exploring potential for corporate social … social responsibility (csr) / private sector...
TRANSCRIPT
Impossible Patna to I’m possible Patna
Exploring Potential for
Corporate Social Responsibility (CSR) / Private Sector Participation (PSP)
in
Smart City Patna
23rd January, 2017
Impossible Patna to I’m possible Patna
C O R P O R AT E S O C I A L R E S P O N S I B I L I T Y ( C S R )
Impossible Patna to I’m possible Patna
Scope of CSR as per Legal Mandate
Activities under Mandate of Companies Act Scope of Projects that can be undertaken in Smart City Proposal
Eradicating extreme hunger and poverty Upgraded and New Shelter Homes (Rain Basera)
Promotion of education Digital Education in Government schools
Promoting gender equality and empowering women Installation of sanitary pad dispensers and incinerators in Government
schools in ABD/PAN City
Reducing child mortality and improving maternal
health; combating HIV, AIDS, malaria etc.
Adoption of slums for health needs in particular HIV/AIDS/Tuberculosis
Ensuring environmental sustainability River Front water development, Maintenance of Park, Maintenance of
Roundabouts, Smart poles
Employment enhancing vocational skills Vocational training for urban youth (eg. ICICI Academy for Skills)
Preventive healthcare and sanitation and making
available safe drinking water
Service Delivery-Water ATM
E-Toilets
Social business projects Sugarcane juice ATMs, construction of ramps in Government buildings suiting
to the requirement of differently abled, Wi-Fi Hotspots, Variable Message
Signage
(Activities which may be included by companies in their CSR Policies (as per Schedule VII of Section 135 of The Companies Act 2013)
Impossible Patna to I’m possible Patna
Mahatma Gandhi
Setu Bridge
River Ganga
AREA BASED DEVELOPMENT SITE: PATNA JUNCTION TO GANDHI MAIDAN
R-Block Golambar
GPO Golambar
Buddha Smriti Park
Patna Junction
Kargil Chowk
IT Golambar
Dak Bunglow Square
Jai Prakash
Narayan
International
Airport
Impossible Patna to I’m possible Patna
ABD Area (Projects) Riverfront
Development
Mandiri Nala
Heritage Park
Kamala Nehru Slum
Station Area
Redevelopment
Mandiri Nala
Riverfront Development
Station Area
Heritage Park
Kamala Nehru Slum Redevelopment
Beer Chand Path – Model Road
Traffic & Transportation Intervention
Impossible Patna to I’m possible Patna
M A N D I R I N A L A
CSR/ PSP Intervention
• Smart Toilets
• Greenery, Plantation, Public Utilities – Water ATMs,
Sugar Cane ATMs,
• Smart Waste container
• Multi-utility Smart Poles
Impossible Patna to I’m possible Patna
Urban Street Landscape
Visual Barrier
Café with viewing Deck
River Promenade Trail
Wetland Trail Wetland Trail
Golghar
Gandhi Maidan
R I V E R F R O N T D E V E L O P M E N T
Impossible Patna to I’m possible Patna
R I V E R F R O N T D E V E L O P M E N T
Café with viewing deckUrban Street Promenade
Lower Deck Wetland Trail
Cafe
Passage
Visual Barrier - Tree Plantation
High Water Table
Low Water Table
UPLAND SHRUB
WET MEADOW EMERGENT AQUATIC EMERGENT
Open Nala
CSR/ PSP Interventions
• Smart Toilets
• Greenery, Plantation, Public Utilities, Water
ATMs, Sugarcane ATM,
• Variable Message Signage
• Smart Waste container
• Multi-utility Smart Poles with Wi-Fi hotspots
• Ganga Viewing Deck – Construction and O&M
Impossible Patna to I’m possible Patna
R A I L W A Y S T A T I O N A R E A R E D E V E L O P M E N T
CSR/ PSP Interventions
• Smart Toilets
• Greenery, Plantation, Public Utilities
• Smart Waste Container
• Multi-utility Smart Poles
• Junction Development and O&M
• Variable Message Signage
• Pedestrian zone O& M
Impossible Patna to I’m possible Patna
Heritage Park
Buddha Smriti Park
• Miniatures, Sculptures of
historical places in Bihar
• Visual depiction of religious
circuits
• E- Library – Historical Ref. of
Bihar
Wisdom Park
H E R I T A G E P A R K
CSR Interventions
• Smart Toilets
• Greenery, Plantation, Public Utilities
• Smart Waste container
• Multi-utility Smart Poles
• Junction Development and O&M
• Variable Message Signage Boards
• Pedestrian zone O& M
Impossible Patna to I’m possible Patna
Bus Bay /Auto
Bay
Model Road
Inter
sections
S M A R T S O L U T I O N S I N A B D - T R A F F I C & T R A N S P O R T A T I O N
Project Module Sub - Projects ComponentPossibilities of
CSR/ PSP
Road Infrastructure Development
Model RoadBEER Chand Marg
(1 Km)Development
and O&M
Smart Road Network
Intersection (15 No.s)
Development and O&M
Smart Road Network
Bus Bays / Auto Bays
Development and O&M
Impossible Patna to I’m possible Patna
Key Components and Possibility – ABD Components
• Smart Toilets: Installation and advertising rights
• Greenery, Plantation, Public Utilities: Creating food corners, Beautiful Covering Sheds for visitors to protect from
Rains and sun, Installation of other Public Utilities, Maintaining the part of the area round the year
• Automated Solid Waste Management System
• Waste container : Installation of Waste container with RFID tags at ABD area
• Multi-utility Smart Poles: Wi-Fi enabled LED Street Lights with Solar Panels and CCTV, pollution sensors, digital
billboards:- Installation & maintenance of poles and advertisement rights
• Traffic & Transportation :
• Awareness programs /campaigns – Public transport, NMT and Road Safety
• Intersection/ junctions development and O&M
• Model road maintenance
• Bus bays / auto bays maintenance
• Variable Message Signage Board.
P O S S I B I L I T I E S O F C S R / P S P
Impossible Patna to I’m possible Patna
Projects under Pa n C i t y C o m p o n e n t
Automated Waste Management System
Smart Street Lighting
Smart Classroom
Possibilities of CSR / PSP in Pan City
Impossible Patna to I’m possible Patna
A u t o m a t e d W a s t e M a n a g e m e n t S y s t e m
Possibility of CSR/ PSPWaste collection
• Component: Waste container
− Installation of Waste container with RFID tags
at ABD area
Waste Vehicle Tracking System
• Component: Tracking of waste collecting
vehicles
− Supply and installation of GPS devices and
integration with Command and Control Centre
at Pan City Level
AB
DP
an C
ity
Impossible Patna to I’m possible Patna
• Solar Panel
• Intelligent energy saving features
• Street video surveillance
• Remote scheduling & monitoring
• Wi-Fi Routers
• Pollution Sensors
• Public Addressable System
Digital
Billboard
S T R E E T L I G H T I N G
Pan
City ABD
Project
Multi-utility
Smart Poles
Possibility of
CSR/ PSP
Installation &
maintenance of
poles and
advertisement
rights
Project
LED Street
Lights with
Mobile Boosters
Possibility of
CSR/ PSP
Installation &
maintenance of
poles and
digital
advertisement
panels
Digital
Billboard
Mobile
Boosters
LED
Street
Lighting
LED
Street
Lighting
Impossible Patna to I’m possible Patna
S m a r t C l a s s r o o m s - S a t e l l i t e & A d v a n c e d M u l t i m e d i a E d u c a t i o n
Live Teaching from Studio Satellite Classroom
Student asking query
over video call
Project
Satellite & Advanced
Multimedia Education
Component
Smart classrooms
Possibility of CSR/ PSP
Supply of handheld devices, Wi-
Fi facility, Software and
Hardware with maintenance
Impossible Patna to I’m possible Patna
Bus Day
Cycle
Day
Traffic Safety
T R A F F I C A W A R E N E S S C A M P A I G N / P R O G R A M S
Impossible Patna to I’m possible Patna
Key Components and Possibility – Pan City Components
P O S S I B I L I T I E S O F C S R / P S P
• Water ATM : Installation of ATMs and Advertising rights
• Mobile App – Apna Patna : Evaluation of existing App and up gradation with required modules as per municipal services
are concerned
• Automated Solid Waste Management System
• Tracking of waste collecting vehicles : Supply and installation of GPS devices and integration with Command
and Control Centre at Pan City Level
• Multi-utility Smart Poles at Pan City Level
• LED Street Lights with Mobile Boosters: Installation & maintenance of poles and digital advertisement panels
• Smart classrooms at ABD level: Supply of handheld devices, Wi-Fi facility, Software and Hardware with maintenance
Impossible Patna to I’m possible Patna
I N D I C A T I V E C O S T
Components CAPEX Expected Nos.
Smart dustbins 20,000 160
Multi utility Pole 15 lakhs 60
Mobile booster lamppost with LED, CCTVs etc. 25 lakhs 40
Smart Classrooms 15 lakhs 300
GPS based vehicle tracking system 12,000 200
Variable Message Signage 20 lakhs 15
Smart Bus Bays with kiosk 20 lakhs 5
Solar based E- Rickshaws 1.6 lakhs 25
Women Empowerment and Skill Development Centre 1
E toilets 10 lakhs 80
Rain Basera
Greenery, Plantation, Public Utilities
Junction Redevelopment and O & M
Pedestrian zone O& M