Exoplanet Exploration Program Large Binocular Telescope Interferometer (LBTI) Operational Readiness Review (ORR) PI: Phil Hinz, UA PS: Rafael Millan-Gabet, NExScI April 2015 The technical data in this document is controlled under the U.S. Export Regulations, release to foreign persons may require an export authorization.

Upload: tamsin-curtis

Post on 29-Dec-2015

214 views

Category:

Documents


1 download

TRANSCRIPT

Exoplanet Exploration Program

Large Binocular Telescope Interferometer (LBTI)Operational Readiness Review (ORR)

PI: Phil Hinz, UA

PS: Rafael Millan-Gabet, NExScI

April 2015

The technical data in this document is controlled under the U.S. Export Regulations, release to foreign persons may require an export authorization.

ExoPlanet Exploration Program

Agenda

2The technical data in this document is controlled under the U.S. Export Regulations, release to foreign persons may require an export authorization.

Start Duration End Topic Who8:00 AM 0:10 8:10 AM Welcome and Introductions Buell Januzi, Director,

Steward Observatory8:10 AM 0:10 8:20 AM Review Board Charter & Success Criteria Muthu Jeganathan,

PM @ JPL8:20 AM 0:20 8:40 AM LBTI Overview and PLRA Phil Hinz, PI8:40 AM 0:30 9:10 AM Measurement Approach Phil Hinz, PI9:10 AM 0:50 10:00 AM Compliance with PLRA performance requiremens Phil Hinz, PI

10:00 AM 0:15 10:15 AM Break10:15 AM 0:15 10:30 AM LBT Operational Readiness C. Veillet, LBT10:30 AM 0:45 11:15 AM LBTI Operational Readiness Phil Hinz, PI11:15 AM 0:45 12:00 PM Nexsci Operational Readiness Rafael Millan-Gabet12:00 PM 1:00 1:00 PM Lunch1:00 PM 0:30 1:30 PM Documentation Hop Bailey, PM @ UA1:30 PM 0:30 2:00 PM Open issues and action items Hop Bailey, PM @ UA2:00 PM 0:30 2:30 PM Schedule & cost Hop Bailey, PM @ UA2:30 PM 0:30 3:00 PM Questions and answers (reseve)3:00 PM 0:30 3:30 PM Board Caucus Board3:30 PM 0:15 3:45 PM Break3:45 PM 0:15 4:00 PM Board Feedback to Project Board4:00 PM Adjourn

ExoPlanet Exploration Program

Charter

• Charter– This ORR evaluates the readiness of the LBTI Project to support HOSTS

observations, and the readiness of LBT, LBTI and NExScI to assume responsibility for HOSTS operations in support of the general astronomy community

• Scope– Compliance with Program Level Requirements Appendix (PLRA) goals

(i.e., derived requirements)– science data management readiness for full science operations– Status of operations plans and procedures– Status of required hardware, software, staffing and facilities– Status of RFAs from past reviews– Risk items and mitigation approaches

3The technical data in this document is controlled under the U.S. Export Regulations, release to foreign persons may require an export authorization.

ExoPlanet Exploration Program

Success Criteria

1. LBTI performance meets PLRA threshold requirements2. LBTI science data management planning and procedures

meet all PLRA requirements3. The necessary interferometer operations plans and procedures are

complete, documented and in place, and under configuration mgmt4. The necessary pipeline processing algorithms, plans and procedures

are complete, documented and in place, and under config. mgmt5. The necessary staffing is in place and training has taken place6. The required actions from previous reviews have been addressed7. Identified risks are acceptable8. UA and NExSci are ready to assume responsibility for LBTI operations

and data delivery & archive

4The technical data in this document is controlled under the U.S. Export Regulations, release to foreign persons may require an export authorization.

OLD

ExoPlanet Exploration Program

ORR Success Criteria to enter SVP

1. LBTI performance requirementsa) LBTI demonstrates 12 zodi sensitivity (1 ,s single star measurement, PLRA zodi model)b) Credible plans documented to meet PLRA threshold performance requirements (6 zodi, 0.3

mJy) by end of science validation phase with low-medium riskc) In-guide plan and assumptions for SVP and HOSTS are documented and the science scope

and available nights are consistent

2. LBTI science data management planning and procedures meet all PLRA requirements

3. The necessary interferometer operations plans and procedures are complete, documented and in place, and under configuration mgmt

4. The necessary pipeline processing algorithms, plans and procedures are complete, documented and in place, and under config. mgmt

5. The necessary staffing is in place and training has taken place6. The required actions from previous reviews have been addressed7. Project risks are documented and acceptable8. During SVP, UA is ready to assume responsibility for LBTI operations and data

delivery; and NExSci is ready to assume responsibility for archive

5The technical data in this document is controlled under the U.S. Export Regulations, release to foreign persons may require an export authorization.

ExoPlanet Exploration Program

Board

• TBD (NASA HQ), Program Scientist - Chair• TBD (JPL)• TBD (UA)• TBD (NExScI)

• Ground rules:– Board Chairman calls time on presentations/discussions– Project responds to written Recommendations for Action from Board

• RFA forms available• Audience RFAs accepted through Board member• Project response will either provide closure information, identify future

action plan to close, or indicate taken as an advisory

6The technical data in this document is controlled under the U.S. Export Regulations, release to foreign persons may require an export authorization.

Potential board members:• Fred Vescelus (JPL)• Mark Colavita (JPL)• Charley Noecker (JPL)• Steve Macenka (JPL)• George Rieke (UA)• Chas Beichman

(NExScI)• John Monnier (U. Mich -

science)

LBTI History, Overview and PLRA

Phil Hinz, LBTI PI

ExoPlanet Exploration Program

LBTI Overview

8The technical data in this document is controlled under the U.S. Export Regulations, release to foreign persons may require an export authorization.

ExoPlanet Exploration Program

LBT Overview

• Include1. Organization, roles and responsibilities2. Project success criteria / science obsjectives3.

9The technical data in this document is controlled under the U.S. Export Regulations, release to foreign persons may require an export authorization.

ExoPlanet Exploration Program

HOSTS Survey

10The technical data in this document is controlled under the U.S. Export Regulations, release to foreign persons may require an export authorization.

ExoPlanet Exploration Program

PLRA Performance Goals

• For full success, the LBTI project shall:– Survey the exozodiacal flux of 50 nearby stars with a 1s noise

equivalent corresponding to 3 times the signal due to the zodiacal dust in our own planetary system (3 zodi) (HOSTS survey)

– Complete the HOSTS survey within 4 years after completion of commissioning (integration and testing [I & T])

11The technical data in this document is controlled under the U.S. Export Regulations, release to foreign persons may require an export authorization.

ExoPlanet Exploration Program

PLRA Instrument Requirements

• The threshold performance requirements to be met by the LBTI instrument shall include:1. Photometric sensitivity (1s ): 0.3 mJy, over bandpass 10-12.5

(standard N’ filter), to be reached during the elementary per-star observing sequence

2. Calibrated null stability (1s) of 1.5x10 -4 (planned null depth 1x10-3),2 to be reached for a full calibration cycle.

• The elementary observing sequence includes measurements to calibrate the background and provide flux normalization, and is expected to last about 30 min with 30% duty cycle, resulting in about 10 min of integration time. A full calibration cycle will typically include three such observing sequences of the target star, bracketed by observing sequences on calibrator stars.

12The technical data in this document is controlled under the U.S. Export Regulations, release to foreign persons may require an export authorization.

ExoPlanet Exploration Program

Data Requirements

13The technical data in this document is controlled under the U.S. Export Regulations, release to foreign persons may require an export authorization.

Measurement Approach

Phil Hinz, LBTI PI

ExoPlanet Exploration Program

• As needed explaining– Measurement sequence– Calibration– Data products (L0-L2) and algorithms– …

15The technical data in this document is controlled under the U.S. Export Regulations, release to foreign persons may require an export authorization.

Compliance with PLRA Requirements

Phil Hinz, LBTI PI

ExoPlanet Exploration Program

Photometric Sensitivity

• Measured performance vs requirement– Current metric plot

• What is it• How is it measured• Error bars, repeatability, accuracy

• If Baseline requirements are met, great.• If baseline requirements are not met but threshold requirements

are met, what is the plan to get to baseline requirement• If threshold requirements are not met (but close), why is it ok?

17The technical data in this document is controlled under the U.S. Export Regulations, release to foreign persons may require an export authorization.

ExoPlanet Exploration Program

Photometric Error Budget

18The technical data in this document is controlled under the U.S. Export Regulations, release to foreign persons may require an export authorization.

ExoPlanet Exploration Program

Null Uncertainty

• Measured performance vs requirement– Current metric plot

• What is it• How is it measured• Error bars

• If Baseline requirements are met, great.• If baseline requirements are not met but threshold requirements

are met, what is the plan to get to baseline requirement• If threshold requirements are not met (but close), why is it ok?

19The technical data in this document is controlled under the U.S. Export Regulations, release to foreign persons may require an export authorization.

ExoPlanet Exploration Program

Null Uncertainty Error Budget

20The technical data in this document is controlled under the U.S. Export Regulations, release to foreign persons may require an export authorization.

ExoPlanet Exploration Program

LBTI science output w.r.t Mission Success Criteria

• How does the null uncertainty and photometric sensitivity relate to Mission Success Criteria– Conversion to Zodi levels

• Rafel/Denis/Bertrand’s slides

21The technical data in this document is controlled under the U.S. Export Regulations, release to foreign persons may require an export authorization.

ExoPlanet Exploration Program

HOSTS Survey to date

• As needed

22The technical data in this document is controlled under the U.S. Export Regulations, release to foreign persons may require an export authorization.

ExoPlanet Exploration Program

Plan to Complete HOSTS Survey

• Whats in the baseline: number of nights, stars, etc.

• It is clear we will not meet 50 star requirement with available resources in the baseline

• What additional resources are needed – lien for FY18

23The technical data in this document is controlled under the U.S. Export Regulations, release to foreign persons may require an export authorization.

LBT Operational Readiness

Christian Veillet, LBT Director

ExoPlanet Exploration Program

• As needed explaining– Pre-run checkout procedures – Threshold metrics to proceed– …

25The technical data in this document is controlled under the U.S. Export Regulations, release to foreign persons may require an export authorization.

LBTI Operational Readiness

Phil Hinz, LBTI PI

ExoPlanet Exploration Program

• As needed explaining– Pre-run checkout procedures – Threshold metrics (with internal source?) to proceed– …– Operations plans & procedures– Documentation, configuration management, maintenance & sparing– Staffing, training, commands & sequences– Risk management– Problem/Issue reporting and tracking– Have lessons learnt from commissioning runs incorporated into

operations plan– Status of facilities, including software development environments

27The technical data in this document is controlled under the U.S. Export Regulations, release to foreign persons may require an export authorization.

ExoPlanet Exploration Program

• Operations system team readiness, including plans and risk assessment for any outstanding items

• 1. Staffing plans and status• 2. Personnel training status• 3. Interfaces status• 4. Procedures status• 5. Tools status• 6. Software status• 7. Facilities status• 8. Contracts status

28The technical data in this document is controlled under the U.S. Export Regulations, release to foreign persons may require an export authorization.

NExScI Operational Readiness

Rafael Millan-Gabet, PS

ExoPlanet Exploration Program

• As needed explaining– Pipeline processing algorithm

– …– Planning tools and schedules, data capture, archiving & curation– Data visualization, data QA, staffing, configuration management, – Interface with UA/LBTI– Pipeline processing with commissioning data– Project management during operations Phase– Issues

30The technical data in this document is controlled under the U.S. Export Regulations, release to foreign persons may require an export authorization.

ExoPlanet Exploration Program

Compliance w requirements

• Have we demonstrated:– Level 0 data to NExScI within 72 hrs of observation– Level 1 data to NExScI within 20 workdays of observation– Level 2 data to NExScI within 40 workdays of observation

– I recommend this be planned for the data from Jan run at some level of automation.

• How is “the quality and integrity of data” determined and assessed

31The technical data in this document is controlled under the U.S. Export Regulations, release to foreign persons may require an export authorization.

ExoPlanet Exploration Program

Archival

• Describe the Web and Program interface– I assume this will be ready by ORR

• What’s the content at the time of the ORR– A table summarizing null sequence observation in db and its data

volume

32The technical data in this document is controlled under the U.S. Export Regulations, release to foreign persons may require an export authorization.

Documentation

Hop Bailey, PM

ExoPlanet Exploration Program

Documentation of plans/procedures complete

34The technical data in this document is controlled under the U.S. Export Regulations, release to foreign persons may require an export authorization.

Title Version & Owner Status

Risks, Action Items and Open Issues

Hop Bailey, PM

ExoPlanet Exploration Program

Risks

36The technical data in this document is controlled under the U.S. Export Regulations, release to foreign persons may require an export authorization.

ExoPlanet Exploration Program

All Action Items Closed

37The technical data in this document is controlled under the U.S. Export Regulations, release to foreign persons may require an export authorization.

ExoPlanet Exploration Program

Open Issues

38The technical data in this document is controlled under the U.S. Export Regulations, release to foreign persons may require an export authorization.

Schedule, Costs & Liens

Hop Bailey, PM

ExoPlanet Exploration Program

Hosts Survey Schedule

40The technical data in this document is controlled under the U.S. Export Regulations, release to foreign persons may require an export authorization.

ExoPlanet Exploration Program

Cost Profile (FY15-17)

41The technical data in this document is controlled under the U.S. Export Regulations, release to foreign persons may require an export authorization.

ExoPlanet Exploration Program

Liens for FY18 & beyond

• Extra nights to complete survey• Detector upgrade?• Spares?

42The technical data in this document is controlled under the U.S. Export Regulations, release to foreign persons may require an export authorization.

ExoPlanet Exploration Program

Decommissioning Plan

• What happens after FY17/18?– LBTI instrument and associated H/W– Archive at Nexsci?

43The technical data in this document is controlled under the U.S. Export Regulations, release to foreign persons may require an export authorization.

Wrap-up

Phil Hinz, PI

ExoPlanet Exploration Program

Summary

45The technical data in this document is controlled under the U.S. Export Regulations, release to foreign persons may require an export authorization.