR DOUBLE DRUM PADFOOT $ 32.16 $ 192.97 $ 578.91 $1,736.72

CONCRETE SCREED-VIBRATORY

CONCRETE SCREED TRUSS 30' $ 21.41 $ 128.47 $ 385.42 $1,156.25

CONCRETE SCREED TRUSS 40-50' $ 21.41 $ 128.47 $ 385.42 $1,156.25

CONCRETE SCREED TUBE $ 16.69 $ 100.11 $ 300.33 $901.00

CONCRETE SCREED TRUSS 42" $ 16.16 $ 96.95 $ 290.84 $872.51

COMPACTORS - SOIL

COMPACTOR 66" - 100 HP $ 67.65 $ 405.93 $ 1,217.78 $3,653.34

COMPACTOR 84" - 125 HP $ 84.31 $ 505.87 $ 1,517.61 $4,552.84

COMPACTOR 84" 150 HP $ 101.45 $ 608.73 $ 1,826.18 $5,478.55

CONCRETE CORE TESTERS

CONCRETE CORE TESTER 250,000 LB $ 7.64 $ 45.83 $ 137.49 $412.48

CRANES,TRAVELIFTS

CRANE RT 80 TON TADANO $ 251.06 $ 1,506.36 $ 4,519.07 $13,557.22

CRANE CRAWLER 110 TON $ 258.82 $ 1,552.94 $ 4,658.83 $13,976.48

CRANE RT 60 TON $ 219.55 $ 1,317.32 $ 3,951.96 $11,855.88

CRANE RT 45 TON $ 142.97 $ 857.79 $ 2,573.37 $7,720.11

CRANE RT 28 - 35 TON $ 128.39 $ 770.31 $ 2,310.94 $6,932.81

CRANE RT 50 TON TADANO/TEREX $ 174.66 $ 1,047.94 $ 3,143.83 $9,431.50

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    32 

 

 

Description Hourly ($/Hour)

Daily (10 HRS) ($/Day)

Weekly (50 HRS) ($/Week)

Monthly (217 HRS) ($/Month)

MANLIFTS, FORM DOLLY

MANLIFT 60' 4WD $ 65.28 $ 391.66 $ 1,174.97 $3,524.91

WORK PLATFORM UNDERBRIDGE $ 182.71 $ 1,096.27 $ 3,288.80 $9,866.41

MANLIFT 80' 4WD $ 90.08 $ 540.50 $ 1,621.49 $4,864.48

PLATFORM LIFT 20' $ 4.78 $ 28.68 $ 86.05 $258.16

MANLIFT 120'-125' STRAIGHT $ 106.44 $ 638.62 $ 1,915.87 $5,747.61

SCISSOR LIFT 32' BATTERY POWER $ 14.59 $ 87.56 $ 262.69 $788.07

BOOM LIFT 105' 4WD $ 91.54 $ 549.23 $ 1,647.68 $4,943.04

SCISSOR LIFT 52' DIESEL $ 49.75 $ 298.50 $ 895.51 $2,686.52

MANLIFT 120' - 125' ARTICULATING $ 131.44 $ 788.64 $ 2,365.91 $7,097.74

EXCAVATORS

EXCAVATOR - Cat 330CL $ 203.37 $ 1,220.21 $ 3,660.62 $10,981.86

EXCAVATOR VOLVO EW180B WHEELED $ 152.66 $ 915.97 $ 2,747.92 $8,243.77

EXCAVATOR CAT 345 $ 308.13 $ 1,848.76 $ 5,546.28 $16,638.85

EXCAVATOR CAT 320 $ 127.65 $ 765.91 $ 2,297.73 $6,893.20

EXCAVATOR CAT 325 $ 176.08 $ 1,056.49 $ 3,169.47 $9,508.42

MAIN PANELS

400 - 600 AMP $ 8.99 $ 53.92 $ 161.76 $485.27

800 - 1200 AMP $ 15.96 $ 95.76 $ 287.28 $861.83

1400 - 2000 AMP $ 26.42 $ 158.52 $ 475.56 $1,426.68

LIGHTING PANEL $ 3.50 $ 21.03 $ 63.08 $189.25

C-100 400 AMP $ 7.24 $ 43.46 $ 130.37 $391.12

DISTRIBUTION PANEL 400 AMP $ 6.16 $ 36.99 $ 110.96 $332.89

TRAILER PANEL $ 5.19 $ 31.16 $ 93.49 $280.48

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    33 

 

 

Description Hourly ($/Hour)

Daily (10 HRS) ($/Day)

Weekly (50 HRS) ($/Week)

Monthly (217 HRS) ($/Month)

TRANSFORMERS

TRANSFORMER 40 - 112 KVA $ 3.74 $ 22.43 $ 67.29 $201.87

TRANSFORMER 113 - 150 KVA $ 4.21 $ 25.23 $ 75.70 $227.10

SUPPLEMENTAL ELECTRICAL

TRAFFIC ARROW BOARD $ 5.36 $ 32.14 $ 96.41 $289.22

WELDER FRAME $ 2.89 $ 17.36 $ 52.09 $156.26

SOLAR MESSAGE BOARD $ 14.59 $ 87.56 $ 262.69 $788.07

SOLAR MINI MESSAGE BOARD $ 13.61 $ 81.63 $ 244.90 $734.69

CONCRETE TROWEL

CONCRETE TROWEL DBL 16-24 HP $ 35.43 $ 212.56 $ 637.69 $1,913.06

CONCRETE TROWEL DBL 44 HP $ 52.29 $ 313.76 $ 941.28 $2,823.85

DECK FINISHER

DECK FINISHER BIDWELL $ 285.26 $ 1,711.58 $ 5,134.75 $15,404.25

DECK FINISHER BIDWELL/GOMACO $ 213.66 $ 1,281.96 $ 3,845.89 $11,537.66

FORKLIFT

FORKLIFT RT 8000 LB $ 65.00 $ 389.98 $ 1,169.94 $3,509.82

FORKLIFT 5000/6000 LB $ 24.28 $ 145.66 $ 436.97 $1,310.92

FORKLIFT 8000 LB STRAIGHT MAST $ 36.42 $ 218.51 $ 655.52 $1,966.56

FORKLIFT RT 9000 LB $ 59.50 $ 356.98 $ 1,070.95 $3,212.84

FORKLIFT RT 9000 LB 4WD $ 64.39 $ 386.31 $ 1,158.94 $3,476.83

FORKLIFT RT 12000 LB $ 77.93 $ 467.55 $ 1,402.65 $4,207.95

FORKLIFT RT 10000 LB $ 75.88 $ 455.28 $ 1,365.84 $4,097.52

FORKLIFT RT 6000 LB $ 51.59 $ 309.57 $ 928.71 $2,786.13

FORKLIFT TAYLOR T520M 52,000# $ 207.10 $ 1,242.59 $ 3,727.78 $11,183.33

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    34 

 

 

Description Hourly ($/Hour)

Daily (10 HRS) ($/Day)

Weekly (50 HRS) ($/Week)

Monthly (217 HRS) ($/Month)

GRADERS

GRADER CAT 140H $ 136.53 $ 819.20 $ 2,457.59 $7,372.78

TUGGER

TUGGER 1000 LB AIR (w/o CABLE) $ 12.54 $ 75.27 $ 225.81 $677.43

TUGGER 3000 LB AIR (w/o CABLE) $ 12.54 $ 75.27 $ 225.81 $677.43

TUGGER 4000 LB AIR (w/o CABLE) $ 17.76 $ 106.54 $ 319.63 $958.88

AIR HOIST 2-TON, 30' CHAIN $ 6.97 $ 41.84 $ 125.52 $376.57

AIR HOIST 3-TON, 30' CHAIN $ 9.31 $ 55.86 $ 167.58 $502.73

AIR HOIST 6-TON, 30' CHAIN $ 15.49 $ 92.96 $ 278.87 $836.60

AIR HOIST 10-TON, 30' CHAIN $ 31.02 $ 186.13 $ 558.38 $1,675.13

TUGGER 8000 LB HYDRAULIC $ 10.12 $ 60.71 $ 182.14 $546.41

HOIST A-FRAME 2 TON $ 9.51 $ 57.05 $ 171.14 $513.41

TOWER CRANES

TOWER CRANE LIEBHERR 420 ECH $ 358.66 $ 2,151.99 $ 6,455.97 $19,367.90

TOWER CRANE LIEBHERR 316 ECH $ 293.73 $ 1,762.37 $ 5,287.12 $15,861.37

TOWER CRANE LIEBHERR 281/290 HC $ 273.06 $ 1,638.36 $ 4,915.09 $14,745.26

TOWER CRANE 290 MAST SECTION $ 13.25 $ 79.48 $ 238.43 $715.28

TOWER CRANE TIE IN COLLAR $ 12.31 $ 73.87 $ 221.60 $664.81

TOWER CRANE TIE IN STRUT $ 9.15 $ 54.89 $ 164.67 $494.00

TOWER CRANE 200 MAST SECTION $ 10.44 $ 62.65 $ 187.96 $563.88

TOWER CRANE TOP CLIMB SECTION $ 73.35 $ 440.08 $ 1,320.24 $3,960.73

TOWER CRANE BASE SECTION $ 32.51 $ 195.08 $ 585.23 $1,755.69

HYTORC TORQUE WRENCH & PUMP $ 12.69 $ 76.13 $ 228.40 $685.19

TORQUE GUN C/W REACTION ARM $ 15.24 $ 91.45 $ 274.34 $823.01

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    35 

 

 

Description Hourly ($/Hour)

Daily (10 HRS) ($/Day)

Weekly (50 HRS) ($/Week)

Monthly (217 HRS) ($/Month)

TORQUE WRENCH 1" (TETON) $ 8.97 $ 53.81 $ 161.43 $484.29

TORQUE WRENCH 1 1/2" (TETON) $ 11.95 $ 71.71 $ 215.13 $645.40

TORQUE WRENCH PUMP (TETON) $ 8.38 $ 50.25 $ 150.76 $452.27

ANCHOR STOOL TEMPLATE $ 8.38 $ 50.25 $ 150.76 $452.27

TORQUE WRENCH 3/4" (TETON) $ 7.06 $ 42.38 $ 127.14 $381.42

TOWER CRANE CLIMBING COLLAR $ 9.15 $ 54.89 $ 164.67 $494.00

HEATERS

HEATER 1.0 - 1.5 MILLION BTU $ 5.46 $ 32.78 $ 98.35 $295.04

OFFICE EQUIPMENT

$1251.00 - $1500.00 $ 0.86 $ 5.18 $ 15.53 $46.59

$1501.00 - $1750.00 $ 1.04 $ 6.25 $ 18.76 $56.29

$1751.00 - $2000.00 $ 1.19 $ 7.12 $ 21.35 $64.05

$2001.00 - $2250.00 $ 1.33 $ 7.98 $ 23.94 $71.82

$2251.00 - $2500.00 $ 1.47 $ 8.84 $ 26.53 $79.58

$3751.00 - $4000.00 $ 2.34 $ 14.02 $ 42.06 $126.17

$4251.00 - $4500.00 $ 2.62 $ 15.74 $ 47.23 $141.70

$4501.00 - $4750.00 $ 2.77 $ 16.61 $ 49.82 $149.46

$5251.00 - $5500.00 $ 3.24 $ 19.41 $ 58.23 $174.70

$5501.00 - $5750.00 $ 3.38 $ 20.27 $ 60.82 $182.46

$6001.00 - $6250.00 $ 3.67 $ 22.00 $ 66.00 $197.99

$6751.00 - $7000.00 $ 4.10 $ 24.59 $ 73.76 $221.28

$8501.00 - $8750.00 $ 5.14 $ 30.84 $ 92.52 $277.57

$8751.00 - $9000.00 $ 5.28 $ 31.70 $ 95.11 $285.34

COPIER, 75 PPM CONNECTED $ 10.21 $ 61.25 $ 183.75 $551.26

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    36 

 

 

Description Hourly ($/Hour)

Daily (10 HRS) ($/Day)

Weekly (50 HRS) ($/Week)

Monthly (217 HRS) ($/Month)

COPIER, PLAN KIP3002 LARGE $ 11.07 $ 66.43 $ 199.28 $597.85

COPIER, XEROX 510DP ENGINEERING PRINTER $ 49.43 $ 296.55 $ 889.65 $2,668.96

MF COPIER $12001-14000 $ 8.23 $ 49.39 $ 148.17 $444.50

MF COPIER $14001-16000 $ 9.42 $ 56.51 $ 169.52 $508.56

MF COPIER $16001-18000 $ 10.57 $ 63.41 $ 190.22 $570.67

MF COPIER $18001-20000 $ 11.75 $ 70.53 $ 211.58 $634.73

MF COPIER $20001-22000 $ 12.90 $ 77.43 $ 232.28 $696.84

MF COPIER $24001-26000 $ 15.24 $ 91.45 $ 274.34 $823.01

COPIER 45 PPM STANDALONE $ 8.38 $ 50.25 $ 150.76 $452.27

COPIER, CONNECTED, RICOH C4000 $ 6.90 $ 41.41 $ 124.23 $372.68

COPIER, MFP, RICOH 3260C $ 15.56 $ 93.39 $ 280.16 $840.48

FAX LASER LARGE $ 1.35 $ 8.11 $ 24.33 $72.98

FAX LASER SMALL $ 0.92 $ 5.54 $ 16.63 $49.89

COPIER, DIGITAL MP4000 $ 6.90 $ 41.41 $ 124.23 $372.68

COPIER, CONNECTED, RICOH 700 $ 9.42 $ 56.51 $ 169.52 $508.56

MFC SITE $2001-4000 $ 2.62 $ 15.74 $ 47.23 $141.70

WEB CAM ES31CBW 18-5W PELCO $ 2.79 $ 16.74 $ 50.21 $150.63

COPIER, 55/60 PPM STANDALONE $ 8.63 $ 51.76 $ 155.28 $465.85

COPIER, 22/32 PPM CLR CONNECTED $ 9.99 $ 59.96 $ 179.87 $539.61

COMPUTER EQUIPMENT

DIGITIZER, ROLLUP, GTCO $ 1.67 $ 10.03 $ 30.09 $90.26

SERVIER JOBSITE ML300 G6 $ 4.44 $ 26.66 $ 79.97 $239.92

PC TABLET F5 PORTABLE $ 3.09 $ 18.57 $ 55.71 $167.13

PLOTTERS, INKJET, HP 800PS/T1100PS $ 4.14 $ 24.82 $ 74.47 $223.42

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    37 

 

 

Description Hourly ($/Hour)

Daily (10 HRS) ($/Day)

Weekly (50 HRS) ($/Week)

Monthly (217 HRS) ($/Month)

PRINTER SHARING DEVICES $ 0.26 $ 1.55 $ 4.66 $13.98

750+ WATT UPS/POWER COND. $ 0.41 $ 2.46 $ 7.38 $22.13

1500+ WATT UPS/POWER COND. $ 0.73 $ 4.40 $ 13.20 $39.60

ROUTER-CISCO 1841 $ 2.00 $ 12.01 $ 36.04 $108.12

PRINTER HP 1120HD MFP $ 13.52 $ 81.09 $ 243.28 $729.84

SCANNER, EPSON 11 X 17C/W ADF $ 2.79 $ 16.74 $ 50.21 $150.63

SERVER, FILE (SMALL), DISTRICT $ 4.71 $ 28.25 $ 84.76 $254.28

WAN STEELHEAD 250-M $ 4.45 $ 26.72 $ 80.17 $240.50

SCANNER, EPSON 11 X 17 $ 1.78 $ 10.65 $ 31.96 $95.89

NOTEBOOK, STANDARD $ 2.12 $ 12.72 $ 38.17 $114.52

PRINTER JOB CLASS $ 0.59 $ 3.52 $ 10.55 $31.64

WATCHGUARD FIREBOX $ 0.81 $ 4.87 $ 14.62 $43.87

SERVER, JOBSITE $ 2.74 $ 16.46 $ 49.37 $148.10

LCD MONITOR 23" $ 0.55 $ 3.28 $ 9.83 $29.50

PRINTER, LASER, PERSONAL 10 PPM $ 0.45 $ 2.67 $ 8.02 $24.07

UPS, 3000 WATT $ 1.46 $ 8.76 $ 26.27 $78.81

HUB, 16 PORT,ETHERNET $ 0.22 $ 1.34 $ 4.01 $12.03

UPS, 2200VA $ 1.76 $ 10.55 $ 31.64 $94.92

TAPE DRIVE ULTRIUM LTO HP $ 2.89 $ 17.32 $ 51.96 $155.87

GTCO DIGITIZER 20 X 24 $ 1.24 $ 7.44 $ 22.32 $66.97

WAN STEELHEAD 1050-L $ 11.43 $ 68.56 $ 205.69 $617.06

BIM WORKSTATION $ 5.30 $ 31.79 $ 95.37 $286.11

PACKETSHAPER 1700-L2002M $ 7.51 $ 45.08 $ 135.23 $405.68

LEXMARK X SERIES MFP $ 2.65 $ 15.92 $ 47.75 $143.25

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    38 

 

 

Description Hourly ($/Hour)

Daily (10 HRS) ($/Day)

Weekly (50 HRS) ($/Week)

Monthly (217 HRS) ($/Month)

NORTEL BAYSTACK 470-48T SWITCH $ 1.72 $ 10.31 $ 30.93 $92.78

PRINTER, LASER, COLOUR HP 4700 $ 3.28 $ 19.67 $ 59.01 $177.02

WIRELESS ACCESS POINT $ 0.55 $ 3.30 $ 9.90 $29.70

PRINTER, LASER, COLOUR HP 9500 $ 6.48 $ 38.89 $ 116.66 $349.97

SERVER, NSPC $ 3.21 $ 19.27 $ 57.81 $173.43

WAN STEELHEAD 250-L $ 3.86 $ 23.18 $ 69.55 $208.66

WORKSTATION, STANDARD $ 1.36 $ 8.15 $ 24.46 $73.37

PRINTER, LASER B/W 24PPM+ $ 1.80 $ 10.81 $ 32.42 $97.25

WIRELESS DATA SYSTEM - $8,000 $ 9.50 $ 56.98 $ 170.94 $512.83

WORKSTATION, CAD DUAL VIDEO HEAD $ 1.82 $ 10.89 $ 32.67 $98.02

DIGITAL SERVICE UNIT, LAN $ 0.47 $ 2.85 $ 8.54 $25.62

DLT 35/70 40/80 TAPE DRIVE $ 2.15 $ 12.88 $ 38.63 $115.88

SWITCH, NORTEL BAYSTACK 450 $ 0.99 $ 5.95 $ 17.86 $53.57

PRINTER. LASER WIDE FORMAT TO 35PPM $ 2.07 $ 12.40 $ 37.20 $111.61

SCANNER, FLAT BED, HP SCANJET $ 0.40 $ 2.42 $ 7.25 $21.74

LEXMARK X620MFP BARE $ 3.04 $ 18.22 $ 54.67 $164.02

PRINTER, LASER COLOR HP5500/6015 $ 5.66 $ 33.97 $ 101.91 $305.72

PRINTER LASER MFP 17 PPM $ 2.19 $ 13.11 $ 39.34 $118.02

ROUTER-CISCO 3945 $ 15.71 $ 94.25 $ 282.75 $848.24

AGED WORKSTATION $ 1.39 $ 8.37 $ 25.10 $75.31

AGED NOTEBOOK GT 3YR $ 2.16 $ 12.94 $ 38.82 $116.46

SWITCH 5510-24 NORTEL $ 3.43 $ 20.56 $ 61.67 $185.02

LCD MONITOR 19" / 20" $ 0.37 $ 2.22 $ 6.66 $19.99

SERVER W/STWORKS TB HD $ 9.82 $ 58.92 $ 176.77 $530.30

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    39 

 

 

Description Hourly ($/Hour)

Daily (10 HRS) ($/Day)

Weekly (50 HRS) ($/Week)

Monthly (217 HRS) ($/Month)

AGED WORKSTATION GT 3YR $ 1.36 $ 8.15 $ 24.46 $73.37

AGED NOTEBOOK P3 $ 2.16 $ 12.94 $ 38.82 $116.46

PACKETSHAPER 2500-L006M PACKETEER $ 7.98 $ 47.88 $ 143.64 $430.92

PRINTER MFP PERSONAL $ 0.55 $ 3.30 $ 9.90 $29.70

NOTEBOOK 3D MODELLING HP $ 2.87 $ 17.21 $ 51.63 $154.90

WAN STEELHEAD 250-H $ 5.86 $ 35.15 $ 105.46 $316.39

WAN STEELHEAD 550-H $ 10.52 $ 63.15 $ 189.45 $568.34

SWITCH 5520-48T PWR $ 5.47 $ 32.80 $ 98.41 $295.24

LCD MONITOR 20" WIDESCREEN $ 0.29 $ 1.77 $ 5.31 $15.92

DST SVR W/STWORKS 5-8 TB $ 9.89 $ 59.33 $ 178.00 $533.99

DUAL DISH RADIO CANOPY $ 7.69 $ 46.15 $ 138.46 $415.39

PACKET SHAPER 1700-L010M 6 MPS $ 9.18 $ 55.08 $ 165.25 $495.75

CANOPY 20MPS MOTOROLA $ 4.80 $ 28.81 $ 86.44 $259.33

FIREWALL SSG-20 JUNIPER $ 1.28 $ 7.68 $ 23.03 $69.10

SWITCH 2526T ERS $ 0.61 $ 3.69 $ 11.06 $33.19

CANOPY 20MPS MOTOROLA $ 3.61 $ 21.68 $ 65.03 $195.08

GENSETS

GENSET 7 KW DIESEL $ 7.98 $ 47.90 $ 143.70 $431.09

GENSET 35 - 40 KW DIESEL $ 46.59 $ 279.55 $ 838.66 $2,515.97

GENSET 55 - 60 KW DIESEL $ 53.04 $ 318.22 $ 954.65 $2,863.95

TETON-GENSET 100 KW DIESEL $ 82.91 $ 497.46 $ 1,492.37 $4,477.11

LIGHT TOWERS

LIGHT TOWER 6 KW WACKER $ 10.35 $ 62.11 $ 186.34 $559.03

LOADERS - WHEELED

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    40 

 

 

Description Hourly ($/Hour)

Daily (10 HRS) ($/Day)

Weekly (50 HRS) ($/Week)

Monthly (217 HRS) ($/Month)

BACKHOE LOADER CAT 420 $ 71.48 $ 428.86 $ 1,286.57 $3,859.71

WHEEL LOADER CAT 980 $ 277.53 $ 1,665.20 $ 4,995.61 $14,986.84

WHEEL LOADER CAT 926G $ 143.03 $ 858.16 $ 2,574.49 $7,723.48

TOOL CARRIER CAT IT62 $ 178.39 $ 1,070.37 $ 3,211.10 $9,633.30

WHEE LOADER CAT 966/VOLVO 150 $ 197.49 $ 1,184.94 $ 3,554.82 $10,664.45

WHEEL LOADER CAT 950/JD644 $ 119.76 $ 718.55 $ 2,155.64 $6,466.91

ANGLE BROOM 6L LOADER $ 21.21 $ 127.25 $ 381.74 $1,145.23

SKID STEER LOADER

SKID STEER CAT 247 TRACKED $ 42.09 $ 252.56 $ 757.67 $2,273.00

SKID STEER LOADER CAT 246 $ 40.52 $ 243.10 $ 729.30 $2,187.91

SKID STEER PICKUP SWEEPER $ 9.35 $ 56.08 $ 168.23 $504.68

SKID STEER SNOWBLOWER $ 13.95 $ 83.68 $ 251.04 $753.13

SKID STEER SNOW BLADE $ 6.22 $ 37.31 $ 111.93 $335.80

MORTAR MIXERS - GROUT PUMPS

MORTAR MIXER 12 CF GAS $ 6.75 $ 40.48 $ 121.45 $364.34

MORTAR MIXER 8 CF GAS $ 5.69 $ 34.12 $ 102.35 $307.06

GROUT PUMP 4 CF AIR $ 18.08 $ 108.48 $ 325.45 $976.35

PUMPS, WATER, TRASH

PUMP TRASH 4" DIESEL $ 28.89 $ 173.34 $ 520.02 $1,560.07

PUMP TRASH 6" DIESEL $ 35.43 $ 212.56 $ 637.68 $1,913.04

PUMP JET 6" DIESEL $ 95.49 $ 572.94 $ 1,718.81 $5,156.43

PILE DRIVING EQUIPMENT

PILE HAMMER DIESEL DELMAG $ 183.02 $ 1,098.10 $ 3,294.30 $9,882.91

DRILL RIG AIR POWERED $ 27.43 $ 164.56 $ 493.68 $1,481.03

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    41 

 

 

Description Hourly ($/Hour)

Daily (10 HRS) ($/Day)

Weekly (50 HRS) ($/Week)

Monthly (217 HRS) ($/Month)

PILE HAMMER VIBRATORY $ 182.75 $ 1,096.48 $ 3,289.45 $9,868.35

DRILL RIG CRANE MOUNTED $ 388.57 $ 2,331.43 $ 6,994.29 $20,982.86

PILE CASING CLAMP 100 TON $ 23.69 $ 142.13 $ 426.39 $1,279.16

PILE HAMMER DIESEL AMERICAN $ 133.61 $ 801.66 $ 2,404.97 $7,214.92

PILE EXTRACTION CLAMP $ 26.69 $ 160.14 $ 480.41 $1,441.24

PUMPS CONCRETE GROUT

SEALANT PUMP $ 22.97 $ 137.82 $ 413.45 $1,240.34

SHOP EQUIPMENT

PIPE BEVEL GROOVE MACHINE $ 8.11 $ 48.63 $ 145.90 $437.71

HYD. TORQUE WRENCH PUMP $ 7.87 $ 47.23 $ 141.70 $425.09

HYD. TORQUE WRENCH, 3/4" HEAD $ 6.51 $ 39.04 $ 117.11 $351.33

HYD. TORQUE WRENCH, 1" HEAD $ 8.30 $ 49.82 $ 149.46 $448.38

HYD. TORQUE WRENCH, 1-1/2" HEAD $ 11.25 $ 67.51 $ 202.52 $607.55

PRESSURE WASHER TRAILER $ 8.35 $ 50.09 $ 150.26 $450.77

LASER SHAFT ALIGNMENT SYSTEM $ 19.25 $ 115.49 $ 346.48 $1,039.44

PIPE OD BEVELLER TRI-TOOL 2-4" $ 7.01 $ 42.06 $ 126.17 $378.51

PIPE OD BEVELLER TRI-TOOL 6-8" $ 7.01 $ 42.06 $ 126.17 $378.51

PIPE OD BEVELLER TRI-TOOL 10-12" $ 19.77 $ 118.62 $ 355.86 $1,067.58

PIPE OD BEVELLER TRI-TOOL 12-14" $ 19.77 $ 118.62 $ 355.86 $1,067.58

PIPE OD BEVELLER TRI-TOOL 14-16" $ 19.77 $ 118.62 $ 355.86 $1,067.58

PIPE OD BEVELLER TRI-TOOL 16-20" $ 19.77 $ 118.62 $ 355.86 $1,067.58

PIPE COUNTER BORE MODULE 3-12" $ 0.97 $ 5.82 $ 17.47 $52.41

PIPE COUNTER BORE MODULE 2-36" $ 2.52 $ 15.10 $ 45.29 $135.87

PIPE MITER MANDREL 6-16" $ 4.96 $ 29.76 $ 89.29 $267.87

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    42 

 

 

Description Hourly ($/Hour)

Daily (10 HRS) ($/Day)

Weekly (50 HRS) ($/Week)

Monthly (217 HRS) ($/Month)

PIPE ID BEVELLER ATTACHMENT $ 8.41 $ 50.47 $ 151.40 $454.21

PIPE BEVELLER ATTACHMENT 8-24" $ 7.01 $ 42.06 $ 126.17 $378.51

PIPE ALLOY ANALYZER NITON X $ 26.64 $ 159.81 $ 479.44 $1,438.33

PIPE 6-WAY POSTWELD HEAT TREAT $ 12.58 $ 75.49 $ 226.46 $679.37

PIPE 9-WAY POSTWELD HEAT TREAT $ 14.41 $ 86.49 $ 259.46 $778.37

PIPE HEAT TREAT RECORDER $ 4.60 $ 27.61 $ 82.82 $248.46

CONCRETE CORE DRILL $ 9.80 $ 58.77 $ 176.31 $528.94

VESSEL ROLLER 30 TON IDLER $ 7.51 $ 45.08 $ 135.23 $405.68

BLOWER VENTILATION 15000 CFM $ 24.77 $ 148.60 $ 445.80 $1,337.39

WELDING HEAD MANIPULATOR $ 34.98 $ 209.85 $ 629.55 $1,888.65

WHEEL WASH SYSTEM $ 121.26 $ 727.57 $ 2,182.72 $6,548.17

PICKUP SNOW PLOW $ 8.23 $ 49.39 $ 148.17 $444.50

ROLL GROOVE MACHINE 2" - 16" $ 15.62 $ 93.71 $ 281.13 $843.39

PRESSURE WASHER $ 6.73 $ 40.37 $ 121.12 $363.35

VESSEL ROLLER, 45 TON DRIVE $ 26.13 $ 156.79 $ 470.38 $1,411.15

BANDSAW HORIZONTAL $ 5.09 $ 30.52 $ 91.55 $274.66

TILE STRIPPER $ 7.69 $ 46.15 $ 138.46 $415.39

AIR MONITORING EQUIPMENT

REBAR EQUIPMENT $ 14.45 $ 86.70 $ 260.10 $780.31

AIR MONITORING EQUIPMENT

REBAR SCANER $ 15.56 $ 93.39 $ 280.16 $840.48

RADIO EQUIPMENT

RADIOS $ 0.77 $ 4.59 $ 13.78 $41.34

BASE STATIONS $ 1.44 $ 8.63 $ 25.88 $77.64

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    43 

 

 

Description Hourly ($/Hour)

Daily (10 HRS) ($/Day)

Weekly (50 HRS) ($/Week)

Monthly (217 HRS) ($/Month)

RADIO TRUCK MOBILE $ 1.38 $ 8.30 $ 24.91 $74.73

REPEATERS $ 3.40 $ 20.38 $ 61.14 $183.43

CHARGER 6 BANK $ 0.10 $ 0.63 $ 1.88 $5.63

RADIO INTRINSICALLY SAFE $ 1.01 $ 6.04 $ 18.12 $54.35

TELEPHONE SYSTEMS

PHONE SYS, PACIFIC $ 10.86 $ 65.13 $ 195.40 $586.20

TELEPHONE SYSTEM - LARGE SITE $ 7.30 $ 43.78 $ 131.35 $394.04

PHONE, 11C, DENVER COM. $ 33.79 $ 202.73 $ 608.20 $1,824.60

ORLANDO TELEPHONE SYSTEM $ 23.26 $ 139.54 $ 418.62 $1,255.87

MINNEAPOLIS BCM400 $ 15.31 $ 91.88 $ 275.63 $826.89

PHONE SYS, NORSTAR ICS, PHOENIX $ 12.01 $ 72.03 $ 216.10 $648.31

INTERCOM SYSTEM (38) $ 22.06 $ 132.38 $ 397.14 $1,191.42

INTERCOM SYSTEM (16) $ 7.19 $ 43.11 $ 129.34 $388.02

VIDEOCONFERENCING SM $ 4.50 $ 27.02 $ 81.07 $243.21

ZERO TO $6000.00 $ 4.85 $ 29.12 $ 87.35 $262.04

$6001.00 - $8000.00 $ 6.42 $ 38.54 $ 115.63 $346.90

$10001.00 - $12000.00 $ 9.67 $ 58.03 $ 174.10 $522.29

$18001.00 - $20000.00 $ 16.10 $ 96.58 $ 289.73 $869.19

$22001.00 - $24000.00 $ 19.31 $ 115.85 $ 347.55 $1,042.64

$24001.00 - $26000.00 $ 20.90 $ 125.38 $ 376.13 $1,128.40

$3501.00 - $3750.00 $ 2.59 $ 15.53 $ 46.59 $139.76

NORTEL BCM400 SAN DIEGO $ 8.71 $ 52.26 $ 156.77 $470.32

PHONE SYS, GLENDALE DIS. BCM400 $ 13.72 $ 82.34 $ 247.03 $741.10

NORSTAR ICS JOBSITE SMALL $ 5.03 $ 30.19 $ 90.58 $271.75

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    44 

 

 

Description Hourly ($/Hour)

Daily (10 HRS) ($/Day)

Weekly (50 HRS) ($/Week)

Monthly (217 HRS) ($/Month)

TETON-ASH GROVE SYSTEM $ 33.95 $ 203.70 $ 611.11 $1,833.33

PHONE SYS, NORSTAR ICS, LAS VEGAS $ 6.97 $ 41.84 $ 125.52 $376.57

S.E.CIVIL TELEPHONE SYSTEM $ 13.52 $ 81.09 $ 243.28 $729.84

VIDEOCONFERENCING SYSTEM $ 11.66 $ 69.94 $ 209.83 $629.49

$2001.00 - $4,000.00 $ 3.22 $ 19.32 $ 57.97 $173.92

$4001.00 - $6000.00 $ 4.81 $ 28.88 $ 86.64 $259.91

$32001.00-$34000.00 PHONE SYSTEM $ 27.35 $ 164.11 $ 492.32 $1,476.95

$34001.00-$36000.00 PHONE SYSTEM $ 28.98 $ 173.88 $ 521.63 $1,564.88

SAWS

SAW RADIAL ARM $ 5.21 $ 31.27 $ 93.82 $281.45

CONCRETE SAW 13" $ 26.28 $ 157.70 $ 473.09 $1,419.27

CONCRETE SAW 20" $ 12.63 $ 75.75 $ 227.25 $681.75

CONCRETE SAW SOFFCUT $ 20.90 $ 125.39 $ 376.18 $1,128.53

CONCRETE SAW 10" SOFF-CUT $ 14.80 $ 88.81 $ 266.44 $799.31

SWEEPERS

SWEEPER 60" RIDE ON $ 20.45 $ 122.71 $ 368.12 $1,104.36

SURVEY EQUIPMENT

LEVEL ENGINEER 28 - 40X $ 1.83 $ 11.00 $ 33.00 $98.99

TRANSIT/THEODOLITE 11" - 20" $ 2.03 $ 12.19 $ 36.56 $109.67

TRANSIT/THEODOLITE 6" - 10" $ 2.44 $ 14.67 $ 44.00 $131.99

TRANSIT/THEODOLITE 1" - 5" $ 3.27 $ 19.63 $ 58.88 $176.64

LASER PIPE $ 5.46 $ 32.78 $ 98.35 $295.04

LASER LEVEL HORIZ/VERTICAL $ 4.13 $ 24.80 $ 74.41 $223.22

LASER LEVEL HORIZONTAL $ 2.59 $ 15.53 $ 46.59 $139.76

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    45 

 

 

Description Hourly ($/Hour)

Daily (10 HRS) ($/Day)

Weekly (50 HRS) ($/Week)

Monthly (217 HRS) ($/Month)

LEVEL, DIGITAL ELECTRONIC $ 5.23 $ 31.38 $ 94.14 $282.42

LASER SLOPE $ 5.86 $ 35.15 $ 105.46 $316.39

GPS SYSTEM $ 42.20 $ 253.20 $ 759.60 $2,278.80

CROSS SLOPE SYSTEM $ 20.36 $ 122.18 $ 366.54 $1,099.61

TOTAL STATION HIGH PERFORMANCE $ 19.93 $ 119.59 $ 358.77 $1,076.32

TOTAL STATION ROBOTIC $ 30.55 $ 183.32 $ 549.97 $1,649.90

TOTAL STATION EXTERNAL DATA $ 9.20 $ 55.21 $ 165.64 $496.91

TOTAL STATION INTERNAL DATA $ 8.70 $ 52.19 $ 156.58 $469.74

DATA RECORDER $ 2.61 $ 15.64 $ 46.91 $140.73

GNSS SYSTEM $ 38.77 $ 232.60 $ 697.81 $2,093.43

FLAT FLOOR METER $ 29.83 $ 179.01 $ 537.03 $1,611.08

STRESSING JACKS/RAMS $ - $ - $ - $0.00

STRESSING JACK 10,000 PSI $ 7.80 $ 46.80 $ 140.40 $421.21

TRACTOR TRACK TYPE

TRACTOR CAT D5 $ 121.72 $ 730.34 $ 2,191.03 $6,573.10

TRAILERS JOBSITE

CONTAINER 8 X 40 $ 1.78 $ 10.68 $ 32.03 $96.08

CONTAINER TOOL CRIB 8 X 40 $ 5.72 $ 34.29 $ 102.88 $308.63

CONTAINER 8 X 10 $ 2.10 $ 12.62 $ 37.85 $113.55

CONTAINER 8 X 40 WELD TEST $ 52.12 $ 312.73 $ 938.18 $2,814.54

CONTAINER 8 X 20 $ 1.58 $ 9.49 $ 28.47 $85.41

TRAILER JOBSITE 10 - 30 $ 6.07 $ 36.45 $ 109.35 $328.04

TRAILER JOBSITE 31 - 40 $ 5.97 $ 35.80 $ 107.41 $322.22

TRAILER JOBSITE 41 - 52 $ 10.77 $ 64.59 $ 193.78 $581.35

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    46 

 

 

Description Hourly ($/Hour)

Daily (10 HRS) ($/Day)

Weekly (50 HRS) ($/Week)

Monthly (217 HRS) ($/Month)

TRAILER JOBSITE 56 - 60 $ 12.08 $ 72.47 $ 217.40 $652.20

FOLDAWAY 40 X 60 X 14 $ 23.47 $ 140.83 $ 422.50 $1,267.51

TRAILER OFFICE COMPLEX $ 41.84 $ 251.04 $ 753.13 $2,259.39

RAPID ROOF SYSTEM 40 X 40 $ 12.08 $ 72.47 $ 217.40 $652.20

TANKS STORAGE

TANK TRAILER FUEL 500G T/A $ 15.03 $ 90.15 $ 270.45 $811.36

TANK WATER TOWER 10000 GAL $ 26.10 $ 156.58 $ 469.74 $1,409.21

TANK TRAILER WATER 1000 GAL $ 13.05 $ 78.29 $ 234.87 $704.60

TANK TRAILER WATER 500 GAL. $ 8.12 $ 48.74 $ 146.23 $438.68

TRAILERS DECK

TRAILER FLATDECK 12' $ 3.32 $ 19.95 $ 59.85 $179.55

TRAILER CARGO 16' $ 5.64 $ 33.86 $ 101.58 $304.75

TRAILER FLATDECK 14-20' $ 4.31 $ 25.88 $ 77.64 $232.93

TRAILER EXTENDABLE 45' HIBOY $ 25.83 $ 154.96 $ 464.88 $1,394.65

TRAILER LOWBOY 100 TON $ 54.98 $ 329.87 $ 989.62 $2,968.85

TRAILER DECKOVER 18-24' $ 5.27 $ 31.60 $ 94.79 $284.37

TRAILER WELL 75 TON $ 74.77 $ 448.60 $ 1,345.80 $4,037.40

TRAILER LOWBOY 55 TON $ 43.80 $ 262.80 $ 788.39 $2,365.18

TRAILER DOLLY SINGLE $ 2.44 $ 14.67 $ 44.00 $131.99

TRAILER CARGO 10' $ 5.27 $ 31.60 $ 94.79 $284.37

TRAILER TILT DECK 29' $ 23.71 $ 142.24 $ 426.71 $1,280.13

TRAILER LOWBOY 30' $ 10.75 $ 64.49 $ 193.46 $580.38

TETON-TRAILER FOG/FAN $ 10.73 $ 64.38 $ 193.14 $579.41

TRAILER FLATDECK (O/S) $ 7.76 $ 46.59 $ 139.76 $419.27

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    47 

 

 

Description Hourly ($/Hour)

Daily (10 HRS) ($/Day)

Weekly (50 HRS) ($/Week)

Monthly (217 HRS) ($/Month)

TRAILER 50-TON LOWBOY (O/S) $ 117.51 $ 705.04 $ 2,115.11 $6,345.33

TRAILER 75-TON (O/S) $ 287.17 $ 1,723.01 $ 5,169.04 $15,507.13

TRAILERS VAN

TRAILER VAN TOOL $ 6.34 $ 38.07 $ 114.20 $342.60

TRAILER VAN 27 - 45 $ 2.32 $ 13.91 $ 41.73 $125.20

TRAILER VAN OFFICE 40 $ 3.36 $ 20.17 $ 60.50 $181.49

TRAILER VAN 6 X 12 S/A $ 4.26 $ 25.56 $ 76.67 $230.02

TRAILER VAN 8 X 16 T/A $ 5.41 $ 32.46 $ 97.38 $292.13

TRUCKS LIGHT

PICKUP 1/2-3/4 TON $ 29.20 $ 175.21 $ 525.62 $1,576.85

PICKUP 1/2-3/4 TON 4X4 $ 36.50 $ 219.03 $ 657.08 $1,971.23

PICKUP 1/2 - 3/4 TON CREWCAB $ 40.71 $ 244.26 $ 732.78 $2,198.34

PICKUP 1/2-3/4 TON EXT CAB $ 36.70 $ 220.21 $ 660.64 $1,981.91

VAN CARGO 1/2-3/4 TON $ 36.70 $ 220.21 $ 660.64 $1,981.91

VAN PASSENGER 12-15 $ 33.86 $ 203.13 $ 609.40 $1,828.21

PICKUP 1/2-3/4 TON EXT CAB 4X4 $ 38.32 $ 229.92 $ 689.75 $2,069.26

SPORT UTILITY VEHICLE $ 31.12 $ 186.74 $ 560.23 $1,680.69

PICKUP 1/4 TON EXT CAB 4X4 $ 28.94 $ 173.63 $ 520.88 $1,562.64

PICKUP 3/4 TON 4X4 DIESEL $ 45.21 $ 271.24 $ 813.72 $2,441.15

PICKUP 1/2-3/4 TON CREWCAB 4X4 $ 42.09 $ 252.56 $ 757.69 $2,273.07

TRUCK MECHANIC 3/4 TON $ 44.36 $ 266.17 $ 798.51 $2,395.53

VEHICLE ATTACHMENTS $ 1.80 $ 10.78 $ 32.35 $97.05

GPS SYSTEM (PER VEHICLE) $ 1.76 $ 10.57 $ 31.70 $95.11

TRUCKS HEAVY

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    48 

 

 

Description Hourly ($/Hour)

Daily (10 HRS) ($/Day)

Weekly (50 HRS) ($/Week)

Monthly (217 HRS) ($/Month)

TRUCK FLATDECK W/MESSAGE $ 65.17 $ 391.02 $ 1,173.05 $3,519.14

TRUCK FLATDECK 1 1/2T CABOVER $ 51.13 $ 306.77 $ 920.30 $2,760.89

TERMINAL/SHUNT TRACTORS $ 88.12 $ 528.72 $ 1,586.17 $4,758.51

TRUCK 1 TON CREWCAB 4X4 DIESEL $ 54.31 $ 325.88 $ 977.65 $2,932.94

TRUCK FUEL 3 TON $ 52.20 $ 313.23 $ 939.68 $2,819.04

TRUCK FLATDECK 1 1/2T CREWCAB $ 48.08 $ 288.46 $ 865.39 $2,596.17

F750 FUEL/LUBE TRUCK DIESEL $ 97.23 $ 583.36 $ 1,750.07 $5,250.21

TRUCK 2 TON FLATDECK $ 64.11 $ 384.65 $ 1,153.96 $3,461.88TRUCK 1 1/2 TON CREW CAB FLAT DECK DIESEL $ 56.85 $ 341.09 $ 1,023.26 $3,069.79

TRUCK FLATDECK 1 TON $ 49.48 $ 296.87 $ 890.62 $2,671.87

TRUCK SERVICE 1 TON $ 36.64 $ 219.84 $ 659.52 $1,978.56

TRUCK MECHANIC 2 TON $ 66.89 $ 401.33 $ 1,203.99 $3,611.96

TRUCK HIGHWAY TRACTOR T/A $ 138.68 $ 832.08 $ 2,496.23 $7,488.70

WATER TRUCK S/A $ 76.47 $ 458.80 $ 1,376.39 $4,129.16

TRUCK SERVICE 2 TON $ 52.77 $ 316.61 $ 949.83 $2,849.48

TRUCK FLATDECK 1T 4X4 DIESEL $ 65.55 $ 393.28 $ 1,179.84 $3,539.52

TRUCK FLATDECK 1 TON 4X4 $ 63.55 $ 381.31 $ 1,143.93 $3,431.79

TRUCK WATER T/A $ 112.72 $ 676.34 $ 2,029.03 $6,087.08

TRUCK FUEL/LUBE 1 1/2 TON $ 69.92 $ 419.50 $ 1,258.51 $3,775.54

BUS 48 PASSENGER USED $ 34.80 $ 208.79 $ 626.37 $1,879.12

TRUCK FLATDECK 1 TON CREW 2WD GAS $ 50.79 $ 304.75 $ 914.24 $2,742.72

CUBE VAN 1 TON DIESEL $ 41.11 $ 246.68 $ 740.04 $2,220.13

ALL TERRAIN VEHICLES

ATV ELECTRIC $ 5.93 $ 35.59 $ 106.76 $320.27

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    49 

 

 

Description Hourly ($/Hour)

Daily (10 HRS) ($/Day)

Weekly (50 HRS) ($/Week)

Monthly (217 HRS) ($/Month)

UTILITY VEHICLE 4X4 DIESEL $ 12.99 $ 77.92 $ 233.77 $701.30

UTILITY VEHICLE KAWASAKI MULE $ 9.60 $ 57.58 $ 172.74 $518.21

ATV GOLF CART $ 7.96 $ 47.75 $ 143.25 $429.75

WELDERS WELDER - GAS OR DIESEL - TRUCK MOUNTED "RIG" $ 30.95 $ 185.72 $ 557.15 $1,671.45

WELDER 250 - 300 AMP DIESEL $ 12.44 $ 74.64 $ 223.93 $671.80

WELDER 300 AMP ELECTRIC $ 1.71 $ 10.24 $ 30.73 $92.20

WELDER 350-400A DIESEL $ 13.54 $ 81.23 $ 243.69 $731.07

WELDER FUSION HDPE $ 9.62 $ 57.69 $ 173.08 $519.23

WELDER INVERTER 450 AMP $ 2.61 $ 15.64 $ 46.91 $140.73

WELDER TIG 350 AMP $ 6.43 $ 38.61 $ 115.82 $347.45

WELDER 150/200 AMP STICK ELEC. $ 1.94 $ 11.65 $ 34.94 $104.82

WELDER, SUB ARC POWER SUPPLY $ 10.89 $ 65.35 $ 196.05 $588.14

WELDER 8-PACK 200 AMP ELECT. $ 15.31 $ 91.88 $ 275.63 $826.89

WELDER 500 AMP DISESL $ 17.91 $ 107.46 $ 322.39 $967.16

WELDER FUSION MCELROY 28 $ 50.08 $ 300.48 $ 901.45 $2,704.36

WELDER FUSION MCELROY 618 $ 93.40 $ 560.40 $ 1,681.19 $5,043.58

HDPE FUSION MACHINE #412 $ 42.84 $ 257.05 $ 771.14 $2,313.41

WELDER FUSION 1/2" TO 2" $ 4.24 $ 25.45 $ 76.35 $229.05

WELDER FUSION 1" TO 4" $ 6.74 $ 40.44 $ 121.32 $363.95

WELDER, 1000 AMP ELECTRIC $ 4.62 $ 27.71 $ 83.14 $249.43

PLASMARC CUTTER EASB 1600 $ 8.09 $ 48.53 $ 145.58 $436.74

SONY VIEW WORKSTATIONS

CLOCK TIME HP4000 RECOGNITION SYS $ 2.15 $ 12.90 $ 38.69 $116.08

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    50 

 

 

Description Hourly ($/Hour)

Daily (10 HRS) ($/Day)

Weekly (50 HRS) ($/Week)

Monthly (217 HRS) ($/Month)

MOBILE TIME SCANNER $ 1.87 $ 11.19 $ 33.58 $100.74

PRINTER BADGE P310 ELTRON $ 0.95 $ 5.67 $ 17.02 $51.05

SCANNER MOBILE RB2K1 KONETIX $ 0.55 $ 3.28 $ 9.83 $29.50

TRAINING WORKSTATIONS $ 1.24 $ 7.44 $ 22.32 $66.97

CONCRETE MATURITY SYSTEM $ 28.70 $ 172.17 $ 516.52 $1,549.55

CHARGER SINGLE DOCK $ 0.33 $ 1.98 $ 5.95 $17.86

SOFTWARE FOR MSDS PROGRAM $ - $ - $ - $0.00

UNDER $5,000.00 $ - $ - $ - $0.00

OVER $5,000.00 $ - $ - $ - $0.00

1. The rental rates for fueled equipment include fuel at $4.00 per gallon. If the cost of fuel exceeds this price for 2 consecutive months, we reserve the right to adjust the rates accordingly.

2. Any equipment not listed on this sheet will be rented from a third party. We will solicit three prices and submit to the owner for approval. The markup for third party equipment is10%.

3. Engineered scaffold systems will be considered a subcontract. We will solicit three prices and submit to the owner for approval.

4. Equipment rates based on 50 hour week at current quoted rates. 5. Equipment rental rates are firm for the project duration.

   

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    51 

 

 

2012 BILLING RATES AND EXPENSE SCHEDULE FOR HOME OFFICE CONSULTING ENGINEERING SERVICES HOURLY BILLING RATES (see Client Billings and Notes)

Salary Plan/Description/Grade/Hourly Billing Rate ($USD) Level Wage Rate 

ADM ‐‐ Administrative/Business    01  $34.89 

Administrative business functions for the firm, including personnel, public relations, publications, purchasing, and other functions. 

  02  $38.35 

  03  $43.80 

  04  $47.97 

  05  $61.50 

  06  $71.17 

  07  $82.90 

  08  $107.04 

  09  $137.34 

ADS ‐‐ Administrative Support    01  $28.61 

Office support including clerical and secretarial.   02  $30.21 

  03  $33.57 

  04  $41.75 

  05  $51.74 

ARC ‐‐ Architecture    01  $45.11 

Architectural design, analysis, and management of the architectural function.   02  $47.30 

  03  $50.06 

  04  $60.17 

  05  $66.05 

  06  $73.95 

  07  $94.01 

CNS ‐‐ Construction Services    01  $45.30 

Construction service functions, including construction management, construction support, resident engineering, and project review. 

  02  $47.90 

  03  $52.86 

  04  $59.30 

  05  $67.43 

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    52 

 

 

HOURLY BILLING RATES (see Client Billings and Notes)

Salary Plan/Description/Grade/Hourly Billing Rate ($USD) Level Wage Rate 

  06  $77.93 

  07  $88.11 

  08  $104.69 

  09  $104.87 

  10  $112.95 

  11   $119.87 

CST ‐ Consulting    01  $212.53 

Provide advisory services to clients regarding operational and administrative functions   02  $268.73 

  03  $282.78 

  04  $338.98 

  05  $374.10 

  06  $423.28 

  07  $465.43 

  08  $493.53 

ENG ‐‐ Engineering  127  $51.64 

Engineering design, analysis, and management. Includes departmental and project assignments including engineering department management. 

128  $55.46 

129  $60.01 

130  $67.96 

131  $80.38 

132  $92.14 

133  $104.16 

134  $121.50 

135  $128.06 

136  $140.06 

ENS ‐‐ Engineering Specialist  128  $48.63 

Professionals who provide expertise and project support for engineering and other types of projects.  129  $50.44 

130  $59.27 

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    53 

 

 

HOURLY BILLING RATES (see Client Billings and Notes)

Salary Plan/Description/Grade/Hourly Billing Rate ($USD) Level Wage Rate 

131  $67.89 

132  $87.42 

133  $92.30 

ENT ‐‐ Engineering Technician  125  $39.72 

Technical designers and drafters.  126  $40.74 

127  $43.19 

128  $48.15 

129  $53.09 

130  $60.10 

131  $71.79 

132  $82.72 

133  $94.63 

134  $103.83 

EST ‐‐ Estimating    01  $48.72 

Professionals who assess the cost related to projects to assist with the preparation of proposals.    02  $51.46 

  03  $54.67 

  04  $58.96 

  05  $70.28 

  06  $92.27 

  07  $105.77 

  08  $114.57 

  09  $133.92 

FIN ‐‐ Finance    01  $33.96 

Project accounting, financial reporting, planning & analysis, accounting operations, and tax.   02  $36.42 

  03  $41.38 

  04  $49.31 

  05  $63.69 

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    54 

 

 

HOURLY BILLING RATES (see Client Billings and Notes)

Salary Plan/Description/Grade/Hourly Billing Rate ($USD) Level Wage Rate 

  06  $69.73 

  07  $82.94 

  08  $92.82 

ITS ‐‐ Information Science    01  $35.09 

Information science functions including systems and software analysis, and network/communications consulting.   02  $37.66 

  03  $39.75 

  04  $59.86 

  05  $71.17 

  06  $83.76 

  07  $92.95 

  08  $111.59 

OFF ‐‐ Office Services    01  $29.00 

Word processing, document control, clerical accounting services, and related group supervisors.    02  $29.78 

  03  $30.55 

  04  $31.84 

  05  $33.30 

  06  $35.61 

  07  $42.58 

  08  $46.14 

PCR ‐‐ Procurement    01  $38.12 

Professionals who secure and administer the purchase of goods, commodities, and services.   02  $44.37 

  03  $50.98 

  04  $57.57 

  05  $67.63 

  06  $76.79 

  07  $94.15 

  08  $106.67 

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    55 

 

 

HOURLY BILLING RATES (see Client Billings and Notes)

Salary Plan/Description/Grade/Hourly Billing Rate ($USD) Level Wage Rate 

  09  $122.10 

PJC ‐‐ Project Controls    01  $48.38 

Professionals who track the cost associated with a project and perform planning and scheduling functions related to projects. 

  02  $54.88 

  03  $59.65 

  04  $69.95 

  05  $80.92 

  06  $90.28 

  07  $106.60 

  08  $118.98 

  09  $125.19 

PMT ‐‐ Project Management    01  $92.54 

Project managers and project directors.    02  $102.20 

  03  $107.84 

  04  $113.78 

  05  $118.02 

  06  $125.79 

  07  $138.28 

  08  $153.19 

SPC ‐‐ Specialized Staff    01  $43.76 

Legal, scientific, economic, and related services for project assignments. Includes scientists, lawyers, economists, etc.   02  $45.09 

  03  $47.00 

  04  $48.45 

  05  $65.41 

  06  $79.27 

  07  $90.84 

  08  $118.95 

  09  $124.67 

e027164
Highlight

Louisville Gas & Electric ‐ Kentucky Utilities | CANE RUN GENERATING STATION 

BLUEGRASS POWER CONSTRUCTORS | Staff and Craft Labor Rates    56 

 

 

HOURLY BILLING RATES (see Client Billings and Notes)

Salary Plan/Description/Grade/Hourly Billing Rate ($USD) Level Wage Rate 

Client Billings:  Client shall pay to Engineer for the performance of the Services the sum of the following amounts unless the compensation is otherwise stated in the specific task assignment. 

1.  Labor cost will be billed as actual hours charged to this project by Black & Veatch personnel and in accordance with the rates above.

2.  Typical and customary home office expenses, including computer related expenses (network server charges, PC usage charges, software and design application charges, printing, plotting, and server storage), reprographic services, document production, fax, telephone, postage/courier, etc. are included in the labor billing rates above. 

3.  Expenses for travel and lodging will be billed at actual cost.  These expenses include cost such as air‐fare, personal mileage, lodging, meals, motor vehicles rental, telephone, special rental equipment, etc. 

4.  Cost of 3rd party services will be billed at actual cost plus 10%.

5.  Field assignments of longer than 60 days will be billed as actual hours charged to this project by Black & Veatch personnel in accordance with  the rate sheet plus uplift as determined by current field services policy.  Expenses for field assignments can be per diem, actual expenses, or a combination of both as specific to the assignment. 

6.  Overtime applies only to non‐exempt personnel as defined by the US Federal Wage and Hour Law.  Overtime will be billed as actual hours charged to this project by Black & Veatch personnel in accordance with the rate sheet plus 50%. 

7.  Any other professionals not specifically identified above will be placed in the most appropriate category above based on function and experience. 

Notes: 

1.  Billing rates are subject to 5% annual increase on each January 1.

2.  This Rate Sheet contains information that may be privileged, confidential and exempt from disclosure under applicable law.  Any unauthorized disclosure, copying, or distribution of this document or any of its contents is prohibited. 

 

e027164
Highlight
e027164
Highlight
e027164
Highlight
e027164
Highlight
e027164
Highlight
e027164
Highlight