Extended Reach Drilling and Completion Solutions in Deepwater
Drilling Challenges in
Deepwater ERD
Extended Reach Drilling and Completion Solutions in Deepwater
Drilling Challenges• Long displacements• Long open hole sections • Hole stability issues• Directional control and surveying
practices• ECD management• Risk - cost of failure• Continuous improvement to reduce
cost• Comprehensive contingency planning
Extended Reach Drilling and Completion Solutions in Deepwater
Technical Keys to Success• Planning• Mud lubricity• Modeling• Drillstring design• Wellbore stability• Hole cleaning• Fit for purpose drilling tool
Extended Reach Drilling and Completion Solutions in Deepwater
Planning• Optimization of directional well
profile• Terminal angle considerations
– wellbore stability– completions /casing running
• Achievable build rates in soft unconsolidated formations
• Gradual angle-build approach provides:– significant torque reduction– improved sliding– improved tubular running
Extended Reach Drilling and Completion Solutions in Deepwater
Mud Lubricity• Complex issue affected by:
– formation – hole cleaning – wellbore stability – cutting bed– filter cake – tortuosity, etc...
• In most projects OBM chosen for:– lubricity– inhibition properties
• Lubricants: little effect• Biggest impact: oil/water ratio
Extended Reach Drilling and Completion Solutions in Deepwater
Modeling• T&D and hydraulics from PowerPlan
drives rig selection• Bit torque (dynamic conditions)
difficult to predict– downhole WOB&TRQ measurements
• Friction coefficients calculated from offset data and real time data
• Engineering subroutines to read MWD data every foot, for monitoring of:– downhole torque/drag– wellbore stability– hole cleaning
Extended Reach Drilling and Completion Solutions in Deepwater
Drillstring Design• S135 drillpipe usually standard• Strict control on
– quality– material specifications– inpections
• Special thread compounds– nonheavy metal– high torque
• Double-shouldered tool joints:– 7 1/2-in. for 5 7/8-in. drillpipe– 40 to 60 % higher capacity
Extended Reach Drilling and Completion Solutions in Deepwater
Hole cleaning• Primary parameter: flow rate• Models used to optimize flow rate• High rpm (above 120):
– no obvious benefits– leads to shocks and vibrations
• Alternating hi/low viscosity tandem pills can be useful
• Downhole weight/torque and APWD:– monitor hole cleaning effectiveness– rotating friction factor and drag
• Must circulate till cuttings removal complete
Extended Reach Drilling and Completion Solutions in Deepwater
Fit for Purpose Drilling Tools
• Forward planning of signal transmission and detection is required
• Cost of failures high Select proven reliable tools
• High flow rate specification tools• 2-D Rotary Steerable• 3-D Rotary Steerable• Real time drilling solutions
Extended Reach Drilling and Completion Solutions in Deepwater
PowerPak Motors• Over 50 models from 2 1/8 in. to 11 1/4 in. • PowerPak XP & GT extended power sections• High flow versions:• A700 rated to 1000 gpm • Working on A975 capable of 2000 gpm
Extended Reach Drilling and Completion Solutions in Deepwater
At Bit Inclination Measurement (AIM*)
• Single axis inclination sensor • 200hr+ operating time• Wireless telemetry• Available from 5-7/8” to 26” hole
sizes
Extended Reach Drilling and Completion Solutions in Deepwater
Power Drive
• PowerDrive 900• PowerDrive 675• World Record reach - 11 278 m
MD• Maximum dogleg capability - 8
°/30 m
Extended Reach Drilling and Completion Solutions in Deepwater
Power Drive - Direct
Extended Reach Drilling and Completion Solutions in Deepwater
MWD Technology
• Flexible frequency control for max. signal strength
• World record depth reached - 11278 m MD
• Flexible data frame format• Two-way communication saves
trips• Continuous surveys save rig time• High LCM tolerance-50 lbm/bbl
medium nut plug• High flow rate options
• 9 1/2-in. 2000 gpm• 6 3/4-in 1000 gpm
Extended Reach Drilling and Completion Solutions in Deepwater
Increase Drillstring and Bit LifeBHA whirling in vertical hole
Multi axis shocks • Reduce drillstring fatigue • Reduce borehole enlargement • Increases ROP/bit life
Larger shocks result in more shock counts
Extended Reach Drilling and Completion Solutions in Deepwater
Accurate control of ECDModeled vs. Actual ECD
• Key for Deepwater drilling• Detect shallow water flows• Detect cuttings loading and swab/surge effects• Manage the pore pressure fracture grad window • Minimize mud weight for optimum ROP
• Incorporated into ARC
• High flow options
• ARC6 800 gpm
• ARC 8 &9 1950 gpm
Extended Reach Drilling and Completion Solutions in Deepwater
Preliminary Planning
Extended Reach Drilling and Completion Solutions in Deepwater
Quality Control
Date Drawn: 01-Mar-2000
Drawn by: W.G. Lesso, Jr
Checked by: uncontrolled
Client OK: ______________
Astrid Marlin Gabon Displacement Review
Surface Location
Lat: N7 0 0.000 Lon: E10 30 0.000
North: 10774021.82 m East: 665701.59 m
Grid Conv: 0.1828° Scale Fact:0.9999
Magnetic Parameters
Model: BGGM 1999
Dip: -10.912° Mag Dec: -2.016°
Date: February 29, 2000 FS: 33199.7 nT
New StructureSTRUCTURE
AF Gabon TotalFIELD
New WellWELL
TotalFina
0 400 800 1200 1600 2000 2400 2800
4000
3600
3200
2800
2400
2000
1600
1200
800
TD 5994 MD
Build 3.00°/30 m
Hold Angle 78°
EOC
3880 MD
KOP
Seafloor 0° 2500 MD
9 5/8'' csg
78° 4070 MD
13 3/8'' csg 0° 3100 MD
20'' csg 0° 2800 MD
Vertical Section ViewT
rue
Ver
tical
Dep
th (
1 cm
= 2
00 m
eter
s)
Vertical Section Departure at 0. (1 cm = 200 meters)
Extended Reach Drilling and Completion Solutions in Deepwater
0
50
100
150
200
250
300
350
400
450
0 5000 10000 15000 20000
MD (ft)
Ho
ok
Lo
ad (
klb
s)
DrillSAFE Tripping Loads Analysis
8 1/2” bit at TD 5994m (19665 ft)40%
20%
20%40%
0%
Extended Reach Drilling and Completion Solutions in Deepwater
2500
3000
3500
4000
4500
1 1.05 1.1 1.15 1.2 1.25 1.3 1.35 1.4
Pressure Gradient (SG)
TV
D
(m)
20" @2800m
13 3/8" @3100m
9 5/8" @3700m
planned TD 4100m (TVD)
Possible Casing Schedule with Pressure Gradients
FPG
PPGp (1010)
PPGp (950)
Extended Reach Drilling and Completion Solutions in Deepwater
Challenges• ECD limiting factor• Solutions:
– Improve mud properties ,lower the rheology
– Use 5 1/2” or 5 7/8” Drillpipe– Extra casing string for contingency
• Under reamers or Bicenter bits
Extended Reach Drilling and Completion Solutions in Deepwater
2500
3000
3500
4000
4500
1 1.05 1.1 1.15 1.2 1.25 1.3 1.35 1.4
Pressure Gradient (SG)
TV
D (
m)
24“ csg @2800m
20“ csg @3100m
16“ csg @3700m or 13 3/8” csg
planned TD 4100m (TVD)
Possible Casing Schedule with Pressure Gradients
FPG
PPGp (1010)
PPGp (950)
26” or 28”” Hole section
22” x 24”” Underreamer hole section
17” x 20” Bicenter hole section
14 ¾” hole section or 12 1/4”
11 ¾” csg @ 4100m or 9 5/8” csg
10 5/8” x 12 ¼” Bicenter Tangentor 8 1/2” hole
Extended Reach Drilling and Completion Solutions in Deepwater
Summary• Well design will require in-depth
studies of:– Drilling fluid requirements– Borehole stability limitations– ESD and ECD characteristics– Well control and kick tolerance
• These factors along with completion and target requirement will determine the technical limits for the ultimate reach capabilities