exhibition: 7 august - 8 october 2018 - north sydney council...project context exhibition: 7 august...
TRANSCRIPT
-
August 2018
NORTH SYDNEY CENTREWARD STREET PRECINCT
MASTERPLAN
Project Context
Exhibition: 7 August - 8 October 2018
-
2
Ward Street Precinct
M
WARD ST PRECINCT
Warringah Expressway
Berry Square
McLaren St
Hampden St
Wal
ker S
tMill
er S
t
Berry St
NT S
FUTURE METRO STATION Ward St
car park
M
FUTURE METRO ENTRANCE
-
3
Ward Street Precinct, today:
1115 dwellings*
3700 jobs
1890 parking spaces* / 925 public parking spaces
20 sqm of public open space
Within 50 metres of the precinct, today:
960 additional dwellings*
1 Metro station proposed
2 independent schools LEGEND
Victoria Cross Metro Station
Ward Street precinct study area
M
M
M
231 dwellings702 dwellings
400 jobs
3300 jobs
570 parking spaces
Mille
r Stre
et
Wal
ker S
treet
McLaren Street
Berry Street
Angelo Street
Den
ison
Stre
et
War
d St
reet
Har
nett
Stre
et
Hampden Street
Bulli
vant
Lan
e
* Includes existing and approved.
Precinct snapshot
N
-
4
Why a Masterplan?
Strong private development
interest
The opportunity to activate the North
Sydney Centre
The arrival of Victoria Cross
Metro Station in 2024
The return of Ward Street car park to Council in 2020
-
5
Council developed a draft Stage 1 Masterplan for the Precinct in 2016.
Following the exhibition of the draft Masterplan in early 2017, this Stage 2 refinement process was undertaken.
The desire to further refine the masterplan originated out of the following factors:
1. INPUT FROM THE COMMUNITY
2. CHANGES TO SYDNEY METRO PROJECT
3. RELEASE OF THE NORTH DISTRICT PLAN
4. NORTH SYDNEY CAPACITY AND LAND USE STUDY
Refining The Draft Masterplan
-
6
M
M
7,900-10,400PEOPLE
The Stage 2 Masterplan builds upon the Stage 1 work and has integrated and expanded upon the defined place principles:
1. INTEGRATE WITH THE METRO
2. COMPLETE THE PEDESTRIAN CORE
3. ENHANCE THE PUBLIC SPACE JOURNEY
4. ESTABLISH A HUB FOR PUBLIC LIFE
5. STRENGTHEN THE COMMERCIAL CENTRE
Place Principles
-
7
Masterplan approach
Facilitate north-south crossing Develop a variety of open space typologies
Create east-west connections Connect to existing public amenity
Berry Street
Mill
er S
tree
t
McLaren Street
Berry Street
Mill
er S
tree
tMcLaren Street
Berry Street
Mill
er S
tree
t
McLaren Street
Berry Street
Mill
er S
tree
t
McLaren Street
-
8
Miller
Street
Walke
r St
Bradfi
eld Hw
yBerry St
McLaren St
Site Analysis
-
9
No existing views to Harbour, Bridge or Opera House
Existing residential views restricted to east
Miller
Street
Walke
r St
Bradfi
eld Hw
y
Paci
fic H
wy
Berry St
McLaren St
Site Analysis
-
10
Residential Strata Schemes
General Protected Building (Heritage)
Under Construction
Carpark - Council Site
Commercial Strata Scheme
Single Ownership Building
Ausgrid Buildings
Developable Area / Envelope
Miller
Street
Walke
r St
Bradfi
eld Hw
y
Paci
fic H
wy
Berry St
McLaren St
Site Analysis
-
11
Miller
Street
Walke
r St
Bradfi
eld Hw
y
Paci
fic H
wy
Berry St
McLaren St
41 McLaren Street
201 Miller Street
199 Miller Street
146 Walker Street
Site Analysis
-
12
3-4 hrs
1-2 hrs
2-3 hrs
0-1 hr
No. Hours Daylight on 21 June between 9am and 3pm
5-6 hrs
Zone of 4+ hours sunlight without new mass
4-5 hrs
Masterplan Option 01 Miller Street Square
Height to north restricted
Height to north restricted
Location of primaryopen space
Location of primaryopen space
Masterplan Option 02 Central Square
Two masterplan options
-
13
21
3
4
6
7
5C
G
E F
A
B
B
D
B
21
3
45
7
8
6C
G
E F
A
B
B
D
B
Two new public squares with connected laneways. Potential for outdoor dining, events and lunchtime seating.Central Square: 530sqmBerry St Square: 1280sqm
1,563sqm 12
New shared pedestrian/ car zones with ‘right of way’ accessibility for laneway 01.
3 3,740sqmNew cultural hub. A mixed-use facility providing gallery spaces and flexible use spaces.
4
5
6
7
8
1,810sqm
New Stanton Branch Library within the podium of the new setback building at 213-219 Miller St.
1,200sqm
New pedestrianised ‘Eat Street Precinct’
750sqm
New ‘North Berry St Square’ with potential for outdoor dining and lunchtime seating.
1,044sqm
New central public square with connected laneways. Potential for outdoor dining, events and lunchtime seating.
1,563sqm 12 New shared pedestrian/ car
zones with ‘right of way’ accessibility for laneway 01.
3 3,740sqm New cultural hub. A mixed-use facility providing gallery spaces and flexible use spaces.
4
5
6
7
1,200sqm
New Stanton Branch Library facing into Central Square, contained wholly on existing council land.
1,200sqm
New pedestrianised ‘Eat Street Precinct’
750sqm
New ‘North Berry St Square’ with potential for outdoor dining and lunchtime seating.
1,044sqm
2,700+ sqm of dedicated parks, plazas and pedestrianised street to be provided within the precinctTwo masterplan options
-
14
B E R R Y S T R E E T
W A
L K E
R S
T R E
E T
M I L L E
R S
T R E
E T
RL190
RL190
RL155
RL100
RL146
RL85
RL100
C2RL170
RL100
C1
RL209
RL79.5
RL100
RL130
RL132.5
RL180
RL131
RL230
RL213
G
DE
M C L A R E N S T R E E T
ARTHUR STREET
WA
RD
STR
EE
T
HAMPDEN STREET
BRAD
FIELD H
WY W
ARR
ING
AH FW
Y
B
RL230
RL285
HA
RN
ETT S
TRE
ET
B E R R Y S T R E E T
W A
L K E
R S
T R E
E T
M I L L E
R S
T R E
E T
RL70
RL86
RL144
C RL190
RL146
RL100
RL100
RL285
RL155 RL190
RL85
RL160
RL190
RL230
RL79.5
RL209
RL100
RL130
RL132.5
RL180
RL131
RL230
RL213
B
G
DE
F
M C L A R E N S T R E E T
ARTHUR STREET
WA
RD
STR
EE
T
HAMPDEN STREET
BRAD
FIELD H
WY W
ARR
ING
AH FW
Y
HA
RN
ETT S
TRE
ET
Miller Street Square Central SquareMasterplan Option 01 Masterplan Option 02
-
15
(existing)
Miller Street Square
WALKER ST
MILLER ST
MCL
AREN
ST
C
G
E
F
B
D
B
G
Number of storeys
57
01
40
31
23
37
32
0432
25
42
36
Central Square
C
G
E
F
B
D
B
WALKER ST
MILLER ST
MCL
AREN
ST
(no change)
(existing)
Number of storeys
57
40
20
23
37
32
04
06
42
36
(no change)
01
G
04
Residential Hotel Conference/Events Community/Events Commercial Retail
Masterplan Option 01 Masterplan Option 02
Built form outcome
-
16Residential Hotel Conference/Events Community/Events Commercial Retail
Miller Street Square Central SquareMasterplan Option 01 Masterplan Option 02
Built form outcome
-
17Residential Hotel Conference/Events Community/Events Commercial Retail
Miller Street SquareMasterplan Option 01
Built form outcome
-
18
21
3
45
7
8
6C
G
E F
A
B
B
D
B
Miller Street SquareMasterplan Option 01
KEY OBJECTIVES
• A civic scale space on Miller Street
• A suitable entrance and presence for the library
• Provide passive recreation spaces
• Opportunity for significant public art installation
• Opportunity to expand the green canopy and planting
• Create lunch time food and beverage experience
-
19
21
3
4
6
7
5C
G
E F
A
B
B
D
B
Central SquareMasterplan Option 02
KEY OBJECTIVES
• Create a safe connector for all hours of the day and night
• Provide an active, events-focused community square
• Create a lunch time food and beverage experience
• Create a night time / weekend economy destination
• Provide a public presence that reconciles residential and
commercial uses
-
20
Stanton CBD Branch Library
Ward Street Cultural HubFloor space: 3,740sqm2
Floor space: 1,200m2
The Stanton Library Masterplan (endorsed by council on 21 March 2016) highlighted the requirement for a CBD Branch library that will meet the needs of the growing North Sydney work-force.
A modern annex branch library of approximately 1,000sqm would be a suitable size to meet the requirements as per the State Library of NSW ‘Small Library Project’ Guidelines.
Gallery and performance spaces were identified as a priority requirement for the CBD and surrounding areas in the ‘Cultural and Strategic Plan’ 2015-17.
A purpose-built facility contained in the ‘heart of the precinct’ will create a cultural destination and will be supported and mutually reinforced by the branch library and newly formed ‘eat street’ along Ward St providing a multi-faceted destination experience.
Mixed use facility that can accommodate such uses as:
• Gallery spaces
• Artists studios
• Retail and Dining
• Makers spaces
• Co-working spaces
• Child care
• Roof top terraces
• Live performances
Cultural hub - same location for both masterplan options
40North Sydney - North of Centre Precinct Plan
20 m
34.5 m
THE ACTIVATION AGENT: COMMUNITY + COLLABORATIVE HUBHUB LOCATION IS IDEALLY LOCATED IN THE HEART OF THE PRECINCT
4,514 m24 storeysRL 85
HUB USES CAN INCLUDE: • RETAIL/DINING • RECREATION FACILITIES• SKILLS TRAINING• NIGHT COURSES• EXHIBITION + FLEXIBLE
FLOOR SPACE• ARTIST STUDIOS• CHILD CARE• PUBLIC ROOF TOP TERRACE
INSPIRATION: THE COMMUNE, NEWTOWN
-
21
3,955sqm of land is owned by CouncilTotal site area: 3.2 hectares
Existing council-owned land
MIL
LER
STR
EET
WAR
D S
TREE
T
HAR
NET
T ST
REE
T
WAL
KER
STR
EET
BERRY STREET
McLAREN STREET
330 lineal metres of new and enhanced pedestrian connections, lane-ways and spaces
Proposed Pedestrian Network
Masterplan Overall Snapshot
-
22
4,750sqm of new council-ownedcommunity spaces comprising a mix ofcultural and library uses to be providedwithin the precinct
Proposed community facilities(120% of existing council land area)
Delivering high quality employment floorspace
155-185,000 sqm of premium and A grade commercial floorspace which means space for up to 9,250 new workers supporting local business
2,700+ sqm of dedicated parks, plazas and pedestrianised street to be provided within the precinct
Proposed open space(68% of existing council land area)
Masterplan Overall Snapshot
-
23
N
Public domain outcome
M
T
McLAREN ST BERRY ST MOUNT ST BLUE STRIDGE ST
BERRY SQUARE
BRETT WHITELEY PLACEthe civic heart
WARD ST PRECINCTprogramme + activity
eat street
MILLER STREET
PACI
FIC H
IGHW
AY
WALKER STREET
McL
ARE
N S
TREE
T
BERR
Y ST
GREENWOOD PLAZAheritage precinctST. LEONARDS PARK
recreation
DENISON STWARD ST GAS LANEELLIOT ST
future connection
N
M
-
24
Precinct & community needs analysis
Establish vision & key objectivesStage 1 review
Masterplanning & design excercise
Testing & appraisalDesign, planning & economic factors
ConsultationIndustry & community
Indepth stakeholder engagement
Consideration of variables
Exhibition: 7 August - 8 October 2018
Final Masterplan
Implementation strategy