Exploration, drilling, well completion and testing of deep-seated aquifers

Leif Bjelm, prof.Engineering Geology, Lund University, Sweden.

ARGeo C-1. Addis Abeba, 2006.

Page 2: Exploration, drilling, well completion and testing of deep

Lund in Europe adjacent to the Tornquist zone,TZ

Page 3: Exploration, drilling, well completion and testing of deep

Exploration Scheme

Design & construction of production systemsGroundwater, geothermal energy etc.

Propose sites for production wellsProduction drilling & Well design

Bidding and contracting

Exploration Drilling & testingSampling & bore hole geophysics

Calibration, revision and prospect evaluation

Siting of Expl. drillholes. Logistics & permitsPrepare Drilling programme.

Bidding & contracting

Data interpretation & Revision of CGMComplementary geology &geophysics etc.

Execution of reconn. Expl. prgrm.Geophysics, reconn. drilling. etc.

Revision of 1st CGMFormulate reconn. exploration programme

Desk top work and field control

Formulation of 1st Conceptual Geological Model/ CGM /

Governing needs and goalsgiven by Authorities, companies etc.

LEIF BJELM. DEG.LU.SE. 20061115.

Page 4: Exploration, drilling, well completion and testing of deep
Page 5: Exploration, drilling, well completion and testing of deep

HIGH

LOW

TZ

TZ

Page 6: Exploration, drilling, well completion and testing of deep

Data acquisition with Towed Array Equipment

Well position

Page 7: Exploration, drilling, well completion and testing of deep

The following drilling methods were used

Conventional rotary drilling with mudRotary air drilling / UBDPercussion drilling/Hammer drilling /UBDMud Hammer drilling

Page 8: Exploration, drilling, well completion and testing of deep
Page 9: Exploration, drilling, well completion and testing of deep

AIR DRILLING SET UP USED FOR DGE #1

By Peter Jonsson Engineering Geology, Lund University

Or Rotary Air bit

Page 10: Exploration, drilling, well completion and testing of deep

Air lift of DGE 01Air lift of DGE 01

Page 11: Exploration, drilling, well completion and testing of deep

*

*

Page 12: Exploration, drilling, well completion and testing of deep
Page 13: Exploration, drilling, well completion and testing of deep
Page 14: Exploration, drilling, well completion and testing of deep

It is inevitable and to many maybe somewhat disturbing that useful production information is

available at first at the very end of a long and many times exhausting exploration chain. But this is a fact

and one must accept this since there are no short cuts in this business.

Page 15: Exploration, drilling, well completion and testing of deep

THANK YOU