exhibitor's checklist · 2020. 7. 31. · 4 8. identification badges exhibitors are required to...

36
Exhibitor's Checklist No Check Point Deadline Order Form Action/Remarks 1 Signboard Application (Shell/Premium) 26 June 2020 Form #1 2 Full Payment On Invoice 3 Technical Utility Service 26 June 2020 Form #2 10% Surcharge after 18 July 4 Submit 'Heavy Exhibits' 26 June 2020 Form #3 If necessary 5 Submit Invoice of Estimated Exhibits 26 June 2020 6 Submit Invoice, Packing List & B/L 26 June 2020 7 Distribution of Free Visitor Tickets 26 June 2020 If necessary 8 Submit 'Exhibit Move In (Out)' 26 June 2020 Form #4 9 Submit 'Booth Installer' 26 June 2020 Form #5 Space Only Exhibitor 10 Submit 'Booth Installation (Alteration)' 26 June 2020 Form #6 Space Only Exhibitor 11 Application for 'Rigging/ Hanging' 26 June 2020 Form #12 Space Only Exhibitor 12 Application for 'Exhibitor Passes' 26 June 2020 Form #7 13 Application for 'Work Passes' 26 June 2020 Form #8 Space Only Exhibitor 14 Distribution of Exhibitor Passes 18~20 July 2020 15 Distribution of Work Passes 18~20 July 2020 16 Application for 'Extension of Working Hours' By 16:00 on the day Form #9 Whenever necessary 17 SubmitAuthentication of Exhibitor(Exhibits) Form #10 Whenever necessary 18 SubmitCertificate of Exhibit(s) Transfer Form #11 Whenever necessary All necessary forms must be completed and returned by Exhibitors if the services are required or applicable. Services cannot be guaranteed for the forms returned late. Exhibitors who apply for exhibition space after the deadline should return the forms immediately.

Upload: others

Post on 24-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

  • Exhibitor's Checklist

    No Check Point Deadline Order Form Action/Remarks

    1 Signboard Application (Shell/Premium) 26 June 2020 Form #1

    2 Full Payment On Invoice

    3 Technical Utility Service 26 June 2020 Form #2※ 10% Surcharge

    after 18 July

    4 Submit 'Heavy Exhibits' 26 June 2020 Form #3 If necessary

    5 Submit Invoice of Estimated Exhibits 26 June 2020

    6 Submit Invoice, Packing List & B/L 26 June 2020

    7 Distribution of Free Visitor Tickets 26 June 2020 If necessary

    8 Submit 'Exhibit Move In (Out)' 26 June 2020 Form #4

    9 Submit 'Booth Installer' 26 June 2020 Form #5 Space Only Exhibitor

    10 Submit 'Booth Installation (Alteration)' 26 June 2020 Form #6 Space Only Exhibitor

    11 Application for 'Rigging/ Hanging' 26 June 2020 Form #12 Space Only Exhibitor

    12 Application for 'Exhibitor Passes' 26 June 2020 Form #7

    13 Application for 'Work Passes' 26 June 2020 Form #8 Space Only Exhibitor

    14 Distribution of Exhibitor Passes 18~20 July 2020

    15 Distribution of Work Passes 18~20 July 2020

    16 Application for 'Extension of Working Hours' By 16:00 on the day Form #9 Whenever necessary

    17 SubmitAuthentication of Exhibitor(Exhibits) Form #10 Whenever necessary18 SubmitCertificate of Exhibit(s) Transfer Form #11 Whenever necessary

    All necessary forms must be completed and returned by Exhibitors if the services are required or applicable. Services cannot be guaranteed for the forms returned late. Exhibitors who apply for exhibition space after the deadline should return the forms immediately.

  • 1

    Ⅰ. KIMEX 2020 Fact Sheet

    Ⅰ KIMEX 2020 Fact Sheet

    ◇ Show title : Korea International Machinery Expo 2020 (KIMEX 2020)

    ◇ Venue : CECO Center Ⅰ Hall 1~2

    ◇ Show period : 21 ~ 24 July 10:00-17:00

    * 24 July 10:00 ~ 16:00

    ◇ Exhibition scale : 7,632㎡

    ◇ Host : Gyeongsangnam-do, Changwon

    ◇ Organizer : Korea Association of Machinery Industry

    ◇ Accompanied Events

    ․ Opening Ceremony ․ Smart Factory Conference & Open Innovation Conference ․ Smart Manufacturing International Conference ․ Prize Event (Exhibitors & Visitors)

    ◇ Exhibit Category

    ○ Metalprocessing & Productive Technology

    ○ Automation & Smart factory

    ○ Measurement & Test Technology

    ○ Energy & Air-conditioning

    ○ Parts & Materials

  • 2

    Ⅱ General Information

    1. Organizer

    ◇ Korea Association of Machinery Industry (KOAMI)

    ․ 9F., KOAMI Bldg., 37, Eunhaeng-ro, Yeongdeungpo-gu, Seoul, Korea․ Tel : +82-2-369-7800․ Fax : +82-2-369-7899․ Web-site : www.kimex.org․ Email : [email protected] * Note : The organizer stays on site during the whole period of move in & out

    and show days.

    2. Venue

    ◇ CECO

    ․ CECO Center Ⅰ Hall 1,2․ Address : 362, Wonidaero, Uichang-gu, Changwon, Gyeongnam, Korea․ Web-site : www.ceco.co.kr

    3. Floor Loading Capacity

    ◇ 2~3000㎏ / ㎡

  • 3

    Ⅱ. General Information

    4. Ceiling Height

    ◇ 9.5~16m

    5. Schedule for Exhibitors

    Date Time◇ Move-In 18 July ~ 20 July 08:00 - 18:00

    ◇ Show days 21 July ~ 24 July10:00 - 17:00

    * 7. 24 10:00~16:00◇ Opening Ceremony 21 July 11:00 - 11:30◇ Move-Out 24 July ~

    25 July

    16:00 - 22:00

    08:00 - 17:00

    6. Official Contractors

    ◇ See the advertisement column page

    7. Exhibitor's Information Pack

    ◇ All Exhibitors should register at the organizer's site office on arrival at the

    exhibition hall to collect their badges and Exhibitor's information pack.

  • 4

    8. Identification Badges

    ◇ Exhibitors are required to submit Form 8 for exhibitor passes and Form 9 for

    work passes by 10 July 2020 so that they can find their badges at the organizer's

    site office on their arrival before 21 July 2020.

    9. Visitor Invitations & Visitor Tickets

    ◇ Each exhibitor will be given 100 copies of the visitor Invitation cards and tickets

    with the additional 50 copies per booth occupied.

  • 5

    Ⅲ. Rules & Regulation

    Ⅲ Rules & Regulation

    1. Working Hours

    (a) Exhibitors may work at their stand in the exhibition halls from 08:00 to 20:00

    in Move-In period and Move-Out period.

    (b) Exhibitor requiring to extend their working hours in the halls should submit Form

    10 to the organizer on site under the condition that the exhibitor will be

    responsible for all costs incurred and should duly obtain the approval of the

    organizer.

    2. Operation of Exhibit(s)

    (a) The organizer reserves the right to determine the acceptable sound level and

    extent of the demonstrations for working exhibits in case of justifiable complaints

    from other exhibitors.

    (b) Moving machinery must be fitted with safety devices and these safety devices

    should be removed only when the machines are not in operation and not be

    connected to the source of power.

    (c) No motors, engines, contrivances or power-driven machinery may be used without

    adequate protection against fire risk.

    (d) All pressure vessels or equipment under pressure must be conformed to the safety

    standards and regulations.

  • 6

    3. Security

    (a) The organizer will not himself be responsible for the safety of property, exhibit(s)

    or article(s) of any kind brought into the exhibition hall by exhibitors, their

    employees, agents or contractors, members of the public or any other person

    whatsoever during the opening hours of the whole period including move-in,

    move-out period and show days.

    (b) Exhibitors should make sure that they are fully covered by insurance, but not

    restricted to, including all risks on their property, exhibits or articles of any kind,

    public liability and comprehensive protection against any loss or damage caused

    by any circumstance whatsoever whether by reason of fire, water, theft, accident

    or any other cause.

    (c) Exhibitors and their staff will not be allowed to stay in the exhibition halls after

    the show hours and exhibit(s) movement in or out of the halls during the show

    hours is not permitted for security and safety reasons.

    (d) All personnel in the exhibition halls must wear identification badges at all times.

    Exhibitor badges and temporary work passes are available from the organizer's

    office site.

    (e) Security guards will patrol the exhibition halls in general, but their duties will not

    include specific attention to individual stands.

    4. Dangerous Materials

    (a) All materials used in stand construction must be properly fire-proofed in

    accordance with the normal international standards and local regulations.

    (b) No naked lights and lamps or temporary gas or electrical fittings may be used

    in the halls without prior permission from the organizer.

  • 7

    Ⅲ. Rules & Regulation

    (c) No explosives, petrol, dangerous gases or highly inflammable sub-stances are

    allowed in the halls.

    (d) No arms, guns, swords, ammunition, other goods of dangerous nature and goods

    prohibited by the laws of Korea will be allowed into the exhibition halls.

    5. Damage to Stand Structures and Exhibition Premises

    (a) No person/exhibitor under any circumstances shall cut into or through any floor

    carpet or wall nor alter any stand service structure except when authorized in

    writing by the organizer.

    (b) Any such damage to stand structures or exhibition premises shall be invoiced to

    the Exhibitor.

    6. Promotion during the Exhibition

    ◇ Exhibitors are reminded not to place stickers, signs or posters anywhere in the

    hall other than within their own stand. Likewise, exhibitors' representative(s) may

    not distribute catalogues, pamphlets, samples, souvenirs, shopping bags, etc. along

    the gangways or near the entrances since this is unfair to other exhibitors and

    may cause inconvenience to visitors.

    7. Sales on Site

    ◇ Direct sales of any exhibits on site is not permitted without permission of the

    organizers.

  • 8

    8. Group Stands and National Groups

    ◇ Contracting parties or local promotor of the show for Group Stands and National

    Groups are responsible for ensuring that all exhibitors with their group are fully

    aware of, and agree to abide by Terms and Conditions and the Rules and

    Regulations as included in the Exhibitor manual.

    9. Subletting of Stands

    ◇ Exhibitors must not transfer, dispose of, part with or otherwise sublet the whole

    or any part of their space whether for financial consideration or otherwise.

    10. Cancellation of Exhibition Space

    (a) In case of the cancellation of exhibition space after the application deadline, all

    the cost paid by the applicant shall not be refunded.

    (b) These terms cannot be varied under any circumstances.

    11. Cancellation or Postponement of the Fair

    ◇ Should the fair be cancelled or postponed for more than a year due to some

    unavoidable circumstances, exhibitors shall be refunded the whole payments

    excluding the amount already charged for the exhibition hall rent by the

    organizer.

  • 9

    Ⅲ. Rules & Regulation

    12. Payment Terms and Conditions

    (a) The organizer will issue full payment invoice including space rental, organizer's

    shell standard booth and utility services, if applied or ordered.

    (b) All exhibitors must pay their full payment by the date specified on the invoice

    issued by the organizer.

    (c) Exhibitor will not be allowed to occupy his space or stands until full payment

    has been paid to the organizer.

    (d) These terms cannot be varied under any circumstances.

    13. Violation of the Rules and Regulations

    ◇ In the event of the violation of the rules and regulations by an exhibitor, causing

    any negative effect on the operation of the exhibition, the organizer may cancel

    his participation before the show and even after the show opens without any

    refund.

    14. Unexpected Occurrences

    ◇ Any other matters and details not described herein will be decided upon

    deliberation with exhibitor and organizer.

  • 10

    Ⅳ Technical Services

    1. Standard(PREMIUM) Shell Stand

    (a) The organizer will provide side and rear walls, ceiling, carpeting of floor, acrylic

    fascia board with a fluorescent light and the exhibitor's name inscribed, stand

    number tag, an information desk a folding chair and electric light fittings.

    (b) Exhibitors who applied standard shell stand or premium shell stand must submit

    Form 1 to the organizer by 26 June 2020 to inscribe their correct company's name

    on the fascia board.

    (c) Shell standard stands are shown as below.

  • 11

    Ⅳ. Technical Services

    ◇ Specifications

    ․ Back and side walls1m wide and 2.5m high white laminated 3㎜ thick plywood panels joined by

    aluminium section.

    ․ Fascia / Nameboard 1m high and 2m long banner at a height of 2.5m with Exhibitor's name in color

    letterings designated by the organizer.

    * No trade marks, logograph or ad. words are allowed.

    ․ Stand number tag (Acrylic)0.6m high and 0.8m long board with the stand no. attached on the stand pole

    opened to the aisle.

    ․ Ceiling covered with aluminium gratings by 1㎡ each at 2.5m high.

    ․ Floor covered with fire-proofed carpet, laid on concrete.

    ․ Lightinga fluorescent tube in Stand number tag and 5 spotlights mounted on gratings

    each booth.

    ․ Furniture a reception desk and a folding chair only will be provided to each exhibitor

    regardless of the dimension of stand.

  • 12

    (d) Premium standard stands are shown as below.

    < 1 booths 3m × 3m × 4m >

  • 13

    Ⅳ. Technical Services

    < 2 booths 6m × 3m × 4m >

    < 3 booths 9m × 3m × 4m >

  • 14

    2. Booth Installation of Space Only Exhibitor

    (a) Space only exhibitors are required to inform the organizer of the booth installer,

    officially appointed by the organizer (see the back of the manual) through

    submitting Form 5 to the organizer by 26 June 2020.

    (b) Any installation or alteration on raw spaces in the exhibition halls must be

    notified to the organizer by submitting Form 6 by 26 June 2020 for the control

    on the short-term construction.

    (c) The forms returned after the deadline may not be permitted to build any

    construction on site.

    (d) Stand Construction Heights : 4.5m height limit

    ◇ Any stand construction should not be exceeded this

    limit. However, 2 storey stands and special structures

    will be possible. 2 storey stands and special structures

    require approval and are subject to specific conditions.

    (e) Rigging/ Hanging

    ◇ The exhibitors occupying more than 54sq.m of exhibition space may install

    rigging or hanging. Exhibitors installing rigging are required to submit Form

    12 by 26 June 2020.

    ◇ The organizer reserves the right to make adjustments on rigging for the

    overall balance if necessary.

  • 15

    Ⅳ. Technical Services

    3. Power Supply and Lighting

    (a) Electric power of 1kw per booth (AC 220V, Single-phase, 2 wire system, 60㎐)

    shall be served free of charge for lighting use only. Even in this case, exhibitors

    requiring the Electricity for lighting use must submit the relevant order form

    (Form 2) to the organizer by 26 June 2020.

    (b) Power Supply for operating exhibits : US$60 / kw

    Current Type Voltage Frequency

    AC

    Single-phase(Illumination, Power)

    220V60Hz Only

    Three-phase (Power) 220VThree-phase (Power) 380V

    (c) All electrical installations must comply with the existing statutory requirement

    ; the Korea Standard Ordinance of Electrical Installation and all the electrical

    installation work at the exhibition must be carried out by appointed contractors

    of the organizer by exhibitors' shares.

    (d) All electrical equipment must be tested by the official licensed engineer prior to

    turning on the power supply.

    (e) Exhibitors requiring special arrangements (e.g. different voltages and frequency of

    special connections to equipment) must arrange for their own transformers and/or

    converters.

    (f) Exhibitors are required themselves to keep regular voltage and to prevent an

    unexpected damage that may be caused by power failure.

    (g) Electricity shall be partially served a couple of days before the show and be fully

    supplied during the show days beginning 10:00 and cut off at 17:00 automatically.

  • 16

    4. Compressed Air

    (a) Exhibitors requiring compressed air are to submit the relevant order form (Form

    2) and should pay from US$200 to US$300 per line including installation charge.

    (b) The details are as follows.

    Unit Pressure Priceø 9mm

    8.5kg/m2US$200

    ø 15mm US$250ø 20mm US$300

    (c) Exhibitors requiring special arrangements (e.g. different capacity for any sensitive

    exhibits) should prepare own air compressor.

    (d) Compressed air shall be partially served a couple of days before the show and

    be fully supplied during the show days beginning 10:00 and cut off at 17:00

    automatically.

    5. Water Supply and Drainage

    (a) Exhibitors requiring water and drainage should submit the relevant order form

    (Form 2) and should pay US$200 per unit including installation charge.

    (b) The details are as follows.

    Unit Water Pressure PriceWater Supply Drainage

    2.5kg/m2 US$200ø25mm ø50mm

    (c) Water shall be partially served a couple of days before the show and be fully

    supplied during the show days beginning 10:00 and cut off at 17:00 automatically.

  • 17

    Ⅳ. Technical Services

    6. Installation of LAN(Local Area Network)

    (a) Exhibitors requiring to use internet during the show days are to submit the

    relevant order form (Form 2) and should pay US$150 per line including

    installation charge.

    (b) Installation charge of LAN is not included rental of LAN-Card.

    (c) The details are as follows.

    CSU Lan Cable JackE1 or T1 CAT5 UPT Cable RJ-45, 8Pin

    (d) Exhibitors requiring special arrangements (e.g. special connections to PC or

    portable PC) must arrange for their own transformers and/ or converters.

    (e) LAN system shall be partially served a couple of days before the show and be

    fully supplied during the show days beginning 10:00 and cut off at 17:00

    automatically.

    7. Lead management system

    ◇ Exhibitors requiring to use Lead management system during the show days are

    to submit the relevant order form (Form 2) and should pay US$200 per unit

    including installation charge.

    8. Application and Alternation for Utility Services

    (a) Exhibitors requiring to use technical services are to submit the relevant order

    form (Form 2) and should fully pay the due payment to the organizer by the date

    on Invoice.

    (b) Any alteration or application of the services ordered after 18 July 2020 shall be

    added 10% surcharge.

  • 18

    Ⅴ Exhibits Move-In & Move-Out

    1. Schedules of Exhibits Move-In & Move-Out

    (a) Schedules are as follows.

    Date Time◇ Move-In 18 July ~ 20 July. 2020 08:00 - 18:00

    ◇ Move-Out24 July ~ 20 July. 2020

    24 July ~ 25 July. 2020

    16:00 - 22:00

    08:00 - 17:00

    (b) Exhibitors are required to submit Form 4 to the organizer not later than 24 July

    2020.

    (c) Exhibitor requiring to extend their working hours in the halls should submit Form

    10 to the organizer on site under the condition that all costs incurred will be

    borne by the exhibitor and should duly obtain the approval of the organizer.

    2. Establishment of Bonded Area

    (a) Exhibition hall will be appointed as Bonded area by Changwon Customs to

    exhibit overseas exhibit(s) without imported tax.(ATA-Carnet)

    (b) In case any exhibitor transport his exhibit(s) with ATA-Carnet condition, his

    exhibit(s) must be taken out of Korea after the end of KIMEX 2020.

  • 19

    Ⅴ. Exhibits Move-In & Move-Out

    3. Inspection of Exhibit(s)

    ◇ Exhibit(s) inspection in the exhibition hall shall be made in the presence of the

    person in charge of the exhibits according to the followings.

    Date Time◇ Move-In Inspection 18 July ~ 20 July. 2020 09:00 - 18:00

    ◇ Move-Out Inspection24 July ~ 20 July. 2020

    24 July ~ 25 July. 2020

    16:00 - 20:00

    09:00 - 18:00

    4. Directions of Exhibit(s) Transport

    (a) Exhibitors should carry out their own customs formalities without any delay and

    should submit Form 10 to the organizer if necessary for the 'Authentication of

    Exhibitor (Exhibits)' to be issued by the organizer since exhibitors themselves are

    to be responsible for the clearance.

    (b) All articles carried into the exhibition hall in bond shall not be moved out without

    the prior approval of the organizer and the customs.

    (c) A copy of invoices of bonded exhibits should be given to the organizer no later

    than 19 June 2020. Invoices and packing lists should be respectively made in

    turns ; 1) Exhibits, 2) Samples or Experimental equipments and 3) Articles of

    consumption or Processed goods.

    (d) Consignee/Notify Party on invoice and B/L should be our official contractor. State

    names of exhibiting items and clearly describe them.

    (e) It is to accommodate convenience by designating one party in charge. It is not

    mandatory for exhibitors to hire a consignee among our official contractors.

    (f) Exhibitors bear all responsibility for customs clearance of exhibits. It is advised

    for exhibitors to prevent misplaced or delayed deliveries.

  • 20

    Ⅵ Other Services & Facilities

    1. Cleaning Service

    (a) The organizer will arrange for the general cleaning of the exhibition

    halls(excluding inside of booth stands and exhibits/ display) during the show

    period and prior to the opening of the show but it is the responsibility of the

    exhibitors to keep their own stand tidy at all times.

    (b) Exhibitors are requested not to place any rubbish or useless materials in the aisles

    at the end of each day to avoid confusion and to be removed by the cleaners with

    no fail.

    2. Furniture & Fixture On Hire

    (a) Exhibitors requiring furniture or fixture may hire one from the designated

    contractors.

    (b) Refer to Official Contractor.

    3. Parking Service

    Exhibitors can take 'Free parking Support' service during the show

    ** Free parking tickets will be offered during the show.

  • 21

    Ⅵ. Other Services & Facilities

    4. Access to the venue(how to get CECO)

    ◇ Exhibitors requiring travel services such as air ticket and accommodation are

    recommended to refer to CECO web page.

    5. Accommodation

  • 22

    6. Official Contractor

    CATEGORY COMPANY CONTACT LIST

    StandFitting

    TEL

    FAX

    WEB

    E-MAIL

    FurnitureRental

    MIS

    TEL +82-55-212-1100

    FAX +82-55-212-1110

    WEB www.cecotop.com

    E-MAIL [email protected]

    Transportation, Customs

    clearance & On-site handling

    KUNG CORP.

    TEL +82-2-6352-5300

    FAX +82-2-6352-5304

    WEB www.k-ung.com

    E-MAIL [email protected]

    Visitor Registration

    SolutionWIZNET

    TEL +82-2-2038-3354

    FAX +82-2-2038-3346

    WEB www.wiznet.ai

    E-MAIL [email protected]

    Power Supply O Sang

    TEL+82-51-747-4421

    (+82-10-8521-0979)

    FAX +82-51-747-4427

    WEB -

    E-MAIL [email protected]

    Compressed Air Dea You

    TEL+82-51-861-3143

    (+82-10-3862-3143)

    FAX +82-51-868-0934

    WEB -

    E-MAIL [email protected]

    +82-51-504-0211

    +82-51-504-0221

    www.thekplus.co.kr

    [email protected]

    KPLUS

  • 23

    Ⅵ. Other Services & Facilities

    Return by 26 June 2020 FORM 1

    KIMEX 2020(21 July ~ 24 July)

    This form must be returned by shell standard(premium shell standard) exhibitors.

    SIGNBOARD APPLICATION (SHELL/PREMIUM)

    We have already applied for shell scheme. □ Yes ( )sq.mWe have already applied for premium shell scheme. □ Yes ( )sq.m

    Our stand facia wordings are : (IN BLOCK LETTER PLEASE)

    Note : Only one facia name is allowed on each exhibiting stand. However, approval for more than one facia name may be granted by the organizer for individual stand size of 9 square meters and above.

    Exhibiting Company : Person in charge : Tel : E-mail : Signature : Date :

  • 24

    Return by 26 June 2020 FORM 2

    KIMEX 2020(21 July ~ 24 July)

    This form must be returned by exhibitors requiring

    TECHNICAL UTILITY SERVICES

    We would like to order following utilities.

    ◇ ELECTRICITY

    Illumination & Power Qty. Price/Unit Cost220V Single Phase Illumination ㎾ Free of Charge *1㎾ per 9㎡220V Single Phase Power ㎾

    US$60US$

    220V Three Phase Power ㎾ US$380V Three Phase Power ㎾ US$

    TOTAL : US$

    ◇ LAN(Local Area Network)

    Type Qty. Price/Unit CostE1 or T1 Unit US$ 150 US$

    TOTAL : US$

    ◇ COMPRESSED AIR, WATER SUPPLY & DRAINAGE

    Item Qty. Price/Unit Cost

    Compressed Airø 9mm Unit US$200 US$

    ø 15mm Unit US$250 US$ø 20mm Unit US$300 US$

    Water Supply & Drainage Unit US$200 US$TOTAL : US$

    ◇ LEAD MANAGEMENT SYSTEM

    Item Qty. Price/Unit CostExhibitor Badge Scanner Unit US$ 150 US$

    TOTAL : US$

    Exhibiting Company : Person in charge : Tel : E-mail : Signature : Date :

  • 25

    Ⅵ. Other Services & Facilities

    Return by 26 June 2020 FORM 3

    KIMEX 2020(21 July ~ 24 July)

    This form must be returned by exhibitors requiring

    HEAVY EXHIBITS

    Do you have any exhibit and/or packing case exceeding 5,000kg? □ Yes □ No

    If yes, please complete the table below and attach the catalogues

    No Item / Description Weight (kg) Date of Arrivalin Korea

    1

    2

    3

    4

    5

    6

    7

    ※ Please attach a separate sheet to this form if the space given is insufficient

    Such exhibits must be arrive in good time for port clearance and reached the exhibition site on or by the first day of build-up period. All such exhibits, without exception, must be handled by our official freight forwarders or site installation contractors on site. Note : Do not expect any availability of storage for empty cartons/packing on site.

    Exhibiting Company : Person in charge : Tel : E-mail : Signature : Date :

  • 26

    Return by 26 June 2020 FORM 4

    KIMEX 2020(21 July ~ 24 July)

    This form must be returned by all Exhibitors.

    EXHIBIT MOVE IN (OUT)

    We are going to move the following exhibit(s) into (out of) the exhibition hall by the Time & Date schedule of Move In : and Move Out :

    No Exhibit Item Unit Quantity Remarks

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    ※ Please attach a separate sheet to this form if the space given is insufficient

    Exhibiting Company : Person in charge : Tel : E-mail : Signature : Date :

  • 27

    Ⅵ. Other Services & Facilities

    Return by 26 June 2020 FORM 5

    KIMEX 2020(21 July ~ 24 July)

    This form must be returned by space only Exhibitors.

    BOOTH INSTALLER

    We have made a contract with the following installer to set up our booth in the exhibition hall and shall abide by the relevant rules and regulations to the booth installation.

    Contractor

    Supervisor Telephone

    E-mail

    Construction Schedule : From To ( days long)

    Number of Workers on site : (Male : Female : )

    Exhibiting Company : Person in charge : Tel : E-mail : Signature : Date :

  • 28

    Return by 26 June 2020 FORM 6

    KIMEX 2020(21 July ~ 24 July)

    This form must be returned by space only exhibitors.

    BOOTH INSTALLATION (ALTERATION)

    We hereby inform the Organizer of the installation (alteration) of our own exhibition booth as the enclosed blueprinted layout with the following particulars.

    Reason for Alteration (if any)

    * Enclosure : a copy of the full blueprints for the booth installation.

    Exhibiting Company : Person in charge : Tel : E-mail : Signature : Date :

  • 29

    Ⅵ. Other Services & Facilities

    Return by 26 June 2020 FORM 7

    KIMEX 2020(21 July ~ 24 July)

    This form must be returned by all Exhibitors.

    EXHIBITOR PASSES

    All Exhibitors must submit the names of their staff including those from their associated companies who will be manning their own stand, for the prefabrication of the exhibitor passes. These passes are to be collected from the organizer's office during 18~20 July 2020. Exhibitors moving in and out of the exhibition will be identified by such passes only, and for security reasons no persons will be allowed into the exhibition grounds without the passes.

    We require badges for the following staff.

    No Name Position

    1

    2

    3

    4

    5

    6

    7

    8

    9

    ※ Please attach a separate sheet to this form if the space given is insufficient

    Exhibiting Company : Person in charge : Tel : E-mail : Signature : Date :

  • 30

    Return by 26 June 2020 FORM 8

    KIMEX 2020(21 July ~ 24 July)

    This form must be returned by space only Exhibitors.

    WORK PASSES

    All personnel for stand installation in the exhibition hall must submit the names of the workers for the prefabrication of temporary work passes. These passes are to be collected from the organizer's office during 18~20 July 2020. Workers moving in and out of the exhibition site will be identified by such passes only and for security reasons no persons will be allowed into the exhibition grounds without the passes.

    We require badges for the following worker(s).

    No Company Name

    1

    2

    3

    4

    5

    6

    7

    8

    9

    ※ Please attach a separate sheet to this form if the space given is insufficient

    Exhibiting Company : Person in charge : Tel : E-mail : Signature : Date :

  • 31

    Ⅵ. Other Services & Facilities

    By 16:00 On site When necessary FORM 9

    KIMEX 2020(21 July ~ 24 July)

    This form must be returned by exhibitors requiring

    EXTENSION OF WORKING HOURS

    During the period of Move In and Move Out, exhibitors may work at their own stand in the exhibition hall from 08:00 to 20:00 everyday. Exhibitors requiring to extend their working hours in the halls must submit this form to the Organizer on site and must duly obtain the approval from the Organizer. All costs incurred shall be borne by the Exhibitor. (payed)

    We need to extend the working hours after 20:00 by the following particulars.

    Hall No. to be used

    Reason for Extension

    Extension Schedule : From 20:00 To ( Hours long)

    Date : 2020

    Exhibiting Company : Person in charge : Tel : E-mail : Signature : Date :

  • 32

    Any time when necessary FORM 10

    KIMEX 2020(21 July ~ 24 July)

    This form must be returned by Exhibitors requiring.

    AUTHENTICATION OF EXHIBITOR (EXHIBITS)

    We, Korea Association of Machinery Industry, the organizer of KIMEX 2020 hereby authenticate the followings in the confirmation of the exhibitor or exhibit(s) participating in the show.

    1. Exhibition Title : KIMEX 2020 [Korea International Machinery Expo 2020] Dates : 21 July ~ 24 July, 2020 Venue : CECO, Changwon, Korea

    2. Exhibitor Name Address President Signature 3. Exhibit(s) Details

    No Exhibit(s) Description Quantity Country of Origin Remarks1234

    4. Authenticated For

    Authenticated and Dated by KOAMI

  • 33

    Ⅵ. Other Services & Facilities

    Any time when necessary FORM 11

    KIMEX 2020(21 July ~ 24 July)

    This form must be returned by Exhibitors requiring

    CERTIFICATE OF EXHIBIT(S) TRANSFER

    We, Korea Association of Machinery Industry, hereby certify that the following item(s) imported in bond to be exhibited in KIMEX 2020 (Korea International Machinery Expor 2020) must be transferred to the transferee specified as follows.

    1. Exhibit Item(s)

    No B/L No. Exhibit Item & Description Quantity Country of Origin Remarks1

    2

    3

    4

    ※ Please attach a separate sheet to this form if the space given is insufficient.

    2. Transferee Name Address Telephone E-mail President Signature

    3. Certified For

    Enclosure : 1. Each copy of B/L, Invoice, Packing List for the bonded importation 2. Each copy of L/C and a dossier of the relevant evidential documents

    Certified and Dated by KOAMI

  • 34

    Return by 26 June 2020 FORM 12

    KIMEX 2020(21 July ~ 24 July)

    This form must be returned by space only Exhibitors.

    Rigging/ Hanging

    1. Service Provider Information

    Truss Structure

    Check

    Company Name CEO

    Person in Charge Position

    Tel. E-mail

    Rigging

    Company Name CEO

    Person in Charge Position

    Tel. E-mail

    2. Details

    No Size (㎜)(Width × Depth × Height)Weight

    (㎏) Installing ItemsStructural Analysis

    Check(Y/N)× × Truss □ Lighting □ Y/N

    × × Truss □ Lighting □ Y/N

    × × Truss □ Lighting □ Y/N

    ※ Please tick the box if applicable.

    Exhibiting Company : Person in charge : Tel : E-mail : Signature : Date :