existing sanitary sewer impacts · corocord o c u l u s play equipment 5-12 years old climbing...
TRANSCRIPT
mosaic park ARLINGTON COUNTY
O C U L U S
Existing Sanitary Sewer Impacts
Final Master PlanPlan
Phase 1 Master Plan - Phase 1
Phase 1 Phases 1 & 2Conceptual Site Plan
O C U L U SWood & Water
O C U L U SWood Platform Seating
O C U L U SInteractive Water Feature
O C U L U SInteractive Water – Fan Jets
O C U L U SInteractive Water – Water Plate
Solar Solar
Wind
O C U L U SGreen Energy
O C U L U SGreen Energy - Wind
O C U L U SGreen Energy - Wind
O C U L U SGreen Energy - Solar
O C U L U SGreen Energy - Solar
O C U L U SPlayground EARTHWORKS
O C U L U SPlayground EARTHWORKS
O C U L U SPlayground EARTHWORKS
O C U L U SPlayground – Fall Zones
O C U L U SPlay Equipment Mounds - Slides
KompanCorocord
Kompan
O C U L U SPlay Equipment 5-12 years old CLIMBING
Kompan Corocord
O C U L U SPlay Equipment - Wood
‘play pump’
Kompan
O C U L U SPlay Equipment SPINNING
Sonic Architecture
Richter
O C U L U SPlay Equipment SOUND
Richter
Richter
Richter
Goric
Richter
Richter
O C U L U SPlay Equipment 2-5 years old
Goric Kompan
No Fault
Pebble-Flex
O C U L U SPlay Surfacing POURED IN PLACE
3/8” Wearing Surface Pebbles
1-1/8” SBR Recycled Rubber
Recycled Rubber Foam
(depth varies with fall height)
*Base will be concrete or asphalt,
Or compacted aggregatep gg g
Compacted Aggregate Base:
• Storm water collects in perforated pipe below grade and connects to storm drainage system
Concrete or Asphalt Base:
• Storm water sheets off surface into drain system.
system.
O C U L U SPlay Surfacing PEBBLE-FLEX POURED IN PLACE
PERFORATED METAL
O C U L U SFencing CHAIN LINKWire Mesh
O C U L U SSite Lighting LED + DARK SKY
O C U L U SSite Lighting LED + DARK SKY
O C U L U SConceptual Site Plan
mosaic park ARLINGTON COUNTY
O C U L U S